Difference between revisions of "February 23 - March 2 RC meetings and run plans"
From HallCWiki
(→Daily Run Information) |
(→Friday, February 23, 2018) |
||
Line 31: | Line 31: | ||
* [https://logbooks.jlab.org/entry/3537564 RC status update] | * [https://logbooks.jlab.org/entry/3537564 RC status update] | ||
+ | * [https://logbooks.jlab.org/entry/3537306 HMS Q2 power supply] | ||
+ | * [https://logbooks.jlab.org/entry/3537467 Ratty beam] | ||
== Saturday, February 24, 2018 == | == Saturday, February 24, 2018 == |
Revision as of 13:21, 26 February 2018
Contents
Useful Links
F2/XEM Run Plans
F2/XEM Data Collection Summary
F2/XEM E-Logs
Hall-C E-Logs
Shift Schedule
Daily Run Information
- The F2/XEM experiments was ongoing for the dates discussed below