  • Andy Kenyon
    • Doing Cryowork this week
    • Moving small green blocks from hall (to send to Hall D) and replacing with large green blocks
    • Leak detector being used from HMS checkout is flakey
  • Dave Gaskell
    • Asked when the Moller SC magnet will be replumbed. Depending on workload, will do this before July HMS cooldown.
  • Joe Beaufait
    • G0 cable move continuing. Mounts for patch panels have been set in wall
    • Got a UPS for Hamlet/Aerogel
  • Paul Brindza
    • Design Projects:
      • Compton upgrade and Moller coils
      • Noble gas Cerenkov
      • Mod to lead glass stand for SHMS
      • SHMS dipole exit flange/spool
      • Assembly of SHMS Shield House Sliding door
      • ELIC concept layout
    • 12 GEV- SHMS:
      • SHMS Bogies delivered to Hall C last week
      • Spool/bearing and bearing housing moved to Hall C from ESB
      • Bids in for SHMS Structure assembly- eval underway- decision this week
      • Q1 Yoke stacking about half way done, contract with Stainless Metalcraft for Vessels
      • DC Power Supplies 3,4 &5 for Dipole, Q2 and Q3 tested and in shipping ETA Mid May
      • HB Helium vessel parts machining, design of LN2 shield and Vacuum vessel, HB yoke complete
      • Dipole Q2 & Q3 yoke steel machining about 80 % done
      • SHMS Dipole prototype coil winding
      • SHMS Dipole, conductor testing, all 6 pieces tested so far are acceptable for use, E layer and F layer, G layer still at JLAB
      • SHMS Dipole Full Design Review April 23/24
  • Stephen Wood
    • Next Hall C User meeting will be in August. Users and staff can express date preferences at the doodle poll.