= Current Issues = | = Current Issues = | ||
− | * We | + | * We still have a high radiation area in the hall. Any access will need special escort. See https://logbooks.jlab.org/entry/3661710 and https://logbooks.jlab.org/entry/3661708 |
− | + | * The HMS Q3 current read-back is non-responsive. Same with the collimator position read-back. These will need to be addressed during access on Tuesday. | |
− | * | + | |
Unresolved Issues: | Unresolved Issues: | ||
− | * [https://logbooks.jlab.org/entry/3660076 HMS Q1 and Q3 PSU M-panel (local front panels) are showing signs of failure]. No action taken. Might be fixed with Q3 current readback error above. (was this checked | + | * [https://logbooks.jlab.org/entry/3660076 HMS Q1 and Q3 PSU M-panel (local front panels) are showing signs of failure]. No action taken. Might be fixed with Q3 current readback error above. (was this checked during last access?) |
* Ethan installed a current limitation board on the HMS Q2 spare PSU. Currently it is set to ~700A. Needs to be increased for CSV. | * Ethan installed a current limitation board on the HMS Q2 spare PSU. Currently it is set to ~700A. Needs to be increased for CSV. | ||
Revision as of 15:15, 4 March 2019
Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Contents
RC Meeting Information
RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
Current Status
- Accelerator issues had about 22 hours downtime on Friday-Saturday. Recovered some of that time with truncated beam-studies today.
- We will finish up officially at 8am tomorrow.
Current Run Plan
- Running Kinematics-4 until end.
Notices in Effect for Shift Crew
- Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
- Missing Reference Times during the replay: check in the 50k. Check in full replay, if able. If it happens, call RC. Guidance to solve it is here: https://logbooks.jlab.org/entry/3654584
Current Issues
- We still have a high radiation area in the hall. Any access will need special escort. See https://logbooks.jlab.org/entry/3661710 and https://logbooks.jlab.org/entry/3661708
- The HMS Q3 current read-back is non-responsive. Same with the collimator position read-back. These will need to be addressed during access on Tuesday.
Unresolved Issues:
- HMS Q1 and Q3 PSU M-panel (local front panels) are showing signs of failure. No action taken. Might be fixed with Q3 current readback error above. (was this checked during last access?)
- Ethan installed a current limitation board on the HMS Q2 spare PSU. Currently it is set to ~700A. Needs to be increased for CSV.
Planned Accesses to the Hall
- None