RC Update and Run Plan for March 22, 2020
From HallCWiki
Jump to navigationJump to searchCurrent RC: Jay Benesch benesch@jlab.org
RC Daily Meetings are M-F at 4:15 PM, 2nd floor Counting House Meeting Room Bluejeans Connection
General updates:
- Hall is in restricted access, laser CANS mode, until late Day shift.
- Vote for your favorite T-shirt design https://misportal.jlab.org/ul/apps/jag/tshirt/index.cfm I prefer Staphany's JLAB word cloud, entry 11, for reasons which will become obvious if you look closely.
Current Run Plan:
Punchlist for Sunday Day shift copied from URL below
https://hallcweb.jlab.org/wiki/index.php/PolHe3_Target_Coil_Rotation_Plan,_Mar_2020
Techs w/ RadCon [Todd (or designate) for cooling jets]
- Turn on turbos for downstream beamline
- Turn on turbos for SHMS and HMS spectrometer vacuums
- Remove the guards on the SHMS and HMS entrance windows
- Remove the guards on the both upstream and downstream beamline windows
- RadCon will remove the bag on the upstream window
- Ensure the beamline window cooling jets are in position and on
- Ensure the target window cooling jets are in position and on
- Install the target enclosure panels
- ??
Miscellaneous
- [Gaskell] Beamline checklist
- [OPS, Jay] Schedule hot checkout of Hall C arc magnets/power-supplies
- [OPS, Jay] Verify all relevant FSDs that may have been masked for the down are known about and ready to unmasked when appropriate
- [Lassiter] Enable all spectrometer magnet supplies (if not ready now?)
- [Brad] Double check that rotation is enabled in the GUIs for both spectrometers (should be)
- [Brad] Ramp all SHMS and HMS magnets to something modest (quick check), or to first kinematic. For example:
- SHMS: 11.0deg, 7.5 GeV/c
- HMS: 13.5deg, 4.2 GeV/c
- NOTE: Coordinate with the target group on the appropriate HB setting so we don't interfere with any target pumping.
- [Techs, Brad?] Do a final check to ensure that there are no potential issues with remote spectrometer rotation
- Restart main alarm handler (resets masked channels)
- ??
Target Group
- The camera in the laser box needs to be realigned
- The rotating motor controller not fully working.
- Needs Ethan’s help at some point to look into it
- Transverse laser spectra-analyzer signal currently is not separate from longitudinal. We had it disconnected to avoid interference. May need to find a way to get separate signal.
Saturday-Sunday
- One of the 3H07B harp wires is visually damaged per I&C. This wire has been providing readings that I didn't believe. It is redundant with the third wire. I&C found it broken in an innocuous place so no action was taken.
- https://logbooks.jlab.org/entry/3807357 has Bill Henry's report on NMR and Kepco problems.
- https://logbooks.jlab.org/entry/3807176 has JP's report on laser polarization and alignment
- https://logbooks.jlab.org/entry/3807201 Has Arun's note about the unfortunate reference cell alignment. He implies
"Shift Leader must request a beam that is shifted horizontally to the beam left side by 2 mm to prevent scraping."
Run Plan for Beam: Sunday SWING — Tuesday OWL
High level plan
- Beam checkout (Call Brad when you think we are close)
- Follow the Beam checkout procedure
- Note that the 3H07B Harp may be degraded!
- Verify Cerenkov threshold in ELREAL trigger is set correctly
- Take Optics data at our production kinematics (below)
- Take data at the settings in the table below
- NOTE: The times are Beam On Target . Do your best to estimate good quality 'beam on' time (ie. do not count trips or bad beam periods)
- NOTE: The beam charge asymmetry does not matter for the optics runs!
- Take and NMR every 2 hours to monitor spin up
- Take data at the settings in the table below
- Use maximum beam current that the Accelerator can provide and remain stable (up to a maximum of 45 uA on the Carbon target)
- Set prescales to get close to 3.5--4 kHz accepted trigger rate in each arm
- NOTE: If the un-prescaled trigger rates are low enough, then use 3/4 trigger instead of EL-REAL
Kinematic Settings
HMS | SHMS | TARGET | POL | I (uA) | RASTER | BEAM TIME | Q (C) | HMS TRIG | SHMS TRIG | STATUS | COMMENT | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
P | THETA | P | THETA | (beam-on-target) | |||||||||||||
Optics: HMS KinA / SHMS KinX | |||||||||||||||||
Optics/No Sieve (Acceptance) | 4.2 | 13.5 | (-) | 7.5 | 11 | (-) | C-Optics | 40 | 4mm | 0.5 | 0.05 | 3/4, ELREAL | 3/4, ELREAL | Done | Verify ELREAL cer thr is correct | ||
Verify ELCLEAN Cerenkov threshold is set correctly in both HMS and SHMS before proceeding. | |||||||||||||||||
Optics/No Sieve (Acceptance) | 4.2 | 13.5 | (-) | 7.5 | 11 | (-) | C-Optics | 40 | 4mm | 0.5 | 0.05 | ELREAL | ELREAL | Done | Need >100k good electrons | ||
No Target/No Sieve | 4.2 | 13.5 | (-) | 7.5 | 11 | (-) | No Target | 40 | 4mm | 0.5 | 0.05 | ELREAL | ELREAL | Need >100k good electrons | |||
Optics/Sieve (angle & ytar) | 4.2 | 13.5 | (-) | 7.5 | 11 | (-) | C-Optics | 40 | 0.5mm | 1 | 0.11 | ELREAL | ELREAL | Done | Need >50k good electrons | ||
No Target/Sieve | 4.2 | 13.5 | (-) | 7.5 | 11 | (-) | No Target | 40 | 0.5mm | 1 | 0.11 | ELREAL | ELREAL | Need >50k good electrons | |||
Optics: HMS KinC / SHMS KinZ | |||||||||||||||||
Optics/No Sieve (Acceptance) | 4.2 | 16.4 | (-) | 6.4 | 14.5 | (-) | C-Optics | 40 | 4mm | 0.5 | 0.05 | ELREAL | ELREAL | Need >100k good electrons | |||
No Target/No Sieve | 4.2 | 16.4 | (-) | 6.4 | 14.5 | (-) | No Target | 40 | 4mm | 0.5 | 0.05 | ELREAL | ELREAL | Need >100k good electrons | |||
Optics/Sieve (angle & ytar) | 4.2 | 16.4 | (-) | 6.4 | 14.5 | (-) | C-Optics | 40 | 0.5mm | 1 | 0.11 | ELREAL | ELREAL | Need >50k good electrons | |||
No Target/Sieve | 4.2 | 16.4 | (-) | 6.4 | 14.5 | (-) | No Target | 40 | 0.5mm | 1 | 0.11 | ELREAL | ELREAL | Need >50k good electrons | |||
Optics: HMS KinB / SHMS KinY | |||||||||||||||||
Optics/No Sieve (Acceptance) | 4 | 20 | (-) | 5.6 | 18 | (-) | C-Optics | 40 | 4mm | 0.5 | 0.05 | ELREAL | ELREAL | Need >100k good electrons | |||
No Target/No Sieve | 4 | 20 | (-) | 5.6 | 18 | (-) | No Target | 40 | 4mm | 0.5 | 0.05 | ELREAL | ELREAL | Need >100k good electrons | |||
Optics/Sieve (angle & ytar) | 4 | 20 | (-) | 5.6 | 18 | (-) | C-Optics | 40 | 0.5mm | 1 | 0.11 | ELREAL | ELREAL | Need >50k good electrons | |||
No Target/Sieve | 4 | 20 | (-) | 5.6 | 18 | (-) | No Target | 40 | 0.5mm | 1 | 0.11 | ELREAL | ELREAL | Need >50k good electrons |
Notes for the Future
- At d2n startup, it would be a good idea to quantitatively check the dispersion at the target. I (D.Mack) don't think we need a tight spec, but if it's as sloppy as 1 cm/% (hence a decent spectrometer), then we're more at risk for things like how much the beam moves when the locks are off, or scraping from an off-energy tail on the beam. Jay:MQA3C13 can be adjusted to change horizontal dispersion.
Pending Issues
- Be sure to restart main alarm handlers and turn up speaker volume before operating magnets! [1] -- Done
- Be sure to restart target alarm handler and turn up speaker volume before operating target! [2] -- Done
- Target Ladder software must throw an error on a 'voltage' readback mismatch! [3]
- Get 3H07B Harp repaired [4] [5]; and a puzzle [6]
- https://logbooks.jlab.org/entry/3807357 has Bill Henry's report on NMR and Kepco problems.
- https://logbooks.jlab.org/entry/3807176 has JP's report on laser polarization and alignment
- https://logbooks.jlab.org/entry/3807201 Has Arun's note about the unfortunate reference cell alignment. He implies
- NOTE: "Shift Leader must request a beam that is shifted horizontally to the beam left side by 2 mm to prevent scraping."
- pNMR issues
- Software
- Software/driver issue needs to be resolved. Checkout during next non-production down time (Moller or SHMS fix)
- EPR problems
- [7] saw some progress on Tuesday [8], but issues remain.
- Tentative plan now is to continue the d2n (and A1n) program by replacing the photo-diode that is placed directly on the pumping chamber (we have many spares).
- It would be good to write up a procedure to streamline this replacement procedure for us and RadCon
- Kepco power supply
- PS commissioning/installation (Todd, Bill) (Bill got a filter design from the vendor and has ordered parts.)
- New filter (for 180 Hz) to install for current mode operation fix. Can always go to voltage mode if it doesn't work.
- NMR Calibration Constants
- Verify that calibration constants and input values associated with NMR and other polarimetry are consistent and will be correct when the software is restarted
- [9] [10] [11] [12] [13] (Bill, Junhao, Arun)
- Add list of calibration runs and what constants apply to what production runs here: PolHe3_Polarization_Measurements
- Beam trips
- Persistent BLM and ion chamber trips
- General activation, weird BLM issues (https://logbooks.jlab.org/entry/3792326), Ad-hoc ion chamber threshold adjustments (https://logbooks.jlab.org/entry/3792095)
- NOTE: Shift crew should NOT give authorization to MCC change ion chamber thresholds. If they ask, tell Operator to contact an appropriate expert. Make a log entry if trips persist, or call the RC if it becomes severe (for example, >20 trips/hour is getting intolerable)
- Beam Studies program will investigate some of these issues (most pressing is significant activation + beam loss in the arcs)
- USB bridge
- Contact with Target readbacks through AnywhereUSB USB bridge still drop out on occasion
- Initial replacement of the USB bridge failed (did not seem to help underlying issue, then bridge stopped working), replaced with original device
- Ensure issues on Sat, March 14 have been corrected [14]
- iochc10 issues
- Green now: Rebooted 3/2/20 with Dave Gaskell assistance. OPs wished to reboot hung iochc10 [15], noted in December as well [16]
- This runs the Moller cryo controls and should not be rebooted without expert oversight (does not impact operations). D. Gaskell is looking into getting this addressed properly with OPs.
- Compton related items in Hall C beam steer-up procedure still cause confusion between MCC and Shift Crew
Opportunistic Access Jobs
None at the moment.
Bluejeans remote connection information
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920