RC meeting and Run Plan, Saturday Oct. 13

From HallCWiki
Revision as of 13:09, 13 October 2018 by Sjjooste (talk | contribs)
Jump to navigationJump to search

Status

  • Beam quality
    • Bottom line: after BLM trip investigation, mostly great beam at 35uA, except for one 3h interruption around midnight
  • Progress
    • Taking data at current kinematic point (theta_Shms=6.49), up to 12% of data collected
    • Possible we might be underestimating the number of lambdas in this setting

Issues: Resolved

  • Problems with hallc_replay:
    • Shift crew noticed replay scripts were missing, as were all other files in hallc_replay
    • I contacted Eric and Brad, and Brad found out it was caused by an erroneous "rm -r *" executed by someone
    • Brad restored a backup from 11pm yesterday, and we re-saved the kaon_lt CSV file

Ongoing

  • SHMS at small angle
    • (Might) need new limits on diffusor ion chamber if we run above >=50uA (Jay Benesh confirmed might be the case), more info here.
  • SHMS at small angle (part 2):
    • Be wary of DC trips!

Request (non-urgent)

  • RadCon wants to put a small detector in the SHMS hut during the next opportunity
    • Needs few hours, communicate with Brad when next opportunity arrises
  • Hall D needs opportunistic 1shift of HallC down for beam studies, not pressing right now (needs to be done before end-of-run)
    • Unlikely this will happen in the next week

Plans - Physics

  • Continue for 2 more shifts with Q2=3. W=3.14 x=0.25 theta_Shms=6.49
    • might only reach 20-25% of statistics goal (according to online analysis)
  • Next setting (end of OWL/begin of DAY): Q2=5.5 W=3.02 x=0.4 theta_Shms=6.49
  • Prepare for 1-2 shifts of luminosity scan early next week
    • Proposed to Jay to do Monday and/or Tuesday SWING when we have experienced shift crew
    • Ryan agreed to be present as third (worker) to deal with the many changes during this study