= Current Issues =
 
= Current Issues =
* No new issues since yesterday.
+
* We now have a high radiation area in the hall due to the radiator. We will need continuous surveillance and escort for any access through the end of the experiment (and the beginning of CSV). See https://logbooks.jlab.org/entry/3661710 and https://logbooks.jlab.org/entry/3661708
 
Recently resolved Issues:
 
Recently resolved Issues:
[https://logbooks.jlab.org/entry/3661148 Beam Right "Waterfall" camera works again] after Dave Gaskell upgraded the firmware.
+
*Rotation controller was rebooted and Q3 current read-back reset during Steve Lassiter's access this morning. Rotation controllers are remotely disabled, and Steve should be contacted to re-enable them if we need to rotate (shouldn't need to).  
 
Unresolved Issues:
 
Unresolved Issues:
* [https://logbooks.jlab.org/entry/3660342 Rotation controller needs rebooted]. Will require access.
+
* [https://logbooks.jlab.org/entry/3660076 HMS Q1 and Q3 PSU M-panel (local front panels) are showing signs of failure]. No action taken. Might be fixed with Q3 current readback error above. (was this checked today?)
* [https://logbooks.jlab.org/entry/3660401 HMS Q3 current readback errors]. Alarm silenced. Will require hall access to power cycle.
+
* [https://logbooks.jlab.org/entry/3660076 HMS Q1 and Q3 PSU M-panel (local front panels) are showing signs of failure]. No action taken. Might be fixed with Q3 current readback error above.  
+
 
* Ethan installed a current limitation board on the HMS Q2 spare PSU. Currently it is set to ~700A. Needs to be increased for CSV.
 
* Ethan installed a current limitation board on the HMS Q2 spare PSU. Currently it is set to ~700A. Needs to be increased for CSV.
  

Revision as of 16:36, 1 March 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

Current Run Plan

  • Finished up kinematics 2, and started kinematics 4.
  • Will stay at setting 4 for the duration of the experiment.

Notices in Effect for Shift Crew

  • Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
  • Missing Reference Times during the replay: check in the 50k. Check in full replay, if able. If it happens, call RC. Guidance to solve it is here: https://logbooks.jlab.org/entry/3654584

Current Issues

Recently resolved Issues:

  • Rotation controller was rebooted and Q3 current read-back reset during Steve Lassiter's access this morning. Rotation controllers are remotely disabled, and Steve should be contacted to re-enable them if we need to rotate (shouldn't need to).

Unresolved Issues:

Planned Accesses to the Hall

  • In order to rotate the spectrometers and change central momenta we will need access to the hall. Whether we need a longer access with survey/sweep or a short escorted access depends on if we want to do anything else while we are down. Changing the Cherenkov pressure is one task would could do with a longer access (~1 hour). Steve should be able to rotate and set magnet currents in a short access. This should be decided by the end of this meeting, so we can inform the relevant parties.

Planned Accelerator Configuration Changes

Special Requests