Hall C Software Documentation
Analysis
Getting an Analyzer up and running | -link here - |
Getting runs (Data) from the mass storage system (mss) | -link here - |
Getting started with Data Analysis | -link here - |
The CEBAF Test Package (CTP) | -link here - |
Keeping Analyzer updated, info on CVS | -link here - |
Updates to Analyzer in last 60 days | -link here - |
Change Log for Analyzer | -link here - |
Calibrations
Calibrations HMS Drift chamber and checking scintillators | -link here - |
Calibrations SOS Drift chamber and checking scintillators | -link here - |
Calibration of the Time of Flight System | -link here- |
Calibration of the HMS or SOS Calorimeter | -link here- -PS file here- |
Calibration of the Gas Cerenkov Counter | -link here- |
Calibration Checking (histograms and such) | -link here- |
Misc Other
Reconstruction Matrix Element Fitting | -link
here-
More details in May1997 (.ps.gz) or July1996 (.ps.gz) |
Notes about HMS field setting program | -link here - -ps file here - |
Hall C beam energy measurement | -link here - -PS file here - |
H(e,e')p check | -link here - |
One Event Display Basics (old 1996 version) | -link here - |
One Event Display (new 1999 version) | -link here - |
A discussion of wire chamber tracking | -link here - |
File initially written by I. Niculescu. Presently maintained by M Jones (x7733,jones@jlab.org).
More information can be found in ~cdaq/documents/
Under Construction