(Tuesday swing – Wednesday day)
(Tuesday swing – Wednesday day)
 
(18 intermediate revisions by the same user not shown)
Line 33: Line 33:
 
=== Tuesday Day ===
 
=== Tuesday Day ===
  
* 9AM down again for accelerator repairs
+
* 9AM down again to replace chopper amplifier causing beam instability [https://logbooks.jlab.org/entry/3772313][https://logbooks.jlab.org/entry/3772366]
* Controlled access from 9ish to
+
** Video of beams on chopper blinking [https://logbooks.jlab.org/entry/3772350] (mostly B, but also visible in A and C)
** Steve and Andy went down to check out SHMS Q3.
+
* Controlled access from 9 to noon
*** No fixes today. Need to replace the valve, which will be ~8 hours. Thursday?
+
** Survey [https://logbooks.jlab.org/entry/3772656]
 +
** Steve and Andy went down to check out SHMS Q3 at 9:15.
 +
*** No fixes today. Need to replace the valve, which will be ~8 hours.
 +
*** Thursday? When we replace the target cell in a week?
 
** Brad rebooted PSU
 
** Brad rebooted PSU
 +
** Larry (with RadCon) grabbed some tools at 11:00
 +
** Joe Beaufait went down at 11:45 to take some pictures for a talk on infrastructure ("water, power, yada yada yada")
 +
* PD Update at 1PM [https://logbooks.jlab.org/entry/3772703]:
 +
  The 24v power supply to the 429MHz chassis in the Injector was found to have a
 +
  3v ripple. A spare power supply was found but the pin out was different and
 +
  needed to be changed. Once the new power supply was installed, the chassis was
 +
  not putting out sufficient power. The chassis has been removed to place on the
 +
  bench for alignment. '''I have no estimation on a time to repair/align the chassis.'''
  
=== Recent polarization measurements ===
+
== Recent polarization measurements ==
 +
  Trans  55%  10AM Tue 1/28  Rotated back to transverse because accelerator is down
 +
  Long  56%  9AM Tue 1/28  After taking longitudinal data
 +
  Trans  61%  7AM Tue 1/28  After taking transverse data
 +
  Long  51%  11PM Mon 1/27  After taking longitudinal data
 +
  Trans  63%  3PM Mon 1/27  After taking transverse data
 +
  Long  49%  8AM Mon 1/27  After taking longitudinal data
 +
  Trans  57%  2AM Sun 1/26  After taking transverse data
  
 
= Current Run Plan =
 
= Current Run Plan =
Line 48: Line 66:
 
  !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
 
  !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
 
  !!                                                    !!
 
  !!                                                    !!
 +
!!  ATTN: SHIFT LEADERS                                !!
 +
!!    Please follow the shift summary template on    !!
 +
!!    the laminated SL instructions.                  !!
 +
!!                                                    !!
 +
!!  ATTN: TARGET OPERATORS                            !!
 
  !!  All NMR measurement HCLOG entries should include:  !!
 
  !!  All NMR measurement HCLOG entries should include:  !!
 
  !!    1) A title that clearly lists polarization      !!
 
  !!    1) A title that clearly lists polarization      !!
 
  !!    2) Screenshots of both NMR_FieldSweep and      !!
 
  !!    2) Screenshots of both NMR_FieldSweep and      !!
  !!        the polarization fit.                        !!
+
  !!        the polarization fit                         !!
 
  !!                                                    !!
 
  !!                                                    !!
  !! For an example see the following entry:           !!
+
  !!     For an example see the following entry:         !!
 
  !!    https://logbooks.jlab.org/entry/3768696      !!
 
  !!    https://logbooks.jlab.org/entry/3768696      !!
 
  !!                                                    !!
 
  !!                                                    !!
 
  !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
 
  !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
  
 +
''Once beam is back'' (I will edit the run plan with more accurate times)
 
* Run plan: https://logbooks.jlab.org/entry/3772076
 
* Run plan: https://logbooks.jlab.org/entry/3772076
 
** General idea: take 4–5 hours transverse data to get polarization up, then ~7 hours longitudinal data
 
** General idea: take 4–5 hours transverse data to get polarization up, then ~7 hours longitudinal data
  
 
=== Future ===
 
=== Future ===
=== Moller & spin dance ===
+
==== Moller & spin dance ====
 
* Spin dance will be part of beam studies. No word on when it'll happen, other than when the PD schedules it.
 
* Spin dance will be part of beam studies. No word on when it'll happen, other than when the PD schedules it.
  
=== Hall Access ===
+
==== Hall Access ====
 
* Thursday morning
 
* Thursday morning
 
** EPR fiber bundle, maybe laser alignment
 
** EPR fiber bundle, maybe laser alignment
 
** SAF112 walkthroughs with Joe at 9AM on Thursday
 
** SAF112 walkthroughs with Joe at 9AM on Thursday
** PSU (under pivot) for polhe3 rack camera and hcreboot5 needs to be manually power cycled [https://logbooks.jlab.org/entry/3772068]
+
** SHMS Q3?
*** "hcreboot5 has a number of the target controls on it as well [which?] so we won't be able to power cycle those remotely either until this is done." - Brad
+
  
=== Other ===
+
==== Other ====
 
* Replace target cell in ~1 week
 
* Replace target cell in ~1 week
 
  
 
= Special Requests =
 
= Special Requests =
Line 83: Line 105:
 
** Good examples for [https://logbooks.jlab.org/entry/3747393 entering] and [https://logbooks.jlab.org/entry/3747544 leaving] laser access.
 
** Good examples for [https://logbooks.jlab.org/entry/3747393 entering] and [https://logbooks.jlab.org/entry/3747544 leaving] laser access.
 
* Magnet policies
 
* Magnet policies
 +
** Spectrometer GUI (<code>go_magnets</code>) should always be visible on Shift Leader computer, hcdesk3
 
** HMS Q1 must be ramped down in 50A steps in all cases
 
** HMS Q1 must be ramped down in 50A steps in all cases
 
** Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
 
** Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
Line 90: Line 113:
 
*Ramp rate lock instructions are here and added to checklist[https://logbooks.jlab.org/entry/3753633]
 
*Ramp rate lock instructions are here and added to checklist[https://logbooks.jlab.org/entry/3753633]
 
*Temporary Laser instructions can be found here [https://logbooks.jlab.org/entry/3753408]
 
*Temporary Laser instructions can be found here [https://logbooks.jlab.org/entry/3753408]
 
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =

Latest revision as of 15:27, 28 January 2020

RC Meeting Information

RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

General updates

Monday Swing – Tuesday Owl

  • 4PM to 10PM production data
  • 10PM beam down
  • 7AM beam back, taking data

Tuesday Day

  • 9AM down again to replace chopper amplifier causing beam instability [1][2]
    • Video of beams on chopper blinking [3] (mostly B, but also visible in A and C)
  • Controlled access from 9 to noon
    • Survey [4]
    • Steve and Andy went down to check out SHMS Q3 at 9:15.
      • No fixes today. Need to replace the valve, which will be ~8 hours.
      • Thursday? When we replace the target cell in a week?
    • Brad rebooted PSU
    • Larry (with RadCon) grabbed some tools at 11:00
    • Joe Beaufait went down at 11:45 to take some pictures for a talk on infrastructure ("water, power, yada yada yada")
  • PD Update at 1PM [5]:
 The 24v power supply to the 429MHz chassis in the Injector was found to have a
 3v ripple. A spare power supply was found but the pin out was different and
 needed to be changed. Once the new power supply was installed, the chassis was
 not putting out sufficient power. The chassis has been removed to place on the
 bench for alignment. I have no estimation on a time to repair/align the chassis.

Recent polarization measurements

 Trans  55%  10AM Tue 1/28   Rotated back to transverse because accelerator is down
 Long   56%   9AM Tue 1/28   After taking longitudinal data 
 Trans  61%   7AM Tue 1/28   After taking transverse data
 Long   51%  11PM Mon 1/27   After taking longitudinal data
 Trans  63%   3PM Mon 1/27   After taking transverse data
 Long   49%   8AM Mon 1/27   After taking longitudinal data
 Trans  57%   2AM Sun 1/26   After taking transverse data

Current Run Plan

  • Always take 120Hz of EDTM

Tuesday swing – Wednesday day

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!                                                     !!
!!  ATTN: SHIFT LEADERS                                !!
!!     Please follow the shift summary template on     !!
!!     the laminated SL instructions.                  !!
!!                                                     !!
!!  ATTN: TARGET OPERATORS                             !!
!!  All NMR measurement HCLOG entries should include:  !!
!!     1) A title that clearly lists polarization      !!
!!     2) Screenshots of both NMR_FieldSweep and       !!
!!        the polarization fit                         !!
!!                                                     !!
!!     For an example see the following entry:         !!
!!     https://logbooks.jlab.org/entry/3768696       !!
!!                                                     !!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

Once beam is back (I will edit the run plan with more accurate times)

Future

Moller & spin dance

  • Spin dance will be part of beam studies. No word on when it'll happen, other than when the PD schedules it.

Hall Access

  • Thursday morning
    • EPR fiber bundle, maybe laser alignment
    • SAF112 walkthroughs with Joe at 9AM on Thursday
    • SHMS Q3?

Other

  • Replace target cell in ~1 week

Special Requests

  • Keep target expert schedule filled out on whiteboard

Notices in Effect for Shift Crew

  • Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
  • Magnet policies
    • Spectrometer GUI (go_magnets) should always be visible on Shift Leader computer, hcdesk3
    • HMS Q1 must be ramped down in 50A steps in all cases
    • Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
    • If SHMS dipole trips again, take a screenshot of the PSU window before resetting the interlock and post it to hclog.
  • Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
  • The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
  • Ramp rate lock instructions are here and added to checklist[6]
  • Temporary Laser instructions can be found here [7]

Planned Accelerator Configuration Changes