RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
General updates
Wednesday swing – Thursday owl
- 7PM Beam back
- 8PM – 11PM beam tuning; hoping for <300 um
- Decided to use a smaller raster (4.5 mm instead of 5 mm [5]) with this spot size (447 um x 351 um [6]) for now
- 11:30PM – 7:30AM Production data; pol 3He, transverse polarization
Thursday day
- 8AM – 11:30AM DOE tour
- 10:30AM SHMS dipole PSU tripped [9].
- Tried resetting and turning on, kept tripping.
- Called Steve Lassiter and he went down to the hall around 11:30AM
- SHMS dipole back up and stable at 1:15PM [10]
- 12PM AFP loss [11]
- 2PM Hall sweep finished; back to beam permit
- 2PM Target polarization cross calibration [12]
- 3PM Another SHMS dipole trip, shortly followed by HMS dipole, Q2, and Q3
- Called Steve, who said to call Mike Fowler, who said they'd look into it.
- Cryo problem? Hall A had similar problems [13]
Recent polarization measurements
Long 34% 6PM Wed [14] Long 36% 9PM Wed [15] Trans 38% 10PM Wed [16] Trans 60% 4AM Thu [17] Long 58% 4AM Thu [18] Long? 58% 8AM Thu [19] Trans 54% 2PM Thu [20]
- Since transverse polarization is high, seems cell has not degraded and don't need to rush to change it.
- After measurements, if longitudinal is indeed lower than transverse, may need to open the enclosure.
- Take data over weekend and open enclosure early next week
- Take advantage of high transverse polarization, rotate to longitudinal polarization, then take data.
Transverse AFP loss test, Thursday 1/23
- Loss per sweep is 1.4% [21]
- Note that "per sweep" means "per single up or down sweep," not per combined up&down sweep.
Beam width
- Tuning width below 300 um will require interruption to Hall B, so this needs to be scheduled in advance with their agreement. [22]
- Clarify procedure described online for beam checkout?
Current Run Plan
- Always take 120Hz of EDTM
Thursday swing – Tuesday day
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !! !! !! All NMR measurement HCLOG entries should include: !! !! 1) A title that clearly lists polarization !! !! 2) Screenshots of both NMR_FieldSweep and !! !! the polarization fit. !! !! !! !! For an example see the following entry: !! !! https://logbooks.jlab.org/entry/3768696 !! !! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
- Polarized 3He target
- The overall plan is to take 10 (i.e. 5+5) hours of data with transverse spin, then 5 hours with longitudinal, then 10 transverse, 5 longitudinal, 10 transverse, etc.
- NMR measurements should be taken every 5 hours, including twice when changing polarization direction (1 before and 1 after). We want to have know polarization before and after each run.
- To clarify:
- Take NMR during the halfway point of transverse data acquisition
- Before changing polarization directions, take an NMR measurement. Then change direction and wait 10 minutes to let things equilibrate. Then take another NMR measurement. Then begin taking data.
So, as a timeline:
NMR Take 5 hours transverse NMR Take 5 hours transverse NMR Change direction, wait 10 minutes NMR Take 5 hours longitudinal NMR Change direction, wait 10 minutes NMR Take 5 hours transverse NMR Take 5 hours transverse NMR Change direction, wait 10 minutes NMR Take 5 hours longitudinal NMR Change direction, wait 10 minutes etc ...
Moller & spin dance
- Tentatively Monday morning, pending Hall A
- Hall B strongly encourages us to push it back to the 30th (because it won't matter to them at that point and they currently have priority)
Future
- Open enclosure early next week, maybe Tuesday 1/28
- Check longitudinal laser setup
- Install the rotation stages?
- Install EPR fiber bundle?
- Check to see if there's any scheduled downtime that we can use for this
- Arun tentatively getting replacement cell prepared early next week; install it in two(?) weeks?
Special Requests
- Keep target expert schedule filled out on whiteboard
Notices in Effect for Shift Crew
- Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
- Magnet policies
- HMS Q1 must be ramped down in 50A steps in all cases
- Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
- Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
- The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
- Ramp rate lock instructions are here and added to checklist[23]
- Temporary Laser instructions can be found here [24]