Difference between revisions of "Main Page"

From HallCWiki
Jump to: navigation, search
(F2/EMC Experiment (E12-10-002/E12-10-008) 5 pass Run Plan)
(XEM2 Run Plans)
 
(455 intermediate revisions by 29 users not shown)
Line 1: Line 1:
 
[[Image:hallcheader.jpg]]
 
[[Image:hallcheader.jpg]]
  
= CT Experiment (E1206107) Run Plan =
+
= EMC and X>1 Experiments (E12-10-008/E12-06-105) =
* [[Overview of run plan]] ([https://hallcweb.jlab.org/wiki/images/4/41/Runplan_e1206107.pdf pdf file])
+
The inclusive electron scattering cross-section will be measured for several light to medium heavy nuclei over a broad range of x (0.1 < x < 1) and at x greater than one (x > 1).
* [[Instructions for monitoring and analysis during shift]] ([https://hallcweb.jlab.org/wiki/images/d/d5/Deb_shift_note.txt txt file])
+
  
== The 6.4 GeV Run Plan (52 hrs) ==
+
'''[https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 RC Meeting Zoom Link]''' - Meeting ID: 160 710 0885
+
* Conditions:  
+
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
|-
+
! beam current:  || 65 μA
+
|-
+
! fast raster: || 2x2 mm2
+
|-
+
! target: || 10cm LH2
+
|-
+
! HMS/SHMS collimator: || PION , COLLIMATOR
+
|-
+
! HMS/SHMS trigger: || Coincidence
+
|-
+
! HMS angle/momentum  || Various
+
|-
+
! SHMS angle/momentum  || Various
+
|}
+
*Run Plan:
+
**HMS is detecting electrons and SHMS is detecting protons.
+
** Use HMS pion collimator and SHMS collimator.
+
** Start with 30uA on lower 6% Carbon, after a 2 hr run, increase to 40 uA and after another 2 hr run move to the upper 6% Carbon and ask for 50 uA.
+
** Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 10000 events for LH2 and Carbon
+
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
|-
+
! Target || Prescales || HMS angle || HMS momentum  || SHMS angle  || SHMS momentum  || Time  || Complete
+
|-
+
! LH2  || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 45.1  deg ||  -2.131      ||  17.1 deg  ||  +5.122 || 12 hrs || Y
+
|-
+
! LH2  || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 || 45.1  deg ||  -2.131      ||  17.1 deg  ||  +5.122 || 30 min || Y
+
|-
+
! Al. Dummy || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0  || 45.1  deg ||  -2.131      ||  17.1 deg  ||  +5.122 || 4 hrs || Y
+
|-
+
! 6% C || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0  || 45.1  deg ||  -2.131      ||  17.1 deg  ||  +5.122 || 36 hrs || Y
+
|-
+
! 6% C || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1  || 45.1  deg ||  -2.131      ||  17.1 deg  ||  +5.122 || 30 min || Y
+
|}
+
  
== The 10.6 GeV Run Plan (282 hrs) ==
+
'''[https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_fall_2022 RC Daily Meetings (Fall 2022)]'''
* Conditions:  
+
== General Information ==
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
* [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-XEM2 Shift Sign-up]
|-
+
* [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-XEM2 Shift Sign-up ('''Read only''')]
! beam current: || 65 μA
+
* [[Information_for_Shift_Takers | Information for Shift Takers (HowTo)]]
|-
+
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
! fast raster: || 2x2 mm2
+
* [[XEM specific shift instructions]]
|-
+
* [[XEM analysis instructions]]
! target: || 10cm LH2
+
* [[XEM_Physics_Status]]
|-
+
* [[XEM: Notable Events and Changes]]
! HMS/SHMS collimator: || LARGE , COLLIMATOR
+
* [https://wiki.jlab.org/xem2wiki/index.php/Main_Page XEM Wiki]
|-
+
! HMS/SHMS trigger: || Coincidence
+
|-
+
! HMS angle/momentum  || Various
+
|-
+
! SHMS angle/momentum  || Various
+
|}
+
*Run Plan:
+
**HMS is detecting electrons and SHMS is detecting protons.
+
** Use HMS pion collimator and SHMS collimator.
+
  
* H(e,e'p) Check
+
== XEM2 Run Plans ==
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
* Runsheets
|-
+
** HMS: [https://hallcweb.jlab.org/wiki/images/5/50/XEM2_HMS_runsheet_NF.pdf New setting], [https://hallcweb.jlab.org/wiki/images/2/2a/XEM2_HMS_runsheet_NF_page2.pdf Continuation]
! Target || Prescales || HMS angle || HMS momentum  || SHMS angle  || SHMS momentum  || Time || Complete
+
** SHMS: [https://hallcweb.jlab.org/wiki/images/c/c9/XEM2_SHMS_runsheet_NF.pdf New setting],[https://hallcweb.jlab.org/wiki/images/2/27/XEM2_SHMS_runsheet_NF_page2.pdf Continuation]
|-
+
! LH2  || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 23.2  deg ||  -5.539      ||  21.6 deg  ||  +5.925 || 4 hrs (3 Hz) || Y
+
|}
+
  
* Q^2 = 14.3 GeV^2 Run Plan
+
*[https://hallcweb.jlab.org/wiki/images/5/59/XEM2_PreProduction_Plan.pdf Pre-Production Run Plan]
** Cycle SHMS magnets since raising momentum
+
** Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 1000 events each for LH2 and Carbon and take two singles run 30 mins each at the beginning and end of the running on a particular target.
+
**For the singles runs the prescale factor on SHMS should be adjusted  as needed to get about equal rate in HMS and SHMS (ie equal rates for PS1 and PS4).
+
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
|-
+
! Target || Prescales || HMS angle || HMS momentum  || SHMS angle  || SHMS momentum  || Time || Complete
+
|-
+
! LH2  || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 39.3  deg ||  -2.982      ||  12.8 deg  ||  +8.505 || 36 hrs || Y
+
|-
+
! LH2  || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 || 39.3  deg ||  -2.982    ||  12.8 deg  ||  +8.505 || 1 hr || Y
+
|-
+
! Al. Dummy || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0  || 39.3  deg ||  -2.982      ||  12.8 deg  ||  +8.505 || 3 hrs || Y
+
|-
+
! 6% C || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0  || 39.3  deg ||  -2.982      ||  12.8 deg  ||  +8.505 || 122 hrs || Y
+
|-
+
! 6% C || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1  || 39.3  deg ||  -2.982      ||  12.8 deg  ||  +8.505|| 1 hr || Y
+
|}
+
  
* Q^2 = 11.5 GeV^2 Run Plan
+
*[https://hallcweb.jlab.org/wiki/images/6/6e/XEM2_Run_Plan_26deg_CSB.pdf Charge Symmetric Background (CSB) Studies at 26 degrees Run Plan]
** Cycle HMS magnets since raising momentum
+
** Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 1000 events each for LH2 and Carbon
+
** For the singles runs the prescale factor on SHMS should be adjusted  as needed to get about equal rate in HMS and SHMS (ie equal rates for PS1 and PS4).
+
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
! Target , current|| Prescales || HMS angle || HMS momentum  || SHMS angle  || SHMS momentum  || Time || Complete
+
|-
+
! 6% C, 50uA || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0  || 28.5  deg ||  -4.478      ||  17.8 deg  ||  +7.001 || 18.5 hrs || Y
+
|-
+
! 6% C, 50 uA || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1  || 28.5  deg ||  -4.478      ||  17.8 deg  ||  +7.001 || 30 min|| Y
+
|-
+
! LH2, 65 uA  || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 28.5  deg ||  -4.478      ||  17.8 deg  ||  +7.001 || 3.5 hrs || Y
+
|-
+
! LH2, 65 uA  || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 || 28.5  deg ||  -4.478      ||  17.8 deg  ||  +7.001 || 30 min || Y
+
|-
+
! Al. Dummy, max allowed || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0  || 28.5  deg ||  -4.478      ||  17.8 deg  ||  +7.001 || 1 hrs || Y
+
|}
+
  
* Q^2 = 9.5 GeV^2 Run Plan  
+
*[https://hallcweb.jlab.org/wiki/images/d/d7/XEM2_Run_Plan_20deg_CSB.pdf Charge Symmetric Background (CSB) Studies at 20 degrees Run Plan - Ladder I]
** Cycle HMS magnets since raising momentum
+
 
** Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut)
+
*[https://hallcweb.jlab.org/wiki/images/6/60/XEM2_Run_Plan_EMC20deg_SRC8deg.pdf XEM2 at 8/20 degrees Run Plan - Ladder I]
** For the singles runs the prescale factor on SHMS should be adjusted  as needed to get about equal rate in HMS and SHMS (ie equal rates for PS1 and PS4).
+
 
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
*[https://hallcweb.jlab.org/wiki/images/7/75/XEM2_CSB_35deg_Part_I.pdf Charge Symmetric Background (CSB) Studies at 35 degrees Run Plan - Ladder I]
|-
+
 
! Target || Prescales || HMS angle || HMS momentum  || SHMS angle  || SHMS momentum  || Counts/time || Complete
+
*[https://hallcweb.jlab.org/wiki/images/archive/b/b2/20221027144843%21XEM2_Target_Boiling_I.pdf XEM2 Target Boiling Studies - Ladder I]
|-
+
 
! 6% C, 50 uA  || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 23.2  deg ||  -5.539      ||  21.6 deg  ||  5.925 || 1000 || N
+
*[https://hallcweb.jlab.org/wiki/images/3/37/XEM2_10_35deg_Run_Plan.pdf  XEM2 at 10/35 degrees Run Plan - Ladder I ]
 +
 
 +
*[https://hallcweb.jlab.org/wiki/images/e/e9/XEM2_Run_Plan-Nov26.pdf Target Ladder I Run Plan]
 +
 
 +
== RC Links ==
 +
 
 +
* [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_fall_2022 RC Daily Meetings (Fall 2022)]
 +
* [https://hallcweb.jlab.org/wiki/index.php/Experts_on_call#On_call_Experts On Call List and Instructions]
 +
* [[XEM_2022_Physics_Status]]
 +
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 +
* [[Shutting off HMS LCW]]
 +
 
 +
= CaFe (E12-16-004) =
 +
{| class="wikitable"
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | '''Online'''
 +
| style="background: #ffffff; color: #000000; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | '''Offline'''
 +
| style="background: #ffffff; color: #000000; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | '''Experiment Info'''
 +
| style="background: #ffffff; color: #000000; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | '''Resources'''
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://github.com/Yero1990/cafe_online_replay/wiki/CaFe:-Instructions-for-Shift-Takers Shift Crew Instructions]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [[Aug 08 Data Analysis]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://docs.google.com/spreadsheets/d/1yJh92q0xC8syekyPSlz6KOBmQ7jC7KV5LQjPqp4s93g/edit#gid=0 CaFe Pre-Run Task List]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]
 
|-
 
|-
! 1.5% C, 60 uA  || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 23.2  deg || -5.539      || 21.6 deg  || +5.925 || 800 || N
+
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://github.com/Yero1990/cafe_online_replay Online Replay]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " |  
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [[CaFe Run Plan]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://logbooks.jlab.org/book/hclog Hall C Logbook]
 
|-
 
|-
! 6% C, 50 uA  || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 || 23.2  deg ||  -5.539      ||  21.6 deg  || +5.925 || >300K each arm || N
+
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://yero1990.github.io/cyero.github.io/ Run Summaries]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " |  
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [[CaFe Preparation]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://hallcweb.jlab.org/wiki/index.php/How-to FAQ/How-to]
 
|-
 
|-
! LH2, 60 uA  || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 || 23.2  deg || -5.539      || 21.6 deg  ||  +5.925 || >300K each arm || N
+
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [[RC Daily Meetings]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " |  
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [[CaFe Disk Space]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures Beam Checkout Procedure] 
 
|-
 
|-
! Al Dummy, 40 uA  || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 23.2  deg || -5.539      || 21.6 deg  ||  +5.925 || 2 hr || N
+
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " |  
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " |  
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-CAFE CaFe Shift Sign-up]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://hallcweb.jlab.org/wiki/index.php/How_to_operate_and_monitor_the_Spectrometer_Magnets Spectrometer Magnets]
 
|-
 
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " |
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " |
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://cyero0027.wixsite.com/cafe-experiment Official Cafe Website]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 210px; height: 21px; " | [https://hallcweb.jlab.org/wiki/index.php/Spectrometer_Rotation Spectrometer Rotation]
 
|}
 
|}
  
= F2 Experiment (E12-10-002) L/T measurement Run Plan =
+
= Pion-LT (E12-19-006) =
* Experts: Simona Malace, Eric Christy
+
Pion Electroproduction Cross Section at 11 GeV and Measurement of the Charged Pion Form Factor to High Q2
* Expected time: 2 days at 30 muA
+
* Goal: Measure one epsilon point to better constrain R at large x
+
* Conditions: ONLY HMS NEEDED. Prescale to 2 kHz, cycle magnets.
+
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
|-
+
! beam current (uA):  || max current
+
|-
+
! fast raster: || 2x2mm
+
|-
+
! target: || 10 cm LH2, Al 10 cm Dummy
+
|-
+
! HMS collimator: || PION
+
|-
+
! HMS trigger: || ELREAL for physics data taking
+
|-
+
! HMS trigger: || SCIN 3/4 *for one run only* in the beginning for trigger efficiency calculation (we are running one trigger at the time)
+
|-
+
! HMS angle/momentum:  || 65 deg / -1 GeV/c - 100 K electrons
+
|-
+
! HMS angle/momentum:  || 65 deg / +1 GeV/c - 10 K positrons
+
|-
+
|}
+
= F2/EMC Experiment (E12-10-002/E12-10-008) 5 pass Run Plan =
+
* Spokespeople E12-10-002: E. Christy, T. Keppel, S. Malace (contact), I. Niculescu
+
* Graduate Students E12-10-002: Deb Biswas, Abel Sun, Fernando Araiza Gonzalez
+
* Spokespeople E12-10-008: J. Arrington, A. Daniel, D. Gaskell (contact), N. Fomin
+
* Graduate Students E12-10-008: Abishek Karki, Kayla Craycraft
+
  
* Conditions:
+
[[COVID guidance for weekend shift-workers]]
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
|-
+
! beam current:  || varies per target
+
|-
+
! fast raster: || 2x2 mm2
+
|-
+
! targets: || 10cm LH2 and LD2, 10 cm Al Dummy, Be, 10,11B, C 1.5 %
+
|-
+
! HMS/SHMS collimator: || Large , COLLIMATOR
+
|-
+
! HMS/SHMS trigger: || ELREAL/ELREAL for NEG. Polarity runs; ELCLEAN/ELCLEAN for POS. Polarity runs
+
|-
+
! HMS angle/momentum  || Various (check run plan below)
+
|-
+
! SHMS angle/momentum  || Various (check run plan below)
+
|}
+
  
 +
'''[https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 RC Meeting Zoom Link]''' -  Meeting ID: 160 710 0885
  
*HMS Dipole saturation check run plan (3-4 hrs) Run Plan:
+
'''[https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan_summer_2022 RC Daily Meetings and Runplans (Summer 2022)]'''
  
[https://hallcweb.jlab.org/DocDB/0009/000954/001/HMS_saturation.pdf HMS saturation measurement run plan]
+
== Run period 3 (high epsilon): '''06-June-2022 - 09-Sept-2022''' ==
  
 +
* [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-PIONLT-2022 Shift Signup]
 +
* [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-PIONLT-2022 Shift Signup ('''Read only''')]
 +
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 +
** [https://logbooks.jlab.org/book/kaonlt KaonLT Logbook] - Used for PionLT updates too
 +
* [https://redmine.jlab.org/projects/hall-c/wiki/2022_Run_Plans_and_Run_Sheets Run Plans]
 +
* [https://redmine.jlab.org/projects/hall-c/wiki Pion-LT Redmine Wiki]
 +
* [[Pion-LT specific shift instructions]]
 +
* [[Pion-LT analysis instructions]]
 +
** [[Pion-LT analysis instructions/adjusting cuts]]
 +
* [[PionLT_2022_Physics_Status]]
  
* Boiling studies
+
== Run period 2 (low epsilon): '''16-Aug-2021 - 07-Feb-2022''' ==
  
-->  HMS: 21 deg, -3.3 GeV/c
+
*[https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-PIONLT Shift Signup]
 +
*[https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLC-PIONLT Shift Signup (Read only)]
 +
*[https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 +
*[https://redmine.jlab.org/projects/hall-c/wiki/2021_Run_Plans_and_Run_Sheets Run Plans] [https://hallcweb.jlab.org/wiki/images/6/6e/Runplan_8p0gev-1.pdf pdf version of run plan]
 +
*[https://redmine.jlab.org/projects/hall-c/wiki Pion-LT Redmine Wiki]
 +
*[[Pion-LT specific shift instructions]]
 +
*[[Pion-LT analysis instructions]]
 +
** [[Pion-LT analysis instructions/adjusting cuts]]
 +
*[[PionLT_2021_Physics_Status]]
  
-->  40 K good e- per run
+
== RC Links ==
  
-->  ELREAL, prescale if needed to keep the prescaled rate below 2000 Hz
+
* [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan_summer_2022 RC Daily Meetings and Runplans (Summer 2022)]
 +
* [https://hallcweb.jlab.org/wiki/index.php/Experts_on_call#On_call_Experts On Call List and Instructions]
 +
* [[PionLT_2022_Physics_Status]]
 +
* [https://logbooks.jlab.org/book/kaonlt KaonLT Logbook] - Used for PionLT updates too
 +
* [[Shutting off HMS LCW]]
 +
* [https://logbooks.jlab.org/entry/4000274 Morning Meetings 2022]
  
-->  Targets/currents:
+
=== Previous Meeting Pages ===
  
--> C 1.5 %: 5, 10, 25, 40, 55, 65
+
* [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan_spring_2022 RC Daily Meetings and Runplans (Spring 2022)]
 +
* [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan_fall_2021 RC Daily Meetings and Runplans (Fall 2021)]
 +
* [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan_summer_2019 RC Daily Meetings and Runplans (Summer 2019)]
  
--> Al: 40 muA
+
= Polarized Helium-3 Experiments (E12-06-110/E12-06-121) =
 +
[[Polarized Helium-3 Experiments]] (E12-06-110/E12-06-121) main page
  
--> LH2: 10, 25, 40, 55, 65
+
Experiment E12-06-110 (A1n) and E12-06-121 (d2n) are scheduled to run from Dec. 3, 2019 to May 6, 2020, with breaks for the X'mas shutdown and the target rotation.
 +
These two experiments focus on studies of the nucleon spin structure.
  
--> LD2: 10, 25, 40, 55, 65
+
= Summer 2019 - E12-06-101/E12-07-105 and E12-15-001 =
  
 +
Experiments E12-06-101/E12-07-105 are pion electroproduction experiments and experiment E12-15-001 is a virtual Compton scattering experiment.
  
*Production Run Plan:  
+
*[https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-SPRING-2019 Shift Signup]
 +
*[https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLC-SPRING-2019 Shift Signup (Read only)]
 +
* [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan_summer_2019 RC Daily Meetings and Runplans (Summer 2019)]
  
[https://hallcweb.jlab.org/DocDB/0009/000953/001/F2_EMC_runlist_final.pdf SHMS Production Run Plan]
+
== Pion-LT E12-19-006 (Run period 1: Low Q2) ==
 +
https://redmine.jlab.org/projects/hall-c/wiki
  
[https://hallcweb.jlab.org/DocDB/0009/000953/001/HMS_sheet_add_pos.pdf HMS Production Run Plan]
+
*[https://redmine.jlab.org/attachments/download/850/runplan_lowQ2.pdf Run Plan]
 +
*[https://redmine.jlab.org/projects/hall-c/wiki Pion-LT Redmine]
 +
*[[Pion-LT specific shift instructions]]
 +
*[[Pion-LT analysis instructions]]
 +
*[[PionLT_2019_Physics_Status]]
  
 +
== The VCS Polarizabilities experiment E12-15-001 ==
  
* Online Analysis Flow: shift takers! follow closely, please
+
Please pay attention as instructions have change (7/25/2019)
  
[[F2/EMC analysis how-to for shift takers Step 1]]  
+
* Redmine page of this experiment: [https://redmine.jlab.org/projects/measurement-of-the-generalized-polarizabilities-of-the-proton-in-virtual-compton-scattering-e12-15-0/wiki]
 +
* [[Instructions for shift crew]]
 +
* [[Instructions for analysis shifts| Physics and yields monitoring]]
 +
* Printable run sheets: [https://hallcweb.jlab.org/wiki/images/archive/2/26/20190720144811%21RunSheetVCS2019_updated.pdf]
 +
* Golden run monitoring display of current running kinematic (Ib): [https://hallcweb.jlab.org/wiki/index.php/File:Ana_monitor_8836.pdf]
  
[[F2/EMC analysis how-to for shift takers Step 2]]
+
- combined runs missing mass spectra (replayed until 7/28 1 PM): [https://hallcweb.jlab.org/wiki/index.php/File:Missmass-1b.pdf]
  
[[F2/EMC analysis how-to for shift takers Step 3]]
+
* Other kinematics:
  
 +
- Kin Ia, golden run monitoring: [https://hallcweb.jlab.org/wiki/index.php/File:Ana_monitor_8926.pdf],
 +
combined runs missing mass spectra: [https://hallcweb.jlab.org/wiki/index.php/File:Allkin1a.png]
  
* Data taken so far
 
  
[https://docs.google.com/document/d/13i-SQGGES52d8fjJo9CTdgMc0A7J7z_t9FdKewW6HEM/edit?ts=5a8db865 SHMS]
+
* All instructions and reference plots can be found in the black binder in the counting house.
  
[https://docs.google.com/document/d/1scxBFrrasplcp8-AznKRal5rr_19KKGk7Wfwsld-8Fw/edit# HMS]
+
{| class="wikitable"
 
+
|-
 
+
| style="background: #ffffff; color: #db0d0d; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | '''[[VCS Online| Info for Shift Crew:]]'''
* Simona's notes
+
| style="background: #ffffff; color: #db0d0d; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | '''Experiment Info:'''
 
+
| style="background: #ffffff; color: #000000; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | '''Resources:'''
[[Daily to do list]]
+
|-
 
+
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [[Information for Shift Takers]]
 
+
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | [[Run plan for VCS| VCS Run Plan]]
* BCM calibration procedure
+
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [[How-to|FAQ/How-to]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | [https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLC-SPRING-2019 Shift Schedule]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://redmine.jlab.org/projects/measurement-of-the-generalized-polarizabilities-of-the-proton-in-virtual-compton-scattering-e12-15-0/wiki  The experiment Redmine]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [[Experts on call]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | [[RC Daily for VCS | Daily Meeting]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [[VCS Online | Shift Summaries]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://hallcweb.jlab.org/wiki/index.php/File:RunSheetVCS2019_updated.pdf Printable Run Sheet]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [https://bta/ Beam Time Accounting (BTA)]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | [https://hallcweb.jlab.org/wiki/index.php/File:Instruction_ana.pdf Analysis Instructions (pdf)]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " |
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [https://misportal.jlab.org/mis/apps/physics/shiftChecklist/index.cfm?shiftChecklistTypeId=2 Shift Checklist]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | [https://hallcweb.jlab.org/wiki/index.php/VCS_batch_replay_Instructions VCS Batch replay Instructions]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " |
 +
|}
  
[ https://hallcweb.jlab.org/doc-public/ShowDocument?docid=957 ]
+
= E12-09-011 (Kaon LT) =
  
== Useful Links ==
+
[https://redmine.jlab.org/projects/kltexp/wiki Kaon-LT Redmine Page]
  
 +
== Run plans==
 +
*[https://redmine.jlab.org/projects/kltexp/wiki/Run_Plans Run plans for all energies on RedMine]
 +
*[https://redmine.jlab.org/documents/41 KAON-LT specific instructions for Shift Takers (PDF)]
 +
*[[KAON-LT specific intructions]]
 +
*[[KAON-LT analysis instructions]]
 +
*[https://redmine.jlab.org/attachments/768/kaonlt_runlist_8p2-6p2.csv Kaon LT Run List 8.2 GeV]
 +
*[https://redmine.jlab.org/attachments/768/kaonlt_runlist_8p2-6p2.csv Kaon LT Run List 6.2 GeV]
 +
*[https://redmine.jlab.org/attachments/611/kaonlt_runlist_3p8-4p9.csv Kaon LT Run List 3.8 GeV]
 +
*[https://redmine.jlab.org/attachments/611/kaonlt_runlist_3p8-4p9.csv Kaon LT Run List 4.9 GeV]
 +
*[https://redmine.jlab.org/attachments/548/kaonlt_runlist.csv Kaon LT Run List 10.6 GeV]
 
=== RC Links ===
 
=== RC Links ===
 +
* [https://hallcweb.jlab.org/wiki/index.php/KaonLT_RC_Daily_Meetings_Spring_2019 RC Daily Meetings and Runplans (Spring 2019)]
 +
* [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan_fall_2018 RC Daily Meetings and Runplans (Autumn 2018)]
 +
* [https://hallcweb.jlab.org/wiki/index.php/Experts_on_call#On_call_Experts On Call List and Instructions]
  
* [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan RC Daily Meetings]
+
=== Kaon-LT Setting Status ===
  
=== F2 E-Logs ===
+
*[https://hallcweb.jlab.org/wiki/index.php/Kaon_LT_Status_Page#Kaon_LT_Physics_Status_at_Ebeam_.3D_8.2.2F6.2_GeV 6.2/8.2 GeV status page]
 +
*[https://hallcweb.jlab.org/wiki/index.php/Kaon_LT_Status_Page#Kaon_LT_Physics_Status_at_Ebeam_.3D_3.8.2F4.9_GeV 3.8/4.9 GeV status page]
 +
*[https://hallcweb.jlab.org/wiki/index.php/Kaon_LT_Status_Page#Kaon_LT_Physics_Status_at_Ebeam_.3D_10.6_GeV 10.6 GeV status page]
  
* [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/ F2-preparations/analysis elog]
+
=== 6.2/8.2 GeV Runplan Overview ===
* [https://hallcweb.jlab.org/elogs/Commissioning+Experiments+Analysis/ Commissioning experiments analysis elog]
+
'''PDF file with run plan details: [https://redmine.jlab.org/attachments/download/640/runplan_6p2gev.pdf 6.2 GeV], [https://redmine.jlab.org/attachments/download/647/runplan_8p2gev.pdf 8.2 GeV]'''
 +
* [https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures Beam checkout]
 +
* Items to be done as soon as possible at 6.2 GeV AND 8.2 GeV
 +
** Arc energy measurement
 +
** BPM calibration check with superharps
 +
* Calibration Runs (HMS/SHMS sieve runs, luminosity scans, heep-check singles and coincidences)
 +
* 6.2 GeV,
 +
** Q2=3.0 W=2.32 x=0.40 , low ε data taking
 +
** Q2=2.115 W=2.95 x=0.21 , low ε data taking
 +
* 8.2 GeV,
 +
** Q2=4.4 W=2.74 x=0.40 , low ε data taking
 +
** Q2=3.0 W=3.14 x=0.25 , low ε data taking
 +
** Q2=5.5 W=3.02 x=0.40  , low ε data taking
  
=== F2 Analysis Meetings ===
+
=== 3.8/4.9 GeV Runplan Overview ===
 +
'''PDF file with run plan details: [https://redmine.jlab.org/attachments/download/556/runplan_3p8gev.pdf 3.8 GeV], [https://redmine.jlab.org/attachments/download/590/runplan_4p9gev.pdf 4.9 GeV]'''
 +
* SHMS beam deflection test plan
 +
** 3.8 GeV
 +
*** Set SHMS to 6.79 degrees, with all magnets ramped to zero
 +
*** Jay Benesch will execute his [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18315 beam deflection test plan]
 +
*** Shift workers will need to ramp SHMS magnets as directed by Jay (use -3.007 GeV/c settings)
 +
** 4.9 GeV
 +
*** Jay has agreed to defer the SHMS beam deflection study until we get to the 6.00 deg setting in the run plan, expected to be morning of Dec 17.
 +
* [https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures Beam checkout]
 +
* Items to be done as soon as possible at 3.8 GeV AND 4.9 GeV
 +
** Arc energy measurement
 +
** BCM calibration
 +
** BPM calibration check with superharps
 +
* Calibration Runs (Heep-check singles and coincidences)
 +
* 3.8 GeV, Q2=0.5, W=2.40, x=0.09, low ε data taking
 +
* 4.9 GeV, Q2=0.5, W=2.40, x=0.09, high ε data taking
  
* BlueJeans Meeting Information
+
=== 10.6 GeV Runplan Overview ===
To join the Meeting:
+
'''PDF file with run plan details: [https://redmine.jlab.org/attachments/download/490/runplan_10p6gev.pdf]'''
https://bluejeans.com/354839810
+
* SHMS beam deflection test plan
To join via Room System:
+
** Set SHMS to 6.66 degrees, with all magnets ramped to zero
Video Conferencing System: bjn.vc -or-199.48.152.152
+
** Jay Benesch will execute his [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18315 beam deflection test plan]
Meeting ID : 354839810
+
** Shift workers will need to ramp SHMS magnets as directed by Jay (use -8.035 GeV/c settings)
To join via phone :
+
* [https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures Beam checkout]
1) Dial:
+
* Detector checkout
    +1.408.740.7256 (United States)
+
* Trigger checkout
    +1.888.240.2560 (US Toll Free)
+
* Items to be done as soon as possible at 10.6 GeV
    +1.408.317.9253 (Alternate number)
+
** Arc energy measurement
    (see all numbers - http://bluejeans.com/numbers)
+
** BCM calibration
2)  Enter Conference ID : 354839810
+
** BPM calibration check with superharps
 +
* Calibration Runs (Optics, Heep-check singles and coincidences)
 +
* Q2=3.0, W=2.32, x=0.40, high ε data taking
 +
* Q2=2.1, W=2.95, x=0.21, high ε data taking
 +
* Q2=4.4, W=2.74, x=0.40, high ε data taking
 +
* Q2=3.0, W=3.14, x=0.25, high ε data taking
 +
* '''[[Run Plan for Kaon LT Luminosity Scan | Luminosity scan]]'''
 +
* Q2=5.5, W=3.02, x=0.40, high ε data taking
 +
* '''[[Run Plan for Kaon LT 10.6GeV End Game]]'''
  
= Deuteron Electro-Disintegration (E12-10-003) Run Plan =
+
= SIDIS pt experiment E12-09-017 Fall 2018 =
*Experts: Werner Boeglin, Mark Jones
+
*[[Procedures for shift takers]]
*Graduate Student: Carlos Yero
+
*[[4 Pass Run Plan]]
*Expected Time: 6 days at 40 uA
+
*[[5 pass Run Plan]]
*Goal: Measure D(e,e'p)n cross section at three kinematic settings, where FSI are small
+
*[[Run List]]
*Conditions: The SHMS will detect electrons and the HMS will detect protons.
+
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
|-
+
! beam energy:  || 10.6 GeV
+
|-
+
! beam current:  || 40 μA
+
|-
+
! fast raster: || 2x2 mm
+
|-
+
! targets: || 10cm LH2, 10cm LD2
+
|-
+
! HMS/SHMS collimator: || Pion , Collimator
+
|-
+
! HMS/SHMS trigger: || Coincidence, HMS: h3/4, SHMS: p3/4
+
|-
+
! HMS angle/momentum  || Various
+
|-
+
! SHMS angle/momentum  || Fixed
+
|-
+
|}
+
  
* H(e,e'p) Check Run Plan
+
= SIDIS [[CSV]] experiment E12-09-002 =
** Check the HMS/SHMS spectrometer pointing
+
==[[CSV Fall 2018 Run Plan| CSV Run Plan]]==
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
+
*[[CSV]]
|-
+
*[https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan_fall_2018 CSV Daily Run Plan - 2018]
! Target || SHMS angle || SHMS momentum  || HMS angle  || HMS momentum  || Time
+
*[https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_and_daily_runplan_spring_2019 CSV Daily Run Plan - 2019]
|-
+
*[[CSV software]]
! LH2  || 12.169  deg || -8.70 GeV/c    || 37.339 deg  || +2.93814 GeV/c || 1 hr
+
 
|-
+
= [[The J/psi-007 Experiment | The J/&psi;-007 Experiment]] =
 +
[[File:Jpsi007.png|300px]]
 +
{| class="wikitable"
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | '''[[J/psi-007 Online|Online]]'''
 +
| style="background: #ffffff; color: #000000; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | '''[[J/psi-007 RC Info|RC Info]]'''
 +
| style="background: #ffffff; color: #000000; font-weight: bold; font-style: normal; text-decoration: none; font-size: 13pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | '''Resources'''
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [[Information for Shift Takers]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | [[Run plan for J/psi-007|Run Plan]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://jpsi-007.sly2j.com Official Website]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [[How-to|FAQ/How-to]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-J/PSI-2019 Shift Schedule]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://redmine.jlab.org/projects/j-psi-007 Redmine]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [[Experts on call]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " | [[RC Daily for J/psi-007 | Daily Meeting]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://redmine.jlab.org/projects/j-psi-007-internal/wiki Internal Redmine]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [[J/psi-007 Instructions for Shift Takers | Instructions for Shift Takers]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " |
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [[J/psi-007 Online | Shift Summaries]]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " |
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [https://bta/ Beam Time Accounting (BTA)]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " |
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " | [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]
 +
|-
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 213px; height: 21px; " | [https://misportal.jlab.org/mis/apps/physics/shiftChecklist/index.cfm?shiftChecklistTypeId=2 Shift Checklist]
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 218px; height: 21px; " |
 +
| style="background: #ffffff; color: #000000; font-weight: normal; font-style: normal; text-decoration: none; font-size: 10pt; text-align: left; vertical-align: bottom; border: 0px; width: 217px; height: 21px; " |
 
|}
 
|}
* D(e,e'p)n Run Plan
 
** Calibration run at low missing momentum used as a cross check with existing data
 
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
 
|-
 
! Target || SHMS angle || SHMS momentum  || HMS angle  || HMS momentum  ||  Missing Momentum || Time
 
|-
 
! LD2  || 12.169  deg ||  -8.70 GeV/c    ||  38.896 deg  ||  +2.93223 GeV/c || 80 MeV ||  1 hr
 
|-
 
|}
 
* Measure the D(e,e'p)n Cross Section at unexplored high missing momentum kinematics settings
 
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
 
|-
 
! Target || SHMS angle || SHMS momentum  || HMS angle  || HMS momentum  ||  Missing Momentum || Time 
 
|-
 
! LD2  || 12.169  deg ||  -8.70 GeV/c    ||  54.961  deg  ||  +2.2622 GeV/c || 580 MeV ||  20 hrs
 
|-
 
! LD2  || 12.169  deg ||  -8.70 GeV/c    ||  58.404 deg  ||  +2.1557 GeV/c || 750 MeV ||  42 hrs
 
|-
 
|}
 
== Alternative Run Plan (Assuming Beam Current of 65-70 uA) ==
 
*The initial H(e,e'p) checkout and D(e,e'p)n at low missing momentum is the SAME as above.
 
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;"
 
|-
 
! Target || SHMS angle || SHMS momentum  || HMS angle  || HMS momentum  ||  Missing Momentum || Time
 
|-
 
! LD2  || 12.169  deg ||  -8.70 GeV/c    ||  53.252 deg  ||  +2.305 GeV/c || 500 MeV ||  8 hrs
 
|-
 
! LD2  || 12.169  deg ||  -8.70 GeV/c    ||  56.401 deg  ||  +2.220 GeV/c || 650 MeV ||  18 hrs
 
|-
 
! LD2  || 12.169  deg ||  -8.70 GeV/c    ||  59.388 deg  ||  +2.120 GeV/c || 800 MeV ||  36 hrs
 
|-
 
|}
 
  
= Fall 2017 Commissioning Plans =
 
*[[Information for Shift Takers]]  ([https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-2017-2018 2017-2018 Shift Signup])
 
*[https://userweb.jlab.org/~smithg/target/Qweak/ Target web page]. [https://userweb.jlab.org/~smithg/target/Qweak/tgt_training_schedule.pdf Target training schedule]
 
* [https://mailman.jlab.org/mailman/listinfo/hallc_running Sign up for hallc_running mailing list]. [https://mailman.jlab.org/pipermail/hallc_running/ Archive]
 
*Runsheets:
 
**[https://logbooks.jlab.org/entry/3504461 First Dec Period]
 
**[https://logbooks.jlab.org/entry/3508052 Second Dec period]
 
*[https://www.jlab.org/exp_prog/experiment_schedule/2018/20180108.2a.pdf Update beam schedule Jan 2018]
 
**[https://www.jlab.org/exp_prog/experiment_schedule/2017/20170914.1_ExpSch.pdf Old Dec 2017 Beam Schedule]
 
*[[Fall 2017 Commissioning Plan]]
 
*[https://hallcweb.jlab.org/elogs/Commissioning+Experiments+Analysis/ Commissioning analysis logbook]
 
*[[Experts on call]]
 
*[[How-to]]
 
*[https://hallcweb.jlab.org/wiki/index.php/Detector_Working_Group_Meetings#Detector_Working_Group_Meetings_in_2017 Detector Working Group Biweekly Meeting Agendas]
 
*[https://hallcweb.jlab.org/wiki/index.php/Detector_Working_Group_Meetings Wiki Page for Detector Working Group Biweekly Meetings]
 
  
= Spring 2017 KPP run =
 
*[[KPP Run Plan]]
 
** [https://hallcweb.jlab.org/DocDB/0008/000847/001/Hall_C_KPP_Demonstration-Mar2017-v8-final.pdf Hall C KPP Slides (final) [pdf]]
 
*[[RC daily meetings and daily runplan]] for KPP
 
*[https://logbooks.jlab.org/entry/3467772 Logbook entry] with pdf of the run sheets.
 
  
= Hall C Links =
+
= [[Past run plans]] =
  
 +
= Hall C Links =
 +
* [https://hallcweb.jlab.org/wiki/index.php/Hall_C_Futures Hall C Futures]
 +
* [https://hallcweb.jlab.org/wiki/index.php/Commissioning_analysis_meetings Commissioning analysis meetings]
 
* [https://hallcweb.jlab.org/document/howtos/ List of (legacy) Hall-C HowTo Documents]
 
* [https://hallcweb.jlab.org/document/howtos/ List of (legacy) Hall-C HowTo Documents]
 
* [https://hallcweb.jlab.org/hcana/docs/ HCANA doxygen]
 
* [https://hallcweb.jlab.org/hcana/docs/ HCANA doxygen]
Line 379: Line 370:
 
= Hall C =
 
= Hall C =
  
Hall C is one of four experimental halls at [http://www.jlab.org/ JLab].
+
* Hall C is one of four experimental halls at [http://www.jlab.org/ JLab].
 +
* Hall C [[Computing]].
 +
* [[Hall C in the Press]].
  
Hall C [[Computing]].
+
== Common Hall C Training Requirements ==
  
[[Hall C in the Press]].
+
NOTE: These are the commonly required training to access and run shifts in Hall C.
 +
 
 +
The formal requirements will be outlined in the [https://hallcweb.jlab.org/safety-docs/Pol3He_2019/ Run Safety Documentation] for your particular experiment.
 +
 
 +
Contact a spokesperson and/or the RC if you have questions.
 +
 
 +
* [https://www.jlab.org/div_dept//train/Security_Awareness/Security_Awareness_2019%20(Published)/index.html Annual Security Awareness] (GEN034) &bull; '''Expires: Annually (January)'''
 +
* [https://www.jlab.org/div_dept/train/Physics%20Work%20Gov%20SAF116kd/Work%20Governance%20Document%20Updt%2010920.pdf Physics Division Work Governance] (SAF116kd) &bull;  '''Expires: Annually (January)'''
 +
* [https://misportal.jlab.org/railsForms/rad_work_permits/95318/briefing General Access RWP] (SAF801kd) &bull;  '''Expires: Annually (December)'''
 +
* [https://www.jlab.org/div_dept/train/ODH/Oxygen_Deficiency_Hazard_Training/index.html Oxygen Deficiency Training] (SAF103) &bull;  '''Expires: Annually (24 months from date taken)'''
 +
* [https://www.jlab.org/div_dept/train/SAF100/index_2018.html ES&H Orientation] (SAF100) &bull;  '''Expires: Annually (24 months from date taken)'''
 +
* RadWorker 1 Written Test (SAF801T) &bull;  '''Expires: Annually (24 months from date taken)''' &bull; ''Must'' be taken on-site -- register well in advance if the Lab is still in a MedCon status!
 +
* Hall C Walkthrough (SAF112) &bull;  '''Expires: Never''' &bull; Must be done at JLab during a down.  Schedule in advance!
 +
 
 +
These are also required as long as JLab is in an elevated MedCon status due to the COVID-19 pandemic
 +
* [https://www.jlab.org/div_dept/train/SAF003/Working%20Safely%20at%20Jefferson%20Lab%20During%20Elevated%20MedCon%20Levels%20(Published)/index.html SAF003 training: Working Safely at Jefferson Lab During Elevated MedCon Levels]
 +
* [https://physdiv.jlab.org/2020MedConOps/OSP102494.pdf ESH-20-102494-OSP: COVID-19 Pandemic Controls] (READ NOW, sign copy in CH when you arrive.)
 +
 
 +
Many courses are Web based and can be found on the [https://www.jlab.org/human_resources/training/webbasedtraining JLab Training Page].
 +
 
 +
You can [https://mis.jlab.org/mis/apps/training/Show_My_CIS_Training_history.cfm check your training status online].
 +
 
 +
'''Also, don't forget to register your visit at least 7 days prior to your trip:'''
 +
* https://misportal.jlab.org/jlabAccess/
 +
 
 +
== Recommended Mailing Lists ==
 +
[[Recommended Mailing Lists]]
 +
{{:Recommended Mailing Lists}};
  
 
= Basic Equipment in Hall C =
 
= Basic Equipment in Hall C =
Line 390: Line 410:
 
*[[Online/Offline Monitoring Working Group Meetings]]
 
*[[Online/Offline Monitoring Working Group Meetings]]
  
== Beamline ==
+
== Beam Energy ==
 +
* [[Table of 12 GeV Beam Energy Measurements]]
  
 +
== Beam Current Monitoring (BCM) ==
 +
* [[HallC_BCMs|Hall C BCMs]]
  
 +
== Beamline ==
 
----
 
----
 
==SHMS Magnets ==
 
==SHMS Magnets ==
Line 398: Line 422:
  
 
The formulas and program should be kept in sync with the [https://github.com/hszumila/field17 repository].  
 
The formulas and program should be kept in sync with the [https://github.com/hszumila/field17 repository].  
 
  
 
*Formulas used for setting current of SHMS magnets  during KPP
 
*Formulas used for setting current of SHMS magnets  during KPP
Line 416: Line 439:
 
*[[SHMS Horizontal Bender]]
 
*[[SHMS Horizontal Bender]]
 
*[[SHMS Q1]]
 
*[[SHMS Q1]]
 +
 +
=SHMS optics page=
 +
=== SHMS Survey data===
 +
=== SHMS Collimator/Sieve ===
 +
*The SHMS collimator/sieve assembly is located between the Horizontal Bender and the first quadrupole.
 +
*The SHMS collimator/sieve are made of Mi-TechTM Tungsten HD-17 (Density 17 g/cc. 90% W, 6% Ni, 4% Cu).
 +
*The SHMS collimator is a flared octagonal aperture with thickness of 2.5 inches.
 +
*There are two SHMS sieves. Each with thickness of 1.25 inches.
 +
*The sieves have the same hole pattern but one sieve has the hole pattern horizontally shifted by half the hole spacing.
 +
*[https://hallcweb.jlab.org/DocDB/0011/001104/002/shms_collimator.pdf Drawings of the collimator and two sieves].
 +
*The drawings show details of the sieve hole patterns and the collimator shape.
 +
 +
=== SHMS optics data===
 +
*[[SHMS-optics-data-wiki-page | Wiki page on the SHMS  optics]]
 +
 +
==HMS Optics==
 +
=== HMS Survey data===
 +
=== HMS Collimator ===
 +
*The HMS collimators/sieve assembly is located in 166.4 cm from the target in front of the first quadrupole.
 +
*The HMS collimators/sieve are made of Mi-TechTM Tungsten HD-17 (Density 17 g/cc. 90% W, 6% Ni, 4% Cu).
 +
*The HMS collimators are both a flared octagonal aperture with thickness of 2.5 inches.
 +
*There are two HMS collimators which are designated as the "larger" and "small" collimators.
 +
*[https://hallcweb.jlab.org/DocDB/0011/001104/002/HMS%20collimator.pdf Drawing of the small collimator]. It is labelled as the "top" collimator in the drawing. The "center" collimator is the drawing was replaced by the present day large collimator.
 +
*Could not find a drawing of the  present day large collimator.
 +
**The dimensions are front (back) opening in the horzontal direction are  4.575cm (4.759cm) along top of octagon and 9.150cm (9.518cm) at the vertical middle of the octagon.
 +
**The dimensions are front (back) opening in the vertical direction are  11.646cm (12.114cm) along side of octagon and 23.292cm (24.228cm) at the horizontal middle of the octagon. 
 +
*The HMS sieve has thickness of 1.25 inches. 
 +
*[https://hallcweb.jlab.org/DocDB/0011/001104/002/HMS-Sieve.pdf Drawings of the sieve].
 +
 +
=== HMS optics data===
 +
*[[HMS-optics-data-wiki-page | Wiki page on the HMS optics]]
 +
  
 
== Scattering Chamber ==
 
== Scattering Chamber ==
Line 424: Line 479:
  
 
== Target ==
 
== Target ==
===Spring 2017 KKP run===
+
===Spring 2017 KPP run===
 
*[https://hallcweb.jlab.org/DocDB/0008/000856/001/HallCTargetConfiguration2-6-17.docx Word doc] describing the targets and their thicknesses. Also available at [https://logbooks.jlab.org/entry/3456394 logbook entry].
 
*[https://hallcweb.jlab.org/DocDB/0008/000856/001/HallCTargetConfiguration2-6-17.docx Word doc] describing the targets and their thicknesses. Also available at [https://logbooks.jlab.org/entry/3456394 logbook entry].
 
*[https://hallcweb.jlab.org/DocDB/0008/000856/001/TGT-301-1001-0110.pdf Drawing] of target ladder. Also available at [https://misportal.jlab.org/jlabDocs/document.seam?id=94157 JLab document repository].
 
*[https://hallcweb.jlab.org/DocDB/0008/000856/001/TGT-301-1001-0110.pdf Drawing] of target ladder. Also available at [https://misportal.jlab.org/jlabDocs/document.seam?id=94157 JLab document repository].
 +
 
===Fall 2017 run ===
 
===Fall 2017 run ===
 
*[https://logbooks.jlab.org/entry/3481732 Logbook entry] on the Fall target configuration which has links to file describing the targets and their thicknesses and a file with the mechanical drawing of the target ladder.
 
*[https://logbooks.jlab.org/entry/3481732 Logbook entry] on the Fall target configuration which has links to file describing the targets and their thicknesses and a file with the mechanical drawing of the target ladder.
Line 434: Line 490:
 
* [https://hallcweb.jlab.org/DocDB/0009/000918/001/target-cell-cf-gen2-1pt6-4cm.pdf Drawing] of cryotarget with 1.6 inch diameter for 4cm cell.
 
* [https://hallcweb.jlab.org/DocDB/0009/000918/001/target-cell-cf-gen2-1pt6-4cm.pdf Drawing] of cryotarget with 1.6 inch diameter for 4cm cell.
 
* [https://hallcweb.jlab.org/DocDB/0009/000918/001/target-cell-cf-gen2-1pt6-10cm.pdf Drawing] of cryotarget with 1.6 inch diameter for 10cm cell.
 
* [https://hallcweb.jlab.org/DocDB/0009/000918/001/target-cell-cf-gen2-1pt6-10cm.pdf Drawing] of cryotarget with 1.6 inch diameter for 10cm cell.
 +
 +
===Sept 2021 run===
 +
* [https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1152 Draft document on the September 2021 target ladder assembly]
 +
*[https://logbooks.jlab.org/entry/3987258 Logbook entry by David Meekins with link to target configuration ]
 +
 +
=== June 2022 run ===
 +
*[https://logbooks.jlab.org/entry/3999623  Logbook entry by David Meekins with link to target configuration ]
  
 
== HMS Magnets and Vacuum Vessel ==
 
== HMS Magnets and Vacuum Vessel ==
Line 456: Line 519:
  
 
== DAQ & Trigger ==
 
== DAQ & Trigger ==
 +
* [[Hall_C_CODA/DAQ_Layout]]
 +
* [[Hall_C_Network]]
 
* [[DAQ/Trigger Run Check Lists]]
 
* [[DAQ/Trigger Run Check Lists]]
 +
* [[DAQ/FADC firmware History]]
 +
* [[Trigger History]]
 
* [[Spring 2018 Commissioning]]
 
* [[Spring 2018 Commissioning]]
 
* [[Fall 2017 Commissioning]]
 
* [[Fall 2017 Commissioning]]
Line 463: Line 530:
 
* [[Trigger]]
 
* [[Trigger]]
 
* [[Electronic/Computer Live Time Studies]]
 
* [[Electronic/Computer Live Time Studies]]
 +
* [[Yerevan Test Stand]]
  
 
== Controls ==
 
== Controls ==
Line 469: Line 537:
 
* Spectrometer Controls (Use go_cmagnets command)
 
* Spectrometer Controls (Use go_cmagnets command)
 
* HMS and SHMS Collimator Control [https://hallcweb.jlab.org/DocDB/0008/000828/001/hallc_collimators.pdf document].
 
* HMS and SHMS Collimator Control [https://hallcweb.jlab.org/DocDB/0008/000828/001/hallc_collimators.pdf document].
 +
** See Collimator controls on [[How-to]] page
 +
** NOTE: Do not attempt a reset of the collimator controls unless you have reason to believe that the collimator has moved ''and'' have checked with the RC
  
 
== Online Replay ==
 
== Online Replay ==
Line 476: Line 546:
 
== Data Analysis ==
 
== Data Analysis ==
 
*[[:Category:12GeV Software|Analyzer and other Hall C related software]]
 
*[[:Category:12GeV Software|Analyzer and other Hall C related software]]
 +
*[[Compiling hcana with cmake]]
 
*[[Documentation/HCANA | Discussion]] of the HCANA software flow.
 
*[[Documentation/HCANA | Discussion]] of the HCANA software flow.
 
*[[HMS_optics | Documentation ]] on the Hall C optics optimization.
 
*[[HMS_optics | Documentation ]] on the Hall C optics optimization.
 
*[[Tasklist_summer_2017 | Software task list]] for summer of 2017.
 
*[[Tasklist_summer_2017 | Software task list]] for summer of 2017.
 
*[[Summer 2017 Analysis Workshop]]
 
*[[Summer 2017 Analysis Workshop]]
 +
*[https://redmine.jlab.org/projects/podd/wiki/Workshop2018 2018 Hall A/C Analysis Workshop]
 
*[https://hallcweb.jlab.org/wiki/index.php/Agendas_for_12GeV_software_meetings Agendas] for biweekly software meetings.
 
*[https://hallcweb.jlab.org/wiki/index.php/Agendas_for_12GeV_software_meetings Agendas] for biweekly software meetings.
 +
*[[Simona's notes]]
  
 
== Monte Carlo ==
 
== Monte Carlo ==
Line 497: Line 570:
  
 
* Wiki pages for 12 GeV experiments:
 
* Wiki pages for 12 GeV experiments:
 +
**[[CaFe Experiment]]
 
**[[b1]]
 
**[[b1]]
 
**[[Polarized WACS]]
 
**[[Polarized WACS]]
 +
**[[Polarized TCS]]
 
**[[Azz]]: [[TAzz Working Meetings|Azz Meetings]]
 
**[[Azz]]: [[TAzz Working Meetings|Azz Meetings]]
**[[E12-10-002]]
+
**[[E12-10-002]] F2/EMC/x>1
 
**[[E12-10-003]] Deuteron Electro-Disintegration At Very High Missing Momenta
 
**[[E12-10-003]] Deuteron Electro-Disintegration At Very High Missing Momenta
 
**[[E12-06-107]] Color Transparency Experiment
 
**[[E12-06-107]] Color Transparency Experiment
 
**[[A1nd2n]] A1n and d2n Experiments E12-06-110 and E12-06-121
 
**[[A1nd2n]] A1n and d2n Experiments E12-06-110 and E12-06-121
 +
**[[SIDIS]] Run group Experiments E12-09-002 (Charge Symmetry Violation) , E12-09-011 (Kaon factorization) and E12-09-017 (P_t scan of SIDIS)
 
*[https://hallcweb.jlab.org/elogs/Hall+C+12+GeV+Preparations/ Elog for 12GeV Preparations]
 
*[https://hallcweb.jlab.org/elogs/Hall+C+12+GeV+Preparations/ Elog for 12GeV Preparations]
 +
* [https://hallcweb.jlab.org/wiki/index.php/Commissioning_analysis_meetings Commissioning Analysis Meetings Page]

Latest revision as of 12:42, 26 November 2022

Hallcheader.jpg

Contents

EMC and X>1 Experiments (E12-10-008/E12-06-105)

The inclusive electron scattering cross-section will be measured for several light to medium heavy nuclei over a broad range of x (0.1 < x < 1) and at x greater than one (x > 1).

RC Meeting Zoom Link - Meeting ID: 160 710 0885

RC Daily Meetings (Fall 2022)

General Information

XEM2 Run Plans

RC Links

CaFe (E12-16-004)

Online Offline Experiment Info Resources
Shift Crew Instructions Aug 08 Data Analysis CaFe Pre-Run Task List MCC White Board
Online Replay CaFe Run Plan Hall C Logbook
Run Summaries CaFe Preparation FAQ/How-to
RC Daily Meetings CaFe Disk Space Beam Checkout Procedure
CaFe Shift Sign-up Spectrometer Magnets
Official Cafe Website Spectrometer Rotation

Pion-LT (E12-19-006)

Pion Electroproduction Cross Section at 11 GeV and Measurement of the Charged Pion Form Factor to High Q2

COVID guidance for weekend shift-workers

RC Meeting Zoom Link - Meeting ID: 160 710 0885

RC Daily Meetings and Runplans (Summer 2022)

Run period 3 (high epsilon): 06-June-2022 - 09-Sept-2022

Run period 2 (low epsilon): 16-Aug-2021 - 07-Feb-2022

RC Links

Previous Meeting Pages

Polarized Helium-3 Experiments (E12-06-110/E12-06-121)

Polarized Helium-3 Experiments (E12-06-110/E12-06-121) main page

Experiment E12-06-110 (A1n) and E12-06-121 (d2n) are scheduled to run from Dec. 3, 2019 to May 6, 2020, with breaks for the X'mas shutdown and the target rotation. These two experiments focus on studies of the nucleon spin structure.

Summer 2019 - E12-06-101/E12-07-105 and E12-15-001

Experiments E12-06-101/E12-07-105 are pion electroproduction experiments and experiment E12-15-001 is a virtual Compton scattering experiment.

Pion-LT E12-19-006 (Run period 1: Low Q2)

https://redmine.jlab.org/projects/hall-c/wiki

The VCS Polarizabilities experiment E12-15-001

Please pay attention as instructions have change (7/25/2019)

- combined runs missing mass spectra (replayed until 7/28 1 PM): [4]

  • Other kinematics:

- Kin Ia, golden run monitoring: [5], combined runs missing mass spectra: [6]


  • All instructions and reference plots can be found in the black binder in the counting house.
Info for Shift Crew: Experiment Info: Resources:
Information for Shift Takers VCS Run Plan MCC White Board
FAQ/How-to Shift Schedule The experiment Redmine
Experts on call Daily Meeting Hall-C Logbook
Shift Summaries Printable Run Sheet Hall-C Controls
Beam Time Accounting (BTA) Analysis Instructions (pdf)
Shift Checklist VCS Batch replay Instructions

E12-09-011 (Kaon LT)

Kaon-LT Redmine Page

Run plans

RC Links

Kaon-LT Setting Status

6.2/8.2 GeV Runplan Overview

PDF file with run plan details: 6.2 GeV, 8.2 GeV

  • Beam checkout
  • Items to be done as soon as possible at 6.2 GeV AND 8.2 GeV
    • Arc energy measurement
    • BPM calibration check with superharps
  • Calibration Runs (HMS/SHMS sieve runs, luminosity scans, heep-check singles and coincidences)
  • 6.2 GeV,
    • Q2=3.0 W=2.32 x=0.40 , low ε data taking
    • Q2=2.115 W=2.95 x=0.21 , low ε data taking
  • 8.2 GeV,
    • Q2=4.4 W=2.74 x=0.40 , low ε data taking
    • Q2=3.0 W=3.14 x=0.25 , low ε data taking
    • Q2=5.5 W=3.02 x=0.40 , low ε data taking

3.8/4.9 GeV Runplan Overview

PDF file with run plan details: 3.8 GeV, 4.9 GeV

  • SHMS beam deflection test plan
    • 3.8 GeV
      • Set SHMS to 6.79 degrees, with all magnets ramped to zero
      • Jay Benesch will execute his beam deflection test plan
      • Shift workers will need to ramp SHMS magnets as directed by Jay (use -3.007 GeV/c settings)
    • 4.9 GeV
      • Jay has agreed to defer the SHMS beam deflection study until we get to the 6.00 deg setting in the run plan, expected to be morning of Dec 17.
  • Beam checkout
  • Items to be done as soon as possible at 3.8 GeV AND 4.9 GeV
    • Arc energy measurement
    • BCM calibration
    • BPM calibration check with superharps
  • Calibration Runs (Heep-check singles and coincidences)
  • 3.8 GeV, Q2=0.5, W=2.40, x=0.09, low ε data taking
  • 4.9 GeV, Q2=0.5, W=2.40, x=0.09, high ε data taking

10.6 GeV Runplan Overview

PDF file with run plan details: [7]

  • SHMS beam deflection test plan
    • Set SHMS to 6.66 degrees, with all magnets ramped to zero
    • Jay Benesch will execute his beam deflection test plan
    • Shift workers will need to ramp SHMS magnets as directed by Jay (use -8.035 GeV/c settings)
  • Beam checkout
  • Detector checkout
  • Trigger checkout
  • Items to be done as soon as possible at 10.6 GeV
    • Arc energy measurement
    • BCM calibration
    • BPM calibration check with superharps
  • Calibration Runs (Optics, Heep-check singles and coincidences)
  • Q2=3.0, W=2.32, x=0.40, high ε data taking
  • Q2=2.1, W=2.95, x=0.21, high ε data taking
  • Q2=4.4, W=2.74, x=0.40, high ε data taking
  • Q2=3.0, W=3.14, x=0.25, high ε data taking
  • Luminosity scan
  • Q2=5.5, W=3.02, x=0.40, high ε data taking
  • Run Plan for Kaon LT 10.6GeV End Game

SIDIS pt experiment E12-09-017 Fall 2018

SIDIS CSV experiment E12-09-002

CSV Run Plan

The J/ψ-007 Experiment

Jpsi007.png

Online RC Info Resources
Information for Shift Takers Run Plan Official Website
FAQ/How-to Shift Schedule Redmine
Experts on call Daily Meeting Internal Redmine
Instructions for Shift Takers Hall-C Logbook
Shift Summaries Hall-C Controls
Beam Time Accounting (BTA) MCC White Board
Shift Checklist


Past run plans

Hall C Links

Hall C

Common Hall C Training Requirements

NOTE: These are the commonly required training to access and run shifts in Hall C.

The formal requirements will be outlined in the Run Safety Documentation for your particular experiment.

Contact a spokesperson and/or the RC if you have questions.

  • Annual Security Awareness (GEN034) • Expires: Annually (January)
  • Physics Division Work Governance (SAF116kd) • Expires: Annually (January)
  • General Access RWP (SAF801kd) • Expires: Annually (December)
  • Oxygen Deficiency Training (SAF103) • Expires: Annually (24 months from date taken)
  • ES&H Orientation (SAF100) • Expires: Annually (24 months from date taken)
  • RadWorker 1 Written Test (SAF801T) • Expires: Annually (24 months from date taken)Must be taken on-site -- register well in advance if the Lab is still in a MedCon status!
  • Hall C Walkthrough (SAF112) • Expires: Never • Must be done at JLab during a down. Schedule in advance!

These are also required as long as JLab is in an elevated MedCon status due to the COVID-19 pandemic

Many courses are Web based and can be found on the JLab Training Page.

You can check your training status online.

Also, don't forget to register your visit at least 7 days prior to your trip:

Recommended Mailing Lists

Recommended Mailing Lists JLab runs many Mailing Lists to communicate with its Staff and Users. Most are available for general sign-up by clicking on the relevant link and following the instructions.

There are a few Mailing Lists that Hall C Users are strongly encouraged to subscribe to:

There are also experiment specific Mailing Lists. Contact the Experiment Coordinator if you do not see yours here:

Basic Equipment in Hall C

Beam Energy

Beam Current Monitoring (BCM)

Beamline


SHMS Magnets

For the Fall 2017 run, see intructions at https://hallcweb.jlab.org/wiki/index.php/How-to

The formulas and program should be kept in sync with the repository.

  • Formulas used for setting current of SHMS magnets during KPP
Magnet Formula
HB Current = 330.05*p - 3.1784*p^2 + 0.4018*p^3
Q1 Current = 222.4*p - 7.709*p^2 + 0.6684*p^3
Q2 Current = 3661*p/11
Q3 Current = 2434*p/11
Dipole Current = 3450*p/11

SHMS optics page

SHMS Survey data

SHMS Collimator/Sieve

  • The SHMS collimator/sieve assembly is located between the Horizontal Bender and the first quadrupole.
  • The SHMS collimator/sieve are made of Mi-TechTM Tungsten HD-17 (Density 17 g/cc. 90% W, 6% Ni, 4% Cu).
  • The SHMS collimator is a flared octagonal aperture with thickness of 2.5 inches.
  • There are two SHMS sieves. Each with thickness of 1.25 inches.
  • The sieves have the same hole pattern but one sieve has the hole pattern horizontally shifted by half the hole spacing.
  • Drawings of the collimator and two sieves.
  • The drawings show details of the sieve hole patterns and the collimator shape.

SHMS optics data

HMS Optics

HMS Survey data

HMS Collimator

  • The HMS collimators/sieve assembly is located in 166.4 cm from the target in front of the first quadrupole.
  • The HMS collimators/sieve are made of Mi-TechTM Tungsten HD-17 (Density 17 g/cc. 90% W, 6% Ni, 4% Cu).
  • The HMS collimators are both a flared octagonal aperture with thickness of 2.5 inches.
  • There are two HMS collimators which are designated as the "larger" and "small" collimators.
  • Drawing of the small collimator. It is labelled as the "top" collimator in the drawing. The "center" collimator is the drawing was replaced by the present day large collimator.
  • Could not find a drawing of the present day large collimator.
    • The dimensions are front (back) opening in the horzontal direction are 4.575cm (4.759cm) along top of octagon and 9.150cm (9.518cm) at the vertical middle of the octagon.
    • The dimensions are front (back) opening in the vertical direction are 11.646cm (12.114cm) along side of octagon and 23.292cm (24.228cm) at the horizontal middle of the octagon.
  • The HMS sieve has thickness of 1.25 inches.
  • Drawings of the sieve.

HMS optics data


Scattering Chamber

  • The scattering chamber window on the SHMS side is 0.020 inches thick 2024-T4 aluminum.

SHMS Entrance Window and Vacuum vessel

  • The Horizontal Bender entrance window is 0.010 inches thick 2024-T3 aluminum.
  • The dipole exit window is 0.020 inches thick 5056 aluminum.

Target

Spring 2017 KPP run

Fall 2017 run

  • Logbook entry on the Fall target configuration which has links to file describing the targets and their thicknesses and a file with the mechanical drawing of the target ladder.
  • BeO target was replaced by the "halo" cylinder target. Logbook entry with drawing of "halo" cylinder target.
  • Drawing of target ladder with cryo cells and solid target ladder.
  • Drawing of cryotarget cell with 2.5inch diameter and 10 cm long (after using insert entrance window). Used for separate LH2 and LD2 cells in ladder.
  • Drawing of cryotarget with 1.6 inch diameter for 4cm cell.
  • Drawing of cryotarget with 1.6 inch diameter for 10cm cell.

Sept 2021 run

June 2022 run

HMS Magnets and Vacuum Vessel

HMS Detectors

SHMS Detectors

DAQ & Trigger

Controls

  • High Voltage
  • Spectrometer Controls (Use go_cmagnets command)
  • HMS and SHMS Collimator Control document.
    • See Collimator controls on How-to page
    • NOTE: Do not attempt a reset of the collimator controls unless you have reason to believe that the collimator has moved and have checked with the RC

Online Replay

Data Analysis

Monte Carlo

Hall C at 12 GeV