* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls] | * [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls] | ||
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | * [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | ||
+ | * [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | ||
= Current Status = | = Current Status = |
Revision as of 15:18, 14 November 2018
Contents
RC Meeting Information
RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
- Detailed Kinematic Group Settings
- KaonLT-SIDIS Group 2018-2019 Shift Schedule
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
Current Status
- Taking kinematic group 10 (Q2 = 4.75, x = 0.45, pi+)
- [RC Daily Update]
Current Run Plan
- Order of Kinematic Groups
Notices in Effect for Shift Crew
- Split the large desired charge between multiple runs (~1 hour per run)
- Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.
- How-to power cycle PLC I/O chassis: https://logbooks.jlab.org/entry/3625862, https://logbooks.jlab.org/entry/3625900
Current Issues
- Worsening of coincidence time resolution
- Cause of coin. time jitter (resolution loss) may have been found? -Brad S.
- Coincidence time after insertion of passive delay -Dave G.
- Follow-up Re: Coincidence time after insertion of passive delay -Dave G. with comment from Dave M.
- More jitter tests -- nothing found on scope... -Brad S.
Planned Accesses to the Hall
- None
Special Requests
- Carlos Munoz Camacho would like access to the hall to show Hall-C to two French engineers working on the NPS project. It should be a ~30 minute access, and is a low priority. He can be contacted at 357-1065