RC Meeting and Runplan, Friday, August 24
From HallCWiki
Jump to navigationJump to search- Status
- LN2 supply issue addressed
- Hall locking up today
- Target cooled down, liquid hydrogen in loop 2
- Beamline vacuum improving, good enough for beam delivery
- First beam to hall potentially swing/owl
- SHMS steering test will be done at 7 degrees instead of 6 - when we need to go to 6 degrees, we will need to redo the test
- Run plan
- Friday SWING-Saturday OWL and DAY
- Initial beam setup to the hall
- If MCC asks, the Compton electron detector is OUT
- Make sure target is OUT
- After initial setup - SHMS steering plan will be executed (please call RC if not already on site). When MCC asks, ramp up magnets (one at a time) to settings for -6.053 GeV.
- After completion of SHMS steering plan, proceed with detector and trigger checkout
- Friday SWING-Saturday OWL and DAY