The HMS dipole control screen looks crazy. The only way entirely reliable way to monitor the field is through the camera.
9:30 start sweeping the hall and controlled access; the computer for HMS control gui is being rebooted.
12:20 hall back to beam permit, but HMS dipole is not ready yet.
12:30 HMS ready, resume data taking;
14:30 reboot target IOC and dipole GUI (PDS)
Mark setup a script that should alarm if the dipole trips off.
A copy of this log entry has been emailed to: slifer@jlab.org