RC Meeting and Runplan, Saturday, Sept 28
From HallCWiki
Jump to navigationJump to search- Status
- Finished 5 of 8 hydrogen kinematics points
- Beam unstable. Seems that maximum is going to be 30-40uA for the weekend.
- Issues
- Main issue is with HMS Dipole LN2 level. https://logbooks.jlab.org/entry/3600022 .The users have to manual change the valve for JT3. There is a alarm to let you know if it get outside its limits but it is best to monitor it so that try one can keep it from reaching extremes.
- Tuesday RF studies. Can fix the JT3 problems then.