Difference between revisions of "RC Meeting and Run Plan, Thurs, January 16th 2020"
From HallCWiki
(Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room </b> * Bluejeans remote connection information: To join the Meeting:...") |
(→Current Run Plan) |
||
Line 29: | Line 29: | ||
*TO class on Thursday in the Hall C counting room from 2:30 pm - 4:00 pm. | *TO class on Thursday in the Hall C counting room from 2:30 pm - 4:00 pm. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
*Beam checkout [https://hallcweb.jlab.org/wiki/index.php/Beam_and_Raster_Checkout_for_A1n/d2n_(Short_Procedure) Short procedure] | *Beam checkout [https://hallcweb.jlab.org/wiki/index.php/Beam_and_Raster_Checkout_for_A1n/d2n_(Short_Procedure) Short procedure] | ||
** Want beam sigma between 100-300um. | ** Want beam sigma between 100-300um. | ||
** Checked with Jay. Promised 250-500um. | ** Checked with Jay. Promised 250-500um. | ||
*Glass cell Commissioning (1 hr each on two glass cells):[https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Glass_Cell_Current_Scan.2FCheckout_and_Commissioning Run plan | *Glass cell Commissioning (1 hr each on two glass cells):[https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Glass_Cell_Current_Scan.2FCheckout_and_Commissioning Run plan | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | == Thursday Day == | + | = Current Run Plan = |
+ | |||
+ | |||
+ | == Thursday Swing/Owl == | ||
+ | *A3) production: [https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Large_Angle_.2830-degree.29_Polarized_3He_Asymmetries_High_Momentum_Setting_.28Kine_4.2CB.29 Run Plan] | ||
+ | |||
+ | |||
+ | == Friday Day == | ||
*Moller measurement will start around 8am. | *Moller measurement will start around 8am. | ||
**Start with Moller setup and measurement at present Wien angle (last about 4 hours). | **Start with Moller setup and measurement at present Wien angle (last about 4 hours). | ||
− | |||
= Special Requests = | = Special Requests = |
Revision as of 15:05, 16 January 2020
Contents
RC Meeting Information
RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
General updates
- Finished 1 pass at around 3:20am.
- Target changeover to 5pass.
- TO class on Thursday in the Hall C counting room from 2:30 pm - 4:00 pm.
- Beam checkout Short procedure
- Want beam sigma between 100-300um.
- Checked with Jay. Promised 250-500um.
- Glass cell Commissioning (1 hr each on two glass cells):[https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Glass_Cell_Current_Scan.2FCheckout_and_Commissioning Run plan
Current Run Plan
Thursday Swing/Owl
- A3) production: Run Plan
Friday Day
- Moller measurement will start around 8am.
- Start with Moller setup and measurement at present Wien angle (last about 4 hours).
Special Requests
- Keep target expert schedule filled out on whiteboard
- Andy Kenyon has parts ready for the nitrogen for the cooling jets.= Ongoing Work in the Hall
- Bill Henry wants to removed a power supply from the hall. Need Radcon to survey it.
Notices in Effect for Shift Crew
- Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
- Magnet policies
- HMS Q1 must be ramped down in 50A steps in all cases
- Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
- Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
- The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
- Ramp rate lock instructions are here and added to checklist[1]
- Temporary Laser instructions can be found here [2]