RC Meeting, Thursday, August 23

From HallCWiki
Jump to navigationJump to search
  • General
    • Beamline vacuum still not great
    • BCMs at 3H04 now at 110 deg. thanks to after hours sleuthing by Dave M.
    • Beam likely not ready to send to hall until Friday
    • LN2 vendor has supply issues - JLab usually gets 2 trucks/day - vendor can only provide 1 truck/day. Alternate supplies under investigation.
    • Dave Mack added some attenuation to BCM4a so it won't saturate at ~ 70 uA


  • Target
    • Target warmed up due to LN2 issue
    • Target cooldown??


  • SHMS
    • After beampipe adjusted, SHMS rotated to 5.69 degrees, but SHMS touched beampipe
    • Minimum safe angle will be 6 degrees
    • Remote motion control allowed down to 7 degrees - for angles below 7 degrees, all motion will be disabled once set (this includes HMS!). Any rotation after will require access
    • SHMS is set to 6 degrees in preparation for beam steering test


  • HMS
    • After beampipe adjusted, and some modification to cable conduit, able to rotate to about 10.9 degrees. Minimum angle will be 11 degrees. Remote motion allowed down to 12.75 degrees
    • Minimum separation between SHMS and HMS 21.5 degrees


  • DAQ