RC Update and Run Plan for Aug 14, 2020
From HallCWiki
Jump to navigationJump to searchRC Meeting Information
RC Daily Meetings are at 4:15 PM, remote
Wednesday Aug 14 2020.
General updates
- Hydrogen and empty Reference cell runs were taken during SWING shift (08/13) [1]
- Polarized He3 data taken during OWL shift. We optimized the current/prescales for SHSM and HMS
- Works out to 24 mA---- prescale 2 for SHMS and prescale 1 for HMS
- Beam current / prescale values for both HMS and SHMS were optimized to keep them around 4 kHZ (about ~85% live time for SHMS).
- Were down for half of the day (10:30 -14:30 ): https://cebaf.jlab.org/dtm/open-events?event_id=6951
- Melanie worked on optimizing the QWP: Transverse Left QWP
- Brad replaced the UPS, hopefully fixed the DC gas supply pressure alarm Gas_Supply_Alarm
- Continuing to coordinate with Hall A about IHWP. They will nominally change every 8 hours. Will remind the shift crew to notify me if it hasn't occurred in 8 hours.
- 3:30 - Jay called to ask if we are interested in switching to 1st pass beam today. Hall A's Moller quad power supplies need replaced and will be down for some time.
- We will keep an eye on how long they will be down for and may make the pass change on Monday or Tuesday (08/17 or 08/18) of next week.....
Pending problem
- Beam trip rate
Recent polarization measurements
- 43% at 3:30 (no fit error but Bill will look into it on SWING)
- Fitting Issue: Estimate around 40% at 10:00 DAY_NMR
- 40.8% at 05:00 OWL_NMR
- 41.7% at 00:05 SWING_NMR
Current Run Plan
Normal Production running
- Prerequisites
- Make sure operational restrictions are followed.
- Make sure the raster size is correct (4-4.5)
- Monitor beam parameters/configuration very often and post an entry like this at the beginning of your shift and when run conditions have changed
- Running on cell targets: raster always ON (4-4.5, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec
- Always take 120Hz of EDTM
- Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs!
- Change the IHWP at least every 8 hours when running on glass cells. If Hall A hasn't changed in 8 hours, call the RC
- Run plan
- Start back with the Beam / Raster checkout (short procedure) Checkout
- Production on 3He; if not able to reach requested current, pro-rate the ABUs
Notes for tomorrow's 7:45 meeting
- Beam stability / trip rate?
Future
- We are on the schedule to switch to 1st pass on Monday (Aug 24) and switch back to 5th pass on Thursday (Aug 27).
- Check the SAD calender for schedule updates (MCC white board isn't currently being updated)
- Next maintenance is hasn't been scheduled as of yet
- EPR diode good for now, but check for future planned accesses.
- If Hall will have opening for 1+ hours, let Simona know as there is work to do on the cerenkov.
Hall Access
When there is a down:
Notices in Effect for Shift Crew
- Beam positions: [2]
- Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
- Magnet policies
- Spectrometer GUI (
go_magnets
) should always be visible on Shift Leader computer, hcdesk3 - HMS Q1 must be ramped down in 50A steps in all cases
- Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
- If any of the Spectrometers magnets trip, take a screenshot of the PSU window and check the hall for smoke or water with the camera before resetting the interlock and post it to hclog.
- Spectrometer GUI (
- Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
- Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
- Ramp rate lock instructions are here and added to checklist[3]
Planned Accelerator Configuration Changes
- Hall C to 1st pass on 8/24 and back to 5th pass on 8/27
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920