Difference between revisions of "RC meeting and Run Plan, Wednesday Nov 14"
From HallCWiki
(→Current Run Plan) |
|||
Line 42: | Line 42: | ||
= Current Issues = | = Current Issues = | ||
− | * | + | * Worsening of confidence time resolution |
+ | ** https://logbooks.jlab.org/entry/3625217 | ||
+ | ** https://logbooks.jlab.org/entry/3625390 | ||
+ | ** https://logbooks.jlab.org/entry/3625474 | ||
= Planned Accesses to the Hall = | = Planned Accesses to the Hall = | ||
− | * | + | * None |
= Special Requests = | = Special Requests = | ||
* Carlos Munoz Camacho would like access to the hall to show Hall-C to two French engineers working on the NPS project. It should be a ~30 minute access, and is a low priority. He can be contacted at 357-1065 | * Carlos Munoz Camacho would like access to the hall to show Hall-C to two French engineers working on the NPS project. It should be a ~30 minute access, and is a low priority. He can be contacted at 357-1065 |
Revision as of 11:46, 14 November 2018
Contents
RC Meeting Information
RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
- Detailed Kinematic Group Settings
- KaonLT-SIDIS Group 2018-2019 Shift Schedule
- Hall-C Controls
- Hall-C Logbook
Current Status
- Taking kinematic group 10 (Q2 = 4.75, x = 0.45, pi+)
- [RC Daily Update]
Current Run Plan
- Order of Kinematic Groups
Notices in Effect for Shift Crew
- Split the large desired charge between multiple runs (~1 hour per run)
- Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.
- How-to power cycle PLC I/O chassis: https://logbooks.jlab.org/entry/3625862, https://logbooks.jlab.org/entry/3625900
Current Issues
- Worsening of confidence time resolution
Planned Accesses to the Hall
- None
Special Requests
- Carlos Munoz Camacho would like access to the hall to show Hall-C to two French engineers working on the NPS project. It should be a ~30 minute access, and is a low priority. He can be contacted at 357-1065