February 23 - March 2 RC meetings and run plans

From HallCWiki
Revision as of 12:23, 2 March 2018 by Pooser (Talk | contribs) (→‎Status Updates)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Contents

  • 1 Useful Links
    • 1.1 F2/XEM Run Plans
    • 1.2 F2/XEM Data Collection Summary
    • 1.3 F2/XEM E-Logs
    • 1.4 Hall-C E-Logs
    • 1.5 Shift Schedule
  • 2 Daily Run Information
    • 2.1 Status Updates

Useful Links

F2/XEM Run Plans

  • SHMS Production Run Plan
  • HMS Production Run Plan

F2/XEM Data Collection Summary

  • SHMS
  • HMS

F2/XEM E-Logs

  • F2-preparations/analysis elog
  • Commissioning experiments analysis elog

Hall-C E-Logs

  • Hall-C Logbook
  • Hall-C Analysis Logbook

Shift Schedule

  • Shift Schedule

Daily Run Information

  • The F2/XEM experiments was ongoing for the dates discussed below

Status Updates

  • Friday, February 23, 2018
  • Saturday, February 24, 2018
  • Sunday, February 25, 2018
  • Monday, February 26, 2018
  • Tuesday, February 27, 2018
  • Wednesday, February 28, 2018
  • Thursday, March 1, 2018
  • Friday, March 2, 2018
Retrieved from "https://hallcweb.jlab.org/wiki/index.php?title=February_23_-_March_2_RC_meetings_and_run_plans&oldid=6952"

Navigation menu

Views

  • Page
  • Discussion
  • View source
  • History

Personal tools

  • Log in

Navigation

  • Hall C JLab Page
  • Wiki Main Page
  • Analyzer
  • Recent changes
  • Random page
  • Help

Shift Crew Information

  • Shift HowTo
  • Experts On Call
  • Live Status Pages
  • Mya Plotting Tool

 

Tools

  • What links here
  • Related changes
  • Special pages
  • Printable version
  • Permanent link
  • Page information
Powered by MediaWiki
  • This page was last modified on 2 March 2018, at 12:23.
  • Privacy policy
  • About HallCWiki
  • Disclaimers