RC Update and Run Plan for Aug 16, 2020
From HallCWiki
Jump to navigationJump to searchRC Meeting Information
RC Daily Meetings are at 4:15 PM, remote
Wednesday Aug 16 2020.
General updates
- Continued with production during SWING
- Several PVs in Target alarm handler disconnected. Brad was able to fix it remotely Target_Alarm_Handler
- QWP drivers and controllers needed to rebooted as well (likely same cause?). Followed Ethan's procedure: Controls_reboot
- Pumping chamber RTD-1 died (more on that below)
- Nitrogen (~1 hour) and Hydrogen (~3 hours) reference cell runs during OWL
- CHL1 2K trip at 08:30 this morning: CHL1_Trip
- QWP Transverse Right optimization during the CHL down: Transverse_Right
Pending problem(s) / Things to track
- Lost Pumping chamber RTD1 during target homing: https://logbooks.jlab.org/entry/3828350
- Target related studies at 90deg
- Complete a temperature curve study (~1 hour process; ~4 NMR measurements at different temps)
- Should plan for a 4--6 hour spin-up after this test (ie. do this before Moller or beam studies)
- Pulse NMR tests (will impact polarization, so need to plan correctly)
- Complete a temperature curve study (~1 hour process; ~4 NMR measurements at different temps)
- Schedule a Moller for mid week (Thurs?)
- Can take remaining ref cell data after Moller during spin-up if needed
- HMS Q1 insulating vacuum excursions are getting worse [1]
Recent polarization measurements
Transverse @ 90 degrees: 41.9% NMR OWL
Analysis Update
SHMS update from Murchhana: SHMS_Update
Current Run Plan
Normal Production running
- Prerequisites
- Make sure operational restrictions are followed.
- Make sure the raster size is correct (4--4.5mm)
- Monitor beam parameters/configuration very often and post an entry like this at the beginning of your shift and when run conditions have changed
- Running on cell targets: raster always ON (4--4.5mm, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec
- Always take 120Hz of EDTM
- Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs!
- Change the IHWP at least every 8 hours when running on glass cells. If Hall A hasn't changed in 8 hours, call the RC
- Run plan
- Start with beam check out (short procedure): https://hallcweb.jlab.org/wiki/index.php/Beam_and_Raster_Checkout_for_A1n/d2n_(Short_Procedure)
- Continue taking production data on the polarized Helium-3 target. If not able to reach requested current, pro-rate the ABUs
Notes for tomorrow's 9:00 am meeting
- Beam stability / trip rate? ---- Has been somewhat better the past few days
- Accel Maintenance RF-recovery day. Still nothing planned as of yet...
- Steve Suhring was going to check on the voltage to Hall C when he could (as a follow-up from the Hall A issues) -- might need to wait until Monday, but can ask
Future
- Please sign up for shifts next week (when the link works...) --- https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLC-POL3HE
- There are several owl shifts starting the end of next week
- We are on the schedule to switch to 1st pass on Monday (Aug 24) and switch back to 5th pass on Thursday (Aug 27).
- Check the SAD calender for schedule updates (MCC white board isn't currently being updated)
- Jay still has no set day for maintenance/beam studies for this upcoming week (or the following week): maybe a short Ray Trace beam studies (~ 1 hour)
- The EPR diode was checked again on 08/15, and still appears fine. Continue periodic checks---- https://logbooks.jlab.org/entry/3827793
Hall Access
When there is a Down
- If Hall will have opening for 1+ hours, let Simona know as there is work to do on the SOLID cerenkov.