- Anaconda passed the liquid nitrogen test on Friday
- Walter
- Working with property to find out about copper wire to see if can be utilized
- Joe
- Working on getting the cables from QWeak in the tray organized
- Counting House painting is complete and able to move back in (control panel and cabinetry are complete)
- Reinstalling video while moving back into the counting house room
- Lights are up and installed
- Gary/Steve Lassiter
- Dan Young is working on the target chamber
- Steve Furches is working with Silviu on pictures of QWeak and targets
- Bert Metzger is working on the shielding for SHMS and Q1 vessel work
- Mike Fowler and Gary are working on construction with the detector work and cable trays
- Paul is working on the Compton upgrade
- Roger
- Talked about the QWeak Collaboration meeting
- They are working on analysis and working to provide results later next year
- March QWeak meeting will be held at George Washington University March 13-15
- Summer QWeak meeting will be held at Virginia Tech in July. Dates are not set at this current time
- Jay Benesch
- It's not the central ray that has to be inside a 5 cm radius of the dump center, it's the entire 4 cm square nominal raster pattern.
- This requires the central ray to be less than 2.25 cm from dump center.
- 4 cm square includes Moliere scattering of rastered beam in diffuser.
- Diffuser thickness nominally 10% radiation length, but could be up to 20% - your call.
- Michael Moore
- Presented results