Privacy and Security Notice

      Hall C Software Documentation 

Analysis
  Getting an Analyzer up and running -link here -
  Getting runs (Data) from the mass storage system (mss) -link here -
  Getting started with Data Analysis -link here -
  The CEBAF Test Package (CTP) -link here -
  Keeping Analyzer updated, info on CVS -link here -
  Updates to Analyzer in last 60 days -link here -
  Change Log for Analyzer -link here -

Calibrations
  Calibrations  HMS Drift chamber and checking scintillators -link here -
  Calibrations  SOS Drift chamber and checking scintillators -link here -
  Calibration of the Time of Flight System -link here-
  Calibration of the HMS or SOS Calorimeter -link here- -PS file here-
  Calibration of the Gas Cerenkov Counter -link here-
  Calibration Checking (histograms and such) -link here-

Misc Other
  Reconstruction Matrix Element Fitting -link here-
More details in May1997 (.ps.gz) or July1996 (.ps.gz)
  Notes about HMS field setting program -link here - -ps file here -
  Hall C beam energy measurement -link here - -PS file here -
  H(e,e')p check -link here -
  One Event Display Basics (old 1996 version) -link here -
  One Event Display (new 1999 version) -link here -
  A discussion of wire chamber tracking -link here -

File initially written by I.  Niculescu. Presently maintained by M Jones (x7733,jones@jlab.org).

More information can be found in ~cdaq/documents/

Under Construction