Hall C Weekly Meeting - December 2, 2013

From HallCWiki
Jump to navigationJump to search
  • Andy Kenyon
    • Will start on gas system plumbing for shrink-off on Tuesday for controller and regulator
    • Cleaning up the hall and physics storage to better utilize space
    • Anaconda is being pumped until the gauge doesn't read anymore and installing the caps on the ends
    • Leak checks are being completed
    • Vacuum on the U-tubes are not looking good
  • Walter Kellner
    • Making 4 gas panels for Brad
  • Mike Fowler for Engineering
    • pouring on Tuesday, has poured 5 yards already which is a little past half way and takes 14 days to cure
    • Working on the doors and roof beams will be completed later
    • Contract for the the platform should be awarded this week
    • Paulo is working on the Compton polarimeter.
    • Bert Metzger is working on installation drawings for the lead walls in the shield huts
    • Dan is working on LAD support design and crane
    • Steve Furches: target design work for Silviu
    • Gary is assisting with SOTR work for the concrete contract
    • Eric is preparing for the dipole finite element analysis review, FEA magnets
    • Steve Lassiter is working on controls, and the Q1 and HB contracts
  • Joe Beaufait
    • Light bulbs are all installed int he HMS
    • Tray order and cable tray SHMS are awaiting quotes to be received back
    • Helping Accelerator with consulting on the power supply
    • G0 cable move has been postponed due to congested area in the hall
    • Has organized the cables are working on putting everything into the cabinet