2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|
Acceptable Beam in Use | 0.00 | 0.00 | 0.00 | 0.00 |
Beam Available but Not in Use | 0.00 | 0.00 | 0.00 | 0.00 |
Beam Not Available or Unacceptable | 1.00 | 1.00 | 1.00 | 3.00 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 0.00 | 0.00 | 0.00 | 0.00 |
Planned Config- uration Change | 0.00 | 0.00 | 0.00 | 0.00 |
Unplanned Experiment Down | 1.00 | 1.00 | 1.00 | 3.00 |
Hall not ready reasons | ||||
Target | 0.00 | 0.00 | 0.00 | 0.00 |
DAQ | 0.00 | 0.00 | 0.00 | 0.00 |
Detectors | 0.00 | 0.00 | 0.00 | 0.00 |
G0 Magnet | 0.00 | 0.00 | 0.00 | 0.00 |
Other | 1.00 | 1.00 | 1.00 | 3.00 |
Comments: end of hall C beam at 21:00 since hall A and Hall C cannot run with same energy.
Data Entry by: breuer