  • Walter Kellner
    • Using 40ft I-beam with wheels to hold Anaconda and be able to work on it and move it around the hall.
    • Chillers checked out. Clean up at dump continues.
    • Lead sheets for 12 GeV shipped out
    • Making shipping containers for shipping HB and Q1 cooling leads
  • Mike Fowler - SOTR
    • Still working on Safety plans for the SHMS structure work.
    • Lift plans have been approved
  • Mike Fowler - Engineering notes
    • Bert/Steve work on the SHMS vacuum system
    • Paulo is working on the Compton upgrade
    • Dan is working on the beam dump shield (shields SHMS detectors from dump at small angles)
    • Gary fire safety and warm gas lines
    • Mike on refitting the Anaconda.


  • Joe Beaufait
    • Set work order for electricians to install upper cable tray for G0 reroute work.
    • Cable reroute in HMS junction box is being worked on.
    • Walk throughs for the contractors.