RC meeting and Run Plan, Wednesday Nov 14

From HallCWiki
Jump to: navigation, search

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

Current Run Plan

Notices in Effect for Shift Crew

Current Issues

Planned Accesses to the Hall

  • None

Planned Accelerator Configuration Changes

  • Monday, Nov 19: system recovery and spot move, estimated 4 hr downtime although it is scheduled for 8.
  • Tuesday, Nov 20: CHL UPS battery change, should be noninvasive however, induced CHL anomaly is possible.
  • Wednesday, Nov 21: Hall A goes offline and MCC wants to conduct high current beam study of energy spread at 40 uA. It is unclear that we will be effected.
  • Monday, Nov 26: Energy change to 1.86 GeV/pass, we will be moved over to 500 MHz laser.

Special Requests

  • Carlos Munoz Camacho would like access to the hall to show Hall-C to two French engineers working on the NPS project. It should be a ~30 minute access, and is a low priority. He can be contacted at 357-1065