General updates
- Production continued during SWING and OWL shifts.
- RF recovery began at 08:00 today. Opportunistic work was preformed in the Hall, including:
- Work on the SOLID cherenkov
- Check of the voltage in the hall under full load conditions
- Temperature study at 90 degrees --- temp_study
- The holding field was rotated to 270 degrees --- holding_field_rotation
- Per MCC, we should try not to make requests during the Operator turnovers (8:00 am, 4:00 pm, 12:00 am). The COVID restrictions make these turnovers a little more time consuming and they want to avoid making any errors that could be avoided otherwise. The request is for a 30 minute buffer (~8:30 am).
- Note this does not apply to immediate/emergency situations
- We plan to do a Moller measurement on Thursday (DAY). It is on SAD Calendar.
Pending problem(s) / Things to track
- QWP controls needed to rebooted again... QWP_controls_reboot
- Target polarization. After the temperature scan, the most recent NMR measurement was only ~ 35%
- The settings had the wrong angle (90 instead of 270, but J.P. still suspects the polarization is low)
- Reference cell runs while we wait to take another NMR
- Beam positions: Have been moving around --beam_positions
- Web monitor browser isn't opening
Recent polarization measurements
- NMR measurment at 02:00: ~40% --- https://logbooks.jlab.org/entry/3829638
Analysis Update
Current Run Plan
Normal Production running
- Prerequisites
- Make sure operational restrictions are followed.
- Make sure the raster size is correct (4--4.5mm)
- Monitor beam parameters/configuration very often and post an entry like this at the beginning of your shift and when run conditions have changed
- Running on cell targets: raster always ON (4--4.5mm, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec
- Always take 120Hz of EDTM
- Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs!
- Change the IHWP at least every 8 hours when running on glass cells. If Hall A hasn't changed in 8 hours, call the RC
- Run plan
- When beam returns after the RF recovery, follow the beam and raster checkout beam_checkout.
- Depending on the time beam returns, we likely will need to take reference cell runs while waiting for the polarized He3 cell to spin up to an acceptable polarization
- Once the polarization is acceptable, continue taking production data on the polarized Helium-3 target. If not able to reach requested current, pro-rate the ABUs
When there is a Down
- If Hall will have opening for 1+ hours, let Simona know as there is work to do on the SOLID cerenkov.
Notices in Effect for Shift Crew
- Beam positions: [1]
- Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
- Magnet policies
- Spectrometer GUI (
go_magnets
) should always be visible on Shift Leader computer, hcdesk3 - HMS Q1 must be ramped down in 50A steps in all cases
- Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
- If any of the Spectrometers magnets trip, take a screenshot of the PSU window and check the hall for smoke or water with the camera before resetting the interlock and post it to hclog.
- Spectrometer GUI (
- Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
- Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
- Ramp rate lock instructions are here and added to checklist[2]