Log entry time 00:08:49 on July 10, 2005

Entry number 99372

keyword=Beam Time Accounting
Hall C

07/09/05 1600-2400
Experiment #: E01-011
Shift Leader: Fatiha
Shift Workers: A. Gasparian

16001700180019002000210022002300Total Time
Acceptable Beam
in Use
0.750.950.860.260.500.670.330.925.23
Beam Available
but Not in Use
0.000.000.000.000.500.000.000.000.50
Beam Not Available
or Unacceptable
0.250.050.140.740.000.330.670.082.27
Accelerator Con-
figuration Change
0.000.000.000.000.000.000.000.000.00
Experiment
Ready
1.001.001.001.001.000.671.001.007.67
Planned Config-
uration Change
0.000.000.000.000.000.000.000.000.00
Unplanned
Experiment Down
0.000.000.000.000.000.330.000.000.33
Hall not
ready reasons
Target0.000.000.000.000.000.000.000.000.00
DAQ0.000.000.000.000.000.330.000.000.33
HKS0.000.000.000.000.000.000.000.000.00
Enge0.000.000.000.000.000.000.000.000.00
Detectors0.000.000.000.000.000.000.000.000.00
Other0.000.000.000.000.000.000.000.000.00

Comments: -Problems with the DAQ in between 8 and 9pm. -MCC took beam from time to time for hall B then it was hard to get the correct beam position for us.

Data Entry by: F. Benmokhtar