= Current Run Plan = | = Current Run Plan = | ||
− | + | *Wednesday evening: Finish taking asymmetries data. Open the target enclosure, remove collimators, do a local EPR and close the panels. Transition to 5-pass. The run plan is here: (https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n ). | |
− | *Wednesday: Finish taking asymmetries data. Open the target enclosure, remove collimators, do a local EPR and close the panels. Transition to 5-pass. The run plan is here: (https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n ). | + | **Beam checkout [https://hallcweb.jlab.org/wiki/index.php/Beam_and_Raster_Checkout_for_A1n/d2n_(Short_Procedure) Short procedure] |
− | **Beam checkout | + | *** Want beam sigma between 100-300um. |
− | **Rate study with Ref 3He Cell: 2 hours at high momentum setting, 2 hours at the low momentum setting. | + | **Glass cell Commissioning (1 hr each on two glass cells):[https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Glass_Cell_Current_Scan.2FCheckout_and_Commissioning Run plan] |
− | ** | + | **If target polarization is close to maximum, we go straight to |
− | ** | + | ***A3) production: [https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Large_Angle_.2830-degree.29_Polarized_3He_Asymmetries_High_Momentum_Setting_.28Kine_4.2CB.29 Run Plan] |
+ | **If not, do some "filler" runs. At any point within B3,B4 and B5, if target polarization is high enough, go back to A3) above. | ||
+ | ***B3) Rate study with Ref 3He Cell: 2 hours at high momentum setting, 2 hours at the low momentum setting.[https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Large_Angle_.2830-degree.29_Rate_study_with_3He_Reference_Cell_or_Polarized_3He_Cell Run Plan] | ||
+ | ***B4) Cycle the magnet to high momentum setting. If this happens during day/swing, ask MCC to perform an energy measurement; | ||
+ | ***B5) Vent the 3He from Ref Cell, take Empty, H2 and N2 (1-2 hours each), [https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Large_Angle_.2830-degree.29_Reference_Cell_H2_and_N2_Runs_.2820_hours_total.29 Run Plan] | ||
*Thursday: TO class + Moller measurement. | *Thursday: TO class + Moller measurement. | ||
Revision as of 16:58, 15 January 2020
Contents
RC Meeting Information
RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
General updates
- Finished 1 pass at around 3:20am.
- Target changeover to 5pass.
- TO class on Thursday in the Hall C counting room from 2:30 pm - 4:00 pm.
Current Run Plan
- Wednesday evening: Finish taking asymmetries data. Open the target enclosure, remove collimators, do a local EPR and close the panels. Transition to 5-pass. The run plan is here: (https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n ).
- Beam checkout Short procedure
- Want beam sigma between 100-300um.
- Glass cell Commissioning (1 hr each on two glass cells):Run plan
- If target polarization is close to maximum, we go straight to
- A3) production: Run Plan
- If not, do some "filler" runs. At any point within B3,B4 and B5, if target polarization is high enough, go back to A3) above.
- B3) Rate study with Ref 3He Cell: 2 hours at high momentum setting, 2 hours at the low momentum setting.Run Plan
- B4) Cycle the magnet to high momentum setting. If this happens during day/swing, ask MCC to perform an energy measurement;
- B5) Vent the 3He from Ref Cell, take Empty, H2 and N2 (1-2 hours each), Run Plan
- Beam checkout Short procedure
- Thursday: TO class + Moller measurement.
Notices in Effect for Shift Crew
- Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
- Magnet policies
- HMS Q1 must be ramped down in 50A steps in all cases
- Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
- Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
- The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
- Ramp rate lock instructions are here and added to checklist[1]
- Temporary Laser instructions can be found here [2]
Ongoing Work in the Hall
Planned Accelerator Configuration Changes
Special Requests
- Keep target expert schedule filled out on whiteboard