Difference between revisions of "RC meeting and Run Plan, Wednesday Nov 14"
From HallCWiki
(→Current Issues) |
|||
(8 intermediate revisions by the same user not shown) | |||
Line 23: | Line 23: | ||
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls] | * [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls] | ||
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | * [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | ||
+ | * [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | ||
= Current Status = | = Current Status = | ||
* Taking kinematic [https://hallcweb.jlab.org/wiki/index.php/CSV_Fall_2018_Run_Plan#Kinematic_Group_10:_Q2_.3D_4.75_GeV2.2C_x_.3D_0.45 group 10 (Q2 = 4.75, x = 0.45, pi+)] | * Taking kinematic [https://hallcweb.jlab.org/wiki/index.php/CSV_Fall_2018_Run_Plan#Kinematic_Group_10:_Q2_.3D_4.75_GeV2.2C_x_.3D_0.45 group 10 (Q2 = 4.75, x = 0.45, pi+)] | ||
− | * [RC Daily Update] | + | * [https://logbooks.jlab.org/entry/3626178 RC Daily Update] |
= Current Run Plan = | = Current Run Plan = | ||
Line 37: | Line 38: | ||
= Notices in Effect for Shift Crew = | = Notices in Effect for Shift Crew = | ||
+ | * Shift leaders, please fill out [https://misportal.jlab.org/mis/apps/physics/shiftChecklist/index.cfm?shiftChecklistTypeId=2 check list] once per shift! | ||
* Split the large desired charge between multiple runs (~1 hour per run) | * Split the large desired charge between multiple runs (~1 hour per run) | ||
* Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k. | * Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k. | ||
Line 45: | Line 47: | ||
** [https://logbooks.jlab.org/entry/3625217 Cause of coin. time jitter (resolution loss) may have been found?] -Brad S. | ** [https://logbooks.jlab.org/entry/3625217 Cause of coin. time jitter (resolution loss) may have been found?] -Brad S. | ||
** [https://logbooks.jlab.org/entry/3625390 Coincidence time after insertion of passive delay] -Dave G. | ** [https://logbooks.jlab.org/entry/3625390 Coincidence time after insertion of passive delay] -Dave G. | ||
− | ** [https://logbooks.jlab.org/entry/3625474 Follow-up Re: Coincidence time after insertion of passive delay] -Dave M. | + | ** [https://logbooks.jlab.org/entry/3625474 Follow-up Re: Coincidence time after insertion of passive delay] -Dave G. with comment from Dave M. |
** [https://logbooks.jlab.org/entry/3625832 More jitter tests -- nothing found on scope...] -Brad S. | ** [https://logbooks.jlab.org/entry/3625832 More jitter tests -- nothing found on scope...] -Brad S. | ||
= Planned Accesses to the Hall = | = Planned Accesses to the Hall = | ||
* None | * None | ||
+ | |||
+ | = Planned Accelerator Configuration Changes = | ||
+ | * Monday, Nov 19: system recovery and spot move, estimated 4 hr downtime although it is scheduled for 8. | ||
+ | * Tuesday, Nov 20: CHL UPS battery change, should be noninvasive however, induced CHL anomaly is possible. | ||
+ | * Wednesday, Nov 21: Hall A goes offline and MCC wants to conduct high current beam study of energy spread at 40 uA. It is unclear that we will be effected. | ||
+ | * Monday, Nov 26: Energy change to 1.86 GeV/pass, we will be moved over to 500 MHz laser. | ||
= Special Requests = | = Special Requests = | ||
* Carlos Munoz Camacho would like access to the hall to show Hall-C to two French engineers working on the NPS project. It should be a ~30 minute access, and is a low priority. He can be contacted at 357-1065 | * Carlos Munoz Camacho would like access to the hall to show Hall-C to two French engineers working on the NPS project. It should be a ~30 minute access, and is a low priority. He can be contacted at 357-1065 |
Latest revision as of 15:32, 14 November 2018
Contents
RC Meeting Information
RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
- Detailed Kinematic Group Settings
- KaonLT-SIDIS Group 2018-2019 Shift Schedule
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
Current Status
- Taking kinematic group 10 (Q2 = 4.75, x = 0.45, pi+)
- RC Daily Update
Current Run Plan
- Order of Kinematic Groups
Notices in Effect for Shift Crew
- Shift leaders, please fill out check list once per shift!
- Split the large desired charge between multiple runs (~1 hour per run)
- Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.
- How-to power cycle PLC I/O chassis: https://logbooks.jlab.org/entry/3625862, https://logbooks.jlab.org/entry/3625900
Current Issues
- Worsening of coincidence time resolution
- Cause of coin. time jitter (resolution loss) may have been found? -Brad S.
- Coincidence time after insertion of passive delay -Dave G.
- Follow-up Re: Coincidence time after insertion of passive delay -Dave G. with comment from Dave M.
- More jitter tests -- nothing found on scope... -Brad S.
Planned Accesses to the Hall
- None
Planned Accelerator Configuration Changes
- Monday, Nov 19: system recovery and spot move, estimated 4 hr downtime although it is scheduled for 8.
- Tuesday, Nov 20: CHL UPS battery change, should be noninvasive however, induced CHL anomaly is possible.
- Wednesday, Nov 21: Hall A goes offline and MCC wants to conduct high current beam study of energy spread at 40 uA. It is unclear that we will be effected.
- Monday, Nov 26: Energy change to 1.86 GeV/pass, we will be moved over to 500 MHz laser.
Special Requests
- Carlos Munoz Camacho would like access to the hall to show Hall-C to two French engineers working on the NPS project. It should be a ~30 minute access, and is a low priority. He can be contacted at 357-1065