  • Walter Kellner
    • Accessing the CMSA (Central Materials Storage Area/Boneyard) continues to be inconvenient.
    • Reported that facilities wants to put Hall equipment under their control and require it to be checked out to be used.
    • SHMS cables for magnet controls arrived.
    • Removal of the raised floor continues
    • The crane to remove the SOS dipole will come on site next week.
  • Joe Beaufait
    • HV, signal and RF connectors order for SHMS cables
    • A number of flood damaged items have been put on palets awaiting checking by RadCon
    • N2 to blow out flooded cables has been requested
    • Danfizik power supplies (Big Quad, compton dipoles) will be tested.
  • Paul Brindza
    • The SHMS magnet iron as arrived from China and is going to Kraft for final machining.
    • SHMS shield house design is almost done.
    • Some design work done for the EMC (Tel Aviv/ODU) was done
    • Site visit Friday for vendors competing for SHMS rail installation

Someone asked if the first 12 GeV experiments will use the Nobel Gas Cerenkov detector.