  • 105928 08/31/05 23:44 Víctor ROC12 Fail
  • 105926 08/31/05 23:24 Víctor ROC11 Fail
  • 105924 08/31/05 22:45 Víctor EDC3 Tripped
  • 105921 08/31/05 20:23 Víctor Change Ethane flow from 20 to 22 psi
  • 105920 08/31/05 20:16 Víctor EDC3 HV tripped. Current reading was 6375 before tripped.
  • 105918 08/31/05 20:06 Víctor EDC3 HV tripped
  • 105916 08/31/05 19:32 Víctor EDC3 HV tripped
  • 105915 08/31/05 19:24 Akihiko Trigger back to coincidence between HKS AND ENGE
  • 105914 08/31/05 19:22 Akihiko Singles rate w/ 10 uA ,Si
  • 105913 08/31/05 19:16 Víctor And current 10 uA
  • 105912 08/31/05 19:16 Víctor Current was 10 uA
  • 105911 08/31/05 19:15 Víctor Current was 7 uA
  • 105910 08/31/05 19:15 Víctor Current was 7 uA
  • 105907 08/31/05 18:58 Víctor ROC12 Fail
  • 105906 08/31/05 18:58 Víctor On run 59813, single kaon arm the Raster was ON
  • 105903 08/31/05 18:45 Akihiko Change trigger to HKS single arm
  • 105901 08/31/05 18:10 Víctor EDC3 HV Tripped
  • 105900 08/31/05 18:07 Víctor EDC3 Tripped
  • 105899 08/31/05 18:07 Víctor Si target is in
  • 105898 08/31/05 17:18 Víctor No beam
  • 105897 08/31/05 17:10 Víctor Target is out
  • 105895 08/31/05 16:04 yuan Beam stop at 16:00
  • 105894 08/31/05 16:03 yuan Shift Summery
  • 105892 08/31/05 15:48 Sumihama Rates with Si and ~9.5 uA.
  • 105891 08/31/05 15:36 yuan BPM & SLI & FB status
  • 105890 08/31/05 15:18 yuan Ask 10 uA beam
  • 105886 08/31/05 14:26 Sumihama Rates with Si and 13 uA.
  • 105883 08/31/05 14:05 yuan Si28 target in
  • 105882 08/31/05 13:46 yuan Target all out
  • 105880 08/31/05 10:04 yuan HKS Q2 trip
  • 105878 08/31/05 08:46 Sumihama Controlled access to check NMR and hall probe for Splitter.
  • 105877 08/31/05 08:42 yuan Beam status
  • 105875 08/31/05 07:32 okayasu Correction: run# 59801 for Si target !!
  • 105874 08/31/05 07:29 okayasu Screen shots for alert magnets
  • 105873 08/31/05 06:22 okayasu Gas flow check for HKS helium bag
  • 105872 08/31/05 06:21 okayasu Si target came back
  • 105871 08/31/05 06:18 okayasu HKS dipole issue
  • 105870 08/31/05 05:39 okayasu Hall C turned to be controlled access.
  • 105869 08/31/05 05:39 okayasu HKS dipole issue
  • 105868 08/31/05 05:23 okayasu Cannot control HKS dipole.
  • 105867 08/31/05 02:42 okayasu Target was moved out
  • 105866 08/31/05 01:20 okayasu Beam will be off until 7:00am
  • 105865 08/31/05 01:07 okayasu Asked MCC for target mask
  • 105864 08/31/05 00:50 okayasu Beam off for while
  • 105863 08/31/05 00:23 okayasu BPM & SLI & FB
  • 105861 08/31/05 00:19 okayasu Raster turned off and data taking started
  • 105860 08/31/05 00:17 okayasu Beam current raised up to 13 uA w/ raster 2x2
  • 105859 08/31/05 00:07 okayasu We changed target to Si
  • 105857 08/31/05 00:00 Fatiha Shift Summary
  • Tuesday

  • 105856 08/30/05 23:59 lcole Roc 12 crashed; rebooted Roc 12
  • 105855 08/30/05 23:58 lcole Roc 12 crashed; rebooted Roc 12
  • 105854 08/30/05 23:53 lcole screenshots from swing shift (8-30-05)
  • 105852 08/30/05 23:38 lcole Roc 12 failed; rebooted Roc 12
  • 105851 08/30/05 23:10 Fatiha Changed current to 17 uA
  • 105848 08/30/05 22:49 lcole Roc 12 crashed; rebooted Roc 12
  • 105846 08/30/05 22:41 lcole Roc 13 crashed, rebooted Rocs 13 & 14
  • 105844 08/30/05 22:25 lcole Roc 12 auto rebooted and Roc 13 failed when starting new run; power cycled
  • 105840 08/30/05 21:29 lcole Roc 11 crashed; rebooted Roc 11 &12
  • 105836 08/30/05 20:35 lcole Roc 12 crashed; rebooted Roc 12
  • 105834 08/30/05 20:27 lcole Roc 13 crashed, rebooted Rocs 13 & 14
  • 105832 08/30/05 20:03 lcole Roc 12 failed; rebooted Rocs 11 & 1
  • 105830 08/30/05 19:40 lcole Roc 12 crashed; rebooted Rocs 11 & 12
  • 105828 08/30/05 19:27 lcoe Roc 13 crashed, rebooted Rocs 13 & 14
  • 105824 08/30/05 18:16 Sumihama Rate with Be and 19 uA.
  • 105822 08/30/05 18:11 Fatiha Beam back
  • 105820 08/30/05 18:07 Fatiha Beam off
  • 105819 08/30/05 17:50 Sumihama Run59780 is HKS single arm trigger.
  • 105817 08/30/05 17:28 Fatiha Beam Back
  • 105815 08/30/05 16:43 Fatiha Beam Status
  • 105809 08/30/05 15:58 Keppel shift summary
  • 105805 08/30/05 15:12 Song ROC 12 failed
  • 105802 08/30/05 14:37 Song ROC 12 hang up
  • 105800 08/30/05 14:27 Song ROC 12 failed
  • 105797 08/30/05 14:00 Song ROC 11 down.
  • 105792 08/30/05 12:58 Song ROC 12 failed
  • 105790 08/30/05 12:29 Akihiko Data transfer rate of ROC14 was too low.Power cycled.
  • 105789 08/30/05 12:24 Song RUN#59756, 59757, 59758, 59759 are all junk
  • 105784 08/30/05 11:58 Akihiko Braker was down
  • 105783 08/30/05 11:57 yuan Update HKS TOF and DC parameter files
  • 105781 08/30/05 11:48 Song The ROC12 problem was solved
  • 105780 08/30/05 11:37 Song Roc 12 problem
  • 105779 08/30/05 09:55 V. Tvaskis No Beam
  • 105778 08/30/05 09:52 saw Summary of last night's network problem
  • 105777 08/30/05 09:44 V. Tvaskis Problems with ROC 9 and ROC 12
  • 105774 08/30/05 08:38 V. Tvaskis Changed Target and Beam Current
  • 105768 08/30/05 06:57 Nonaka Beam monitor of RUN#59710-59730
  • 105766 08/30/05 06:37 okayasu ROC11,12 rebooted
  • 105764 08/30/05 06:06 okayasu VESDA alerts
  • 105761 08/30/05 05:26 okayasu ROC11 rebooted
  • 105759 08/30/05 05:04 okayasu ROC12 rebooted automatically.
  • 105758 08/30/05 04:56 okayasu Run# 59727, 59728 are junk
  • 105748 08/30/05 01:29 okayasu ROC 13 'Extra data'
  • 105746 08/30/05 01:02 okayasu ROC11,12 and 13 rebooted.
  • 105742 08/30/05 00:46 okayasu ROC 12 down
  • 105738 08/30/05 00:02 Victor Swing Shift Summary
  • Monday

  • 105736 08/29/05 23:51 Victor BPM & SLI & FB
  • 105734 08/29/05 23:46 Victor Si target is in
  • 105733 08/29/05 23:40 Victor Target all out
  • 105732 08/29/05 23:30 Víctor We are back
  • 105731 08/29/05 23:17 lcole Hall in Controlled Access
  • 105730 08/29/05 23:13 lcole Network Problems; Need to access the Hall
  • 105729 08/29/05 22:41 Víctor Network problem. Master Switch rebooted
  • 105727 08/29/05 22:28 Víctor ROC12 Fail
  • 105723 08/29/05 21:24 Nonaka Beam monitor of RUN#59690-59710
  • 105718 08/29/05 19:41 Víctor ROC12 Fail
  • 105714 08/29/05 18:47 Víctor ROC11 Fail
  • 105713 08/29/05 18:45 Víctor Change trigger to COIN
  • 105711 08/29/05 18:34 Víctor Triger change to single kaon arm
  • 105709 08/29/05 18:06 Víctor ROC12 Fail
  • 105707 08/29/05 17:34 Víctor RF problem in the accelerator
  • 105706 08/29/05 17:21 Sumihama Rates with Si and 13 uA beam.
  • 105704 08/29/05 17:15 Víctor Beam is back
  • 105703 08/29/05 16:54 Víctor MCC has RF cavity problem
  • 105702 08/29/05 16:47 Víctor Si target is in
  • 105701 08/29/05 16:39 Víctor MCC is tunning the beam
  • 105698 08/29/05 15:47 amour day shift summary
  • 105694 08/29/05 12:58 saw HKS readings?
  • 105691 08/29/05 11:31 pavel Enge radiation dose update
  • 105690 08/29/05 11:31 Akihiko Discriminator replaced
  • 105688 08/29/05 11:09 Sumihama Beam off due to Setup of vertical polarization in HallA.
  • 105684 08/29/05 09:04 Luo Beam off from 9:00 am to 7:00 pm
  • 105683 08/29/05 08:59 seva target all out for beam study
  • 105680 08/29/05 08:09 Luo ROC11 failed, reboot
  • 105675 08/29/05 06:45 okayasu Run#59679, 59680 are junk.
  • 105669 08/29/05 04:28 okayasu ROC 12 rebooted
  • 105667 08/29/05 03:53 okayasu Run# 59675, 59677 are junk.
  • 105664 08/29/05 03:35 misp ROCs 11, 12, 13 needed several reboots ro allow a run to start
  • 105663 08/29/05 03:09 okayasu ROC11,12,13 and 14 rebooted
  • 105660 08/29/05 02:59 okayasu ROC13 rebooted
  • 105658 08/29/05 02:24 okayasu ROC13 reboot
  • 105655 08/29/05 01:09 okayasu Coda rebooted
  • 105654 08/29/05 01:07 okayasu ROC12, event builder rebooted at the end of 59679
  • 105651 08/29/05 00:00 Victor Swing Shift Summary
  • Sunday

  • 105649 08/28/05 23:09 Victor BPM & SLI & FB
  • 105647 08/28/05 22:50 Víctor ROC11 Fail
  • 105645 08/28/05 22:36 Víctor Beam is back
  • 105644 08/28/05 22:30 Nonaka I added beam position moniter
  • 105643 08/28/05 22:00 Víctor No beam fow a while. MCC called the experts to fix RF problem.
  • 105642 08/28/05 21:29 Víctor MCC has RF problems no beam for 15 minutes.
  • 105640 08/28/05 20:52 Víctor ROC12 Fail
  • 105638 08/28/05 20:21 Víctor ROC11 Fail
  • 105635 08/28/05 19:33 Víctor CODA Fail
  • 105632 08/28/05 18:04 Víctor ROC12 Fail
  • 105630 08/28/05 17:56 Víctor ROC11 Fail
  • 105626 08/28/05 17:13 Víctor ROC12 Fail
  • 105624 08/28/05 17:01 Víctor ROC11 Fail
  • 105622 08/28/05 16:41 Nonaka Beam monitor of RUN#59630-59650
  • 105620 08/28/05 16:31 Víctor ROC12 Autoreboot
  • 105618 08/28/05 16:04 lcole Shift Summary
  • 105616 08/28/05 15:45 sreenshots from 8-28-05 day shift
  • 105614 08/28/05 15:35 lcole Roc 13 crashed, rebooted Rocs 13 & 14.
  • 105612 08/28/05 14:55 lcole Roc 12 crashed; rebooted Roc 12
  • 105609 08/28/05 14:19 lcole Roc 12 crashed; rebooted Roc 12
  • 105608 08/28/05 14:08 lcole ps1 is 10 for run 59648
  • 105605 08/28/05 13:50 lcole Roc 11 crashed; rebooted Roc 11
  • 105604 08/28/05 13:47 Sumihama Run59648 is HKS arm single trigger.
  • 105601 08/28/05 13:33 lcole Roc 12 crashed; rebooted Roc 12
  • 105600 08/28/05 13:26 lcole Roc 11 crashed; run 59646 is JUNK.
  • 105598 08/28/05 13:24 lcole Roc 11 crashed during Run 59642; rebooted Roc 11
  • 105594 08/28/05 12:22 lcole Roc 11 crashed during Run 59642; rebooted Roc 11
  • 105591 08/28/05 11:03 lcole Roc 12 crashed during Run 59640, not 59641
  • 105590 08/28/05 11:01 lcole Roc 12 crashed during Run 59641; Rebooted Roc 12
  • 105587 08/28/05 10:24 Nonaka Beam monitor of RUN#59610-59630
  • 105574 08/28/05 06:08 okayasu CODA rebooted
  • 105566 08/28/05 03:14 misp ROC 11 failure
  • 105564 08/28/05 03:01 okayasu ROC12 rebooted
  • 105563 08/28/05 02:59 okayasu BPM & SLI
  • 105559 08/28/05 01:33 misp ROC 11 failure
  • 105556 08/28/05 01:03 okayasu ROC12 down
  • 105554 08/28/05 00:41 okayasu Roc 13 crashed.
  • 105552 08/28/05 00:09 okayasu EB1 got error
  • 105550 08/28/05 00:00 Victor Victor
  • Saturday

  • 105548 08/27/05 23:46 Víctor ROC12 Fail
  • 105546 08/27/05 23:31 Victor ROC11 Fail
  • 105545 08/27/05 23:28 Victor CODA Fail
  • 105542 08/27/05 22:56 Víctor ROC12 Fail
  • 105540 08/27/05 22:30 Victor ROC11 Fail
  • 105538 08/27/05 22:22 Victor ROC12 Fail
  • 105537 08/27/05 22:14 Victor BPM & SLI & FB
  • 105533 08/27/05 21:26 Víctor ROC12 Fail
  • 105530 08/27/05 20:30 Víctor ER CODA fail
  • 105527 08/27/05 19:34 Víctor ROC12 Fail
  • 105525 08/27/05 19:26 Víctor ROC12 Fail
  • 105523 08/27/05 18:57 Víctor ROC12 Fail
  • 105521 08/27/05 18:32 Víctor Q2 tripped error was MagWater/Inpvolt
  • 105520 08/27/05 18:26 Víctor Q2 Tripped
  • 105518 08/27/05 18:06 Víctor ROC11 Autoreboot
  • 105516 08/27/05 17:57 Víctor ER EB Coda Fail
  • 105513 08/27/05 17:23 Víctor ROC12 Autoreboot
  • 105509 08/27/05 16:20 Sumihama Run59584 is HKS single arm trigger.
  • 105508 08/27/05 16:10 lcole screenshots from day shift (8-27-05)
  • 105506 08/27/05 16:02 Leon Cole Shift Summary
  • 105504 08/27/05 15:47 Akihiko Disk space of home directory was almost FULL
  • 105502 08/27/05 15:37 Akihiko ROC 11 crashed, rebooted
  • 105501 08/27/05 15:36 lcoel Roc 11 crashed during Run 55582; Rebooted Roc 11.
  • 105499 08/27/05 15:15 lcole Runs 55581, 55977, 59668, 59665 are incorrect run numbers, these are the correct run numbers
  • 105498 08/27/05 15:01 lcole Roc 11 crashed during Run 55581; Rebooted Roc 13.
  • 105495 08/27/05 13:40 lcole Daq problems
  • 105492 08/27/05 13:26 lcole Roc 11 crashed during Run 55977; Rebooted Roc 11 &12
  • 105491 08/27/05 13:25 lcole CODA problems & Roc 13
  • 105487 08/27/05 12:51 lcole Roc 12 crashed during Run 59574; Rebooted Roc 11 &12
  • 105485 08/27/05 12:07 lcole Eb failed during run 59572.
  • 105479 08/27/05 10:52 lcole Roc 11 crashed during Run 59668; Rebooted Roc 11 &12
  • 105476 08/27/05 10:19 lcole Roc 12 crashed during Run 59665; Rebooted Roc 11 &12
  • 105473 08/27/05 09:40 lcole Run 59664 didn't end properly; Roc 11 failed; rebooted Rocs 11 & 12.
  • 105471 08/27/05 09:10 lcole Roc 12 crashed during Run 59563; Rebooted Roc 11 &12
  • 105469 08/27/05 08:53 lcole Roc 12 crashed during Run 59562; Rebooted Roc 11 &12
  • 105467 08/27/05 08:30 lcole Roc 12 failed; ended run and rebooted Rocs 11 & 12.
  • 105465 08/27/05 08:14 lcole Roc 12 failed; rebooted Rocs 11 & 12.
  • 105462 08/27/05 07:35 Luo ROC 6 failed , reboot at 7:32
  • 105458 08/27/05 06:24 Luo Reboot all ROC at 6:18
  • 105455 08/27/05 06:12 Luo ROC 12 failed.Rebooted at 6:12
  • 105453 08/27/05 05:56 luo ROC 12 no responding, reboot at 5:54
  • 105452 08/27/05 05:55 luo ROC 11 reboot
  • 105449 08/27/05 05:05 Luo RUN#59550 is junk
  • 105447 08/27/05 04:53 Luo RUN#59549 is junk & ROC 11 & 13 rebooted
  • 105445 08/27/05 04:47 okayasu roc13 rebooted
  • 105442 08/27/05 04:05 Luo ROC 12 no responding, reboot at 4:03
  • 105440 08/27/05 03:57 Luo ROC 12 no responding, reboot
  • 105438 08/27/05 03:42 Luo RUN#59545 is junk
  • 105437 08/27/05 03:40 Luo ROC 11 no responding
  • 105434 08/27/05 03:10 Luo ROC 12 failed at 3:10, reboot
  • 105431 08/27/05 02:28 luo ROC 12 failed at 2:27
  • 105429 08/27/05 02:04 luo roc 12 failed at 2:03
  • 105427 08/27/05 01:28 luo ROC 13 failed and reboot at 1:22
  • 105424 08/27/05 00:33 luo ROC 12 hung up at 0:32
  • 105422 08/27/05 00:19 luo bpm & bcm screen shot
  • 105420 08/27/05 00:02 M Jones Swing shift summary
  • Friday

  • 105416 08/26/05 23:20 tigran ROC 12 failed.Rebooted.
  • 105414 08/26/05 23:08 tigran ROC 12 failed.Rebooted.
  • 105412 08/26/05 22:54 tigran Roc 13 crashed.
  • 105410 08/26/05 22:28 tigran ROC 12 failed.Rebooted.
  • 105404 08/26/05 20:00 M JOnes Beam off for injector work for Hall A
  • 105401 08/26/05 19:39 M Jones Lost newtwork connection to vmemon1,vmemon12, ROC 11-14 and the alarm handler
  • 105398 08/26/05 18:57 tigran ROC 12 failed.Rebooted.
  • 105395 08/26/05 17:46 tigran ROC 12 autorebooted.
  • 105393 08/26/05 17:26 tigran ROC 12 down.
  • 105390 08/26/05 16:58 tigran ROC 11 failed. Rebooted
  • 105388 08/26/05 16:45 Nonaka Trigger rate(trig/charge) every run
  • 105386 08/26/05 16:32 M Jones Change to Si target, no raster 13uA
  • 105384 08/26/05 16:11 M Jones Change to Si target, Start with 2x2 raster 7uA
  • 105381 08/26/05 16:00 vulcan Shift Summary
  • 105379 08/26/05 15:31 Song ROC 13 died at 15:24
  • 105376 08/26/05 15:03 song ROC 11 down.
  • 105374 08/26/05 14:55 song ROC 11 & 12 rebooted
  • 105373 08/26/05 14:52 Song EB failed at 14:46
  • 105369 08/26/05 14:03 Song Trigger back to coincidence of HKS and ENGE at 13:58
  • 105366 08/26/05 13:50 song RUN#59500 is a RUN of single HKS trigger(i made a mistake in the last entry, here correct it)
  • 105365 08/26/05 13:47 song RUN#59499 is Junk
  • 105363 08/26/05 13:44 song ROC 12 crashed
  • 105362 08/26/05 13:44 song changed to HKS single trigger
  • 105359 08/26/05 13:00 Nonaka Beam current and momentum of latest 20 runs.
  • 105357 08/26/05 12:57 song ROC 11 Failure Error
  • 105355 08/26/05 12:47 song ROC 12 crashed
  • 105354 08/26/05 12:46 song Roc 13 crashed.
  • 105352 08/26/05 12:23 song Roc 13 crashed.
  • 105349 08/26/05 11:59 Song ROC 11 crashed , RUN#59491 is junk
  • 105347 08/26/05 11:54 song ROC 12 crashed,RUN#59490 is junk
  • 105343 08/26/05 10:59 Nonaka I added current moniter.
  • 105341 08/26/05 10:45 song RUN#59486 is junk, ROC 12 crashed
  • 105339 08/26/05 10:41 song ROC 12 failed.
  • 105337 08/26/05 10:25 song ROC 12 crashed
  • 105332 08/26/05 09:16 song ROC 12 failed.Rebooted.
  • 105331 08/26/05 09:14 Nonaka Latest beam momentum monitor
  • 105328 08/26/05 08:40 vulcan C target
  • 105327 08/26/05 08:38 song ROC13 crashed
  • 105325 08/26/05 08:08 song ROC 12 failed
  • 105322 08/26/05 07:41 seva roc 12 not reported status
  • 105320 08/26/05 07:29 okayasu Beam current changed to 13 uA from 59473
  • 105319 08/26/05 07:28 seva roc 11 not reported status
  • 105317 08/26/05 07:26 seva roc 11 not reported status
  • 105314 08/26/05 07:01 okayasu Beam will be back
  • 105313 08/26/05 06:36 okayasu Beam off
  • 105312 08/26/05 05:57 okayasu Beam back
  • 105310 08/26/05 04:36 seva also only 7.5 uA
  • 105309 08/26/05 04:32 okayasu Beam current has been decreased since 30 minutes ago
  • 105307 08/26/05 04:28 seva we got only 7.5 uA for this run
  • 105306 08/26/05 04:27 seva roc 11 not reported status
  • 105303 08/26/05 03:15 seva roc 13 dma transfer terminated
  • 105301 08/26/05 02:39 seva roc 12 and TS not reported status
  • 105300 08/26/05 02:36 seva roc 11 not reported status
  • 105298 08/26/05 02:32 seva roc 12 not reported status
  • 105296 08/26/05 02:16 seva roc 12 dma transfer terminated
  • 105294 08/26/05 02:08 seva roc 12 connection closed
  • 105293 08/26/05 01:57 seva roc 11 dma transfer terminated
  • 105290 08/26/05 00:51 seva roc 12 not reported status
  • 105287 08/26/05 00:06 M JOnes Swing shift summary
  • Thursday

  • 105285 08/25/05 23:57 tigran Roc 13 crashed.
  • 105283 08/25/05 23:49 tigran ROC 12 failed.Rebooted.
  • 105281 08/25/05 23:25 tigran Roc 13 crashed.
  • 105277 08/25/05 22:30 M Jones Hall A to start energy dithering
  • 105273 08/25/05 21:00 M Jones Run 59451 ended when CODA hung
  • 105270 08/25/05 20:29 Sumihama Run59449 is HKS single. Change back to Coin trigger.
  • 105268 08/25/05 20:17 Sumihama Change trigger to HKS single.
  • 105265 08/25/05 16:11 vulcan magnets on fsd
  • 105264 08/25/05 16:09 M JOnes Target in "Allout" position for mCC to tune beam
  • 105262 08/25/05 16:01 yuan Shift Summery
  • 105261 08/25/05 16:00 vulcan magnets on fsd
  • 105260 08/25/05 15:55 luo Screenshots Bpm & Bcm
  • 105259 08/25/05 15:27 luo requested beam permit at 3:26 pm
  • 105258 08/25/05 14:47 saw New TOSP for water Cerenkov
  • 105255 08/25/05 14:20 yuan HKS Q2 trip
  • 105254 08/25/05 13:37 pavel Correction to the Radiation Levels report
  • 105253 08/25/05 11:49 yuan Radiation dose reading from Enge ARM
  • 105252 08/25/05 10:05 Luo Beam Study start at 10 am
  • 105249 08/25/05 09:19 yuan BPM Y position shift
  • 105244 08/25/05 07:51 okayasu VESDA alert
  • 105241 08/25/05 07:22 seva roc 12 not reported status
  • 105239 08/25/05 07:14 seva roc 12 dma transfer terminated
  • 105237 08/25/05 06:57 seva roc 11; extra data in tdc
  • 105235 08/25/05 06:42 seva roc 11 dma transfer terminated
  • 105234 08/25/05 06:38 seva roc 12 not reported status
  • 105232 08/25/05 06:24 seva roc 12 not reported status
  • 105230 08/25/05 06:08 seva roc 12 not reported status
  • 105228 08/25/05 05:25 okayasu Q2recovered and got beam again
  • 105227 08/25/05 05:24 seva beam back, taking data
  • 105225 08/25/05 05:22 seva Q2 back on; called mcc to give us beam
  • 105224 08/25/05 05:06 okayasu Q2 tripped
  • 105222 08/25/05 04:29 seva roc 11 rebooted
  • 105220 08/25/05 04:16 seva roc 12 not reported status
  • 105217 08/25/05 03:20 seva roc 12 not reported status
  • 105215 08/25/05 03:08 seva roc 11 error: invalid board
  • 105211 08/25/05 01:07 seva roc 12 not reported status
  • 105207 08/25/05 00:00 M JOnes Swing shift summary
  • Wednesday

  • 105202 08/24/05 22:46 tigran BCM & BPM screen shot
  • 105199 08/24/05 22:13 tigran ROC 13 failure Error
  • 105196 08/24/05 22:01 tigran ROC 12 failed.
  • 105195 08/24/05 21:45 tigran ROC 12 failed.Rebooted.
  • 105187 08/24/05 20:09 tigran Roc 13 crashed.
  • 105183 08/24/05 19:08 M Jones Run 59400 ended because ENGE Scin tripped off
  • 105181 08/24/05 18:59 tigran ROC 12 crashed
  • 105179 08/24/05 18:49 M Jones Run 59397 ended by Roc 12 autoreboot
  • 105177 08/24/05 18:37 tigran ROC 11 failed. Rebooted
  • 105175 08/24/05 18:29 tigran ROC 11 failed. Rebooted
  • 105172 08/24/05 17:58 tigran Roc 13 crashed.
  • 105170 08/24/05 17:27 tigran ROC 11 down.
  • 105168 08/24/05 17:02 M Jones Run 59390 ended by roc 12 crash
  • 105165 08/24/05 16:43 M Jones Run 59389 ended with CODA hanging.
  • 105163 08/24/05 16:22 M Jones Run 59388 ended by Roc 12 crash
  • 105160 08/24/05 16:02 lcole Shift Summary
  • 105159 08/24/05 15:52 lcole famous screenshots from the day shift
  • 105156 08/24/05 15:26 lcole Beam is back.
  • 105155 08/24/05 15:19 lcole MCC needs to adjust set points on the vaccum; taking beam away.
  • 105150 08/24/05 14:23 song ROC 12 crashed
  • 105146 08/24/05 13:37 song Roc 13 failed at 13:33
  • 105145 08/24/05 13:36 song RUN#59378 something looks strange.
  • 105141 08/24/05 12:38 song ROC13 failed
  • 105139 08/24/05 11:53 lcole Q2 tripped.
  • 105137 08/24/05 11:46 song ROC 12 hang up at 11:46
  • 105136 08/24/05 11:15 lcole Rates for 13uA, Si
  • 105134 08/24/05 11:01 song ROC 12 failed
  • 105132 08/24/05 10:29 lcole Asked MCC to mask hall probe.
  • 105131 08/24/05 10:21 lcole MCC called and that hall probe has died.
  • 105130 08/24/05 10:13 Akihiko How to start debug window
  • 105128 08/24/05 09:58 song ROC 13 failed, ROC 11 12 13 14 rebooted
  • 105126 08/24/05 09:51 paul Roc12 error
  • 105124 08/24/05 09:32 song ROC 11 & 12 rebooted
  • 105121 08/24/05 09:03 song ROC 11 failed and RUN#59365 is a junk
  • 105119 08/24/05 08:49 paul The Runs are back ro 500K limit.
  • 105118 08/24/05 08:46 song ROC11 & 12 rebooted at 8:35
  • 105117 08/24/05 08:42 paul
  • 105115 08/24/05 08:40 paul Parameters has been changed/RasterOFF/current 13uA
  • 105114 08/24/05 08:21 paul The Run59343 is JUNK
  • 105111 08/24/05 07:56 okayasu Changed target to Si
  • 105109 08/24/05 07:40 okayasu BPM & SLI
  • 105106 08/24/05 06:41 okayasu ENGE alcohole bubbler was ENPTY!!
  • 105101 08/24/05 05:53 seva roc 12 not reported status
  • 105099 08/24/05 05:26 seva roc 11 too many return values
  • 105097 08/24/05 05:15 seva roc 11 not reported status
  • 105095 08/24/05 05:11 seva roc 12 not reported status
  • 105093 08/24/05 05:01 seva roc 12 not reported status
  • 105089 08/24/05 04:18 seva roc 12 not reported status
  • 105088 08/24/05 04:08 seva rebooted hall c switch since rocs 11 to 14 did not respond (no connection)
  • 105087 08/24/05 04:06 Akihiko Reboot network module
  • 105081 08/24/05 02:07 seva roc 11,13 rebooted itself
  • 105074 08/24/05 00:01 M Jones Swing shift summary
  • Tuesday

  • 105073 08/23/05 23:48 Nue Standby mode of FFB
  • 105071 08/23/05 23:37 tigran ROC 11 failed. Rebooted. Run# 59334 - Junk.
  • 105070 08/23/05 23:37 tigran End of Run# 59333 failed.
  • 105068 08/23/05 23:16 Nue Fast Feed back was not working properly from 19:40 to 20:20.
  • 105063 08/23/05 21:45 tigran ROC 12 failed. Run# 59329 - JUNK.
  • 105060 08/23/05 20:52 tigran BCM & BPM screen shot
  • 105054 08/23/05 19:18 Sumihama Update ENGINE.
  • 105053 08/23/05 19:15 M JOnes ROC 11 crashed at beginning of run 59322
  • 105050 08/23/05 18:51 tigran Mistake in entry 105049.
  • 105049 08/23/05 18:49 tigran End of Run# 59321 failed.
  • 105047 08/23/05 18:17 tigran ROC 12 failed.
  • 105043 08/23/05 17:32 Nue Rates for 23.7uA, Be
  • 105042 08/23/05 17:31 M Jones Ended run 59315 by ROC 12 crash
  • 105041 08/23/05 17:26 Nue Rates for 20uA, Be
  • 105040 08/23/05 17:23 M Jones Be traget inserted
  • 105036 08/23/05 16:02 lcole Shift Summary
  • 105034 08/23/05 16:00 lcole The time will should be 16:15 instead of 15:15.
  • 105033 08/23/05 15:54 lcole MCC said they will provide update around 15:15.
  • 105032 08/23/05 15:48 lcole MCC called and they are having magnets problems. Beam will be off for a few minutes.
  • 105031 08/23/05 15:47 lcole 8-22-05 Day Shift Runs Status
  • 105029 08/23/05 15:36 song ROC12 crashed
  • 105028 08/23/05 15:28 lcole bpm, sli, & bcm screen shoots
  • 105026 08/23/05 14:56 lcole Beam is back and we are taking data
  • 105024 08/23/05 14:44 Sumihama Updata ENGINE -minor changes.
  • 105023 08/23/05 14:33 lcole Beam is off; MCC needs to reboot IOC.
  • 105021 08/23/05 13:46 song RUN#59307 is a junk
  • 105019 08/23/05 13:42 song ROC 11 Failure Error
  • 105017 08/23/05 13:29 lcole Rates for 13uA, Si, run 59306
  • 105016 08/23/05 13:29 lcole Rates for 13uA, Si, run 59306
  • 105015 08/23/05 13:28 lcole Rates for 13uA, Si, run 59306
  • 105013 08/23/05 13:16 song ROC 12 failed at 13:13
  • 105012 08/23/05 13:07 lcole Rates for run 59304, HKS Single Trigger
  • 105010 08/23/05 13:03 song ROC12 hang up
  • 105007 08/23/05 12:24 song ROC12 crashed, ROC 12 &11 rebooted
  • 105006 08/23/05 12:10 song RUN#59301 is a junk
  • 105004 08/23/05 12:05 song ROC13 crashed
  • 105002 08/23/05 11:50 Sumihama Change the mode for resdout of HKS-q2 hall probe.
  • 105001 08/23/05 11:45 lcole Rates for 13uA, Si
  • 104999 08/23/05 11:38 lcole beam is back
  • 104998 08/23/05 11:25 lcole Beam off due to vaccum problem
  • 104996 08/23/05 11:02 song RUN#59298 is a junk
  • 104995 08/23/05 11:01 song ROC11 & 12 rebooted at 11:00
  • 104993 08/23/05 10:58 song ROC12 crashed at 10:57
  • 104991 08/23/05 10:39 song ROC11 crashed while prestarting at 10:35
  • 104990 08/23/05 10:35 song ROC12 failed at 10:33
  • 104989 08/23/05 10:34 lcole Rates for 13uA, Si
  • 104988 08/23/05 10:17 lcole beam is back
  • 104986 08/23/05 10:12 lcole Beam off, Vaccum Value Problem
  • 104984 08/23/05 09:39 song RUN#59292 is a junk
  • 104982 08/23/05 09:36 song ROC12 failed
  • 104979 08/23/05 08:50 song RUN#59288 is a junk
  • 104976 08/23/05 08:10 song ROC 11 Failure Error
  • 104969 08/23/05 04:49 seva&paul roc 11 rebooted
  • 104966 08/23/05 04:37 seva&paul roc 11 not responding
  • 104963 08/23/05 03:39 seva roc 12 not reported status
  • 104960 08/23/05 02:24 seva roc 12 not responding
  • 104957 08/23/05 01:40 seva roc 13 not responding
  • 104955 08/23/05 01:08 seva roc 12 not responding
  • 104952 08/23/05 00:31 seva roc 12 not responding
  • 104950 08/23/05 00:12 seva roc 11 not responding
  • 104948 08/23/05 00:01 Fatiha Shift Summary
  • Monday

  • 104945 08/22/05 23:10 tigran ROC 12 failed.
  • 104940 08/22/05 21:58 tigran ROC 11 failed. Rebooted
  • 104935 08/22/05 20:33 tigran ROC 11 failed. Rebooted.
  • 104934 08/22/05 20:28 tigran BCM & BPM screen shot.
  • 104932 08/22/05 20:13 tigran ROC 11 failed. Rebooted
  • 104931 08/22/05 20:05 Reinhold EZ magnet Hall probe masked
  • 104929 08/22/05 19:49 tigran ROC 12 failed.Rebooted.
  • 104927 08/22/05 19:41 tigran ROC 11 failed. Rebooted
  • 104923 08/22/05 18:35 tigran ROC 12 failed.Rebooted.
  • 104921 08/22/05 17:48 tigran ROC 12 down.
  • 104919 08/22/05 17:41 tigran ROC 11 rebooted
  • 104918 08/22/05 17:37 Nue Rates for 13uA, Si
  • 104915 08/22/05 17:19 Nue Rates for 7uA, Si, raster ON
  • 104914 08/22/05 17:19 Fatiha Beam permit
  • 104912 08/22/05 16:32 Victor & Nue Bad Q1 Hall probe controller
  • 104911 08/22/05 16:05 lcole Summary of replay runs taken doing the Day Shift (8-22-05)
  • 104910 08/22/05 16:04 lcole Summary of replay runs taken doing the Day Shift (8-22-05)
  • 104908 08/22/05 16:03 Victor Victor
  • 104907 08/22/05 15:54 Nue Run59246 is HKS single trigger. Rates for it.
  • 104906 08/22/05 15:53 Víctor No beam for a while due to vacuum problem in Accelerator
  • 104904 08/22/05 15:42 Víctor Coda Fail
  • 104902 08/22/05 15:33 Sumihama EPICS readout problem for hall probes.
  • 104901 08/22/05 15:30 Víctor ROC11 Fail
  • 104899 08/22/05 15:17 Víctor ROC12 Fail
  • 104897 08/22/05 14:36 Víctor ROC12 Fail
  • 104894 08/22/05 13:53 Víctor ROC12 Fail
  • 104893 08/22/05 13:45 Mizuki Quit EPICS
  • 104891 08/22/05 13:35 Víctor ROC12 Fail
  • 104889 08/22/05 13:08 Víctor We turn of an on the display probes for Q1 and Splitter to recover the reading
  • 104888 08/22/05 13:01 Nue Rates for 13uA, Si
  • 104887 08/22/05 12:59 Nue Rates for 7uA, Si raster 2x2
  • 104884 08/22/05 12:48 Víctor ROC12 Fail
  • 104883 08/22/05 12:08 Víctor Water problem was man made
  • 104882 08/22/05 11:48 lcole target "all out"
  • 104881 08/22/05 11:33 Víctor & Nue Hall Access
  • 104880 08/22/05 11:13 Víctor D, Q1, Q2 and Enge magnets are On now and set
  • 104879 08/22/05 11:13 Víctor Ask for controlled access
  • 104878 08/22/05 11:10 lcole Hall C Going to Controlled Access
  • 104877 08/22/05 11:08 lcole All magnets tripped
  • 104876 08/22/05 10:42 Víctor ENGE and DZ and EZ magnets are also off
  • 104875 08/22/05 10:36 Víctor All HKS magnets and Splitter magnet tripped
  • 104874 08/22/05 10:24 Victor BPM & SLI & FB
  • 104873 08/22/05 10:24 Nue Rates for 12uA, Si
  • 104871 08/22/05 10:04 Víctor ROC11 Fail
  • 104868 08/22/05 09:33 Víctor ROC12 Fail
  • 104862 08/22/05 07:27 seva roc 13 to many return value
  • 104861 08/22/05 07:11 seva roc 12 not reported status
  • 104859 08/22/05 07:02 seva roc 12 not reported status
  • 104858 08/22/05 06:30 seva roc 12 not reported status
  • 104856 08/22/05 06:27 seva roc 12 not reported status
  • 104854 08/22/05 05:56 seva roc 12 not responding
  • 104851 08/22/05 04:59 seva roc 12 not reported status
  • 104850 08/22/05 04:34 okayasu Started data taking
  • 104846 08/22/05 03:44 okayasu target changed to Si
  • 104845 08/22/05 02:20 okayasu Hall changed to beam permit
  • 104844 08/22/05 02:20 Reinhold Still no field readback
  • 104843 08/22/05 02:18 Reinhold Q2 up again
  • 104840 08/22/05 00:28 Reinhold Bill will come in
  • 104838 08/22/05 00:06 Reinhold Field readback still not working
  • 104837 08/22/05 00:04 Paul Baturin Shift Summary // Swing (08/21/05) | 16:00 pm - 0:00 am
  • 104835 08/22/05 00:04 Reinhold Paged Bill & Joe
  • Sunday

  • 104834 08/21/05 23:26 Reinhold Q2 also trips in local
  • 104833 08/21/05 23:16 Reinhold Q2 keeps tripping on MagWater
  • 104832 08/21/05 23:13 Reinhold Target ans slit controller working again
  • 104831 08/21/05 21:55 paul Problem with controller / and HKS-Q2 is down again!
  • 104830 08/21/05 21:52 Reinhold Not my day: Q2 tripped again
  • 104829 08/21/05 21:39 Reinhold All slit positions and target position funny
  • 104828 08/21/05 21:30 Nonaka MCC is done with beam tuning
  • 104827 08/21/05 21:27 Reinhold Target won't move
  • 104826 08/21/05 20:54 Reinhold Reboot hcpc10401
  • 104825 08/21/05 20:45 Reinhold No field readback in GUI
  • 104824 08/21/05 20:44 Reinhold Reset and set Q2
  • 104823 08/21/05 20:38 Reinhold Q2 tripped again MagWater
  • 104822 08/21/05 20:19 Nonaka This doesn't mean need of target position adjustment.
  • 104821 08/21/05 20:07 Reinhold Reset Q2 locally
  • 104820 08/21/05 19:56 Paul We are in Controlled access due to Q2 problem
  • 104819 08/21/05 19:08 Reinhold HKS-Q2 faults again on MagWater
  • 104818 08/21/05 19:07 Nonaka Target contoller cycled.
  • 104817 08/21/05 18:58 Nonaka Target out because of beam tuning.
  • 104816 08/21/05 18:48 Reinhold HKS vacuum gauge controller bypassed
  • 104815 08/21/05 18:15 Reinhold Got two new gauge controllers from physics storage building
  • 104814 08/21/05 18:04 Sumihama Modify replay on CVS.
  • 104813 08/21/05 17:50 Reinhold Valve 3H00B would not open; toggeled gauge
  • 104811 08/21/05 16:03 Victor Day Shift Summary
  • 104810 08/21/05 15:58 reinhold e_trans_scin.f (again, with better fromatting)
  • 104809 08/21/05 15:57 reinhold e_trans_scin.f
  • 104808 08/21/05 15:26 Víctor No beam due to Hall C laser. Expert will fix it.
  • 104807 08/21/05 14:41 Víctor There had been beam for a while. MCC is having problems.
  • 104806 08/21/05 13:50 reinhold e_trans_scin.f in CVS and online differ
  • 104804 08/21/05 12:52 Victor BPM & SLI & FB
  • 104802 08/21/05 12:43 Víctor This was a network error, no ROCs. Network swtich rebooted.
  • 104801 08/21/05 12:41 Víctor ROC11, 12 and 14 Fail
  • 104797 08/21/05 11:35 Víctor ROC12 Fail
  • 104795 08/21/05 11:29 Víctor ROC12 Fail
  • 104793 08/21/05 11:01 Victor ROC12 Fail
  • 104792 08/21/05 11:00 Víctor Si target is in
  • 104790 08/21/05 10:40 Víctor Target is out for tunning beam
  • 104789 08/21/05 10:28 Víctor Hall in beam permit
  • 104788 08/21/05 10:27 Víctor "Vacuum problem" is fixed.
  • 104787 08/21/05 09:14 Víctor Hall is in Controlled Access
  • 104786 08/21/05 09:07 Víctor Paul Hood is going to check vacuum pump
  • 104785 08/21/05 09:01 Víctor MCC wants we checlk the vacuum pumps
  • 104784 08/21/05 08:51 Víctor The vacuum valve in trouble is 3H00B
  • 104783 08/21/05 08:32 Víctor Vacuum problem in the Hall, near the target
  • 104781 08/21/05 08:13 Víctor ROC11 Fail
  • 104777 08/21/05 07:23 seva roc 12 not responding
  • 104773 08/21/05 06:23 seva roc 11 problems
  • 104768 08/21/05 04:02 seva roc 12 not reported status
  • 104765 08/21/05 02:44 seva roc 11 not responding
  • 104762 08/21/05 01:18 seva roc 12 not reported status
  • 104759 08/21/05 00:35 seva roc 12 dma transfer error,rebooted
  • 104755 08/21/05 00:02 amour Shift Summary
  • Saturday

  • 104749 08/20/05 22:09 paul Newtork communication problem
  • 104748 08/20/05 21:56 paul SLI, BPM, BCM screenshots
  • 104745 08/20/05 21:24 paul Roc11
  • 104744 08/20/05 21:18 paul Roc 12 gave an error
  • 104740 08/20/05 19:54 paul Roc12 DMA error
  • 104737 08/20/05 19:15 paul Roc12 has not reported status error
  • 104734 08/20/05 18:58 paul not-identified stop of run
  • 104732 08/20/05 18:33 paul EDC trigger error message for run#59169 /// JUNK
  • 104730 08/20/05 18:27 paul Roc13 tripped
  • 104728 08/20/05 18:21 paul Roc12 problem
  • 104726 08/20/05 18:08 paul Roc12 error
  • 104725 08/20/05 18:00 paul Roc12 crashed
  • 104722 08/20/05 17:24 paul The beam is back
  • 104721 08/20/05 17:13 paul The beam is OFF due to RF problem
  • 104720 08/20/05 16:52 paul Splitter Magnetic field value is slightly lower
  • 104719 08/20/05 16:49 paul The beam is back
  • 104718 08/20/05 16:46 paul RF problem / beam is off
  • 104715 08/20/05 16:26 paul Roc11 error message
  • 104713 08/20/05 16:01 abdellah Day shift summary
  • 104708 08/20/05 14:44 song ROC12 problem, rebooted
  • 104706 08/20/05 14:28 song the problem on HDC1 raw wiremap is solved by rebooting ROC 13 & 14
  • 104704 08/20/05 14:19 song HDC1 raw wiremap looks strange
  • 104703 08/20/05 14:12 abdellah Rates for Si with 13 uA
  • 104700 08/20/05 12:27 abdellah status update
  • 104698 08/20/05 09:44 abdellah beam off update
  • 104696 08/20/05 07:57 okayasu Target changed
  • 104695 08/20/05 07:39 okayasu Current accelerator status
  • 104694 08/20/05 07:35 okayasu Beam off for while due to the IOCCH7 problem
  • 104692 08/20/05 06:43 seva roc 11 not responding
  • 104689 08/20/05 05:34 seva roc 12 not responding
  • 104684 08/20/05 02:57 seva roc 11 not responding
  • 104681 08/20/05 02:07 seva roc 12
  • 104677 08/20/05 00:50 seva roc 12
  • 104675 08/20/05 00:29 seva roc 12
  • 104673 08/20/05 00:19 seva roc 11 dma error
  • Friday

  • 104669 08/19/05 23:39 tigran ROC 12 failed.
  • 104668 08/19/05 23:32 tigran ROC 11 failed. Rebooted.
  • 104664 08/19/05 22:46 tigran ROC12 rebooted.
  • 104661 08/19/05 22:00 tigran ROC 12 failed.Rebooted.
  • 104657 08/19/05 21:12 tigran ROC 12 failed.Rebooted.
  • 104655 08/19/05 21:09 tigran End of Run# 59120 failed.
  • 104652 08/19/05 20:22 tigran ROC 11 failed. Rebooted
  • 104651 08/19/05 20:17 tigran BPM & BCM screen shot
  • 104649 08/19/05 20:04 tigran ROC 11 failed. Rebooted
  • 104648 08/19/05 20:01 tigran ROC 12 failed.Rebooted.
  • 104645 08/19/05 19:41 tigran ROC 12 failed.Rebooted.
  • 104643 08/19/05 19:19 tigran ROC 11 and 12 rebooted
  • 104641 08/19/05 18:56 Nue Rates for C 26uA
  • 104640 08/19/05 18:50 Nue Tonight plan
  • 104638 08/19/05 18:42 Nue Raster pattern for B10 Calibration
  • 104637 08/19/05 18:36 Nue Rates for B10 10uA, no raster, Target was gone...
  • 104636 08/19/05 18:34 Nue Rates for B10, 10uA 2x2 raster
  • 104632 08/19/05 17:50 Akihiko Trigger rate w/ 12.5uA, Si.HKS single arm trigger
  • 104631 08/19/05 17:49 tigran ROC 11 and 12 rebooted
  • 104627 08/19/05 17:31 tigran CODA crashed.
  • 104625 08/19/05 16:56 tigran CODA crashed.
  • 104622 08/19/05 16:08 Abdellah Day shift summary
  • 104621 08/19/05 16:02 paul Roc11 got an error
  • 104617 08/19/05 15:21 paul Roc12 auto reboot
  • 104615 08/19/05 15:13 paul Rocs 11 and 12
  • 104611 08/19/05 14:28 paul Roc11
  • 104610 08/19/05 14:21 paul Roc12 DMA error
  • 104607 08/19/05 13:36 paul Roc12 DMA error
  • 104604 08/19/05 12:47 paul Roc12 crashed
  • 104601 08/19/05 12:11 Nue Rates for Si 12.5uA
  • 104598 08/19/05 11:29 cdaq beam is back
  • 104597 08/19/05 10:50 abdellah beam off
  • 104595 08/19/05 10:14 paul Roc12 crashed on run 59086
  • 104594 08/19/05 09:53 abdellah beam back on
  • 104592 08/19/05 09:40 abdellah beam off
  • 104590 08/19/05 09:19 paul Roc11 error message
  • 104589 08/19/05 09:14 paul Roc11 error message
  • 104586 08/19/05 09:09 paul Roc 11 Error message
  • 104585 08/19/05 08:59 paul Prestart Failed
  • 104580 08/19/05 07:44 seva roc 12 not Responding
  • 104577 08/19/05 06:51 okayasu BPM & SLI
  • 104572 08/19/05 05:26 seva roc 11 dma errors
  • 104565 08/19/05 03:22 seva roc 12 dma errors
  • 104563 08/19/05 03:13 seva roc 11 dma errors
  • 104561 08/19/05 02:48 seva roc 12 not responding
  • 104556 08/19/05 01:22 seva roc 11 not responding
  • 104554 08/19/05 01:15 seva roc 12
  • 104552 08/19/05 00:55 seva roc 12
  • 104549 08/19/05 00:10 seva roc 11 not responding
  • Thursday

  • 104547 08/18/05 23:59 Hamlet/Arthu Shift summary
  • 104545 08/18/05 23:52 hamlet Run 59052 is junk, ROC11 and ROC12 died.
  • 104543 08/18/05 23:46 hamlet Run 59051 is junk, ROC11 died.
  • 104541 08/18/05 23:18 hamlet Run 59049 ended at Coingate=224k. ROC12 died.
  • 104539 08/18/05 22:57 hamlet Run 59048 is junk, ROC12 died.
  • 104535 08/18/05 22:04 hamlet Run59045 is Junk, ROC11 died.
  • 104531 08/18/05 20:46 hamlet Run 5941 is junk, ROC12 died.
  • 104528 08/18/05 19:57 hamlet Run 59038 with Coingate=499k. End run failed. EB died.
  • 104526 08/18/05 19:37 Arthur BCM & BPM screen shot
  • 104524 08/18/05 19:31 hamlet Beam back. Start run 59037 is junk, ROC11 died.
  • 104523 08/18/05 19:12 Akihiko Data transfer of ROC14 was too low
  • 104522 08/18/05 18:58 hamlet Beam will be OFF next 10-15min
  • 104520 08/18/05 18:35 Arthur Run 59035 ended at Coingate=307k, ROC11 and ROC12 died
  • 104517 08/18/05 17:55 Nue Rates for 13uA, Si (beam current 0.5uA increased)
  • 104516 08/18/05 17:52 hamlet Run 59033 is junk. ROC11 and ROC12 died.
  • 104514 08/18/05 17:44 Nue Rates for Si 13uA
  • 104513 08/18/05 17:41 Nue Rates for HKS single trig, 13uA Si
  • 104511 08/18/05 17:22 hamlet Trigger back to normal HKS&ENGE
  • 104509 08/18/05 17:02 hamlet Test Run 59030 is junk, ROC11 died.
  • 104507 08/18/05 17:01 hamlet Change trigger from HKS&ENGE to HKS only
  • 104504 08/18/05 16:01 R.Asaturyan shift summary
  • 104502 08/18/05 15:22 Razmik beam off
  • 104498 08/18/05 14:05 Arshak ROC 11 reboot
  • 104495 08/18/05 13:22 Arshak ROC 12 reboot
  • 104490 08/18/05 12:18 Arshak ROC 13 reboot
  • 104486 08/18/05 11:12 Arshak ROC 12 reboot
  • 104484 08/18/05 10:45 Arshak ROC 11
  • 104482 08/18/05 10:10 saw Simple analyzer to scan data file for F1 problems
  • 104479 08/18/05 09:47 Arshak ROC 11 and 12 rebooted
  • 104478 08/18/05 09:46 Akihiko ROC 11 had errors every scaler evnt. Rebooted
  • 104476 08/18/05 09:17 Akihiko ROC12 rebooted
  • 104475 08/18/05 09:15 arshak roc 12 rebooted
  • 104474 08/18/05 09:14 arshak roc 12 rebooted
  • 104471 08/18/05 09:01 Akihiko Network module rebooted
  • 104468 08/18/05 08:45 arshak roc 12 rebooted
  • 104466 08/18/05 08:29 arshak roc 11 rebooted
  • 104463 08/18/05 08:00 seva roc 12 rebooted
  • 104462 08/18/05 07:55 okayasu VESDA alert
  • 104460 08/18/05 07:49 seva roc 11 rebooted
  • 104459 08/18/05 07:46 seva roc 12 rebooted
  • 104456 08/18/05 06:53 seva roc 11 rebooted
  • 104454 08/18/05 06:33 seva roc 12 rebooted
  • 104451 08/18/05 05:46 okayasu BPM & SLI
  • 104450 08/18/05 05:46 okayasu BPM & SLI
  • 104447 08/18/05 05:31 seva roc 12 rebooted
  • 104445 08/18/05 05:26 seva roc 12 rebooted
  • 104442 08/18/05 04:45 seva roc 12 rebooted
  • 104440 08/18/05 04:34 seva roc 12 rebooted
  • 104439 08/18/05 04:13 seva roc 12 rebooted
  • 104438 08/18/05 03:59 okayasu Beam back
  • 104437 08/18/05 02:38 okayasu Beam down
  • 104436 08/18/05 02:37 Akihiko Change F1library before run58987
  • 104433 08/18/05 02:00 seva roc 12 rebooted, run 58985 junk
  • 104431 08/18/05 01:48 seva roc 11 rebooted, run 58984 junk
  • 104427 08/18/05 00:33 seva run 58980 junk
  • 104425 08/18/05 00:28 seva roc11 failed
  • 104422 08/18/05 00:00 Arthur/Hamle Shift summary
  • 104420 08/18/05 00:00 hamlet ROC12 died.
  • Wednesday

  • 104419 08/17/05 23:53 hamlet Run 58977 is junk, DAQ problem.
  • 104417 08/17/05 23:48 hamlet 23:48 ROC11 and ROC12 down.
  • 104416 08/17/05 23:26 hamlet Run 58975 is Junk, ROC13 problem.
  • 104414 08/17/05 23:19 hamlet End run problem for 58974. ROC13 died.
  • 104411 08/17/05 22:17 hamlet Run 58972 is junk. ROC11 died.
  • 104408 08/17/05 21:46 hamlet Run 58970 is junk. ROC11 died.
  • 104405 08/17/05 21:15 hamlet Run 58968 is junk. ROC12 died.
  • 104402 08/17/05 20:47 hamlet Run 58966 is a Junk. ROC12 died.
  • 104399 08/17/05 20:10 Reinhold Current trigger rates on Si with 12 uA
  • 104398 08/17/05 20:09 hamlet Run 58963-58964 are junk.
  • 104397 08/17/05 20:06 Arthur BCM & BPM screen shot
  • 104395 08/17/05 20:02 hamled Run 58963 is junk.
  • 104393 08/17/05 19:58 Reinhold Restored trigger to PID and coincidence
  • 104392 08/17/05 19:52 hamlet Trigger changed back to normal
  • 104391 08/17/05 19:43 Reinhold Changed trigger to noPID (run 58962)
  • 104389 08/17/05 19:41 hamlet Run 58962 without PID
  • 104387 08/17/05 19:10 hamlet Beam back. Run 58960 is junk !
  • 104385 08/17/05 18:39 hamlet Beam off due to RF trip.
  • 104384 08/17/05 18:31 Arthur BCM & BPM screen shot
  • 104382 08/17/05 18:10 hamlet Run 58958; ROC12 died at Coingate=64k.
  • 104381 08/17/05 18:09 hamlet Run 58957 ended. At Coingate=93k, ROC11 died.
  • 104380 08/17/05 18:08 Arthur BCM & BPM screen shot
  • 104378 08/17/05 18:04 Nue Rates for Si 14uA
  • 104376 08/17/05 17:53 Nue Rates for Coin trig, Si 13uA
  • 104375 08/17/05 17:36 hamlet Before run 58956 Trigge back to HKS&ENGE
  • 104373 08/17/05 17:25 hamlet Trigger changed from HKS and ENGE to HKS only
  • 104372 08/17/05 17:25 Nue Trigger was changed to the HKS single arm. Rates for HKS single trig, 13uA Si
  • 104371 08/17/05 17:22 Nue Rates for Si, 13uA
  • 104366 08/17/05 16:01 R.Asaturyan shift summary
  • 104333 08/17/05 06:28 seva roc 12 failed
  • 104331 08/17/05 06:09 okayasu ROC12 rebooted.
  • 104329 08/17/05 05:39 okayasu ROC13 rebooted
  • 104326 08/17/05 04:53 okayasu CODA rebooted
  • 104325 08/17/05 04:46 okayasu ROC11 rebooted
  • 104323 08/17/05 04:43 okayasu ROC12 rebooted.
  • 104321 08/17/05 04:12 seva roc 11 failed
  • 104315 08/17/05 02:57 seva roc 11 failed
  • 104311 08/17/05 01:32 seva roc 11 failed
  • 104309 08/17/05 01:29 seva roc 12 failed
  • 104304 08/17/05 00:09 hamlet Beam time account
  • Tuesday

  • 104303 08/16/05 23:59 Arthur/Hamle Shift summary
  • 104299 08/16/05 23:01 hamlet Run 58894 is junk. EB and ER died
  • 104297 08/16/05 22:51 Arthur BCM & BPM screen shot
  • 104294 08/16/05 22:04 hamlet Run 58891 ended with Coingate=124k. ROC12, EB and ER error
  • 104292 08/16/05 21:39 hamlet Run 58889 is junk. ROC12 died.
  • 104291 08/16/05 21:35 hamlet Run 58888 is a good but not in a runlist.
  • 104289 08/16/05 21:20 Arthur Run 58886 ended with Coingate=329k. ROC11 died.
  • 104287 08/16/05 20:56 Arthur BCM & BPM screen shot
  • 104285 08/16/05 20:52 Arthur Run 58885 ended with Coingate=482k. ROC12 died
  • 104283 08/16/05 20:18 hamlet Run 58884 ended with Coingate=410k. ROC12 died
  • 104272 08/16/05 16:29 Arthur Run 58874 is Junk, ROC11 died
  • 104270 08/16/05 16:13 Arthur BCM & BPM screen shot
  • 104267 08/16/05 16:01 R.Asaturyan shift summary
  • 104262 08/16/05 14:26 Reinhold What's the definition of the ENGE focal plane?
  • 104254 08/16/05 12:20 Arshak BPM&BCM screan
  • 104252 08/16/05 12:06 Reinhold Followup: ENGINE update: it's the scaler analysis
  • 104251 08/16/05 12:04 Nue Rates for 13uA, Si
  • 104249 08/16/05 11:58 Reinhold ENGINE update
  • 104248 08/16/05 11:53 Razmik beam back
  • 104246 08/16/05 10:06 razmik Beam off
  • 104239 08/16/05 08:02 Paul Gueye, Shift Summary
  • 104236 08/16/05 07:21 gueye ROC11 crashed
  • 104232 08/16/05 06:46 gueye ROC11 crahsed @ end of run 58848
  • 104228 08/16/05 05:45 gueye ROC11 crashed @ end of run 58845
  • 104224 08/16/05 04:29 gueye Reboot ROC11
  • 104220 08/16/05 03:26 gueye Beam back
  • 104219 08/16/05 03:22 gueye RF problem
  • 104217 08/16/05 03:07 okayasu VESDA alert
  • 104216 08/16/05 02:56 gueye ROC13 reboot
  • 104215 08/16/05 02:42 gueye run 58835 with EDC residual7 = 0
  • 104212 08/16/05 02:25 gueye run 58834 is junk
  • 104209 08/16/05 01:59 gueye ROC12 crashed @ 58k in run 58832
  • 104207 08/16/05 01:52 gueye CODA restarted
  • 104206 08/16/05 01:46 gueye Injector problem again
  • 104204 08/16/05 01:26 gueye ROC12 crashed @ 66k on run 58829
  • 104202 08/16/05 01:18 gueye MCC called - beam back
  • 104201 08/16/05 00:35 gueye MCC called - injector problem
  • 104199 08/16/05 00:05 Hamlet/Arthu Shift summary
  • Monday

  • 104198 08/15/05 23:59 hamlet Run 58827 is Junk, ROC12 died
  • 104196 08/15/05 23:52 hamlet Run 58826 ended with Coingate=341k. ROC12 died
  • 104194 08/15/05 23:31 Arthur BCM & BPM screen shot
  • 104192 08/15/05 23:02 Arthur Run 58824 is junk, ROC11 and ROC12 died
  • 104190 08/15/05 22:56 Paul run's info
  • 104189 08/15/05 22:36 Paul B. AC grouping study
  • 104187 08/15/05 22:31 Akihiko New parameter files for EDC
  • 104186 08/15/05 22:31 Akihiko New parameter files for EDC
  • 104184 08/15/05 22:10 hamlet Run 58821 ended with Coingate=260k, ROC12 died
  • 104183 08/15/05 22:09 hamlet Run 58819 is junk
  • 104178 08/15/05 20:53 hamlet Run 58816 ended with Coingate=206k, ROC12 died
  • 104177 08/15/05 20:50 Arthur ROC12 had no response
  • 104176 08/15/05 20:47 Arthur BPM & BCM screen shot
  • 104175 08/15/05 20:45 Arthur BPM & BCM screen shot
  • 104173 08/15/05 20:36 Arthur ROC12 died
  • 104169 08/15/05 19:31 Arthur Run 58812 is junk, ROC12 died
  • 104167 08/15/05 19:16 Nue Summary of Rates for various targets, currents.
  • 104165 08/15/05 19:04 Akihiko ROC 11 had errors every scaler evnt. Rebooted
  • 104163 08/15/05 19:01 Akihiko This time ROC12 had problem
  • 104162 08/15/05 18:57 hamlet Run 58809 is Junk. ROC14 problem.
  • 104160 08/15/05 18:50 Akihiko Data transfer of ROC14 was too low
  • 104159 08/15/05 18:43 hamlet Run 58808 is junk. Have DAQ problem.
  • 104158 08/15/05 18:42 Nue Rates for 13uA Si
  • 104157 08/15/05 18:37 Nue Switch on breaker for ROC12 and Hall Probes (Control
  • 104156 08/15/05 18:31 hamlet Run 58807 to check Si target
  • 104154 08/15/05 18:28 Nue Run title is wrong, 7uA, 2x2 raster on for target heating up
  • 104153 08/15/05 18:26 hamlet Si target on the beam
  • 104151 08/15/05 18:20 Arthur Taget is aout by request MCC
  • 104150 08/15/05 18:14 hamlet Ready for beam
  • 104149 08/15/05 17:47 Hamlet Ask for Cotrolled access
  • 104148 08/15/05 17:38 Arthur Run #58806 is Junk, ROC12 died.
  • 104143 08/15/05 16:41 Arthur Run #58802 is Junk. ROC12 died
  • 104141 08/15/05 16:31 Arthur Run #58799-58800 are Junk
  • 104137 08/15/05 16:03 R.Asaturyan Shift summary
  • 104135 08/15/05 15:58 Nue Rates for 15uA, Si, No raster
  • 104134 08/15/05 15:58 razmik beam back
  • 104131 08/15/05 15:45 Razmik Beam will be back after 10-15 min.
  • 104130 08/15/05 15:44 Razmik Beam will be back after 10-15 min.
  • 104129 08/15/05 15:36 Razmik Beam will be back after 10-15 min.
  • 104128 08/15/05 15:22 Razmik No beam for next 1-1.5 hours
  • 104127 08/15/05 15:00 Nue Beam ramping up spped is 0.5uA/sec
  • 104126 08/15/05 14:41 Nue Si target seems surviving even without generous way of beam startup
  • 104124 08/15/05 14:25 Nue Rates for 13uA, Si
  • 104121 08/15/05 13:53 Arshak target is in
  • 104120 08/15/05 13:18 Arshak MCC ready to send beam
  • 104119 08/15/05 12:58 Tang An e-mail from safety official
  • 104118 08/15/05 12:03 Nue Reason why F1 resolution was changed
  • 104117 08/15/05 12:00 Arshak target is out
  • 104116 08/15/05 11:52 razmik Beam study
  • 104115 08/15/05 11:50 Nue Harp scan before the beam study was cancelled due to EZ trip
  • 104114 08/15/05 11:34 razmik harp scan
  • 104113 08/15/05 11:32 Reinhold MCC running our harps
  • 104111 08/15/05 11:00 saw ROC 12 many suspended processes
  • 104110 08/15/05 10:57 razmik beam off
  • 104108 08/15/05 10:41 Akihiko F1 resolution for EDC(ROC11) changed to 118 ps
  • 104107 08/15/05 10:15 Reinhold Access postponed until 2 pm
  • 104103 08/15/05 08:27 Reinhold Monday day plan: up to 2 h access at 10 am
  • 104100 08/15/05 08:02 Akihiko New parameter files
  • 104093 08/15/05 07:04 gueye
  • 104092 08/15/05 06:47 gueye
  • 104090 08/15/05 06:36 okayasu BPM & SLI
  • 104089 08/15/05 06:35 okayasu BPM & SLI
  • 104082 08/15/05 03:02 gueye
  • 104080 08/15/05 02:42 gueye
  • 104078 08/15/05 02:00 gueye
  • 104077 08/15/05 01:50 Akihiko F1s that caused DMA error
  • 104075 08/15/05 00:54 gueye
  • 104072 08/15/05 00:26 gueye run 58766 - Junk
  • 104069 08/15/05 00:18 gueye ROC11&12 failed - run 58765
  • 104067 08/15/05 00:02 Victor Swing Shift Summary
  • Sunday

  • 104064 08/14/05 23:10 Víctor ROC12 Fail
  • 104063 08/14/05 23:08 Víctor Rates for 13 uA, Si
  • 104061 08/14/05 22:38 Víctor ROC12 Fail
  • 104059 08/14/05 22:22 Víctor ROC11 Fail
  • 104057 08/14/05 21:48 Víctor Beam is back
  • 104056 08/14/05 21:18 Víctor No beam to verify why it is too unstable
  • 104054 08/14/05 20:48 Víctor ROC12 Fail
  • 104052 08/14/05 20:31 Víctor ROC11 Fail
  • 104050 08/14/05 20:17 Víctor ROC12 Fail
  • 104043 08/14/05 18:29 Víctor ROC12 Fail
  • 104041 08/14/05 18:24 Víctor ROC12 Fail
  • 104035 08/14/05 17:29 Víctor ROC11 Fail
  • 104033 08/14/05 17:23 Víctor ROC11 Fail
  • 104031 08/14/05 17:17 Víctor ROC12 Fail
  • 104028 08/14/05 16:55 Victor BPM & SLI & FB
  • 104027 08/14/05 16:55 Victor BPM & SLI & FB
  • 104025 08/14/05 16:45 Víctor & Joe Log for ROC errors
  • 104023 08/14/05 16:40 Víctor ROC12 and 11 Fail
  • 104022 08/14/05 16:39 Víctor ROC11 Fail
  • 104021 08/14/05 16:37 Reinhold Turned on logging of ROC 11 & 12
  • 104018 08/14/05 16:16 Víctor ROC11 Autoreboot
  • 104016 08/14/05 16:04 lcole Shift Summary
  • 104013 08/14/05 15:50 lcole Roc 11 crashed, rebooted.
  • 104010 08/14/05 15:23 lcole Screenshots with Si Target
  • 104008 08/14/05 15:18 lcole Roc 11 crashed; rebooted.
  • 104006 08/14/05 15:08 lcole Correct rates for Si with beam on
  • 104003 08/14/05 14:53 song 58729 something looks strange
  • 103998 08/14/05 14:17 lcole Roc 12 crashed; rebooted.
  • 103993 08/14/05 13:51 lcole Roc 12 crashed; rebooted.
  • 103992 08/14/05 13:48 lcole Rates for Si
  • 103989 08/14/05 13:32 Tang ROC11 failed to start at beginning of run 58719
  • 103986 08/14/05 13:17 lcole Warming up Si
  • 103985 08/14/05 13:12 lcole Changed to Si Target.
  • 103982 08/14/05 12:24 Roc 12 crash
  • 103980 08/14/05 12:11 lcole Run 58714 is junk.
  • 103978 08/14/05 12:02 lcole Changed number of events taken
  • 103976 08/14/05 11:55 lcole Roc 11 failed; rebooted.
  • 103973 08/14/05 11:39 lcole Run 58710 is junk.
  • 103971 08/14/05 11:26 lcole Coda is back.
  • 103969 08/14/05 11:11 lcole Coda has frozen
  • 103968 08/14/05 10:54 lcole Roc 11 failed; rebooted.
  • 103967 08/14/05 10:38 lcole Roc 12 failed; rebooted Roc 12.
  • 103964 08/14/05 08:37 lcole Roc 12 failed; rebooted Rocs 11 & 12.
  • 103963 08/14/05 08:29 song ROC 12 failed while rebooting
  • 103961 08/14/05 08:13 lcole Roc 11 crashed during Run 58703; Rebooted Roc 11 &12
  • 103957 08/14/05 07:20 okayasu ROC 11, 12 rebooted
  • 103955 08/14/05 07:03 okayasu RUN58700 stopped due to the event builder error
  • 103954 08/14/05 06:52 okayasu Where is the 2nd person on this shift ?
  • 103952 08/14/05 06:23 okayasu ROC 11 rebooted
  • 103951 08/14/05 06:19 okayasu Discussion about the problem; xpf on the ENGE
  • 103949 08/14/05 05:48 okayasu ROC13 rebooted
  • 103947 08/14/05 05:36 okayasu ROC 11 12 rebooted
  • 103945 08/14/05 05:04 okayasu ROC 12 rebooted
  • 103943 08/14/05 04:57 okayasu ROC 11 rebooted
  • 103942 08/14/05 04:38 okayasu Usual message from ROC11
  • 103940 08/14/05 04:12 okayasu VESDA alert
  • 103938 08/14/05 03:58 okayasu ROC11 reboot during beam off
  • 103936 08/14/05 03:28 okayasu ROC13 rebooted
  • 103935 08/14/05 03:26 okayasu EHOD 8-T sometimes tripped
  • 103933 08/14/05 03:12 okayasu ROC 11 Failure Error
  • 103931 08/14/05 03:02 okayasu ROC 11 rebooted @ 612k trig.
  • 103929 08/14/05 02:30 okayasu ROC 11 12 rebooted
  • 103927 08/14/05 01:57 okayasu ROC 11 Failure Error
  • 103925 08/14/05 01:43 okayasu ROC 12 failed.Rebooted.
  • 103923 08/14/05 01:04 okayasu ROC13 rebooted
  • 103919 08/14/05 00:38 okayasu ROC 12 failed.Rebooted.
  • 103915 08/14/05 00:15 okayasu ROC 11 Failure Error
  • 103913 08/14/05 00:02 Victor Swing Shift Summary
  • 103911 08/14/05 00:01 Víctor ROC11 and ROC12 Fail
  • Saturday

  • 103909 08/13/05 23:23 seva roc 11 error
  • 103908 08/13/05 23:23 Víctor ROC11 Fail
  • 103906 08/13/05 22:50 Víctor Beam is back
  • 103905 08/13/05 22:32 Víctor No beam for some minutes
  • 103903 08/13/05 22:02 Víctor ROC12 Fail
  • 103901 08/13/05 21:27 Víctor ROC12 Fail
  • 103899 08/13/05 21:09 Seva ROC11 Power cycled
  • 103897 08/13/05 21:07 seva roc 11 error
  • 103896 08/13/05 21:04 Víctor ROC11 Autoreboot
  • 103895 08/13/05 20:37 Víctor Beam is back
  • 103893 08/13/05 19:30 Víctor No beam for some minutes
  • 103891 08/13/05 19:05 Nonaka Compearing before and after changing TUL
  • 103890 08/13/05 18:39 Reinhold Rates with new and old AC TUL program
  • 103889 08/13/05 18:39 Reinhold Rates with new and old AC TUL program
  • 103887 08/13/05 18:00 seva slight improvement of tracking code
  • 103885 08/13/05 17:52 Víctor ROC12 Fail
  • 103884 08/13/05 17:39 Nonaka I finished corrected assingment TUL program for ACs.
  • 103882 08/13/05 17:30 Víctor CODA Fail
  • 103880 08/13/05 16:45 Victor BPM & SLI & FB Swing Shift
  • 103877 08/13/05 16:31 seva roc 12 error
  • 103876 08/13/05 16:31 Víctor ROC12 Fail
  • 103875 08/13/05 16:30 Nonaka TUL AC pin assignment is incorrect !!
  • 103873 08/13/05 16:19 Víctor Beam is back
  • 103872 08/13/05 16:13 Víctor Beam is off
  • 103871 08/13/05 16:09 Paul Baturin Shift Summary
  • 103869 08/13/05 15:58 song esin1 RAW TDC looks strange
  • 103863 08/13/05 14:49 song ROC 12 hang up at 14:47
  • 103859 08/13/05 13:59 song escine1 RAW TDC looks unnormal.
  • 103856 08/13/05 13:47 Paul B. BCM&BPM&SLI screenshots
  • 103855 08/13/05 13:45 song ROC 12 hang up at 13:42
  • 103853 08/13/05 13:33 Akihiko Modified F1 library
  • 103852 08/13/05 13:26 Tang Comments on Okayasu's report
  • 103850 08/13/05 13:12 Akihiko Execute code may be quite different
  • 103848 08/13/05 12:58 Paul B Hall A changing beam params for callibration
  • 103847 08/13/05 12:54 song ROC 12 hang up at 12:45
  • 103843 08/13/05 12:41 song ROC 11 problem. got junk data#58646
  • 103841 08/13/05 12:18 song ROC 11 12 problem at 12:11
  • 103840 08/13/05 12:18 song ROC 11 error at 12:05
  • 103836 08/13/05 11:50 song EB failed at RUN#58641
  • 103834 08/13/05 11:34 song ROC 12 auto booted
  • 103832 08/13/05 11:18 song ROC 12 failed at 11:12
  • 103825 08/13/05 09:59 song ROC 11 error at 9:52
  • 103821 08/13/05 09:31 song ROC 12 auto booted
  • 103819 08/13/05 09:12 song ROC11 failed
  • 103816 08/13/05 08:58 Paul B The beam is back
  • 103815 08/13/05 08:41 Paul B. The beam will be OFF for about 15 mins
  • 103813 08/13/05 08:18 song ROC 11 Failure Error
  • 103811 08/13/05 08:06 paul ROCK 12 crashed
  • 103807 08/13/05 07:39 Nonaka RUN 58623 is junk.
  • 103805 08/13/05 07:23 Nonaka ROC11 rebooted
  • 103802 08/13/05 07:04 Nonaka ROC 12 failed at RUN#58621. This run is junk.
  • 103800 08/13/05 06:56 Nonaka ROC13 rebooted
  • 103797 08/13/05 06:29 Nonaka ROC 12 failed at RUN#58618. This run is junk.
  • 103796 08/13/05 06:22 Akihiko F1s caused DMA error
  • 103794 08/13/05 06:13 Nonaka Be careful for raw EDC data.
  • 103791 08/13/05 05:31 Nonaka RUN58614 is junk
  • 103788 08/13/05 05:10 Nonaka ROC 11 failed.RUN58613 is junk.
  • 103787 08/13/05 05:04 Nonaka ROC12 failed.RUN58612 is junk.
  • 103782 08/13/05 04:27 Nonaka ROC 12 rebooted
  • 103779 08/13/05 03:56 Nonaka ROC 11 Failure Error
  • 103775 08/13/05 03:09 Nonaka This message is wrong!
  • 103774 08/13/05 03:09 okayasu Continued - Comments for ENGE sieve slit run.
  • 103772 08/13/05 03:02 Nonaka EB failed at RUN#58603
  • 103771 08/13/05 03:01 Nonaka EB failed at RUN#58602
  • 103769 08/13/05 02:57 Nonaka Current beam propaty
  • 103768 08/13/05 02:56 Nonaka ROC12 failed at RUN#58602
  • 103767 08/13/05 02:56 okayasu Continued - Comments for ENGE sieve slit run.
  • 103765 08/13/05 02:40 Nonaka ROC12 autorebooted.
  • 103762 08/13/05 02:20 Nonaka ROC 12 failed at RUN#58599
  • 103761 08/13/05 02:18 Nonaka ROC 12 failed at RUN#58599
  • 103759 08/13/05 01:58 Nonaka RUN58597 is junk(ROC12 failed and reboot)
  • 103757 08/13/05 01:48 Nonaka ROC 12 failed reboot
  • 103756 08/13/05 01:47 Nonaka ROC 12 rebooted at RUN#58594
  • 103755 08/13/05 01:44 okayasu Comments for ENGE sieve slit run.
  • 103752 08/13/05 01:18 Nonaka ROC 12 rebooted at RUN#58594
  • 103748 08/13/05 00:55 Nue Steve's auto-reboot work-around and WC adder work fine (Summary of DAQ troubles)
  • 103743 08/13/05 00:03 Fatiha Shift Summary
  • Friday

  • 103737 08/12/05 23:20 Nue Rates for 26uA, C
  • 103732 08/12/05 22:56 Nue Rates for C 28uA
  • 103728 08/12/05 22:27 Nue Rates for C 26uA
  • 103725 08/12/05 22:00 Akihiko ROC 12 tNetTask became "SUSPEND" during run58575
  • 103724 08/12/05 21:58 Fatiha ENGE/HKS fridge temperatures are too high
  • 103722 08/12/05 21:48 Akihiko ROC12 rebooted automatically
  • 103720 08/12/05 21:39 Akihiko ROC 11, slot 11 "Resolution NOT Rocked", power cycled.
  • 103718 08/12/05 21:38 Akihiko ROC 11 status "ROC" became "SUSPEND" in run58572
  • 103716 08/12/05 21:12 Akihiko ROC 12 had so many DMA errors after 12675 event
  • 103712 08/12/05 20:27 Akihiko ROC 12 had so many DMA errors after 169483 event
  • 103711 08/12/05 20:23 Akihiko About run58566
  • 103710 08/12/05 20:17 Fatiha Beam back
  • 103708 08/12/05 20:10 Fatiha Beam status,
  • 103706 08/12/05 19:57 Fatiha Beam down
  • 103705 08/12/05 19:55 Akihiko run58565 no beam
  • 103704 08/12/05 19:51 Akihiko Rates for C 24uA
  • 103702 08/12/05 19:45 Akihiko ROC 11 failed to enable data reboot
  • 103701 08/12/05 19:44 Nue Trigger back to coincidence of HKS and ENGE
  • 103700 08/12/05 19:41 Fatiha C12 in
  • 103699 08/12/05 19:36 Akihiko DMA errors in run58563
  • 103698 08/12/05 19:35 Akihiko DMA errors in run58563
  • 103697 08/12/05 19:13 Fatiha Beam permit
  • 103696 08/12/05 19:04 Fatiha Beam permit
  • 103695 08/12/05 18:47 saw ROC12 slot 16 may be bad
  • 103691 08/12/05 18:22 saw Identifying a possible bad F1
  • 103690 08/12/05 18:19 saw Some investigation of ROC11/12 crashes
  • 103688 08/12/05 18:11 Fatiha Controlled access
  • 103685 08/12/05 17:45 Fatiha TS tests
  • 103684 08/12/05 17:32 Fatiha Status
  • 103682 08/12/05 16:12 Víctor Day Shift Summary
  • 103671 08/12/05 13:59 saw Capture of address and data from ROC 12 crash
  • 103666 08/12/05 12:22 saw Got a ROC12 crash
  • 103664 08/12/05 12:06 saw Replaced vmec12
  • 103663 08/12/05 11:56 Reinhold Status ENGE ROC failures
  • 103660 08/12/05 11:35 Reinhold Pavel inspects ENGE electronics shielding
  • 103657 08/12/05 10:15 saw Cosmic run 58536, ROC12 reboots after 12.8kevents
  • 103654 08/12/05 09:44 saw ROC11 autoreboot during cosmics run 58535
  • 103651 08/12/05 09:13 Víctor Hall in Controlled Access
  • 103650 08/12/05 09:07 saw ROC12 autoreboot 58533
  • 103648 08/12/05 09:01 saw ROC12 soft fail run 58532
  • 103647 08/12/05 08:59 saw ROC12 soft fail run 58531
  • 103645 08/12/05 08:55 Víctor ROC12 fail
  • 103643 08/12/05 08:51 ROC12 autoreboot 58529 & 58530
  • 103642 08/12/05 08:50 Víctor ROC12 Autoreboot
  • 103640 08/12/05 08:47 Víctor ROC12 Autoreboot
  • 103639 08/12/05 08:46 saw ROC12 stopped responding in run 58527
  • 103636 08/12/05 08:36 saw Exception on vmec12 reboot
  • 103634 08/12/05 08:29 Víctor ROC12 Autoreboot
  • 103631 08/12/05 07:49 Nonaka PS factor of RUN#58524 and 58525(junk) is 1. It is not 110 .
  • 103630 08/12/05 07:44 okayasu Q2 tripped again
  • 103629 08/12/05 07:44 okayasu Q2 recoverd
  • 103628 08/12/05 07:42 Nonaka ROC11 failed
  • 103627 08/12/05 07:39 Nonaka This is not production run.
  • 103626 08/12/05 07:38 Nonaka HKS sieve slit run status
  • 103625 08/12/05 07:32 okayasu Q2 tripped.
  • 103622 08/12/05 07:19 okayasu Changed trigger for HKS sieve slit run
  • 103621 08/12/05 07:08 Nonaka ROC 11 failed. Rebooted
  • 103619 08/12/05 06:59 okayasu ENGE sieve slit run status
  • 103618 08/12/05 06:56 Nonaka ROC 11 auto rebooted.
  • 103615 08/12/05 06:39 Nonaka EB,ER failed at end run
  • 103613 08/12/05 06:25 Nonaka ROC 12 failed.
  • 103610 08/12/05 06:10 Akihiko About ROCs autoreboot
  • 103608 08/12/05 05:57 Nonaka RUN 58515 is junk
  • 103606 08/12/05 05:50 Nonaka ROC 11 failed. Rebooted
  • 103604 08/12/05 05:40 Nonaka This run(#58511) is sieve slit run
  • 103602 08/12/05 05:31 Nonaka ROC 12 rebooted
  • 103598 08/12/05 04:56 okayasu Trigger changed
  • 103597 08/12/05 04:54 okayasu Beam current & sieve slit changed
  • 103589 08/12/05 03:58 Akihiiko run58502 is junk
  • 103585 08/12/05 03:34 okayasu Sieve slit & target monitor
  • 103581 08/12/05 03:12 okayasu Trigger changed
  • 103580 08/12/05 03:11 okayasu Back to collimator
  • 103579 08/12/05 03:06 Akihiko ROCs problem
  • 103578 08/12/05 02:59 okayasu We asked beam
  • 103574 08/12/05 02:03 okayasu Status of Hall C changed to controlled access.
  • 103573 08/12/05 02:00 okayasu Collimator changed to sieve slit
  • 103572 08/12/05 01:55 okayasu Target changed from Si to C
  • 103566 08/12/05 00:16 Bosted Shift summary
  • Thursday

  • 103565 08/11/05 23:38 Bosted Hall in Controlled Access
  • 103564 08/11/05 23:37 Bosted ROC12 crash
  • 103562 08/11/05 23:16 Bosted ROC12 crashed at 1.5K in run 58488
  • 103560 08/11/05 23:12 Bosted ROC12 crashed at 79K in run 58487
  • 103559 08/11/05 23:10 Bosted Target really Si Runs 58484 to 7
  • 103558 08/11/05 23:08 Akihiko Rates for Si 10uA
  • 103556 08/11/05 23:01
  • 103555 08/11/05 23:00 Bosted ROC 11
  • 103553 08/11/05 22:59 Bosted ROC11
  • 103552 08/11/05 22:57 Nue Rates for Si 12uA
  • 103550 08/11/05 22:54 Bosted ROC11 autoreboot
  • 103548 08/11/05 22:52 Bosted Changed target to Si
  • 103546 08/11/05 22:40 Bosted ROC11 autorebooted at 130K in run 58482
  • 103543 08/11/05 22:27 Bosted ROC 12 died again
  • 103542 08/11/05 22:21 saw vmec12 error
  • 103540 08/11/05 22:18 Bosted ROC12 again
  • 103538 08/11/05 22:14 Bosted ROC12 died
  • 103535 08/11/05 22:00 Bosted ROC12 died
  • 103534 08/11/05 21:58 Akihiko Tigger latency for ROC12 changed
  • 103532 08/11/05 21:45 Akihiko, Vic vmec12 replacement
  • 103531 08/11/05 21:42 Akihiko Replace CPU module
  • 103530 08/11/05 21:36 Bosted Ask for beam
  • 103529 08/11/05 21:35 Akihiko Trigger back to coincidence between HKS AND ENGE(A AND B)
  • 103528 08/11/05 21:26 Bosted Trigger changed
  • 103526 08/11/05 19:36 Bosted Another entry into the Hall
  • 103525 08/11/05 18:58 Bosted Controlled access
  • 103524 08/11/05 18:54 Bosted ROC12 autoreboot run 58474 at 132K
  • 103523 08/11/05 18:50 Bosted ROC12 disable scalars
  • 103521 08/11/05 18:45 saw Remove scaler code from vmec12
  • 103519 08/11/05 18:32 Bosted ROC12 Autoreboot at 59K in run 58472.
  • 103516 08/11/05 18:20 Bosted ROC12 Autoreboot in run 58470 at 287K
  • 103515 08/11/05 18:09 Akihiko Singles rate w/ 22 uA,C target
  • 103514 08/11/05 18:07 Akihiko ROC12 reboot itself every run
  • 103512 08/11/05 18:05 Bosted Beam off
  • 103509 08/11/05 17:53 Tang Beam back, but run started with one ROC12 auto reboot and followed with a crash, power cycled
  • 103505 08/11/05 17:29 lcole target all out
  • 103501 08/11/05 16:22 seva mor eon hdc tracking efficiency
  • 103500 08/11/05 16:12 amour trigger changed to ff chamber
  • 103498 08/11/05 16:01 Victor Victor
  • 103496 08/11/05 14:57 Tang Comments about ROC crashes
  • 103495 08/11/05 14:44 seva HDC tracking
  • 103494 08/11/05 14:37 Nue He bag gas
  • 103493 08/11/05 13:06 Víctor Beam is down due to a MCC controlled access
  • 103487 08/11/05 12:18 Nue Rates for Carbon 22 uA, WC1-9,10 conections were corrected.
  • 103485 08/11/05 12:09 Víctor ROC12 autoreboot
  • 103483 08/11/05 11:59 Reinhold WC 1-9 and 1-10 discriminator signals to TUL were swapped.
  • 103481 08/11/05 11:55 Víctor ROC12 Autoreboot
  • 103478 08/11/05 11:42 Víctor ROC12 Reboot itself
  • 103477 08/11/05 11:38 yuan F1TDC gate width for card 1X3 of H1X is wider
  • 103475 08/11/05 11:31 Reinhold Water (WC) 1-9 and 1-10 might not be in trigger
  • 103472 08/11/05 11:11 Victor BPM & SLI & FB
  • 103470 08/11/05 11:09 Sumihama Proton/Pion ratio w and w/o adders of WC.
  • 103469 08/11/05 11:09 Víctor ROC12 Fail
  • 103468 08/11/05 11:09 seva rates for C at 22uA
  • 103466 08/11/05 10:57 Víctor ROC11 fail
  • 103465 08/11/05 10:56 Reinhold/Sev HDC1X raw tdc distribution funny
  • 103463 08/11/05 10:47 Víctor ROC11 Reboot itself
  • 103460 08/11/05 09:53 Víctor ROC11 Fail. Ed contacted
  • 103459 08/11/05 09:52 Reinhold Changed trigger to Scintillator HKS only
  • 103458 08/11/05 09:42 Víctor ROC12 Fail
  • 103456 08/11/05 09:26 Víctor Beam is back
  • 103454 08/11/05 09:07 Víctor No beam
  • 103453 08/11/05 09:01 Víctor ROC12 Reboot itself
  • 103451 08/11/05 08:45 Víctor ROC12 Fail
  • 103449 08/11/05 08:27 Víctor ROC13 Fail
  • 103447 08/11/05 08:21 Rebekah Halk ROC 11 Failure Error
  • 103445 08/11/05 08:04 okayasu Current optics study status for ENGE arm
  • 103443 08/11/05 07:56 Nonaka ROC12 rebooted
  • 103442 08/11/05 07:56 Nonaka ROC 12 rebooted
  • 103440 08/11/05 07:45 Nonaka ROC 12 rebooted
  • 103438 08/11/05 07:34 Nonaka EB trouble at end run
  • 103437 08/11/05 07:21 Nonaka Current beam propaty
  • 103436 08/11/05 07:19 Nonaka Current beam propaty
  • 103434 08/11/05 07:10 Nonaka ROC 11 failed. Rebooted
  • 103431 08/11/05 06:38 Nonaka ROC 12 rebooted
  • 103429 08/11/05 06:25 Nonaka ROC 12 rebooted
  • 103427 08/11/05 05:57 Nonaka Current beam propaty
  • 103424 08/11/05 05:31 Nonaka ROC 12 failed.Rebooted.
  • 103422 08/11/05 05:10 Nonaka ROC 12 rebooted
  • 103421 08/11/05 04:59 Nonaka Current beam propaty
  • 103419 08/11/05 04:44 Nonaka ROC 12 failed. It rebooted.
  • 103416 08/11/05 03:51 Nonaka Current beam propaty
  • 103414 08/11/05 02:28 okayasu Beam off for ten & few minutes
  • 103413 08/11/05 02:22 Nonaka RUN#58418 and 58419 is junk
  • 103411 08/11/05 02:10 Nonaka Prestart failed.ROC 12 reboot.
  • 103410 08/11/05 01:56 Nonaka Current beam propaty
  • 103408 08/11/05 01:47 Nonaka beam current was changed to 22uA at #58413
  • 103406 08/11/05 01:27 Nue WC threshold and rates (C 24uA)
  • 103405 08/11/05 01:17 okayasu About the problem w/ ROCs crash
  • 103403 08/11/05 01:07 okayasu Beam will be down for few minutes
  • 103402 08/11/05 01:04 Nue Rates for 22uA, C (new WC adder)
  • 103400 08/11/05 01:02 Sumihama The kaon number after modification of WC.
  • 103399 08/11/05 01:01 Akihiko Restarted CODA and rebooted all ROCs
  • 103398 08/11/05 00:59 Nue TDC spectra of WC
  • 103397 08/11/05 00:50 okayasu Changed beam current
  • 103395 08/11/05 00:38 Nonaka ROC 12 rebooted
  • 103393 08/11/05 00:13 Sumihama Cut conditions and the number of Lambda/Sigma and C(g.s).
  • 103391 08/11/05 00:08 Bosted Shift summary
  • Wednesday

  • 103389 08/10/05 23:57 Nue Passive adder for WC triggers
  • 103386 08/10/05 23:02 Tang ROC13 crashed at events #278k in run58408, power cycle &reboot
  • 103383 08/10/05 22:43 Tang ROC12 crashed at events #55k in run58406, power cycle &reboot
  • 103382 08/10/05 22:42 Sumihama HV for 1-2B and 2-1T is set to -2200V.
  • 103378 08/10/05 22:22 Sumihama HV for 1-2B and 2-1T is set to -2100V.
  • 103377 08/10/05 22:21 Tang ROC13 crashed at events #163k in run58403, power cycle &reboot
  • 103376 08/10/05 22:20 Tang ROC13 crashed at events #322k in run58401, power cycle &reboot
  • 103375 08/10/05 22:19 Nue Rates for C, 24uA
  • 103373 08/10/05 22:06 Bosted Roc13 died in run 58401 at 320K
  • 103371 08/10/05 22:05 Bosted Resume production running, now on Carbon
  • 103369 08/10/05 21:49 Bosted Put in Carbon target
  • 103368 08/10/05 21:27 Bosted Pulsed beam
  • 103367 08/10/05 17:54 Akihiko Trigger back to coincidence of HKS and ENGE
  • 103366 08/10/05 17:43 Akihiko How to access ROCs via terminal server on debug window
  • 103365 08/10/05 17:23 ReinholdMove
  • 103363 08/10/05 17:11 Bosted Hall in Beam Permit
  • 103362 08/10/05 17:08 Akihiko Run 58397&58398 are test run w/o beam
  • 103360 08/10/05 16:44 Sumihama Updated coin.f
  • 103359 08/10/05 16:42 Sumihama Coin ntuples are on /scratch/sumihama/ntuple/coin/
  • 103355 08/10/05 15:58 Victor ENGE magnet has been turn on
  • 103354 08/10/05 15:51 Akihiko Change trigger to OR of HKS and ENGE
  • 103353 08/10/05 14:21 Sumihama HV is now set to -2000V for 1-2B and 2-1T.
  • 103352 08/10/05 12:31 Sumihama Signals from fore PMTs of EHODO are small or bad shape.
  • 103351 08/10/05 11:48 vulcan DZ hall probe
  • 103350 08/10/05 11:29 Reinhold Turned off ENGE magnet
  • 103349 08/10/05 11:10 Nue He Bag bottle
  • 103348 08/10/05 11:03 amour trigger changed to FF detector
  • 103345 08/10/05 08:31 yuan Owl shift summary
  • 103343 08/10/05 08:06 Kawama End run failed. ROC 12 rebooted.
  • 103340 08/10/05 07:53 Kawama ROC 14 rebooted.
  • 103339 08/10/05 07:49 Kawama ROC 11 rebooted.
  • 103333 08/10/05 06:58 Kawama ROC 12 failed
  • 103330 08/10/05 06:39 Kawama Run 58358 shows 'No EDC trigger signal' in offline analysis
  • 103327 08/10/05 06:12 Kawama ROC 12 failed
  • 103324 08/10/05 05:57 Kawama ROC 11 autorebooted.
  • 103321 08/10/05 05:47 Kawama Network problem
  • 103315 08/10/05 04:36 yuan BPM & SLI & FB status
  • 103310 08/10/05 03:55 Kawama ROC 12 failed
  • 103306 08/10/05 03:23 Kawama ROC 12 failed.
  • 103304 08/10/05 03:08 Kawama ROC 12 failed.
  • 103300 08/10/05 02:35 Kawama ROC 11 rebooted automaticaly
  • 103296 08/10/05 02:11 Kawama 58334,35,37,38 has no EDC trigger
  • 103294 08/10/05 02:07 Kawama ROC 11 failed. Rebooted
  • 103292 08/10/05 01:52 Kawama ROC 11 has error
  • 103288 08/10/05 01:12 Kawama ROC 11,12 rebooted
  • 103285 08/10/05 00:59 Kawama ROC 13 'Extra data'
  • 103276 08/10/05 00:00 Bosted Shift summary
  • Tuesday

  • 103275 08/09/05 23:57 Nonaka EB is failed at RUN#58343
  • 103273 08/09/05 23:49 Reinhold HHODO timing offsets
  • 103272 08/09/05 23:46 Reinhold HHODO timing offsets
  • 103270 08/09/05 23:36 Nonaka beam current status
  • 103268 08/09/05 23:21 Nonaka ROC 12 failed.Rebooted at RUN#58340
  • 103266 08/09/05 23:14 Nonaka EB is failed at end of RUN#58339
  • 103265 08/09/05 23:14 Bosted Bad ADC spectra
  • 103263 08/09/05 23:05 Nonaka ROC 11 failed. Rebooted at RUN#58338
  • 103260 08/09/05 22:33 Nonaka ROC 12 rebooted at RUN#58336
  • 103257 08/09/05 22:20 Nonaka EB is failed at RUN#58333 and 58334
  • 103255 08/09/05 22:06 Nonaka RUN#58333 is junk
  • 103249 08/09/05 20:57 Nonaka ROC14 fail.rebooted at RUN#58329
  • 103245 08/09/05 20:16 Nonaka RUN#58324 and 58325 is junk
  • 103244 08/09/05 20:16 Nonaka ROC 12 rebooted at RUN#58324
  • 103240 08/09/05 19:47 Nonaka ROC 12 rebooted at RUN#58321
  • 103238 08/09/05 19:39 Nonaka beam current status
  • 103234 08/09/05 18:51 Nonaka beam current status
  • 103228 08/09/05 17:20 Bosted Still no beam
  • 103226 08/09/05 16:27 Reinhold Moved Silicon target in
  • 103224 08/09/05 16:10 Víctor Change to previous trigger
  • 103223 08/09/05 16:10 Victor Victor
  • 103222 08/09/05 15:55 Víctor Hall in Beam Permit
  • 103221 08/09/05 15:49 Víctor Hall in Power Permit
  • 103220 08/09/05 15:44 Víctor Last raw data saved in Silo
  • 103219 08/09/05 15:06 Akihiko How to cntroll VME crate
  • 103218 08/09/05 14:59 Akihiko Air conditioner was OFF . I turned it on.
  • 103217 08/09/05 14:36 Tang What we will do to further optimize the experiment
  • 103215 08/09/05 14:27 Víctor Change trigger to Fission Chamber for test
  • 103214 08/09/05 13:56 Víctor Hall in Controlled Access to fix viewers
  • 103213 08/09/05 13:44 Víctor MCC has problems
  • 103212 08/09/05 13:22 Víctor Target is out
  • 103211 08/09/05 13:04 Akihiko Network problem of ROC11 VMEcrate fixed
  • 103210 08/09/05 12:42 Víctor Controlled Access to fix network problem
  • 103209 08/09/05 12:20 Víctor There is a Network problem with VME11
  • 103208 08/09/05 12:19 Reinhold Network problems: how to reboot network switch with hcreboot1
  • 103207 08/09/05 11:59 Víctor ROC11 Fail
  • 103199 08/09/05 10:45 Víctor ROC14 Fail
  • 103197 08/09/05 10:31 Víctor ROC12 Fail
  • 103196 08/09/05 10:26 Víctor ROC11 Fail
  • 103194 08/09/05 10:23 Reinhold target mass in production coin-ntuple
  • 103187 08/09/05 09:13 Víctor ROC12 Fail
  • 103182 08/09/05 08:27 Víctor ROC13 Fail
  • 103178 08/09/05 08:07 Victor F1 (VMEC11,slot7) "NOT Initialized"
  • 103177 08/09/05 08:06 Paul Baturin Shift Summary
  • 103170 08/09/05 06:43 Kawama End run failed due to EB
  • 103166 08/09/05 06:10 Kawama ROC 12 down
  • 103164 08/09/05 06:01 Kawama ROC 11 down.
  • 103160 08/09/05 05:36 Nonaka TUL changing before/after figure.
  • 103158 08/09/05 05:30 Kawama ROC11 down
  • 103156 08/09/05 05:27 K ROC 12 down
  • 103154 08/09/05 05:19 Kawama ROC12 down
  • 103153 08/09/05 05:18 Akihiko Singles rate w/ 12.5 uA, Si, New TUL
  • 103152 08/09/05 05:14 Nonaka TUL HTF2X program is changed at RUN#58269
  • 103145 08/09/05 04:09 Nonaka Current loaded TUL programs
  • 103140 08/09/05 03:34 Kawama ROC 11 rebooted
  • 103139 08/09/05 03:23 Kawama ROC 12 rebooted
  • 103137 08/09/05 03:21 Kawama ROC 12 was bad. Junk
  • 103134 08/09/05 03:00 Nonaka HTF2 TUL same program download again.
  • 103131 08/09/05 02:44 Kawama ROC 12 power reboot
  • 103128 08/09/05 02:30 Kawama ROC 11 failed. Rebooted
  • 103125 08/09/05 02:06 Akihiko I wrote wrong ID
  • 103123 08/09/05 01:53 Akihiko ROC 11,slot 17 failed "Enable data"
  • 103121 08/09/05 01:50 Akihiiko End run failed due to EB
  • 103120 08/09/05 01:48 Akihiko New grouping made hall?
  • 103117 08/09/05 01:25 Akihiiko Message logger showed some error
  • 103115 08/09/05 01:13 Nue 12.5uA, Si, New X2 grouping
  • 103114 08/09/05 01:10 Yuan H1X and H2X time difference
  • 103112 08/09/05 00:59 Nue Rates for revised 2X TUL, 12uA, Si
  • 103111 08/09/05 00:59 Reinhold trackable events after TUL-2X update
  • 103110 08/09/05 00:53 Reinhold trackable events after TUL-2X update
  • 103109 08/09/05 00:51 Nonaka Changing TUL grouping after #58244
  • 103108 08/09/05 00:51 Nonaka Changing TUL grouping after #58244
  • 103107 08/09/05 00:50 Nue Rates for new TUL 2X group setting , 12uA, Si
  • 103105 08/09/05 00:44 Akihiko ROC 12 reboot automatically
  • 103104 08/09/05 00:42 Nue Rates for 12uA, Si, Before TUL grouping rearrangement
  • 103099 08/09/05 00:00 Reinhold H2X grouping
  • Monday

  • 103097 08/08/05 23:50 Akihiko EDC bad hitpattern
  • 103093 08/08/05 23:17 Kawama The TDC offset of HTOF
  • 103092 08/08/05 23:06 Sumihama TDC of drift chambers is also started by H1X.
  • 103090 08/08/05 22:55 Akihiko Message logger cannot connect cmlog server.
  • 103088 08/08/05 22:50 Sumihama KID cut and the number of kaons.
  • 103086 08/08/05 22:37 Nonaka beam current status
  • 103085 08/08/05 22:32 Nonaka ROC11,12 and 14 rebooted at RUN#58232
  • 103084 08/08/05 22:32 Nonaka RUN#58232 is junk
  • 103083 08/08/05 22:31 Nonaka ROC 12 rebooted at RUN#58231
  • 103079 08/08/05 21:55 Nonaka ROC 11 rebooted at Run#58229
  • 103076 08/08/05 21:25 Nonaka RUN#58227 beam condition
  • 103074 08/08/05 21:19 Reinhold Followup: HHODO offsets wrong?!
  • 103071 08/08/05 20:59 Sumihama This offset is due to an ambiguity of which counter determined common start.
  • 103070 08/08/05 20:55 Nonaka ROC 12 rebooted at RUN#58224
  • 103066 08/08/05 20:25 Nonaka It is not #58222.It's of #58221.
  • 103065 08/08/05 20:18 Nonaka RUN#58222 beam condition
  • 103060 08/08/05 19:43 Nonaka RUN#58218 beam condition
  • 103054 08/08/05 18:46 Nonaka ROC 12 rebooted at Run#58213
  • 103051 08/08/05 18:25 Nonaka ROC 12 rebooted 18:24
  • 103045 08/08/05 17:28 Nonaka End run failed, EB hang up RUN#58206
  • 103044 08/08/05 17:27 Nonaka RUN#58206 beam condition
  • 103042 08/08/05 17:22 Reinhold HHODO offsets wrong?!
  • 103037 08/08/05 16:44 Nonaka RUN#58200 beam condition
  • 103035 08/08/05 16:38 Nonaka ROC 12 rebooted 16:35
  • 103031 08/08/05 16:08 Tang Shift summary
  • 103026 08/08/05 15:27 song ROC 12 hang up at 14:00
  • 103025 08/08/05 15:26 song ROC 11 problem at 13:31
  • 103024 08/08/05 15:23 song ROC12 hung up at 13:37
  • 103023 08/08/05 15:21 song ROC 11 problem at 15:15
  • 103021 08/08/05 15:11 song EB time out, End run failed at 11:52
  • 103020 08/08/05 15:10 song EB time out, End run failed at 11:31
  • 103008 08/08/05 13:29 song ROC12 rebooted
  • 103005 08/08/05 13:10 song Roc 11 12 13 14 reboot
  • 102993 08/08/05 10:35 song ROC12 and 11 crashed at 10:24 . Power cycle and reboot
  • 102984 08/08/05 09:26 Tang ROC12 hang up. Power cycle
  • 102981 08/08/05 08:59 Akihiko ROC 12 hung during run58160
  • 102977 08/08/05 08:26 Akihiko Shift summary
  • 102975 08/08/05 08:16 okayasu ABU screen
  • 102973 08/08/05 08:14 okayasu ABU screen
  • 102972 08/08/05 08:11 Akihiko ROC 11 error. Power cycled.
  • 102966 08/08/05 07:25 Akihiko ROC 11 had error
  • 102964 08/08/05 07:10 Akihiko ROC 12 hung up. Restart CODA and reboot all ROCs
  • 102962 08/08/05 07:03 Akihiko End Run Failed again due to EB
  • 102959 08/08/05 06:37 Akihiko End Run Failed due to EB
  • 102957 08/08/05 06:23 Akihiko ROC 12 hung up
  • 102956 08/08/05 06:22 Akihiko Ending run58145 failed due to EB1
  • 102955 08/08/05 06:11 Akihiko Integrated rate of run 58144
  • 102952 08/08/05 05:55 Akihiko ROC 12 hung up.ROC11, slot 4 "Resolution NOT Locked"
  • 102948 08/08/05 05:26 Akihiko ROC 12 hung during run58140
  • 102941 08/08/05 04:11 Akihiko ROC 12 hung up at the end of run58134
  • 102938 08/08/05 03:46 Akihiko ROC 11 rebooted automatically
  • 102936 08/08/05 03:34 Akihiko ROC 11, slot 3 "Resolution NOT Locked"
  • 102932 08/08/05 03:11 Akihiko ROC 12 hung during run58128
  • 102929 08/08/05 02:46 Akihiko ROC 11 error. Power cycled.
  • 102925 08/08/05 02:15 Akihiko FFB, BCM, IOC, BPM, SLI
  • 102923 08/08/05 02:08 Akihiko EB prestart failed
  • 102922 08/08/05 02:07 Paul B. hsbeta with AC tracking cuts
  • 102917 08/08/05 01:08 okayasu Fire alarm from VESDA
  • 102915 08/08/05 01:03 Akihiko ROC 11 failed "f1EnableData".Power cycled.
  • 102911 08/08/05 00:30 Akihiko DAQ dead time is about 5.4 % for run58112
  • 102908 08/08/05 00:08 lgan shift summary
  • 102907 08/08/05 00:06 lgan ABU screen
  • Sunday

  • 102899 08/07/05 23:06 lgan run again
  • 102898 08/07/05 23:02 lgan beam back
  • 102897 08/07/05 22:59 lgan IOC is fixed
  • 102896 08/07/05 22:48 lgan IOC is fixed
  • 102895 08/07/05 22:30 lgan Control Access
  • 102894 08/07/05 21:29 lgan beam off due to IOC problem
  • 102893 08/07/05 20:29 Tang Proper KID in the analysis and Kaon yield evaluation
  • 102885 08/07/05 18:42 lgan ROC 11 is slow
  • 102877 08/07/05 17:12 amur ABU REPORT, day shift
  • 102875 08/07/05 17:06 L. gan What to do in case of network problem
  • 102873 08/07/05 16:41 lgan network problem
  • 102872 08/07/05 16:32 amur ABU screen
  • 102870 08/07/05 16:25 amur ABU screen
  • 102869 08/07/05 16:17 Amour/Kathle shift summary
  • 102867 08/07/05 16:11 Reinhold Water cerenkov trigger efiiciency
  • 102823 08/07/05 08:03 okayasu ABU screen shot
  • 102819 08/07/05 07:20 okayasu BPM & SLI
  • 102813 08/07/05 06:32 okayasu ROC14 fail
  • 102810 08/07/05 06:02 okayasu ROC 12 had error
  • 102798 08/07/05 03:51 okayasu ROC 11 had error
  • 102795 08/07/05 03:23 okayasu ROC12 crashed
  • 102783 08/07/05 01:26 Elaasar End Run Failed
  • 102777 08/07/05 00:39 L. Gan bad channels on EDC
  • 102775 08/07/05 00:30 L. Gan ABU screen
  • 102773 08/07/05 00:20 L. Gan ABU screen
  • 102772 08/07/05 00:13 L. Gan evening shift summary
  • 102770 08/07/05 00:07 L. Gan hot channels on EDC layer 10
  • Saturday

  • 102766 08/06/05 23:41 Kawama Note that this value is normalized in I=30uA
  • 102764 08/06/05 23:29 Kawama Kaon rate in run#57950-53(Si, HKS sigle run) is 128Hz
  • 102756 08/06/05 22:17 Reinhold Coincidence timing for protons
  • 102744 08/06/05 20:29 Kawama There are many background...
  • 102739 08/06/05 19:49 Nue Accidental Kaons?
  • 102737 08/06/05 19:29 Tang Poor data taking efficiency due to ACC down time and DAQ
  • 102733 08/06/05 18:56 Kawama Whether kaon or not
  • 102723 08/06/05 17:39 Reinhold RUN 57821 What was the trigger?
  • 102721 08/06/05 17:25 seva found 1Y-6 in not plugged in group 6 trigger
  • 102719 08/06/05 17:17 seva rates for Si and coin trigger
  • 102718 08/06/05 17:14 seva rates for Si and coin trigger
  • 102717 08/06/05 17:12 seva trigger changed to PID ; COINCIDENCE
  • 102712 08/06/05 16:13 seva he bottle replaced
  • 102711 08/06/05 16:08 seva shift report
  • 102710 08/06/05 16:05 seva shift report, abu
  • 102709 08/06/05 15:50 seva roc 11,12,13,14 power cycled
  • 102705 08/06/05 15:19 seva single arm trigger , HKS, 1x&2x&1y
  • 102696 08/06/05 13:49 seva swing sift sli and bpm
  • 102695 08/06/05 13:48 seva swing sift sli and bpm
  • 102693 08/06/05 13:43 seva roc 12 power cycled
  • 102691 08/06/05 13:29 seva beam back
  • 102689 08/06/05 13:07 seva mcc called , no beam for 15 min minimum
  • 102688 08/06/05 12:55 seva roc 13 power cycled
  • 102687 08/06/05 12:52 seva roc 13 power cycled
  • 102681 08/06/05 12:04 seva roc 11 power cycled
  • 102677 08/06/05 11:30 Nue Let us take the HKS single arm trigger run once in a shift
  • 102675 08/06/05 11:14 seva coincidence trigger back on
  • 102672 08/06/05 11:04 Nue Rates for 12uA, Si, HKS single arm trigger
  • 102670 08/06/05 11:00 seva trigger hks single arm
  • 102669 08/06/05 10:56 Nue Rates for 12uA Si
  • 102667 08/06/05 10:45 Akihiko ROC 13 hung up
  • 102664 08/06/05 10:33 Akihiko ROC 11 rebooted after a few thousand
  • 102663 08/06/05 10:30 seva roc 11 rebooted itself
  • 102662 08/06/05 10:24 seva roc 11 rebooted itself two times
  • 102660 08/06/05 10:17 seva rebooted all roc's, killed coda
  • 102659 08/06/05 10:14 Reinhold Tip for Kawama'a analysis
  • 102657 08/06/05 10:00 Reinhold Followup: PID with cointime
  • 102655 08/06/05 09:54 seva roc 12 rebooted
  • 102654 08/06/05 09:53 seva beam back, silicon, raster on
  • 102652 08/06/05 09:02 seva target out, beam permit
  • 102651 08/06/05 09:00 Akihiko He gas in Hall
  • 102650 08/06/05 08:58 Akihiko Trigger back to coincidence between HKS and ENGE
  • 102649 08/06/05 08:52 okayasu vmec11mon recovered
  • 102647 08/06/05 08:12 okayasu Owl shift summary
  • 102646 08/06/05 07:10 okayasu ROC11 network problem
  • 102645 08/06/05 06:35 okayasu ROC 11 problem
  • 102634 08/06/05 05:08 Elaasar End Run #57902 Failed, # of coin. gates
  • 102628 08/06/05 04:25 Elaasar Roc 12 crahsed
  • 102625 08/06/05 04:08 Elaasar End of run failed and Roc12 crashed
  • 102622 08/06/05 03:51 Kawama Is this kaon?
  • 102617 08/06/05 03:32 Elaasar Roc 13 crashed
  • 102614 08/06/05 03:03 Elaasar Roc 11 crashed
  • 102611 08/06/05 02:43 Kawama Kaon rate with new cut condition
  • 102599 08/06/05 01:24 Kawama Kaon rate in run#57837-66 is 3.6Hz
  • 102597 08/06/05 00:58 okayasu Rates for Si 14uA w/o raster
  • 102595 08/06/05 00:54 okayasu Correction: Raster pattern w/ 14 uA
  • 102593 08/06/05 00:48 okayasu Rates for Si 14uA w/ raster 2x2
  • 102591 08/06/05 00:46 okayasu Raster off
  • 102590 08/06/05 00:38 Raster patte
  • 102589 08/06/05 00:29 okayasu Rates for Si 10uA w/ raster 2x2
  • 102587 08/06/05 00:23 okayasu Changed current from 10 uA to 14 uA w/ raster 2x2
  • Friday

  • 102585 08/05/05 23:00 A. Gasparian trigger type for the run #57873
  • 102584 08/05/05 22:28 Kawama Kaon rate in run#57837&57839 is 2.2Hz
  • 102583 08/05/05 22:07 Akihiko New ntuple directory "production"
  • 102582 08/05/05 22:00 Sumihama Selection of kaons in a real coincidence time.
  • 102581 08/05/05 21:50 Sumihama Not unpdated the AC/WC codes on offline yet!
  • 102579 08/05/05 20:55 Tang Correct run numbers and trigger conditions
  • 102577 08/05/05 19:58 Akihiko Number of Kaon
  • 102576 08/05/05 19:18 Halkyard Beam Down
  • 102575 08/05/05 18:51 Tang Beam off due to RF problem since about 17:15
  • 102574 08/05/05 18:28 Tang Our experimental status
  • 102573 08/05/05 17:47 Reinhold Trigger: TUL changes last night
  • 102566 08/05/05 16:13 seva MISSING SHIFT SUMMARIES -->ABU
  • 102563 08/05/05 16:08 seva ABU REPORT, day shift
  • 102562 08/05/05 15:51 Akihiko EHODO TDC is now fine
  • 102558 08/05/05 15:28 Akihiko ROC 11 rebooted automatically
  • 102556 08/05/05 15:25 Reinhold DAQ efficience on Si now compared to "engineering" run
  • 102555 08/05/05 15:24 k. johnston hodoscope tdc
  • 102553 08/05/05 15:00 seva fire alarm, dave coming
  • 102551 08/05/05 14:54 seva all runs ok
  • 102550 08/05/05 14:51 seva SLI screen looks ok again
  • 102548 08/05/05 14:44 seva ROC 13 , rebooted
  • 102547 08/05/05 14:31 seva SLI screen
  • 102540 08/05/05 13:35 Akihiko ROC11, slot 15 failed initialization.Power cycled
  • 102539 08/05/05 13:24 Akihiko Visual scaler w/ 14 uA, Si, raster OFF
  • 102537 08/05/05 13:21 seva ROC 13 , rebooted
  • 102536 08/05/05 13:07 Akihiko Epics of FFB
  • 102532 08/05/05 12:44 seva raster off, silicon, 14uA RATES
  • 102528 08/05/05 12:19 yuan HKS TOF parameter file updated
  • 102527 08/05/05 12:18 seva RASTER ON
  • 102526 08/05/05 12:17 seva rates for silicon target at 13uA raster offf
  • 102524 08/05/05 12:03 seva rates for silicon target at 5,10,13,15uA
  • 102522 08/05/05 11:56 seva current trigger settings
  • 102521 08/05/05 11:55 Nue Beam up ramping speed
  • 102517 08/05/05 10:47 seva problem resolved
  • 102516 08/05/05 10:01 Tang Network problem, lost target control and all probe readings
  • 102509 08/05/05 08:18 okayasu Owl shift summary
  • 102508 08/05/05 08:15 okayasu Trigger changed back .
  • 102505 08/05/05 08:03 Elaasar End Run Failed
  • 102504 08/05/05 07:55 okayasu Changed trigger for TOF calibration(pion run)
  • 102502 08/05/05 07:52 Tang TOF calibration run: Run# 57821 (Trigger: 1X&1Y&2X&WC&Enge
  • 102499 08/05/05 07:31 Elaasar End Run Failed
  • 102494 08/05/05 06:50 Elaasar ROC 12 hung up
  • 102492 08/05/05 06:38 Elaasar ROC 12 hung up
  • 102486 08/05/05 05:46 Elaasar Roc 11 Crashed
  • 102479 08/05/05 04:58 Akihiko Run 57800 - 57803 are junk
  • 102478 08/05/05 04:57 Akihiko F1 (ROC 11 slot 18) failed to enable data
  • 102477 08/05/05 04:54 okayasu EPICS read out failed.
  • 102471 08/05/05 04:13 Kawama Kaon rate in run#57789-90 is 3.2Hz.
  • 102468 08/05/05 04:06 Akihiko Figure of EHODO
  • 102466 08/05/05 03:55 Akihiko ROC 11 failed "f1EnableData"
  • 102464 08/05/05 03:38 Akihiko ROC 11 rebooted automatically
  • 102462 08/05/05 03:30 Elaasar End Run Failed
  • 102460 08/05/05 03:26 Kawama Kaon rate in run#57783-84 is 2.7Hz
  • 102458 08/05/05 03:19 Elaasar End Run Failed
  • 102453 08/05/05 02:48 okayasu Beam current was changed from 5 uA to 24 uA.
  • 102452 08/05/05 02:44 Nue AC, WC logic for now
  • 102450 08/05/05 02:41 Akihiko F1 trigger latency for EHODO changed
  • 102449 08/05/05 02:40 okayasu FFB was stand by
  • 102447 08/05/05 02:35 Akihiko Change F1 TDC latency for EHODO
  • 102446 08/05/05 02:31 Nue Rates for C 5uA for check ENGE F1 time window
  • 102444 08/05/05 02:20 Akihiko ROC 11 rebooted automatically
  • 102442 08/05/05 02:14 Akihiko ROC 12 hung up. ROC status is "SUSPEND"
  • 102441 08/05/05 02:11 Nonaka Changed TUL programs.
  • 102440 08/05/05 02:04 Reinhold Trigger timing after all TUL change: FINAL for now
  • 102438 08/05/05 01:56 Nue Computer living time is 93% for C 24uA with new TUL setting
  • 102437 08/05/05 01:56 Akihiko ROC 12 no response. rebooted
  • 102435 08/05/05 01:51 seva group study, rates after aditional tul changes
  • 102434 08/05/05 01:51 okayasu ROC11 crashed
  • 102433 08/05/05 01:51 okayasu Beam current was changed
  • 102431 08/05/05 01:07 Nue Recommended procedure to give high current beam to the Si target
  • 102430 08/05/05 00:39 Nue Summary of Thursday work and tonight's plan
  • 102429 08/05/05 00:33 seva here are the pictures
  • 102428 08/05/05 00:31 seva effects on cointime
  • 102427 08/05/05 00:29 seva effects on cointime
  • 102425 08/05/05 00:26 seva effects on cointime
  • 102423 08/05/05 00:12 Akihiko ROC12 End run failed
  • 102422 08/05/05 00:02 Reinhold Trigger: Group 6 check
  • Thursday

  • 102421 08/04/05 23:57 Reinhold Trigger: Group 5 check
  • 102419 08/04/05 23:55 Reinhold Trigger: Group 4 check
  • 102417 08/04/05 23:44 seva group study, run 57776
  • 102415 08/04/05 22:41 Nue Coin time for group3
  • 102414 08/04/05 22:40 Nue Coin time for Gr2
  • 102413 08/04/05 22:38 Nue Coin time for Gr1
  • 102412 08/04/05 21:55 seva group study
  • 102410 08/04/05 21:51 Reinhold Trigger: Group 3 check
  • 102409 08/04/05 21:47 Reinhold Trigger: Group 2 check
  • 102407 08/04/05 21:44 Reinhold Trigger: Group 1 check
  • 102402 08/04/05 19:35 Sumihama Update ENGINE to add some variables for AC/WC (haernum and hwatnum) in coin-ntuple.
  • 102399 08/04/05 19:23 Reinhold Trigger status: coincidence time distributions
  • 102398 08/04/05 19:19 Nue Rates for 10ns delayed ENGE, 24uA C
  • 102395 08/04/05 19:11 Reinhold Trigger change: added 10 ns to ENGE PRETRG
  • 102393 08/04/05 18:59 Nue Rates for 5ns shortened ENGE coin time,
  • 102392 08/04/05 18:58 Reinhold Trigger change before run 57764: shortened ENGE window
  • 102391 08/04/05 18:54 Sumihama Change the WC/AC codes and paramter files from 57762.
  • 102385 08/04/05 18:34 Reinhold Trigger: delayed ENGE trigger by 14 ns
  • 102383 08/04/05 18:19 Sumihama Going to chenge AC/WC codes of ENGINE.
  • 102381 08/04/05 18:13 Reinhold Trigger: coincidence timing fine tuning
  • 102380 08/04/05 18:13 Nue Rates for another 4ns shortened ENGE
  • 102379 08/04/05 18:12 Reinhold Trigger: adjusted ENGE front-back coincidence
  • 102377 08/04/05 17:41 Sumihama Correct figure.
  • 102376 08/04/05 17:37 Sumihama Coincidence time was shifted in the wrong direction and cut protons!
  • 102372 08/04/05 17:11 Reinhold Trigger: correction: ENGE window was only shortened by 5 ns
  • 102371 08/04/05 17:11 Nue Rates for C, 24uA
  • 102370 08/04/05 17:08 Reinhold Entry 102365 is duplicate.
  • 102369 08/04/05 17:07 Reinhold Trigger: changed coincidence timing window (Before run 57751)
  • 102367 08/04/05 17:03 Nue Rates for shortened Coin window between HKS and ENGE
  • 102365 08/04/05 16:56 Reinhold Current trigger status
  • 102363 08/04/05 16:38 Tang WC coin. setting
  • 102362 08/04/05 16:29 Nue WC rotary switch 8 is equivalent to 0.
  • 102361 08/04/05 16:28 Reinhold Coincidence timing distros
  • 102359 08/04/05 16:20 seva update
  • 102357 08/04/05 16:16 Paul Baturin cdaq // beam accounting (screenshort)
  • 102356 08/04/05 16:12 Paul Baturin Shift Report
  • 102354 08/04/05 16:01 seva ac fire efficiency using HDC tracking
  • 102352 08/04/05 15:56 Current Coin
  • 102343 08/04/05 14:32 Sumihama H1Y efficiency
  • 102340 08/04/05 14:17 paul&sharmal WC thresholds and currents
  • 102339 08/04/05 13:46 Reinhold Current trigger status
  • 102334 08/04/05 13:07 Reinhold Trigger: WC-TUL set wrong (runs 57720 & 57730)
  • 102333 08/04/05 13:00 paul ps5=2
  • 102332 08/04/05 13:00 paul ps5=2
  • 102329 08/04/05 12:54 Nue Rates for 1X*1Y*2X*!AC*WC
  • 102328 08/04/05 12:53 Reinhold Trigger change: added 1Y to trigger
  • 102327 08/04/05 11:25 Sharmalee Beam is back
  • 102326 08/04/05 10:25 Sharmalee MCC doing beam study
  • 102325 08/04/05 10:11 cdaq Beam Time accounting pictures (August 4)
  • 102324 08/04/05 10:09 Cdaq Beam Time accounting pictures (August 2 and 3)
  • 102320 08/04/05 08:55 Akihiko Q1 magnetic field adjustment
  • 102317 08/04/05 08:10 sharmalee & Beam tune
  • 102316 08/04/05 08:10 sharmalee & Beam tune
  • 102313 08/04/05 06:46 Kawama hks_ntuple with WC TDC study
  • 102311 08/04/05 06:44 okayasu Singles rate w/ 12 uA(11.57 uA), 12C
  • 102310 08/04/05 06:31 okayasu Beam current was changed from 18 uA to 12 uA.
  • 102304 08/04/05 05:27 Elaasar Roc12 crashed
  • 102302 08/04/05 05:19 okayasu BPM & SLI <- improved since yesterday!!
  • 102301 08/04/05 05:17 Elaasar Roc11 is not working right
  • 102300 08/04/05 05:15 okayasu ABU-GUI need to be modified
  • 102298 08/04/05 05:07 Elaasar Roc 11 Crashed
  • 102295 08/04/05 04:30 Elaasar End of run failed and Roc12 crashed
  • 102291 08/04/05 03:41 Akihiko Error messages
  • 102289 08/04/05 03:36 okayasu ROC11 crashed
  • 102287 08/04/05 03:18 Kawama Kaon rate in run#57683-4 is 3.6Hz
  • 102286 08/04/05 03:13 Akihiko Singles rate w/ 18 uA, 12C
  • 102284 08/04/05 03:10 okayasu Beam current was changed from 24 uA to 18 uA.
  • 102281 08/04/05 02:47 Akihiko ROC 12 reboot automatically
  • 102280 08/04/05 02:47 Akihiko ROC 12 reboot automatically
  • 102279 08/04/05 02:46 Nue Rate for HTF1X*2X*WC
  • 102271 08/04/05 01:47 Akihiko Singles rate w/ 22.4 uA, 12C
  • 102270 08/04/05 01:44 Akihiko Restarted CODA and rebooted all ROCs
  • 102269 08/04/05 01:40 okayasu CODA crashed
  • 102267 08/04/05 01:19 Akihiko CODA counld not talk to EB. Restart
  • 102266 08/04/05 01:19 Akihiko CODA counld not talk to EB. Restart
  • 102262 08/04/05 00:48 Akihiko DAQ dead time is 8.6 % for run57685
  • 102260 08/04/05 00:42 Akihiko ROC 11 had error
  • 102255 08/04/05 00:17 Kawama Kaon rate in run#57680 is 1.2Hz
  • 102254 08/04/05 00:16 Akihiko ROC 11 error. Power cycled.
  • 102252 08/04/05 00:14 Nue Rates for 24uA, C, WC 31,31,45mV, Up/down OR, layer Coin, AC up/down Coin 2/3 layer
  • 102249 08/04/05 00:04 Akihiko ROC 12 hung during run57680
  • 102248 08/04/05 00:00 furic Shift Summary
  • Wednesday

  • 102246 08/03/05 23:53 seva WC threshold
  • 102245 08/03/05 23:51 Akihiko During run 57678, ROC 12 tNetTask is "SUSPENDED"
  • 0 08/03/05 23:49 no_name no_key
  • 102243 08/03/05 23:47 Kawama Kaon rate in run#57679 is 3Hz
  • 102241 08/03/05 23:21 Kawama Kaon rate in run#57677, 57678 is 144Hz, 143Hz, respectivly
  • 102240 08/03/05 23:18 Nue Water C was removed from trigger
  • 102239 08/03/05 23:16 Kawama not 57675, but 57676
  • 102238 08/03/05 23:12 Akihiko Singles rate w/ 22 uA, 12C target
  • 102236 08/03/05 23:10 Akihiko Now Trigger is Coincidence of HKS and ENGE
  • 102235 08/03/05 23:08 Kawama Kaon rate in run#57675 is 144Hz
  • 102234 08/03/05 23:01 Akihiko Singles rate w/ 2 uA, 12C target
  • 102233 08/03/05 22:58 Kawama 57677's ps5=1
  • 102231 08/03/05 22:47 seva WC TDC hit pattern
  • 102229 08/03/05 22:46 Kawama Kaon rate in run#57675 is 148Hz
  • 102228 08/03/05 22:34 Akihiko Error messages
  • 102226 08/03/05 22:26 Akihiko ROC 11 rebooted before run57675
  • 102224 08/03/05 22:15 Sumihama Trigger condition now.
  • 102222 08/03/05 20:57 Akihiko ROC 12 no response. rebooted
  • 102221 08/03/05 20:17 Kawama The title of Fig1 was wrong
  • 102218 08/03/05 20:04 Akihiko ROC 12 no response. rebooted
  • 102217 08/03/05 19:59 Akihiko ROC 11, slot 13 had errors. power cycled
  • 102216 08/03/05 19:56 Tang Kaon loss investigation
  • 102215 08/03/05 19:51 Kawama Particles rate in the test run
  • 102212 08/03/05 19:42 seva aerogel 'fire' efficiency
  • 102210 08/03/05 19:31 Kawama "hwatnpe1" in #57654&57655 is wrong
  • 102208 08/03/05 19:21 seva rates study
  • 102206 08/03/05 19:14 Akihiko ROC 11, slot 13 "Resolution NOT Locked"
  • 102205 08/03/05 19:08 Akihiko ROC 12, slot 10 F1 Failed to Initialize
  • 102193 08/03/05 17:32 seva WC threshold
  • 102192 08/03/05 17:12 Akihiko Visual scalers stopped
  • 102191 08/03/05 16:53 Akihiko ROC12 had no response
  • 102190 08/03/05 16:11 seva WC threshold
  • 102189 08/03/05 15:58 Victor Day shift summary
  • 102186 08/03/05 12:58 Víctor Run 57649 is ungroup and only has 100k good events
  • 102184 08/03/05 12:55 seva ac threshold changed
  • 102182 08/03/05 12:41 Víctor ROC11 Fail
  • 102181 08/03/05 12:40 Reinhold Trigger to grouped 1x*2x*AC(1/3)50mV 8kHz rate
  • 102180 08/03/05 12:38 yuan Update HKS TOF and driftmap parameter file
  • 102178 08/03/05 12:25 Reinhold Trigger to ungrouped RHKS=32kHz
  • 102176 08/03/05 12:04 Reinhold Trigger changed
  • 102175 08/03/05 12:03 Víctor ROC12 Fail
  • 102174 08/03/05 11:52 Víctor Trigger experts are working to solve kaon overkilling
  • 102173 08/03/05 10:34 Victor Beam Time Swing 08/02 and Owl 08/03
  • 102170 08/03/05 10:17 Víctor EB and ER Fail
  • 102167 08/03/05 09:47 Víctor ROC12 Fail
  • 102162 08/03/05 09:18 Víctor ROC11 Reboot Itself
  • 102158 08/03/05 08:47 Víctor He Bottle replace yesterday
  • 102156 08/03/05 08:39 Víctor ROC11 Fail
  • 102154 08/03/05 08:27 Víctor DAQ Fail at end of run 57629
  • 102152 08/03/05 08:10 okayasu Owl shift summary
  • 102148 08/03/05 07:39 okayasu ROC12 crashed
  • 102144 08/03/05 07:12 okayasu ROC11 crashed
  • 102142 08/03/05 07:00 okayasu ROC13 rebooted
  • 102140 08/03/05 06:45 okayasu BPM & SLI
  • 102134 08/03/05 05:58 okayasu ROC12 crashed
  • 102131 08/03/05 05:41 okayasu ROC11 crashed
  • 102128 08/03/05 05:30 okayasu Run#57610 end failed
  • 102124 08/03/05 04:54 okayasu ROC11 crashed
  • 102120 08/03/05 04:24 okayasu ROC12 crashed again
  • 102118 08/03/05 04:20 okayasu ROC11 crashed
  • 102116 08/03/05 04:16 okayasu ROC12 crashed
  • 102110 08/03/05 03:29 okayasu ROC11 rebooted
  • 102108 08/03/05 03:25 okayasu Run#57596 end failed
  • 102104 08/03/05 02:52 okayasu ROC12 crashed
  • 102099 08/03/05 02:16 okayasu ROC11 crashed
  • 102098 08/03/05 02:13 Nue Is it OK that 1X*2X*WC*AC has only 7kHz?
  • 102096 08/03/05 02:04 okayasu Beam back
  • 102094 08/03/05 01:58 okayasu Dz magnet hole probe read out failed
  • 102091 08/03/05 01:33 okayasu ROC12 crashed
  • 102088 08/03/05 01:18 okayasu Run#57583 end failed.
  • 102084 08/03/05 00:45 okayasu ROC11 crashed
  • 102083 08/03/05 00:41 Akihiko Coin.f modified
  • 102080 08/03/05 00:29 okayasu ROC12 crashed
  • 102079 08/03/05 00:29 Nue Rates for 24uA Carbon, AC top/bottom coin, -50mV, WC top/bottom OR, WC eff.
  • 102077 08/03/05 00:22 Akihiko ROC 12 hung up. ROC status is "SUSPEND"
  • 102076 08/03/05 00:16 Kawama The number of kaons(new cut condition)
  • 102074 08/03/05 00:04 Nue Summary of recent rates study and plan
  • 102073 08/03/05 00:01 gabriel shift summary
  • Tuesday

  • 102071 08/02/05 23:58 NKalantarian ROC13 failed
  • 102068 08/02/05 23:32 Akihiko Restarted CODA and rebooted all ROCs
  • 102067 08/02/05 23:30 Kawama The number of kaons in run#57530-33
  • 102066 08/02/05 23:27 Akihiko ROC 12 hung up again. This time, ROC is "SUSPEND"
  • 102065 08/02/05 23:23 Sumihama Strange events in beta.
  • 102062 08/02/05 23:10 Akihiko ROC 12 hung up
  • 102061 08/02/05 22:59 NKalantarian ROC11 rebooted
  • 102059 08/02/05 22:55 Kawama The number of kaons in run#57228-57230
  • 102055 08/02/05 22:28 NKalantarian Beam being returned
  • 102053 08/02/05 22:18 Kawama The list of HKS single, Be run
  • 102051 08/02/05 22:17 Nue Q1 field was low
  • 102050 08/02/05 22:14 NKalantarian Beam being retuned
  • 102049 08/02/05 22:13 NKalantarian HKS Q1 field too low
  • 102047 08/02/05 21:55 NKalantarian Swing sli and bpm
  • 102046 08/02/05 21:51 NKalantarian ROC12 rebooted
  • 102042 08/02/05 21:25 NKalantarian C12 target being used
  • 102040 08/02/05 21:15 Akihiko Measured prescale factor for unbiased trigger
  • 102039 08/02/05 21:12 NKalantarian ROC13 rebooted
  • 102036 08/02/05 20:57 Akihiko Simple HAPPEX checker
  • 102033 08/02/05 20:36 NKalantarian Restarted CODA
  • 102030 08/02/05 20:16 Kawama Correct number of pion,proton(followup for #102011)
  • 102023 08/02/05 19:26 Nue Computer living time for C, 24uA, UB trigger prescale factor of 541
  • 102021 08/02/05 19:21 NKalantarian ROC12 rebooted
  • 102020 08/02/05 19:21 Nonaka Current WCs TUL program.
  • 102019 08/02/05 19:20 Nue Rates for 24uA C, AC top/bottom coin, th-50mV, WC top/bottom OR
  • 102018 08/02/05 19:14 Nue Prescale factor for unbiased trigger
  • 102016 08/02/05 19:10 NKalantarian Target moved to C12
  • 102015 08/02/05 19:04 NKalantarian comment on current run 57546
  • 102014 08/02/05 19:01 Nue Rates for when unbiased trigger prescale factor 200->600
  • 102013 08/02/05 18:58 NKalantarian Restarted CODA
  • 102011 08/02/05 18:56 Kawama A short report for the number of particle in run#57542,57543
  • 102009 08/02/05 18:46 Nonaka Current WCs TUL program.
  • 102008 08/02/05 18:45 NKalantarian Restarted CODA
  • 102007 08/02/05 18:33 Nue WC top/bottom OR program was downloaded to TUL, Rates for 20uA, Be
  • 102005 08/02/05 18:24 Nue Rates when AC, WC, unbiased trigger are restored
  • 102004 08/02/05 17:38 Nonaka HKS OR trigger rate
  • 102001 08/02/05 17:28 Akihiko ROC 11 also reboot by itself,power cycled
  • 102000 08/02/05 17:26 Nue Rates for grouped 1X*2X only trigger, 20uA, Be
  • 101999 08/02/05 17:24 Akihiko ROC12 rebooted automatically after start run.Power cycled.
  • 101996 08/02/05 17:17 NKalantarian prescale and trigger change
  • 101995 08/02/05 17:10 Reinhold Trigger/rate study
  • 101993 08/02/05 17:03 NKalantarian ROC11 rebooted
  • 101992 08/02/05 17:02 Sumihama From this run, Vth = -50mV
  • 101989 08/02/05 16:47 Nue Rates for 20uA Be, AC top/bottom Coin, AC 50mV thre.
  • 101988 08/02/05 16:25 Nonaka Current TUL program of ACs
  • 101986 08/02/05 15:58 Victor Day Shift Summary
  • 101985 08/02/05 15:48 Victor & Mir Good SLI
  • 101984 08/02/05 15:46 Victor & Mir BPM & SLI & FB
  • 101983 08/02/05 15:05 NUe Rates for AC 50mV, Coin trigger
  • 101982 08/02/05 14:56 Nue Rates for AC 50mV
  • 101981 08/02/05 14:54 Nue Rates for AC 60mV
  • 101979 08/02/05 14:51 Akihiko Run 57532, ps5=30
  • 101978 08/02/05 14:50 Nue Rates for 20uA Be, AC top/bottom Coin, Single K trigger (ps5-30)
  • 101977 08/02/05 14:48 Akihiko Run 57530 , ps5=40, HKS single arm trigger
  • 101975 08/02/05 14:44 Sumihama Vth of AC -75mV ->-60mV
  • 101973 08/02/05 14:35 Nue Rates for Be 20uA, AC top bottom Coin, Coin trigger
  • 101971 08/02/05 14:25 Akihiko ROC12 hung up
  • 101969 08/02/05 14:16 Victor BPM & SLI & FB
  • 101968 08/02/05 14:10 Víctor MCC has Fast FB problem. They call technitian
  • 101967 08/02/05 14:07 Akihiko Ion Chamber
  • 101966 08/02/05 14:06 Akihiko Ion Chamber
  • 101964 08/02/05 14:02 Akihiko Singles rate w/ 20 uA, Be.
  • 101963 08/02/05 13:50 Víctor Be9 Target is in
  • 101962 08/02/05 12:52 Sumihama Hall probe was checked.
  • 101960 08/02/05 12:15 Nue Summary of Kawama's K rate for various beam intensity
  • 101959 08/02/05 12:15 Tang Target change during access for viewer change
  • 101958 08/02/05 11:58 Víctor Change trigger to FC
  • 101956 08/02/05 11:49 Sumihama H1X hit pattern is different between low current and hight current.
  • 101955 08/02/05 11:34 Akihiko DAQ is ready
  • 101953 08/02/05 10:34 Sumihama H1Y2-L(6-L) is OK now.
  • 101951 08/02/05 10:19 Akihiko Trigger changed OR of HKS and ENGE to check DAQ
  • 101950 08/02/05 10:18 amour FF detector operation change
  • 101949 08/02/05 10:09 Akihiko Replace CPU module and ethernet cable
  • 101948 08/02/05 09:40 Víctor More work
  • 101947 08/02/05 09:10 Víctor Hall in Controlled Access
  • 101944 08/02/05 08:27 Victor ROC12 Fail
  • 101942 08/02/05 08:24 Tang Problem with ROC 11 and 12 and access to the hall
  • 101939 08/02/05 08:05 Yuichi Okaya Owl shift summary
  • 101937 08/02/05 07:56 okayasu Triger superviser crashed
  • 101936 08/02/05 07:51 okayasu ROC12 rebooted.
  • 101934 08/02/05 07:42 okayasu Roc12 rebooted
  • 101931 08/02/05 07:20 okayasu BPM & SLI
  • 101930 08/02/05 07:17 okayasu Helium gas empty!
  • 101927 08/02/05 06:57 okayasu ROC12 rebooted.
  • 101925 08/02/05 06:45 okayasu ROC12 rebooted.
  • 101923 08/02/05 06:40 okayasu ROC13 rebooted
  • 101922 08/02/05 06:37 okayasu Singles rate w/ 20 uA, Be
  • 101919 08/02/05 06:07 okayasu H1Y2 TDC seems bad
  • 101918 08/02/05 06:07 okayasu ROC12 rebooted.
  • 101917 08/02/05 06:03 okayasu ROC11 rebooted
  • 101913 08/02/05 05:27 okayasu ROC11 rebooted
  • 101909 08/02/05 05:00 okayasu ROC12 rebooted.
  • 101906 08/02/05 04:36 okayasu ROC12 rebooted.
  • 101905 08/02/05 04:32 Nonaka Lambda and Sigma production rate per charge
  • 101904 08/02/05 04:26 okayasu Target changed again!
  • 101899 08/02/05 03:29 okayasu ROC13 rebooted
  • 101896 08/02/05 03:11 Kawama The number of kaons in several C,CH2 runs
  • 101894 08/02/05 03:05 okayasu Changed back to Be9
  • 101892 08/02/05 02:51 okayasu Target out
  • 101891 08/02/05 02:42
  • 101890 08/02/05 02:29 okayasu Hall C fire alarm(cont'd)
  • 101889 08/02/05 02:11 okayasu Hall C fire alarm(cont'd)
  • 101888 08/02/05 01:34 okayasu Hall C fire alarm
  • 101886 08/02/05 01:29 okayasu Run# 57491 endrailed.
  • 101885 08/02/05 01:16 Sumihama TDC/ADC spectra of H1X-17 depends on the beam current.
  • 101883 08/02/05 01:13 okayasu Roc12 rebooted
  • 101880 08/02/05 00:42 okayasu ROC11,12 rebooted
  • 101876 08/02/05 00:20 Kawama The number of kaons in several Be runs
  • 101875 08/02/05 00:14 okayasu ROC11 rebooted
  • 101874 08/02/05 00:13 Sumihama run57228 PS5=20
  • 101870 08/02/05 00:00 gabriel shift summary
  • Monday

  • 101869 08/01/05 23:55 NKalantarian Restarted CODA
  • 101867 08/01/05 23:46 Akihiko Singles rate w/ 20 uA, Be
  • 101866 08/01/05 23:46 Sumihama TOF distributions by group trigg. and un-group tirgg.
  • 101865 08/01/05 23:44 NKalantarian ROC12 rebooted
  • 101863 08/01/05 23:36 Run 57480 is BE9 ~2.2 uA raster OFF, PS5=1, trigger: HTF1X*2X*ENGE
  • 101862 08/01/05 23:03 Akihiko Singles rate w/ 2.2 uA, Be. W/O AC and WC
  • 101860 08/01/05 22:49 Akihiko Current of Run 57479 is 2.2 uA
  • 101859 08/01/05 22:49 Akihiko Singles rate w/ 2.2 uA, Be. W/O AC and WC
  • 101857 08/01/05 22:36 Akihiko Singles rate w/ 20 uA, Be. W/O AC and WC
  • 101856 08/01/05 22:36 Nue Run 57478 is triggered by HTF1X*HTF2X only (HKS single arm trigger)
  • 101854 08/01/05 22:24 yuan HKS TOF parameter file updated
  • 101853 08/01/05 22:17 Akihiko Singles rate w/ 20 uA, Be. W/O AC and WC
  • 101852 08/01/05 22:16 Run 57477's group coins were made by HTF1X*HTF2X only.
  • 101851 08/01/05 22:12 Nue AC, WC are removed from Grouping Coincidence
  • 101848 08/01/05 21:38 NKalantarian CODA restarted
  • 101846 08/01/05 21:24 NKalantarian ROC12 rebooted
  • 101843 08/01/05 20:59 NKalantarian ROC12 rebooted
  • 101836 08/01/05 19:42 NKalantarian ROC11 rebooted
  • 101832 08/01/05 19:07 Kawama Wrong ps5 factor
  • 101830 08/01/05 18:54 NKalantarian ROC11 problem fixed
  • 101829 08/01/05 18:51 saw ROC 11 wont work
  • 101826 08/01/05 18:36 NKalantarian Problem with ROC11 panel
  • 101825 08/01/05 18:32 Nue Be rate study summary
  • 101823 08/01/05 18:18 Nue Update for C 18uA trigger rate study
  • 101821 08/01/05 18:10 Reinhold CVS not up to date: PARAM/edriftmap.param.56385 missing!
  • 101820 08/01/05 18:09 NKalantarian SLI screen for swing
  • 101819 08/01/05 18:02 NKalantarian BPM & SLI for swing
  • 101818 08/01/05 17:59 NKalantarian ROC11 rebooted
  • 101817 08/01/05 17:59 NKalantarian ROC12 rebooted
  • 101815 08/01/05 17:54 Sumihama Time of flight distributions in HKS w/o tracking.
  • 101812 08/01/05 17:34 NKalantarian Rebooted ROC's 11-14
  • 101807 08/01/05 16:54 NKalantarian ROC12 failed
  • 101803 08/01/05 16:26 Nue Rates for Be, 20uA, coin
  • 101802 08/01/05 16:22 NKalantarian Switched to Be9
  • 101799 08/01/05 16:10 Victor shift summary
  • 101793 08/01/05 15:30 Nue Rates for 1.4uA, CH2 #2, HKS single trig.
  • 101791 08/01/05 15:27 Akihiko F1 had NO error
  • 101789 08/01/05 15:08 Víctor Change to HKS single trigger
  • 101788 08/01/05 15:07 Víctor Change to CH2 Target
  • 101785 08/01/05 14:36 Víctor ROC12 Fail
  • 101783 08/01/05 14:24 adaniel HDC1x layer 3 starnge hit pattern
  • 101780 08/01/05 14:08 Akihiko ROC13 rebooted
  • 101778 08/01/05 13:55 Víctor ROC12 Fail
  • 101775 08/01/05 13:28 Víctor ROC12 Fail
  • 101772 08/01/05 13:04 Victor & Aji Last run's Splitter Histogram
  • 101771 08/01/05 13:02 Victor & Aji Splitter Hall Probe histogram
  • 101768 08/01/05 12:42 Nue Trigger rate study about 18uA Carbon data
  • 101764 08/01/05 12:07 Víctor ROC12 and EB fail
  • 101763 08/01/05 12:05 Nue Trigger rate study for 5uA Be data
  • 101762 08/01/05 11:56 Nue Rates for 5uA, BeHKS signle trigger
  • 101761 08/01/05 11:53 Nue Rates for Be, 20uA
  • 101759 08/01/05 11:49 Víctor Be, 20 uA trigger rates
  • 101757 08/01/05 11:40 Víctor Change to 20 uA and PS5=1
  • 101755 08/01/05 11:19 Victor SLI problem is solved
  • 101754 08/01/05 11:17 Víctor Change PS=5
  • 101753 08/01/05 11:14 Víctor Change to Kaon single trigger and PS5=30
  • 101751 08/01/05 11:10 Víctor Change current to 5 uA
  • 101750 08/01/05 11:05 Victor SLI problem
  • 101748 08/01/05 10:53 Víctor ROC11
  • 101745 08/01/05 10:36 Víctor ROC12 Fail
  • 101743 08/01/05 10:05 Victor FB (Last entry It wasn't there)
  • 101742 08/01/05 10:03 Victor BPM & SLI & FB
  • 101739 08/01/05 09:45 Víctor ROC12 Fail
  • 101735 08/01/05 09:18 Víctor ROC11 Reboot Itself
  • 101734 08/01/05 09:14 Victor BTA SnapShots
  • 101732 08/01/05 09:05 víctor ROC12 Fail
  • 101729 08/01/05 08:54 Víctor ROC11 Reboot itself
  • 101726 08/01/05 08:32 Gibson ROC 13 failure Error
  • 101724 08/01/05 08:09 okayasu ABU counting does not work !!!!!!
  • 101721 08/01/05 08:03 Yuichi Okaya Owl shift summary
  • 101719 08/01/05 07:39 okayasu Run failed
  • 101715 08/01/05 07:10 okayasu ROC11 rebooted
  • 101711 08/01/05 06:31 okayasu ROC11 rebooted
  • 101706 08/01/05 05:53 okayasu DAQ rebooted
  • 101702 08/01/05 05:13 okayasu Roc12 rebooted
  • 101699 08/01/05 04:57 okayasu ROC11 rebooted
  • 101697 08/01/05 04:48 okayasu BPM & SLI
  • 101695 08/01/05 04:42 okayasu Roc12 rebooted
  • 101690 08/01/05 03:57 okayasu ROC11 rebooted
  • 101687 08/01/05 03:29 okayasu Roc12 rebooted
  • 101684 08/01/05 03:11 okayasu Roc12 rebooted
  • 101680 08/01/05 02:35 okayasu ROC11 rebooted
  • 101676 08/01/05 02:05 okayasu Roc12 rebooted
  • 101674 08/01/05 01:47 okayasu Beam gun tripped
  • 101673 08/01/05 01:46 okayasu Roc12 rebooted
  • 101663 08/01/05 00:03 Furic Swing shift summary-cont.