keyword=shift summary
12:00 start shift with beam tuning.
2:00 MCC still tuning the beam , X position looks good on all BPMs, Y position need to be corrected.
2:20 Beam position look's O.K. MCC still doing fine tuning.
3:00 MCC still need time todo fine tuning, they estimate,that need one more hour to finish.
6:30 Finaly beam tuning is finished , we put C12 target on the beam.
8:00 we are taking data on C12 target. Run 56043