Difference between revisions of "RC Update and Run Plan for Aug 20, 2020"
From HallCWiki
(→General updates) |
|||
(8 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
=General updates= | =General updates= | ||
− | * | + | * Todd's Access, He3 refill at 6:45pm |
− | * | + | * Reference cell run: 6 hours |
− | * | + | * Magnet polarity change |
− | * | + | * Positron run (SHMS at 11 degree, P=+7.5 GeV): 1.5 hours |
− | * | + | * Moller is still going |
− | + | ||
==Pending problem(s) / Things to track== | ==Pending problem(s) / Things to track== | ||
Line 16: | Line 16: | ||
== Recent polarization measurements == | == Recent polarization measurements == | ||
*OWL (08/20) 2:30 - 29% | *OWL (08/20) 2:30 - 29% | ||
− | + | *OWL (08/20) 12:20 - 10% | |
+ | *OWL (08/20) 14:51 - 19.5% | ||
= Current Run Plan = | = Current Run Plan = | ||
Line 26: | Line 27: | ||
<ul> | <ul> | ||
− | *Make sure | + | * Make sure the raster size is correct (4--4.5mm) |
− | * | + | * Monitor beam parameters/configuration very often and post an entry like [https://logbooks.jlab.org/entry/3777457 this] at the beginning of your shift and when run conditions have changed |
− | * | + | * Running on cell targets: raster always ON (4--4.5mm, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec |
− | * | + | * Always take 120Hz of EDTM |
− | + | * Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs! | |
− | + | ||
− | *Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs! | + | |
* Change the IHWP at least every 8 hours when running on glass cells. If Hall A hasn't changed in 8 hours, call the RC | * Change the IHWP at least every 8 hours when running on glass cells. If Hall A hasn't changed in 8 hours, call the RC | ||
Line 45: | Line 44: | ||
<ul> | <ul> | ||
− | * | + | * Complete the Moller measurement (still 4-6 hours of work remain), while keeping an eye on the target polarization. |
− | + | ||
</ul> | </ul> | ||
− | |||
− | |||
− | |||
− | |||
= Notices in Effect for Shift Crew = | = Notices in Effect for Shift Crew = | ||
Line 59: | Line 53: | ||
* Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access. | * Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access. | ||
** Good examples for [https://logbooks.jlab.org/entry/3747393 entering] and [https://logbooks.jlab.org/entry/3747544 leaving] laser access. | ** Good examples for [https://logbooks.jlab.org/entry/3747393 entering] and [https://logbooks.jlab.org/entry/3747544 leaving] laser access. | ||
+ | * Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly. | ||
+ | * Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position. | ||
+ | * Ramp rate lock instructions are here and added to checklist[https://logbooks.jlab.org/entry/3753633] | ||
+ | * An new reference Cell refill procedure: [https://hallcweb.jlab.org/wiki/index.php/Polarized_Helium-3_Experiments#Pol_He-3_Target_Information New procedure] | ||
* Magnet [https://hallcweb.jlab.org/wiki/index.php/How_to_operate_and_monitor_the_Spectrometer_Magnets policies] | * Magnet [https://hallcweb.jlab.org/wiki/index.php/How_to_operate_and_monitor_the_Spectrometer_Magnets policies] | ||
** Spectrometer GUI (<code>go_magnets</code>) should always be visible on Shift Leader computer, hcdesk3 | ** Spectrometer GUI (<code>go_magnets</code>) should always be visible on Shift Leader computer, hcdesk3 | ||
+ | ** Slow ramping procedure of the SHMS, go small steps to the MOL, [https://logbooks.jlab.org/entry/3831559 an great example] (1 hour 30 min process) | ||
** HMS Q1 must be ramped down in 50A steps in all cases | ** HMS Q1 must be ramped down in 50A steps in all cases | ||
** Do not ramp HMS Q2 to zero, only go to 10A and then switch off power. | ** Do not ramp HMS Q2 to zero, only go to 10A and then switch off power. | ||
** If any of the Spectrometers magnets trip, take a screenshot of the PSU window and check the hall for smoke or water with the camera '''before''' resetting the interlock and post it to hclog. | ** If any of the Spectrometers magnets trip, take a screenshot of the PSU window and check the hall for smoke or water with the camera '''before''' resetting the interlock and post it to hclog. | ||
− | * | + | * [https://logbooks.jlab.org/entry/3831644 New SHMS matrix element] |
− | + | ||
− | + | ||
− | + | ||
= Planned Accelerator Configuration Changes = | = Planned Accelerator Configuration Changes = |
Latest revision as of 16:14, 20 August 2020
Contents
RC Meeting Information
RC Daily Meetings are at 4:15 PM, remote
General updates
- Todd's Access, He3 refill at 6:45pm
- Reference cell run: 6 hours
- Magnet polarity change
- Positron run (SHMS at 11 degree, P=+7.5 GeV): 1.5 hours
- Moller is still going
Pending problem(s) / Things to track
Recent polarization measurements
- OWL (08/20) 2:30 - 29%
- OWL (08/20) 12:20 - 10%
- OWL (08/20) 14:51 - 19.5%
Current Run Plan
Normal Production running
- Prerequisites
- Make sure the raster size is correct (4--4.5mm)
- Monitor beam parameters/configuration very often and post an entry like this at the beginning of your shift and when run conditions have changed
- Running on cell targets: raster always ON (4--4.5mm, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec
- Always take 120Hz of EDTM
- Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs!
- Change the IHWP at least every 8 hours when running on glass cells. If Hall A hasn't changed in 8 hours, call the RC
- Run plan
- Complete the Moller measurement (still 4-6 hours of work remain), while keeping an eye on the target polarization.
Notices in Effect for Shift Crew
- Follow all COVID rules and regulations as well as remind each other.
- Beam positions: [1]
- Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
- Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
- Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
- Ramp rate lock instructions are here and added to checklist[2]
- An new reference Cell refill procedure: New procedure
- Magnet policies
- Spectrometer GUI (
go_magnets
) should always be visible on Shift Leader computer, hcdesk3 - Slow ramping procedure of the SHMS, go small steps to the MOL, an great example (1 hour 30 min process)
- HMS Q1 must be ramped down in 50A steps in all cases
- Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
- If any of the Spectrometers magnets trip, take a screenshot of the PSU window and check the hall for smoke or water with the camera before resetting the interlock and post it to hclog.
- Spectrometer GUI (
- New SHMS matrix element
Planned Accelerator Configuration Changes
- Hall C to 1st pass on 8/31 and back to 5th pass on 9/03
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920