  • Walter Kellner
    • A station to cut lead glass and Aerogel has been completed
    • Several HKS detectors have been moved from the EEL Mezzanine to the ESB building where they have been located near other HKS components.
    • Working on drilling wall plates to mount the new Jib crane. (This crane is for accessing the back end of the SHMS, e.g. calorimeter)
    • Waiting for parts in order to finish gas shed work.
  • Mike Fowler
    • The forms have been stripped from the SHMS shield house roof beams
    • The concrete vendor is working on the lift plan to do the test fit of the roof beams
    • The shield house barn door (between detector and electronics bunkers) has been installed
    • The SHMS decking is nearing completion. The power supplies will be moved to the deck on Wednesday.
  • Joe Beaufait
    • Walked down position of transformers and junctions boxes that will go on the SHMS
    • Materials for installation of electrical/power service on SHMS are in
    • Started installation of power and data junction boxes with Andy