Difference between revisions of "RC Meeting and Run Plan, Tue, January 28th 2020"
From HallCWiki
(→General updates) |
(→General updates) |
||
Line 26: | Line 26: | ||
=General updates= | =General updates= | ||
− | === Monday Swing === | + | === Monday Swing – Tuesday Owl === |
− | * | + | * 4PM to 10PM production data |
− | * | + | * 10PM beam down |
+ | * 7AM beam back, taking data | ||
− | === | + | === Tuesday Day === |
− | * | + | |
+ | * 9AM down again for accelerator repairs | ||
+ | * Controlled access from 9ish to | ||
+ | ** Steve and Andy went down to check out SHMS Q3. | ||
+ | *** No fixes today. Need to replace the valve, which will be ~8 hours. Thursday? | ||
+ | ** Brad rebooted PSU | ||
=== Recent polarization measurements === | === Recent polarization measurements === |
Revision as of 11:58, 28 January 2020
Contents
RC Meeting Information
RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
General updates
Monday Swing – Tuesday Owl
- 4PM to 10PM production data
- 10PM beam down
- 7AM beam back, taking data
Tuesday Day
- 9AM down again for accelerator repairs
- Controlled access from 9ish to
- Steve and Andy went down to check out SHMS Q3.
- No fixes today. Need to replace the valve, which will be ~8 hours. Thursday?
- Brad rebooted PSU
- Steve and Andy went down to check out SHMS Q3.
Recent polarization measurements
Current Run Plan
- Always take 120Hz of EDTM
Tuesday swing – Wednesday day
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !! !! !! All NMR measurement HCLOG entries should include: !! !! 1) A title that clearly lists polarization !! !! 2) Screenshots of both NMR_FieldSweep and !! !! the polarization fit. !! !! !! !! For an example see the following entry: !! !! https://logbooks.jlab.org/entry/3768696 !! !! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
- Run plan: https://logbooks.jlab.org/entry/3772076
- General idea: take 4–5 hours transverse data to get polarization up, then ~7 hours longitudinal
Future
Moller & spin dance
- Spin dance will be part of beam studies. No word on when it'll happen, other than when the PD schedules it.
Hall Access
- Thursday morning
- EPR fiber bundle, maybe laser alignment
- SAF112 walkthroughs with Joe at 9AM on Thursday
- PSU (under pivot) for polhe3 rack camera and hcreboot5 needs to be manually power cycled [1]
- "hcreboot5 has a number of the target controls on it as well [which?] so we won't be able to power cycle those remotely either until this is done." - Brad
Other
- Replace target cell in ~1 week
Special Requests
- Keep target expert schedule filled out on whiteboard
Notices in Effect for Shift Crew
- Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
- Magnet policies
- HMS Q1 must be ramped down in 50A steps in all cases
- Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
- If SHMS dipole trips again, take a screenshot of the PSU window before resetting the interlock and post it to hclog.
- Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
- The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
- Ramp rate lock instructions are here and added to checklist[2]
- Temporary Laser instructions can be found here [3]