Hall C Weekly Meeting - November 18, 2013

From HallCWiki
Jump to navigationJump to search
  • Andy
    • Anaconda passed the liquid nitrogen test on Friday
  • Walter
    • Working with property to find out about copper wire to see if can be utilized
  • Joe
    • Working on getting the cables from QWeak in the tray organized
    • Counting House painting is complete and able to move back in (control panel and cabinetry are complete)
    • Reinstalling video while moving back into the counting house room
    • Lights are up and installed
  • Gary/Steve Lassiter
    • Dan Young is working on the target chamber
    • Steve Furches is working with Silviu on pictures of QWeak and targets
    • Bert Metzger is working on the shielding for SHMS and Q1 vessel work
    • Mike Fowler and Gary are working on construction with the detector work and cable trays
    • Paul is working on the Compton upgrade
  • Roger
    • Talked about the QWeak Collaboration meeting
    • They are working on analysis and working to provide results later next year
    • March QWeak meeting will be held at George Washington University March 13-15
    • Summer QWeak meeting will be held at Virginia Tech in July. Dates are not set at this current time
  • Jay Benesch
    • It's not the central ray that has to be inside a 5 cm radius of the dump center, it's the entire 4 cm square nominal raster pattern.
    • This requires the central ray to be less than 2.25 cm from dump center.
    • 4 cm square includes Moliere scattering of rastered beam in diffuser.
    • Diffuser thickness nominally 10% radiation length, but could be up to 20% - your call.
  • Michael Moore
    • Presented results