RC meeting and Run Plan, Monday Oct. 15

From HallCWiki
Jump to navigationJump to search

Status

Issues: Resolved

Issues: Requiring attention

Ongoing

  • SHMS at small angle
    • (Might) need new limits on diffusor ion chamber if we run above >=50uA (Jay Benesh confirmed might be the case), more info here.
    • Be wary of DC trips!
      • Added during RC meeting and Run Plan, Friday Oct. 12
      • During luminosity scan, SHMS DCs might trip at higher currents (1MHz+ singles rate)
      • If we can really reach high current --> be ready to disable SHMS DCs when rates get too high (still want HMS data at those currents).


Request (non-urgent)

  • RadCon wants to put a small detector in the SHMS hut during the next opportunity
    • Needs few hours, communicate with Brad when next opportunity arrises
  • Hall D needs opportunistic 1shift of HallC down for beam studies, not pressing right now (needs to be done before end-of-run)
    • I told Hall D there might be an opportunity when we switch aerogel trays for the next experiment

Plans - Physics

  • Conduct for 1-2 shifts for luminosity scan starting this swing shift
    • Tentative run plan
    • Ryan agreed to help as third during swing, and Richard will help as third during owl if needed
  • Expect another downtime tomorrow during day for RF recovery
  • Run 2-3 more shifts with Q2=5.5. W=3.02 x=0.40 theta_Shms=6.49 (real shifts, excluding scheduled downtime)
    • Currently collected 23% of statistics + Al data in 3 shifts
    • Switch sometime between Tuesday and Wednesday to the next point