Difference between revisions of "Instructions for monitoring and analysis of SIDIS runs during shift"
From HallCWiki
Line 31: | Line 31: | ||
c. Analyze the full run with : | c. Analyze the full run with : | ||
− | ./run_full_sidis.sh <run_number> and | + | ./run_full_sidis.sh <run_number> and fill in the run-list wiki. |
+ | |||
+ | d. Run this script. Make sure we see a clear coincidence time peak. Record counts to run_list wiki | ||
− | |||
./UTIL_SIDIS/run_beancounter.sh <run_number> <target> | ./UTIL_SIDIS/run_beancounter.sh <run_number> <target> | ||
<target> = d or h | <target> = d or h |
Revision as of 22:14, 10 April 2018
Instructions for SIDIS Experiment
1. Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam ON are steady
2. In the middle of the run, check online plots for the detectors
a. Login to cdaql1 machine and go to hallc_replay directory if you are not there already:
> ssh cdaql1 > go_analysis
b. Update the file " standard.Kinematics "
path : /net/cdaqfs/home/cdaq/hallc-online/hallc_replay/DBASE/COIN/STD/standard.kinematics
c. Run scripts
for SHMS detector check: ./run_coin_shms.sh <run_number>
for HMS detector check: ./run_coin_hms.sh <run_number>
3. After the full run, check the Good events and Update the run_list wiki
a. Make sure the standard.Kinematics file was updated correctly in step 2 above.
b. For a quick report on the charge collected in the run Analyze the full run with :
./run_charge_sidis.sh <run_number> and record the total charge in the run-list wiki.
c. Analyze the full run with :
./run_full_sidis.sh <run_number> and fill in the run-list wiki.
d. Run this script. Make sure we see a clear coincidence time peak. Record counts to run_list wiki
./UTIL_SIDIS/run_beancounter.sh <run_number> <target> <target> = d or h