RC Meeting and Run Plan, Tuesday, February 26
From HallCWiki
Jump to navigationJump to search Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
RC Meeting Information
RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
Current Status
- Good beam overnight. Finished with ~2 hrs on Dummy target for Phase-1 kinematics.
- "RF Recovery" started at 8. Went to controlled access and Steve did some work in the hall.
- Rotated and set magnets for Phase-2 kinematic
- Beam came back around 1:30pm and pretty bad since.
- Will continue running J/Psi on kinematic Phase-2.
Current Run Plan
- J/Psi Experiment:
- Run Production Phase-2. Shooting for a total of 6.5 C for phase-2 kinematic before returning to Phase-3.
Notices in Effect for Shift Crew
- Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
- Target Operators: When the alarm handler goes white, it is disconnected from the IOC. Log it and include carlin@jlab.org every time. Acknowledge the warning. If it is still white and not coming back, restart the alarm handler. Do not permanently silence the alarm handler.
- Missing Reference Times during the replay: check in the 50k. Check in full replay, if able. If it happens, call RC. Guidance to solve it is here: https://logbooks.jlab.org/entry/3654584
Current Issues
- SHMS Q1 and Dipole communications fixed.
- HMS Dipole power cycled to fix odd behavior.
- HMS Q1 and Q3 PSU M-panel (local front panels) are showing signs of failure. No action taken at this time.
- Ethan installed a current limitation board on the HMS Q2 spare PSU. Currently it is set to ~700A.
- Some de-icing of SHMS leads.
- Rotation Controllers turned back on and left on this morning.
- Concerning target alarms (loss of cooling power/over head) continued when running with hall A.
Planned Accesses to the Hall
Planned Accelerator Configuration Changes
Special Requests
- Latif's GEM testing completed this morning during beam studies.