Hall C Weekly Meeting - October 28, 2013
From HallCWiki
Jump to navigationJump to search- Andy Kenyon
- The stingers are being welded to the Anaconda
- SHMS magnet stands being moved this week to the hall.
- Walter will confirm with survey group on plan to survey locations of magnet stands.
- The SHMS utubes have been moved to the ESB
- No one has contacted Andy or Walter about beamline work yet
- Joe Beaufait
- Funds have been release to paint the counting house console.
- For the G0 cable move, the HV cables are back in the rack
- 30 signal cables are in the top tray
- Eric Sun
- Paul Brindza is headed to England and France to visit the Q1 and Q2/Q3/D vendors
- There will be a review of Eric's dipole Finite Element Analysis in mid November
- Force calculations are being done by the vendor to evaluate the effect of placing iron near the magnet to redirect fringe fields.
- Concrete is being poured this week to finish the shield hut walls
- Howard Fenker
- MSU is welding the HB Helium vessel
- Michael Moore
- Building a mesh of the first 4 SHMS magnets in order to simulate fringe fields
- Bert Manzlak
- In December there will be a review of machine tool usage and documentation