  • Andy Kenyon
    • The techs are helping the Regina group with the SHMS Heavy Gas Cerenkov
    • Jessica and Boogie are adjusting the HMS controls
    • Installing cabinets for the G0 cable relocation
    • Walter is looking to move SHMS power supplies to are occupied by cables
    • The high radiation area on the HMS was organized to allow access to the HMS dipole valves
  • Mike Fowler
    • The SHMS structure assembly is proceeding well.
    • The structure assembly is estimated to be completed by Aug 29
    • The start date for concrete work on the structure is September 3
  • Joe Beaufait
    • Finished sorting (G0) cables for first tray/rack.
    • Conducted a walk through.
    • Contact Joe to arrange a Hall C walk through for SAF112.
  • Steve Lassiter
    • Paulo is working on the Compton beamline design
    • Bert is working on cooling schemes for the SHMS calorimeter
    • Steve Furches is working on the GEM/Sieve slit design
    • Dan is designing the TOF detector transport fixture
    • Garry is working on platform infrastructure (cable routing etc.)
    • Steve Lassiter visited SMI (Q1). They are putting more manpower on the job.
    • Eric visited MSU (Horizontal Bender). Welding of the vessel is progressing.
    • Best and Final Offers are being evaluated for the replacement coils for the Moller Polarimeter large quadrupoles.