Run plan/To do list - November 30 2017

From HallCWiki
Jump to navigationJump to search

To do list in preparation for running

  • General
    • Issue with Hall C arc-string power supply discovered during hot checkout - testing with dummy-load today and tonight
    • NO lockup for hot checkout tonight
    • Target training right now
    • Shift "show and tell" at 1 pm Friday - featuring Brad S. and Mike F.
    • Hall lockup at 5:30 pm tonight for hot checkout
    • Hall lockup scheduled for Friday 4pm
    • target cool down (helium) Friday
    • Condense hydrogen in target on Monday
    • Beam over the weekend looking less likely - all shifts until Sunday DAY shift are "on call" (don't come unless notified)
  • Beamline
    • Fast raster ready (FSD issue resolved)
    • One BCM cavity on blue platform can't be tuned (ok - we have 2 more on that platform + BCM1/BCM2)
  • DAQ and Trigger
    • Emphasis on coincidence trigger/analysis for now
    • Single arm 3/4 trigger ready - still some work to do on PID trigger (ELREAL, ELCLEAN, etc.)


  • SHMS - general
    • Shutter work nearing completion
    • Shielding work in hut ongoing


  • HMS - general
    • HMS rotated to ~70 degrees last night, 13.5 degrees today


  • SHMS - detectors


  • HMS - detectors