Hall C Weekly Meeting - April 8, 2013
From HallCWiki
Jump to navigationJump to search- Steven Smith
- Gave a presentation on safety culture based on quarterly survey results
- Andy Kenyon
- Moving S4 green blocks out of hall and rebuilding electronics shield wall with larger S2 blocks.
- Welding rod for cryo work is here. Starting to do welding work on C-can
- Mike Fowler
- Structure SOTR:
- Structure contractor chosen but not awarded yet
- Target platform delivered
- Flexible Cryo line supports delivered
- Design Projects:
- SHMS spectrometer vacuum system
- Swing & Barn door hardware
- SHMS Cryo system
- Paul at the the 12 GeV Temple review
- Structure SOTR:
- Joe Beaufait
- Junction box for the HMS cable rerouting delivered
- Lower rack for reloated G0 patch panel installed
- Has been appointed Interlock system owner for Hall C. /Interlock_Training.ppsx Interlock Bypass Training
- Stephen Wood
- Next Hall C User meeting will be in August. Users and staff can express date preferences at the doodle poll.
A discussion of the possibility of simplifying the 12 GeV cryogenics routing was held.