Jefferson Lab Hall C Logbook for December 06 - Full Listing

  • Main INDEX

    Friday

  • 130031 12/22/06 12:23 gzero End of Run 33059:
  • 130030 12/22/06 12:22 gzero Run 33059: test
  • 130029 12/22/06 12:21 gzero End of Run 33058:
  • 130028 12/22/06 11:20 Fatiha/Riad Turned some of the electronics off
  • 130027 12/22/06 11:11 gzero End of Run 33057:
  • 130026 12/22/06 11:10 gzero Run 33057: test roc31
  • Thursday

  • 130025 12/21/06 20:39 Breuer Analysis: Comparison of net mult-2 with mutl-3 rates with quartz and borosilicate tubes
  • 130024 12/21/06 19:52 herbert,maud new tubes serial numbers
  • 130023 12/21/06 19:40 herbert,maud new HVs for all French Cerenkovs.
  • 130022 12/21/06 19:39 Breuer/Verst installed quartz tubes in the last octants: French octants 2 and 6; spare tube info, trouble tube info
  • 130021 12/21/06 19:26 Breuer/Verst removed remaining polyethylene shielding from cryostat upstream window areas
  • 130020 12/21/06 18:11 smithg Target: Isolated ballast tank
  • 130019 12/21/06 17:37 cdaq Beam Time Accounting
  • 130018 12/21/06 16:49 cdaq Moller Run 62127: LED flasher
  • 130017 12/21/06 16:40 gzero End of Run 33056:
  • 130016 12/21/06 16:26 gzero Run 33056: test
  • 130015 12/21/06 16:26 gzero End of Run 33055:
  • 130014 12/21/06 16:11 gzero Run 33055: test
  • 130013 12/21/06 16:08 gzero End of Run 33054:
  • 130012 12/21/06 15:13 gzero Run 33054: test
  • 130011 12/21/06 15:11 gzero End of Run 33053:
  • 130010 12/21/06 14:52 smithg Target: valved in parallel helium bottle
  • 130009 12/21/06 14:49 gzero Run 33053: test
  • 130008 12/21/06 14:48 gzero End of Run 33052:
  • 130007 12/21/06 14:48 gzero Run 33052: test
  • 130006 12/21/06 14:46 gzero End of Run 33051:
  • 130005 12/21/06 14:46 gzero Run 33051: test
  • 130004 12/21/06 14:23 gzero End of Run 33050:
  • 130003 12/21/06 14:23 gzero End of Run 33050:
  • 130002 12/21/06 14:22 gzero Run 33050: test roc31
  • 130001 12/21/06 14:19 gzero End of Run 33049:
  • 130000 12/21/06 14:19 gzero End of Run 33049:
  • 129999 12/21/06 14:19 gzero End of Run 33049:
  • 129998 12/21/06 14:18 gzero Run 33049: test roc31
  • 129997 12/21/06 14:02 gzero End of Run 33048:
  • 129996 12/21/06 13:57 gzero Run 33048: test
  • 129995 12/21/06 11:08 Doug Beck Analysis: Background corrected coincidence matrices
  • Wednesday

  • 129994 12/20/06 22:41 smithg Beam: warmed up
  • 129993 12/20/06 21:43 muether SMS: Magnet Ramped down for the holiday
  • 129992 12/20/06 21:30 Breuer Origin of Oct 3 random matrix 8/9 problem
  • 129991 12/20/06 21:15 gaskell Moller target and collimators
  • 129990 12/20/06 21:09 Breuer final G0 shift summary for 2006: 20-dec-06, 16:00-21:00
  • 129989 12/20/06 21:06 cdaq Beam Time Accounting
  • 129988 12/20/06 21:00 gzero End of Run 33047:
  • 129987 12/20/06 20:54 maud Target: last target checklist snapshots of the year ...
  • 129986 12/20/06 20:28 gzero Run 33047: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129985 12/20/06 20:26 gzero End of Run 33046:
  • 129984 12/20/06 20:26 gzero End of Run 33046:
  • 129983 12/20/06 20:20 gzero Run 33046: test of herbert
  • 129982 12/20/06 20:15 gzero End of Run 33045:
  • 129981 12/20/06 20:09 gzero Run 33045: Production run, 5 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129980 12/20/06 20:01 gzero Run 33044: Production run, 5 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult3, borsil:mult2
  • 129979 12/20/06 19:58 gzero End of Run 33043:
  • 129978 12/20/06 19:45 Breuer future action on lower octants increased rate
  • 129977 12/20/06 19:17 gzero Run 33043: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129976 12/20/06 19:12 gzero End of Run 33042:
  • 129975 12/20/06 17:58 gzero Run 33042: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129974 12/20/06 17:57 gzero End of Run 33041:
  • 129973 12/20/06 17:33 gzero Run 33041: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129972 12/20/06 16:56 gzero End of Run 33040:
  • 129971 12/20/06 16:51 gaskell OK - 9 pm
  • 129970 12/20/06 16:01 cdaq Beam Time Accounting
  • 129969 12/20/06 15:56 neven Day Shift Summary
  • 129968 12/20/06 15:53 gzero Run 33040: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129967 12/20/06 15:52 gzero End of Run 33039:
  • 129966 12/20/06 14:54 gzero Run 33039: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129965 12/20/06 14:53 gzero End of Run 33038:
  • 129964 12/20/06 14:28 suleiman Beam: Ignore this entry. The schedule is as before (Laser on Day Jan 2nd, and beam on Swing Jan 3rd).
  • 129963 12/20/06 13:53 gzero Run 33038: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129962 12/20/06 13:53 gzero End of Run 33037:
  • 129961 12/20/06 13:18 ellis slave database--how to
  • 129960 12/20/06 12:59 gaskell Run ends around 8 pm tonight
  • 129959 12/20/06 12:54 gzero Run 33037: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129958 12/20/06 12:54 gzero End of Run 33036:
  • 129957 12/20/06 11:53 gzero Run 33036: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129956 12/20/06 11:51 gzero End of Run 33035:
  • 129955 12/20/06 11:51 gzero End of Run 33035:
  • 129954 12/20/06 10:59 gzero Run 33035: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129953 12/20/06 10:55 suleiman Beam: The Pockels Cell Alignment is now Scheduled for Swing Shift Wednesday 1/3/07
  • 129952 12/20/06 09:47 gzero Run 33034: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129951 12/20/06 09:46 gzero End of Run 33033:
  • 129950 12/20/06 08:47 gzero Run 33033: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129949 12/20/06 08:46 gzero End of Run 33032:
  • 129948 12/20/06 08:01 cdaq Beam Time Accounting
  • 129947 12/20/06 07:57 Franklin Owl Shift Summary
  • 129946 12/20/06 07:55 muether iocse17 reboot....this did not help the strange 4-wire sums asymmetries
  • 129945 12/20/06 07:45 gzero Run 33032: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129944 12/20/06 07:41 gzero End of Run 33031:
  • 129943 12/20/06 07:17 muether Analysis Check List Runs (33015-33030)
  • 129942 12/20/06 06:54 gzero Run 33031: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129941 12/20/06 06:53 muether Shift check list screen grabs
  • 129940 12/20/06 06:52 gzero End of Run 33030:
  • 129939 12/20/06 05:54 gzero Run 33030: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129938 12/20/06 05:53 gzero End of Run 33029:
  • 129937 12/20/06 05:02 muether Updated randoms plot
  • 129936 12/20/06 04:54 gzero Run 33029: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129935 12/20/06 04:51 gzero End of Run 33028:
  • 129934 12/20/06 04:46 muether Shoulders on 4-wire sum charge asymetrries
  • 129933 12/20/06 03:56 gzero Run 33028: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129932 12/20/06 03:54 gzero End of Run 33027:
  • 129931 12/20/06 02:59 gzero Run 33027: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129930 12/20/06 02:56 gzero End of Run 33026:
  • 129929 12/20/06 01:53 gzero Run 33026: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129928 12/20/06 01:52 gzero End of Run 33025:
  • 129927 12/20/06 01:31 Breuer Analysis: Analysis of special background-matrix runs 32990 to 32999, better formatting
  • 129926 12/20/06 01:08 Breuer Analysis: Analyis of special background-matrix runs 32990 to 32999
  • 129925 12/20/06 00:54 gzero Run 33025: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129924 12/20/06 00:52 gzero End of Run 33024:
  • 129923 12/20/06 00:13 cdaq Beam Time Accounting
  • 129922 12/20/06 00:12 Breuer Shift summary, 16:00-24:00, December 19, 2006; aexpanded
  • 129921 12/20/06 00:10 Breuer Shift summary, 16:00-24:00, December 19, 2006
  • Tuesday

  • 129920 12/19/06 23:49 gzero Run 33024: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129919 12/19/06 23:47 gzero End of Run 33023:
  • 129918 12/19/06 23:44 maud Target: nothing to report
  • 129917 12/19/06 23:08 cdaq Beam Time Accounting
  • 129916 12/19/06 22:32 Breuer changed pion matrix back to random matrix; oct 7 lemo output problem
  • 129915 12/19/06 22:27 Breuer snapshot of pion matrix with pions instead of randoms, run 33021
  • 129914 12/19/06 22:24 gzero Run 33023: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129913 12/19/06 22:21 gzero End of Run 33022:
  • 129912 12/19/06 22:12 maud SMS: alarm : Transport Protocol Error
  • 129911 12/19/06 22:10 gzero Run 33022: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129910 12/19/06 22:03 gzero End of Run 33021:
  • 129909 12/19/06 21:25 gzero Run 33021: Production {run;pion} matrix=pions, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129908 12/19/06 21:17 gzero End of Run 33020:
  • 129907 12/19/06 20:16 Breuer changed random matrix into pion matrix
  • 129906 12/19/06 20:03 gzero Run 33020: Production run;pion matrix=pions, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129905 12/19/06 20:01 gzero End of Run 33019:
  • 129904 12/19/06 19:54 Breuer Remaining 9 Quartz tubes arrived this afternoon, first 4 of those tested ok.
  • 129903 12/19/06 19:51 Breuer French Cerenkov tube amplitudes on 12/18/06
  • 129902 12/19/06 18:54 gzero Run 33019: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129901 12/19/06 18:54 gzero End of Run 33018:
  • 129900 12/19/06 17:56 gzero Run 33018: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129899 12/19/06 17:50 gzero End of Run 33017:
  • 129898 12/19/06 17:06 gaskell Mini- Run Plan
  • 129897 12/19/06 16:54 gaskell dump diffuser problem solved
  • 129896 12/19/06 16:48 gzero Run 33017: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129895 12/19/06 16:29 smithg Target: multiple reboots to fix noisy tach
  • 129894 12/19/06 16:03 neven Day Shift Summary
  • 129893 12/19/06 15:53 Carissa Target: Shift Checklist
  • 129892 12/19/06 14:51 gaskell dump diffuser update
  • 129891 12/19/06 14:35 M Jones Beam: Beam Energy measurement
  • 129890 12/19/06 14:33 Carissa Analysis: Analysis Checklist: Runs 32982-33011
  • 129889 12/19/06 13:59 gaskell Dump diffuser water inspection
  • 129888 12/19/06 13:34 neven Hall C in Controlled Access
  • 129887 12/19/06 13:04 Fatiha Slower file transfer and analysis because Ps4 is lowered to 400
  • 129886 12/19/06 12:56 gzero End of Run 33016:
  • 129885 12/19/06 12:56 neven Beam off. Problem with the diffuser.
  • 129884 12/19/06 12:13 gzero Run 33016: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129883 12/19/06 12:11 gzero End of Run 33015:
  • 129882 12/19/06 11:23 suleiman Beam: Parity Controls Screen
  • 129881 12/19/06 11:12 gaskell half wave plate changed from IN to OUT
  • 129880 12/19/06 11:11 gzero Run 33015: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129879 12/19/06 11:07 gzero End of Run 33014:
  • 129878 12/19/06 10:54 gzero Run 33014: Test run
  • 129877 12/19/06 10:54 Carissa Target: Target moved back in (LD2)
  • 129876 12/19/06 10:46 Carissa Target: Rebooted target IOC....
  • 129875 12/19/06 10:13 Carissa Target: Target moved out of beam...
  • 129874 12/19/06 10:08 suleiman Beam: Change Hall A IA Slope to -1025 ppm/V
  • 129873 12/19/06 09:55 gzero End of Run 33013:
  • 129872 12/19/06 09:52 gzero Run 33013: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129871 12/19/06 09:51 gzero End of Run 33012:
  • 129870 12/19/06 09:39 gzero Run 33012: Test run: Charge feedback test
  • 129869 12/19/06 09:35 gzero End of Run 33011:
  • 129868 12/19/06 08:53 gzero Run 33011: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129867 12/19/06 08:52 gzero End of Run 33010:
  • 129866 12/19/06 08:30 gaskell Plans for today
  • 129865 12/19/06 08:01 cdaq Beam Time Accounting
  • 129864 12/19/06 07:52 gzero Run 33010: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129863 12/19/06 07:52 Franklin Owl Shift Summary
  • 129862 12/19/06 07:48 gzero End of Run 33009:
  • 129861 12/19/06 07:07 muether Shift checklist scren grabs
  • 129860 12/19/06 06:51 gzero Run 33009: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129859 12/19/06 06:49 gzero End of Run 33008:
  • 129858 12/19/06 06:18 muether Hall A Charge Feedback Difficulties.
  • 129857 12/19/06 05:53 gzero Run 33008: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129856 12/19/06 05:51 gzero End of Run 33007:
  • 129855 12/19/06 05:31 gzero Run 33007: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129854 12/19/06 05:28 gzero End of Run 33006:
  • 129853 12/19/06 04:16 muether SMS: G0 Magnet computer configured for Interpage paging
  • 129852 12/19/06 04:07 gzero Run 33006: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129851 12/19/06 04:06 gzero End of Run 33005:
  • 129850 12/19/06 03:32 muether Effects of hall A on Charge asym widths
  • 129849 12/19/06 03:07 gzero Run 33005: Production run, 20 uA LD2, Ps4=400, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129848 12/19/06 03:06 gzero End of Run 33004:
  • 129847 12/19/06 03:03 gzero Run 33004: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129846 12/19/06 03:00 gzero End of Run 33003:
  • 129845 12/19/06 02:28 gzero Run 33003: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129844 12/19/06 02:24 gzero End of Run 33002:
  • 129843 12/19/06 01:28 gzero Run 33002: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129842 12/19/06 01:26 gzero End of Run 33001:
  • 129841 12/19/06 00:23 gzero Run 33001: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129840 12/19/06 00:20 gzero End of Run 33000:
  • 129839 12/19/06 00:00 cdaq Beam Time Accounting
  • Monday

  • 129838 12/18/06 23:59 Breuer shift summary evening (swing) dec 18, 2006
  • 129837 12/18/06 23:56 gzero Run 33000: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129836 12/18/06 23:52 gzero End of Run 32999:
  • 129835 12/18/06 23:46 maud Target: target quiet ...
  • 129834 12/18/06 23:42 Breuer Snapshot of array, random run 32999 with FPDs delayed 60 ns
  • 129833 12/18/06 22:55 gzero Run 32999: Random matrix special: all FPD's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129832 12/18/06 22:51 gzero End of Run 32998:
  • 129831 12/18/06 22:46 gzero Run 32998: Random matrix special: all FPD's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129830 12/18/06 21:55 Fatiha ts_Fullinj ---> Ts_Full
  • 129829 12/18/06 21:44 gzero End of Run 32997:
  • 129828 12/18/06 21:31 gzero Run 32997: Random matrix special: all FPD's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129827 12/18/06 21:30 gzero End of Run 32996:
  • 129826 12/18/06 21:28 gzero Run 32996: Random matrix special: all FPD's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129825 12/18/06 21:27 gzero End of Run 32995:
  • 129824 12/18/06 21:25 gzero Run 32995: Random matrix special: all FPD's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129823 12/18/06 21:25 gzero End of Run 32994:
  • 129822 12/18/06 21:24 gzero Run 32994: Random matrix special: all FPD's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129821 12/18/06 21:23 gzero End of Run 32993:
  • 129820 12/18/06 21:21 gzero Run 32993: Random matrix special: all FPD's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129819 12/18/06 21:20 gzero End of Run 32992:
  • 129818 12/18/06 21:15 gzero Run 32992: Random matrix special: all FPD's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129817 12/18/06 20:50 gzero End of Run 32991:
  • 129816 12/18/06 20:50 gzero End of Run 32991:
  • 129815 12/18/06 20:47 gzero Run 32991: test:Random matrix special: all FPD's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129814 12/18/06 19:51 Breuer Run 32990 plot of coinc matrix: CED's delayed by 60 ns
  • 129813 12/18/06 19:38 gzero Run 32990: Random matrix special: all CED's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129812 12/18/06 19:33 gzero End of Run 32989:
  • 129811 12/18/06 19:05 gzero Run 32989: Random matrix special: all CED's delayed 60 ns, Ch trigger: quartz:mult2, borsil:mult3
  • 129810 12/18/06 19:03 gzero End of Run 32988:
  • 129809 12/18/06 17:57 gzero Run 32988: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129808 12/18/06 17:54 gzero End of Run 32987:
  • 129807 12/18/06 16:40 suleiman Beam: The Hall C Charge Asymmetry width depends on Hall A Current
  • 129806 12/18/06 16:39 gzero Run 32987: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz:mult2, borsil:mult3
  • 129805 12/18/06 16:37 gzero End of Run 32986:
  • 129804 12/18/06 16:34 suleiman Changed CODA Config to ts_fullinj before run 32986
  • 129803 12/18/06 16:32 gzero Run 32986: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129802 12/18/06 16:30 gzero End of Run 32985:
  • 129801 12/18/06 16:24 Armstrong Mott results (just for the record)
  • 129800 12/18/06 16:01 cdaq Beam Time Accounting
  • 129799 12/18/06 15:57 neven Day Shift Summary
  • 129798 12/18/06 15:33 Carissa C Target: Shift Checklist Screenshots
  • 129797 12/18/06 15:31 gzero Run 32985: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129796 12/18/06 15:30 gzero End of Run 32984:
  • 129795 12/18/06 15:21 suleiman Beam: Hall C BPMs Widths from run 32983
  • 129794 12/18/06 15:20 suleiman Beam: G0 Cavity Signals from run 32983
  • 129793 12/18/06 15:19 suleiman Beam: Charge Asymmetry and Position Differences fron run 32983 - IN, RHWP=7000 -
  • 129792 12/18/06 15:18 suleiman Beam: Coil Modulation Cycle from run 32982
  • 129791 12/18/06 14:32 Carissa C. Analysis: Analysis Checklist for Runs 32976-32981
  • 129790 12/18/06 14:29 suleiman Beam: Pockels Cell Alignment and Injector Work in January -- Update
  • 129789 12/18/06 14:23 gzero Run 32984: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129788 12/18/06 14:22 gzero End of Run 32983:
  • 129787 12/18/06 13:29 suleiman Beam: The new Hall A IA Slope is -500 ppm/V
  • 129786 12/18/06 13:25 suleiman Beam: Changing Lambda/4 angle for Hall A IA system
  • 129785 12/18/06 13:24 gzero Run 32983: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129784 12/18/06 13:22 gzero End of Run 32982:
  • 129783 12/18/06 12:48 gzero Run 32982: Test run.
  • 129782 12/18/06 12:41 gzero End of Run 32981:
  • 129781 12/18/06 11:31 neven MCC finished Mott measurement
  • 129780 12/18/06 11:27 gzero Run 32981: Run testing the new Hall A IA setting
  • 129779 12/18/06 10:03 neven Beam off. MCC will do the Mott measurement next hour.
  • 129778 12/18/06 10:02 gzero End of Run 32980:
  • 129777 12/18/06 09:36 gzero Run 32980: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129776 12/18/06 09:33 gzero End of Run 32979:
  • 129775 12/18/06 08:39 gaskell Hall A 1 Pass Running Update
  • 129774 12/18/06 08:36 gzero Run 32979: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129773 12/18/06 08:35 gzero End of Run 32978:
  • 129772 12/18/06 08:34 gaskell Mott measurement today around 10 am
  • 129771 12/18/06 08:02 cdaq Beam Time Accounting
  • 129770 12/18/06 08:01 Franklin Owl Shift Summary
  • 129769 12/18/06 07:47 muether Analysis Checklit (32967-32975)
  • 129768 12/18/06 07:32 gzero Run 32978: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129767 12/18/06 07:32 gzero End of Run 32977:
  • 129766 12/18/06 06:39 muether Shift check list screen grabs
  • 129765 12/18/06 06:32 gzero Run 32977: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129764 12/18/06 06:32 gzero End of Run 32976:
  • 129763 12/18/06 05:53 gzero Run 32976: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129762 12/18/06 05:35 gzero End of Run 32975:
  • 129761 12/18/06 04:32 gzero Run 32975: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129760 12/18/06 04:32 gzero End of Run 32974:
  • 129759 12/18/06 03:33 gzero Run 32974: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129758 12/18/06 03:33 gzero End of Run 32973:
  • 129757 12/18/06 02:34 gzero Run 32973: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129756 12/18/06 02:34 gzero End of Run 32972:
  • 129755 12/18/06 01:35 gzero Run 32972: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129754 12/18/06 01:34 gzero End of Run 32971:
  • 129753 12/18/06 00:51 franklin Beam: IOC se 20 rebooted
  • 129752 12/18/06 00:35 gzero Run 32971: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129751 12/18/06 00:34 gzero End of Run 32970:
  • 129750 12/18/06 00:27 Breuer shift summary , evening shift of Dec. 17, 2006
  • 129749 12/18/06 00:25 cdaq Beam Time Accounting
  • 129748 12/18/06 00:22 Breuer Oct 7 NCD CED scalers 4 to 8 acted up again after powercylcling bin
  • 129747 12/18/06 00:06 Papavassilio Target: Shift summary
  • Sunday

  • 129746 12/17/06 23:55 Papavassilio Analysis: Checklist and plots
  • 129745 12/17/06 23:34 gzero Run 32970: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129744 12/17/06 23:32 gzero End of Run 32969:
  • 129743 12/17/06 23:28 Breuer Bottom octant FPDs see increased raw rate; octant 5 CED FPD rate increased since long time?
  • 129742 12/17/06 23:22 Papavassilio Beam: Funny position caught in snapshot
  • 129741 12/17/06 23:16 Papavassilio Screenshots from checklist
  • 129740 12/17/06 22:29 gzero Run 32969: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129739 12/17/06 22:28 gzero End of Run 32968:
  • 129738 12/17/06 21:50 Breuer Trouble with pion/random matrix oct 3; back to status before run 32966
  • 129737 12/17/06 21:15 gzero Run 32968: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129736 12/17/06 21:10 gzero End of Run 32967:
  • 129735 12/17/06 20:51 gzero Run 32967: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129734 12/17/06 20:50 gzero End of Run 32966:
  • 129733 12/17/06 20:35 Breuer Run 32065 is a test run, oct 3 pion-matrix bin 9/8 repaired
  • 129732 12/17/06 20:34 Breuer Run 32065 is a test run
  • 129731 12/17/06 20:18 gzero Run 32966: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129730 12/17/06 20:16 gzero End of Run 32965:
  • 129729 12/17/06 20:16 gzero Run 32965: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129728 12/17/06 20:04 gzero End of Run 32965:
  • 129727 12/17/06 19:27 gzero Run 32964: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129726 12/17/06 19:27 gzero End of Run 32963:
  • 129725 12/17/06 18:33 gzero Run 32963: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129724 12/17/06 18:32 gzero End of Run 32962:
  • 129723 12/17/06 17:53 Papavassilio Target: Intermittent gpt8 alarms continue
  • 129722 12/17/06 17:50 Breuer NA Cerenkov SPE amplitudes
  • 129721 12/17/06 17:33 gzero Run 32962: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129720 12/17/06 17:32 gzero End of Run 32961:
  • 129719 12/17/06 16:44 cdaq Beam Time Accounting
  • 129718 12/17/06 16:42 breuer changed rotatable half wave plate from 0 to +7000 before start of run32961
  • 129717 12/17/06 16:35 gzero Run 32961: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129716 12/17/06 16:31 gzero End of Run 32960:
  • 129715 12/17/06 16:00 neven This is a wrong entry.
  • 129714 12/17/06 15:56 neven This is a wrong entry
  • 129713 12/17/06 15:52 neven Day Shift Summary
  • 129712 12/17/06 15:51 maud Target: checklist. out of range values. snapshots.
  • 129711 12/17/06 15:50 neven Day Shift Summary
  • 129710 12/17/06 15:30 gzero Run 32960: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129709 12/17/06 15:29 gzero End of Run 32959:
  • 129708 12/17/06 14:20 gzero Run 32959: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129707 12/17/06 14:19 gzero End of Run 32958:
  • 129706 12/17/06 13:21 gzero Run 32958: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129705 12/17/06 13:20 gzero End of Run 32957:
  • 129704 12/17/06 12:16 gzero Run 32957: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129703 12/17/06 12:14 gzero End of Run 32956:
  • 129702 12/17/06 11:16 IHWP Cahnge: Screen capture of "Laser Polarization and Parity Control"
  • 129701 12/17/06 11:12 neven IHWP changed from OUT to IN
  • 129700 12/17/06 11:09 gzero Run 32956: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129699 12/17/06 11:08 gzero End of Run 32955:
  • 129698 12/17/06 10:34 gzero Run 32955: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129697 12/17/06 10:33 gzero End of Run 32954:
  • 129696 12/17/06 10:06 maud Target: gpt8 hits low alarm again.
  • 129695 12/17/06 09:32 gzero Run 32954: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129694 12/17/06 09:31 gzero End of Run 32953:
  • 129693 12/17/06 08:32 gzero Run 32953: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129692 12/17/06 08:31 gzero End of Run 32952:
  • 129691 12/17/06 08:02 cdaq Beam Time Accounting
  • 129690 12/17/06 07:49 Franklin Owl Shift Summary
  • 129689 12/17/06 07:44 muether Analysis Checklist (Runs 32943-32950)
  • 129688 12/17/06 07:28 gzero Run 32952: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129687 12/17/06 07:18 gzero End of Run 32951:
  • 129686 12/17/06 07:16 Franklin Beam: Beam not stable in x
  • 129685 12/17/06 07:03 muether Scan of shift checklist
  • 129684 12/17/06 06:55 muether Shift Chek list Screen Grabs
  • 129683 12/17/06 06:42 muether FPD and CED Singles since 32790 (take 2)
  • 129682 12/17/06 06:40 muether FPD and CED Singles since 32790
  • 129681 12/17/06 06:18 muether Cerenkov singles rates since 32790
  • 129680 12/17/06 06:09 gzero Run 32951: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129679 12/17/06 06:06 gzero End of Run 32950:
  • 129678 12/17/06 05:12 gzero Run 32950: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129677 12/17/06 05:11 gzero End of Run 32949:
  • 129676 12/17/06 04:49 muether Target: gpt8 (not gpt13) has been experiencing periodic alarms
  • 129675 12/17/06 04:11 gzero Run 32949: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129674 12/17/06 04:11 gzero End of Run 32948:
  • 129673 12/17/06 03:12 gzero Run 32948: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129672 12/17/06 03:12 muether q^2 change from 2 in Ferris wheel move
  • 129671 12/17/06 03:10 gzero End of Run 32947:
  • 129670 12/17/06 02:12 gzero Run 32947: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129669 12/17/06 02:12 muether Charge Feedback GUI oddity
  • 129668 12/17/06 02:10 gzero End of Run 32946:
  • 129667 12/17/06 01:13 gzero Run 32946: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129666 12/17/06 01:13 gzero End of Run 32945:
  • 129665 12/17/06 00:40 Papavassilio Analysis: Checklist
  • 129664 12/17/06 00:31 Papavassilio Rebooted vmec15
  • 129663 12/17/06 00:21 cdaq Beam Time Accounting
  • 129662 12/17/06 00:15 Anna Micherd Swing shift summary
  • 129661 12/17/06 00:13 gzero Run 32945: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129660 12/17/06 00:00 gzero End of Run 32944:
  • Saturday

  • 129659 12/16/06 23:27 gzero Run 32944: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129658 12/16/06 23:26 gzero End of Run 32943:
  • 129657 12/16/06 23:21 Papavassilio Shift checklist screenshots
  • 129656 12/16/06 22:26 gzero Run 32943: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129655 12/16/06 22:24 gzero End of Run 32942:
  • 129654 12/16/06 21:24 gzero Run 32942: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129653 12/16/06 21:03 gzero Run 32941: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129652 12/16/06 20:44 Anna Micherd End of run 32940 failed.
  • 129651 12/16/06 20:38 gzero End of Run 32940:
  • 129650 12/16/06 20:36 gzero End of Run 32940:
  • 129649 12/16/06 20:34 gzero End of Run 32940:
  • 129648 12/16/06 19:33 gzero Run 32940: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129647 12/16/06 19:32 gzero End of Run 32939:
  • 129646 12/16/06 18:47 Papavassilio Target: gpt13 alarm
  • 129645 12/16/06 18:33 gzero Run 32939: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129644 12/16/06 18:32 gzero End of Run 32938:
  • 129643 12/16/06 17:32 gzero Run 32938: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129642 12/16/06 17:30 gzero End of Run 32937:
  • 129641 12/16/06 17:11 gaskell half wave plate switch tomorrow
  • 129640 12/16/06 16:44 gzero Run 32937: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129639 12/16/06 16:32 gzero End of Run 32936:
  • 129638 12/16/06 16:25 vanoers/papa Screen Shots from Checklist
  • 129637 12/16/06 16:00 cdaq Beam Time Accounting
  • 129636 12/16/06 15:55 M Jones Day shift summary
  • 129635 12/16/06 15:34 gzero Run 32936: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129634 12/16/06 15:32 gzero End of Run 32935:
  • 129633 12/16/06 14:27 gzero Run 32935: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129632 12/16/06 14:26 gzero End of Run 32934:
  • 129631 12/16/06 13:22 gzero Run 32934: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129630 12/16/06 13:21 gzero End of Run 32933:
  • 129629 12/16/06 12:04 gzero Run 32933: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129628 12/16/06 12:03 gzero End of Run 32932:
  • 129627 12/16/06 10:39 gzero Run 32932: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129626 12/16/06 10:37 gzero End of Run 32931:
  • 129625 12/16/06 09:37 gzero Run 32931: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129624 12/16/06 09:36 gzero End of Run 32930:
  • 129623 12/16/06 08:34 gzero Run 32930: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129622 12/16/06 08:34 vanoers/jone Target: Target IOC problem
  • 129621 12/16/06 08:30 gzero End of Run 32929:
  • 129620 12/16/06 08:07 gzero Run 32929: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129619 12/16/06 08:06 gzero End of Run 32928:
  • 129618 12/16/06 08:03 cdaq Beam Time Accounting
  • 129617 12/16/06 08:00 muether Analysis Shift Checklist (32919-32926)
  • 129616 12/16/06 07:52 Franklin Owl Shift Summary
  • 129615 12/16/06 07:02 gzero Run 32928: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129614 12/16/06 07:01 gzero End of Run 32927:
  • 129613 12/16/06 06:59 Franklin SMS: Cell missing in (CED,FPD) space
  • 129612 12/16/06 06:33 muether Shift Check List Screen Grabs
  • 129611 12/16/06 06:04 gzero Run 32927: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129610 12/16/06 06:00 gzero End of Run 32926:
  • 129609 12/16/06 05:06 gzero Run 32926: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129608 12/16/06 05:04 gzero End of Run 32925:
  • 129607 12/16/06 04:05 gzero Run 32925: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129606 12/16/06 04:03 gzero End of Run 32924:
  • 129605 12/16/06 03:07 gzero Run 32924: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129604 12/16/06 03:06 gzero End of Run 32923:
  • 129603 12/16/06 02:09 muether HALO05 and 06 also strange
  • 129602 12/16/06 02:06 gzero Run 32923: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129601 12/16/06 02:04 gzero End of Run 32922:
  • 129600 12/16/06 02:02 muether Large LUMI widths for run 32915
  • 129599 12/16/06 01:09 gzero Run 32922: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129598 12/16/06 01:07 gzero End of Run 32921:
  • 129597 12/16/06 00:46 Franklin Beam: Beam back
  • 129596 12/16/06 00:39 Papavassilio Analysis: Checklist and plots
  • 129595 12/16/06 00:39 Franklin Beam: Beam off
  • 129594 12/16/06 00:12 cdaq Beam Time Accounting
  • 129593 12/16/06 00:03 gzero Run 32921: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129592 12/16/06 00:02 jschaub Swing Shift Summary
  • 129591 12/16/06 00:01 gzero End of Run 32920:
  • Friday

  • 129590 12/15/06 23:02 gzero Run 32920: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129589 12/15/06 23:01 gzero End of Run 32919:
  • 129588 12/15/06 22:00 gzero Run 32919: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129587 12/15/06 21:58 gzero End of Run 32918:
  • 129586 12/15/06 21:39 Breuer New Quartz tube XP4578/B serial # 00131 has problem.
  • 129585 12/15/06 21:23 Breuer Analysis: Beam current scan result: Background fit functions and plots.
  • 129584 12/15/06 21:02 gzero Run 32918: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129583 12/15/06 21:00 gzero End of Run 32917:
  • 129582 12/15/06 20:55 Breuer Analysis: Beam current scan result (mult2 and 3); results
  • 129581 12/15/06 20:52 Papavassilio Screenshots from shift checklist
  • 129580 12/15/06 20:48 gzero Run 32917: PZT Scan, 10 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129579 12/15/06 20:46 gzero End of Run 32916:
  • 129578 12/15/06 20:06 gzero Run 32916: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129577 12/15/06 20:02 gzero End of Run 32915:
  • 129576 12/15/06 19:04 gzero Run 32915: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129575 12/15/06 19:03 gzero End of Run 32914:
  • 129574 12/15/06 19:02 Papavassilio Checklist scan
  • 129573 12/15/06 18:49 jmammei Beam: position monitor calibrations for new DB
  • 129572 12/15/06 18:08 gzero Run 32914: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129571 12/15/06 18:06 gzero End of Run 32913:
  • 129570 12/15/06 17:59 jschaub Beam: Restarted Beam Feedback and Realtime Analyzers
  • 129569 12/15/06 17:54 jschaub Analysis: Changes to Realtime Analyzer
  • 129568 12/15/06 17:15 jmammei Beam: position monitor calibration for run 32881
  • 129567 12/15/06 17:01 gzero Run 32913: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129566 12/15/06 16:58 gzero End of Run 32912:
  • 129565 12/15/06 16:04 cdaq Beam Time Accounting
  • 129564 12/15/06 16:03 Armstrong Day Shift Summary
  • 129563 12/15/06 15:55 gaskell Pivot BPMs frozen
  • 129562 12/15/06 15:30 gzero Run 32912: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129561 12/15/06 15:29 gzero End of Run 32911:
  • 129560 12/15/06 14:28 gzero Run 32911: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129559 12/15/06 14:26 gzero End of Run 32910:
  • 129558 12/15/06 14:25 Armstrong position differences etc. since IHWP set to OUT
  • 129557 12/15/06 14:10 vanoers HClog screen-shots 1 thru 10 at 14:00 on 12/15/2006
  • 129556 12/15/06 14:08
  • 129555 12/15/06 13:30 suleiman Beam: G0 Cavity Signals from run 32908
  • 129554 12/15/06 13:29 suleiman Beam: Hall C BPMs Widths from run 32908
  • 129553 12/15/06 13:28 suleiman Beam: Charge Asymmetry and Position Differences from run 32908 - OUT -
  • 129552 12/15/06 13:14 gzero Run 32910: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129551 12/15/06 13:11 gzero End of Run 32909:
  • 129550 12/15/06 12:47 muether Some results from Herbert's random study
  • 129549 12/15/06 11:43 gzero Run 32909: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129548 12/15/06 11:42 gzero End of Run 32908:
  • 129547 12/15/06 11:40 suleiman Beam: Looking at the wire G0XM - the current scan should give the right pedestal but the beam off gives a different one
  • 129546 12/15/06 10:37 gzero Run 32908: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129545 12/15/06 10:36 gzero End of Run 32907:
  • 129544 12/15/06 09:30 gzero Run 32907: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129543 12/15/06 09:29 gzero End of Run 32906:
  • 129542 12/15/06 08:17 gzero Run 32906: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129541 12/15/06 08:14 gzero End of Run 32905:
  • 129540 12/15/06 08:04 cdaq Beam Time Accounting
  • 129539 12/15/06 07:54 jroche owl shift summary
  • 129538 12/15/06 07:45 maud Target: goat++ check
  • 129537 12/15/06 07:31 maud Target: nothing to report....
  • 129536 12/15/06 07:12 gzero Run 32905: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129535 12/15/06 07:11 gzero End of Run 32904:
  • 129534 12/15/06 05:59 gzero Run 32904: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129533 12/15/06 05:59 gzero End of Run 32903:
  • 129532 12/15/06 05:01 gzero Run 32903: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129531 12/15/06 05:00 gzero End of Run 32902:
  • 129530 12/15/06 04:25 jroche Analysis: target info ending up correct in the data base (follow up form our daq trouble from this night)
  • 129529 12/15/06 03:33 gzero Run 32902: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129528 12/15/06 03:33 gzero End of Run 32901:
  • 129527 12/15/06 02:48 jroche Beam: width of hc parameters
  • 129526 12/15/06 02:46 Fatiha Rebooted most of the elcetronics, DAQ is working fine now
  • 129525 12/15/06 02:39 jroche turned coil modulation on
  • 129524 12/15/06 02:35 gzero Run 32901: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129523 12/15/06 02:32 gzero End of Run 32900:
  • 129522 12/15/06 02:27 gzero End of Run 32900:
  • 129521 12/15/06 02:27 gzero Run 32900: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129520 12/15/06 02:25 gzero End of Run 32899:
  • 129519 12/15/06 02:24 gzero Run 32899: test
  • 129518 12/15/06 02:14 gzero End of Run 32898:
  • 129517 12/15/06 02:14 gzero Run 32898: test
  • 129516 12/15/06 02:11 gzero Run 32897: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129515 12/15/06 02:10 gzero End of Run 32896:
  • 129514 12/15/06 02:09 gzero Run 32896: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129513 12/15/06 02:08 gzero End of Run 32895:
  • 129512 12/15/06 02:08 gzero Run 32895: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129511 12/15/06 02:01 gzero End of Run 32894:
  • 129510 12/15/06 02:00 gzero Run 32894: test
  • 129509 12/15/06 01:55 gzero End of Run 32893:
  • 129508 12/15/06 01:54 gzero Run 32893: test
  • 129507 12/15/06 01:53 gzero End of Run 32892:
  • 129506 12/15/06 01:53 gzero Run 32892: test
  • 129505 12/15/06 01:46 gzero End of Run 32891:
  • 129504 12/15/06 01:46 gzero Run 32891: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129503 12/15/06 01:45 gzero End of Run 32890:
  • 129502 12/15/06 01:41 gzero Run 32890: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129501 12/15/06 01:38 gzero End of Run 32889:
  • 129500 12/15/06 01:16 jroche ET error
  • 129499 12/15/06 01:16 jroche ET error
  • 129498 12/15/06 01:13 jroche stopped coil modulation before starting run 32889
  • 129497 12/15/06 01:12 gzero Run 32889: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129496 12/15/06 01:09 gzero End of Run 32888:
  • 129495 12/15/06 00:51 jroche DAQ issue continued
  • 129494 12/15/06 00:46 gzero Run 32888: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129493 12/15/06 00:45 jschaub VESDA Alarm
  • 129492 12/15/06 00:44 jroche DAQ issue continued
  • 129491 12/15/06 00:37 gzero End of Run 32887:
  • 129490 12/15/06 00:31 jroche coda issue: switching to ts_Full
  • 129489 12/15/06 00:22 Papavassilio Analysis: Checklist and plots
  • 129488 12/15/06 00:22 gzero Run 32887: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129487 12/15/06 00:20 gzero End of Run 32886:
  • 129486 12/15/06 00:18 cdaq Beam Time Accounting
  • 129485 12/15/06 00:18 jschaub Analysis: CODA Crash
  • 129484 12/15/06 00:16 jschaub Swing Shift Summary
  • 129483 12/15/06 00:05 gzero Run 32886: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129482 12/15/06 00:01 gzero End of Run 32885:
  • Thursday

  • 129481 12/14/06 23:37 jschaub Beam: New Slope for Hall A Charge Feedback
  • 129480 12/14/06 23:13 gzero Run 32885: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129479 12/14/06 23:09 Papavassilio Screenshots from shift checklist
  • 129478 12/14/06 22:22 gzero End of Run 32884:
  • 129477 12/14/06 22:17 gzero Run 32884: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129476 12/14/06 22:16 gzero End of Run 32883:
  • 129475 12/14/06 21:54 jschaub Beam: Asymmetries Large Again
  • 129474 12/14/06 21:37 gzero Run 32883: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129473 12/14/06 21:35 gzero End of Run 32882:
  • 129472 12/14/06 21:05 jschaub Parity Quality Snapshot
  • 129471 12/14/06 20:43 gzero Run 32882: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129470 12/14/06 20:42 jmammei Beam: BPM/BCM calibration complete
  • 129469 12/14/06 20:41 gzero End of Run 32881:
  • 129468 12/14/06 19:50 suleiman Beam: The signal coming to us was saturated - the actual width is 240 ppm.
  • 129467 12/14/06 19:35 suleiman Beam: Changed Hall A BCM signal to 3XBCM2
  • 129466 12/14/06 18:23 jmammei Beam: BPM/BCM calib
  • 129465 12/14/06 18:01 gzero Run 32881: BPM/BCM Calibration, LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129464 12/14/06 18:00 gzero End of Run 32880:
  • 129463 12/14/06 17:58 gzero Run 32880: BPM/BCM Calibration, LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129462 12/14/06 17:41 gzero End of Run 32879:
  • 129461 12/14/06 17:19 pking Strange relationship between Hall A charge signal and injector charge signal in run 32877
  • 129460 12/14/06 17:07 Armstrong MCC had indeed informed us...
  • 129459 12/14/06 16:36 jmammei Beam: non-invasive test by MCC finished
  • 129458 12/14/06 16:31 gzero Run 32879: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129457 12/14/06 16:29 gzero End of Run 32878:
  • 129456 12/14/06 16:26 gaskell RC Summary and Run Plans 12/14/2006
  • 129455 12/14/06 16:05 Armstrong Day Shift Summary
  • 129454 12/14/06 16:05 suleiman Beam: Hall A Charge Asymmetry width is only 20 ppm at 85 uA
  • 129453 12/14/06 16:03 cdaq Beam Time Accounting
  • 129452 12/14/06 15:55 horn Analysis: checklist
  • 129451 12/14/06 15:48 Armstrong a bit more on coil modulation
  • 129450 12/14/06 15:38 horn Checklist: figures
  • 129449 12/14/06 15:34 suleiman Beam: Coil Modulation Cycle from run 32877 - After increasing coils amplitudes.
  • 129448 12/14/06 15:33 horn beam position adjustment
  • 129447 12/14/06 15:31 gzero Run 32878: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129446 12/14/06 15:28 gzero End of Run 32877:
  • 129445 12/14/06 15:27 jmammei Beam: BPM calibration with gains "off"
  • 129444 12/14/06 15:16 Armstrong Present run header maybe not in database?
  • 129443 12/14/06 14:39 gzero Run 32877: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129442 12/14/06 14:38 gzero End of Run 32876:
  • 129441 12/14/06 13:47 suleiman Beam: New method to find the BPMs' Pedestals
  • 129440 12/14/06 13:44 Armstrong back to production
  • 129439 12/14/06 13:41 gzero Run 32876: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129438 12/14/06 13:35 gzero End of Run 32875:
  • 129437 12/14/06 13:35 suleiman Beam: The Gain Control Screen with Gains OFF selected
  • 129436 12/14/06 13:30 suleiman Beam: Hall C BPM IOC in Auto-gain at 20 uA and gain OFF at 10 uA
  • 129435 12/14/06 13:18 horn Target: LD2 target back in beam (late entry)
  • 129434 12/14/06 13:17 horn/gaskell Moller summary - after spot move
  • 129433 12/14/06 13:12 gzero Run 32875: Test BPMs with Auto-gain OFF settings.
  • 129432 12/14/06 13:10 gzero End of Run 32874:
  • 129431 12/14/06 13:07 gzero Run 32874: test new coil pulsing amplitudes
  • 129430 12/14/06 12:47 gaskell MOller backout
  • 129429 12/14/06 12:35 gaskell ran flipper after Moller run 62124
  • 129428 12/14/06 12:35 cdaq Moller Run 62126: Moller run IHWP=OUT (after spot move)
  • 129427 12/14/06 12:30 cdaq Moller Run 62125: Moller run IHWP=OUT (after spot move)
  • 129426 12/14/06 12:26 cdaq Moller Run 62124: Moller run IHWP=OUT (after spot move)
  • 129425 12/14/06 12:21 cdaq Moller Run 62123: Moller run IHWP=OUT (after spot move)
  • 129424 12/14/06 11:51 cdaq Moller Run 62122: Moller run IHWP=IN (after spot move)
  • 129423 12/14/06 11:47 cdaq Moller Run 62121: Moller run IHWP=IN (after spot move)
  • 129422 12/14/06 11:43 cdaq Moller Run 62120: Moller run IHWP=IN (after spot move)
  • 129421 12/14/06 11:39 cdaq Moller Run 62119: Moller run IHWP=IN (after spot move)
  • 129420 12/14/06 11:36 Armstrong note on coil modulation (and editorial)
  • 129419 12/14/06 11:13 gaskell/horn Pre-spot move Moller summary
  • 129418 12/14/06 10:55 gaskell Spot move started at 10 am
  • 129417 12/14/06 10:51 gaskell SOS sprung a leak!
  • 129416 12/14/06 10:50 suleiman Beam: Doubled the amplitude of Coils: 2,3,4,5,6 to increase the beam motion during the Coil Modulation Cycle
  • 129415 12/14/06 09:58 cdaq Moller Run 62118: Moller run IHWP=OUT (before spot move)
  • 129414 12/14/06 09:55 cdaq Moller Run 62117: Moller run IHWP=OUT (before spot move)
  • 129413 12/14/06 09:52 cdaq Moller Run 62116: Moller run IHWP=OUT (before spot move)
  • 129412 12/14/06 09:50 cdaq Moller Run 62115: Moller run IHWP=IN (before spot move)
  • 129411 12/14/06 09:46 cdaq Moller Run 62114: Moller run IHWP=IN (before spot move)
  • 129410 12/14/06 09:42 cdaq Moller Run 62113: Moller run IHWP=IN (before spot move)
  • 129409 12/14/06 09:37 cdaq Moller Run 62112: Moller run IHWP=IN (before spot move)
  • 129408 12/14/06 09:34 cdaq Moller Run 62111: Moller run IHWP=IN (before spot move)
  • 129407 12/14/06 09:31 cdaq Moller Run 62110: Tuning
  • 129406 12/14/06 09:26 cdaq Moller Run 62109: Tuning
  • 129405 12/14/06 08:32 horn Target: out of beam
  • 129404 12/14/06 08:28 horn Moller setup
  • 129403 12/14/06 08:27 cdaq Moller Run 62108: DAQ Test
  • 129402 12/14/06 08:21 gzero End of Run 32873:
  • 129401 12/14/06 08:07 jroche owl shift sumary
  • 129400 12/14/06 08:05 cdaq Beam Time Accounting
  • 129399 12/14/06 07:42 gzero Run 32873: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129398 12/14/06 07:42 jroche RHWP to 7000
  • 129397 12/14/06 07:39 gzero End of Run 32872:
  • 129396 12/14/06 07:30 maud Target: Shift Summary and Checklist Snapshots : out of range values
  • 129395 12/14/06 06:28 jroche beam quality with rhwp=6000, my mistake
  • 129394 12/14/06 06:15 gzero Run 32872: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129393 12/14/06 06:12 gzero End of Run 32871:
  • 129392 12/14/06 06:12 jroche hall A is back
  • 129391 12/14/06 05:44 gzero Run 32871: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129390 12/14/06 05:39 gzero End of Run 32870:
  • 129389 12/14/06 04:33 gzero Run 32870: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129388 12/14/06 04:31 jroche Beam: RHWP: from 6000 to 5000
  • 129387 12/14/06 04:29 gzero End of Run 32869:
  • 129386 12/14/06 04:06 jroche Beam: parity quality (rhwp setting 6000): no so good
  • 129385 12/14/06 03:27 jroche Beam: Hall A is off so is the charge asymmetry width in hall C
  • 129384 12/14/06 03:24 gzero Run 32869: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129383 12/14/06 03:23 gzero End of Run 32868:
  • 129382 12/14/06 02:35 muether Corrected second plot
  • 129381 12/14/06 02:33 gzero Run 32868: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129380 12/14/06 02:33 muether Rates back to pre-"moved ferris wheel" levels
  • 129379 12/14/06 02:27 gzero End of Run 32867:
  • 129378 12/14/06 02:22 jroche Analysis: today's ugrade to the run_summary_online scripts (better formating)
  • 129377 12/14/06 02:22 jroche Analysis: today's ugrade to the run_summary_online scripts
  • 129376 12/14/06 01:21 gzero Run 32867: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129375 12/14/06 01:09 gzero End of Run 32866:
  • 129374 12/14/06 01:01 gzero Run 32866: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129373 12/14/06 00:57 gzero End of Run 32865:
  • 129372 12/14/06 00:43 Papavassilio Analysis: Checklist
  • 129371 12/14/06 00:15 Papavassilio Checklist page scans
  • 129370 12/14/06 00:03 cdaq Beam Time Accounting
  • 129369 12/14/06 00:00 Papavassilio Screenshots from shift checklist
  • Wednesday

  • 129368 12/13/06 23:59 jmammei Shift Summary
  • 129367 12/13/06 23:39 jmammei coincidence matrix after fix
  • 129366 12/13/06 23:33 gzero Run 32865: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129365 12/13/06 22:28 gzero End of Run 32864:
  • 129364 12/13/06 22:25 jmammei Beam: beam will be down for another 30 min.
  • 129363 12/13/06 22:15 jmammei Beam: RF zone dropout
  • 129362 12/13/06 22:12 gaskell/pkin Ferris Wheel back at 4 inches
  • 129361 12/13/06 22:07 gzero Run 32864: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129360 12/13/06 22:06 gzero End of Run 32863:
  • 129359 12/13/06 22:03 pking/gaskel Octants 1 and 3 hopefully solved
  • 129358 12/13/06 22:03 gzero Run 32863: test; no beam
  • 129357 12/13/06 22:01 gzero End of Run 32862:
  • 129356 12/13/06 21:48 jmammei called MCC for controlled access
  • 129355 12/13/06 21:11 gzero Run 32862: octants 1 and 5 switched at CFDs
  • 129354 12/13/06 21:08 jmammei fastclear not enabled for run 32860
  • 129353 12/13/06 21:05 gzero End of Run 32861:
  • 129352 12/13/06 20:55 gzero Run 32861: French only - fastclear enabled
  • 129351 12/13/06 20:55 gzero End of Run 32860:
  • 129350 12/13/06 20:53 gzero Run 32860: French only - fastclear enabled
  • 129349 12/13/06 20:50 gzero End of Run 32859:
  • 129348 12/13/06 20:22 gzero Run 32859: junk
  • 129347 12/13/06 20:12 gzero Run 32858: junk
  • 129346 12/13/06 20:06 jmammei runs 32855, 32856 and 32857 junk?
  • 129345 12/13/06 20:06 gzero End of Run 32857:
  • 129344 12/13/06 19:56 jmammei DAQ problems
  • 129343 12/13/06 19:52 gzero Run 32857: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129342 12/13/06 19:47 gzero End of Run 32856:
  • 129341 12/13/06 19:46 gzero Run 32856: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129340 12/13/06 19:45 gzero End of Run 32855:
  • 129339 12/13/06 18:58 gzero Run 32855: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129338 12/13/06 18:55 gzero End of Run 32854:
  • 129337 12/13/06 18:51 jmammei Beam: HV trip
  • 129336 12/13/06 18:36 jmammei Beam: G0 and G0B "unresolved"
  • 129335 12/13/06 18:09 gzero Run 32854: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129334 12/13/06 18:07 gzero End of Run 32853:
  • 129333 12/13/06 17:27 jmammei Analysis: updated good_for_gui
  • 129332 12/13/06 17:25 jmammei Beam: parity quality
  • 129331 12/13/06 17:20 gzero Run 32853: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129330 12/13/06 17:19 gzero End of Run 32852:
  • 129329 12/13/06 17:18 muether The case of the moving ferris wheel
  • 129328 12/13/06 17:08 jschaub/sule Beam: I give up!
  • 129327 12/13/06 17:08 pking Modifed the good_for_GUI to restore "rwp_scan" as an option.
  • 129326 12/13/06 17:06 jschaub/sule Beam: &%@!ing File Formats!
  • 129325 12/13/06 17:03 jschaub/sule Beam: Injector Optimization--Better Better Format
  • 129324 12/13/06 17:01 jschaub/sule Beam: Injector Optimization--Better Format
  • 129323 12/13/06 17:00 jschaub/sule Beam: Injector Optimization
  • 129322 12/13/06 17:00 jmammei Beam: parity quality
  • 129321 12/13/06 16:56 jmammei Analysis: Coincidence matrix plot
  • 129320 12/13/06 16:16 gzero Run 32852: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129319 12/13/06 16:04 cdaq Beam Time Accounting
  • 129318 12/13/06 16:02 Armstrong Shift summary for Day shift
  • 129317 12/13/06 16:00 horn Analysis: shift checklist
  • 129316 12/13/06 15:44 gzero End of Run 32851:
  • 129315 12/13/06 15:42 gzero Run 32851: junk
  • 129314 12/13/06 15:36 gaskell RC Summary and Runplan
  • 129313 12/13/06 15:15 suleiman Beam: Charge Asymmetry and Position Differences from run 32849 - (IN, RHWP=120, IA=5.0)
  • 129312 12/13/06 14:25 Armstrong Parity beam studies, not production
  • 129311 12/13/06 14:15 horn Beam: new RHWP settings
  • 129310 12/13/06 14:11 horn starting regular beam studies
  • 129309 12/13/06 14:04 gzero End of Run 32850:
  • 129308 12/13/06 14:02 gzero Run 32850: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3, RHWP=120.
  • 129307 12/13/06 14:00 gzero End of Run 32849:
  • 129306 12/13/06 13:16 gzero Run 32849: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3, RHWP=120.
  • 129305 12/13/06 13:13 gzero End of Run 32848:
  • 129304 12/13/06 12:10 gzero Run 32848: RHWP run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129303 12/13/06 12:09 gzero End of Run 32847:
  • 129302 12/13/06 12:01 gzero Run 32847: RHWP run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129301 12/13/06 11:59 gzero End of Run 32846:
  • 129300 12/13/06 11:02 suleiman/jsc Beam: IOCSE 11 and 19 back in auto gain, iocse11 has different IF gains now
  • 129299 12/13/06 10:58 gzero Run 32846: RHWP run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129298 12/13/06 10:52 gzero End of Run 32845:
  • 129297 12/13/06 10:32 gzero Run 32845: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129296 12/13/06 10:29 gzero End of Run 32844:
  • 129295 12/13/06 10:17 gzero Run 32844: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129294 12/13/06 10:15 suleiman/jsc Beam: Helicity controls
  • 129293 12/13/06 10:07 suleiman/jsc Beam: Injector IOCSEs
  • 129292 12/13/06 10:03 gzero End of Run 32843:
  • 129291 12/13/06 09:44 horn Hall A charge feedback
  • 129290 12/13/06 09:31 gzero Run 32843: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129289 12/13/06 09:29 gzero End of Run 32842:
  • 129288 12/13/06 08:16 gzero Run 32842: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129287 12/13/06 08:15 gzero End of Run 32841:
  • 129286 12/13/06 08:01 maud Target: Shift Summary and Checklist Snapshots : out of range values
  • 129285 12/13/06 08:01 cdaq Beam Time Accounting
  • 129284 12/13/06 08:00 jroche owl shift summary
  • 129283 12/13/06 07:50 jroche double counting in Octant 1 CED4 NC
  • 129282 12/13/06 07:40 jroche Beam: parity quality over night
  • 129281 12/13/06 07:01 gzero Run 32841: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129280 12/13/06 06:50 gzero End of Run 32840:
  • 129279 12/13/06 06:44 gzero Run 32840: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129278 12/13/06 06:42 jroche Beam: beam instability : HV trip
  • 129277 12/13/06 06:39 gzero End of Run 32839:
  • 129276 12/13/06 06:07 gzero Run 32839: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129275 12/13/06 06:06 gzero End of Run 32838:
  • 129274 12/13/06 06:06 jroche Beam: hall A off: charge assymetry decreased by a factor of two
  • 129273 12/13/06 06:05 jroche Beam: hall A off: charge assymetry decreased by a factor of two
  • 129272 12/13/06 05:23 gzero Run 32838: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129271 12/13/06 05:23 jroche Beam: beam feedback off between 3:40 and 4:15
  • 129270 12/13/06 05:21 gzero End of Run 32837:
  • 129269 12/13/06 04:27 gzero Run 32837: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129268 12/13/06 04:20 gzero End of Run 32836:
  • 129267 12/13/06 04:18 jroche/breue Octant 7 e_CED_NCD channel 5 to 8 : actually still flaky
  • 129266 12/13/06 04:12 Breuer Problem: flaky oct 7 MH-C electronics board
  • 129265 12/13/06 04:07 gzero Run 32836: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129264 12/13/06 03:59 gzero End of Run 32835:
  • 129263 12/13/06 03:32 gzero Run 32835: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129262 12/13/06 03:23 gzero End of Run 32834:
  • 129261 12/13/06 03:12 jroche oct5_piCED-FPD matrix empty
  • 129260 12/13/06 03:07 gzero Run 32834: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129259 12/13/06 03:05 gzero End of Run 32833:
  • 129258 12/13/06 02:47 gzero Run 32833: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129257 12/13/06 02:46 gzero End of Run 32832:
  • 129256 12/13/06 01:27 gzero Run 32832: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129255 12/13/06 01:25 gzero End of Run 32831:
  • 129254 12/13/06 00:30 Papavassilio Target: Shift summary
  • 129253 12/13/06 00:22 gzero Run 32831: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129252 12/13/06 00:18 gzero End of Run 32830:
  • 129251 12/13/06 00:14 Papavassilio Analysis: Shift Checklist
  • 129250 12/13/06 00:02 cdaq Beam Time Accounting
  • 129249 12/13/06 00:01 Bosted Evening shift summary
  • Tuesday

  • 129248 12/12/06 22:57 gzero Run 32830: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129247 12/12/06 22:54 gzero End of Run 32829:
  • 129246 12/12/06 22:40 Papavassilio Corrected current halo screenshot
  • 129245 12/12/06 22:28 Papavassilio Screenshots
  • 129244 12/12/06 22:22 Papavassilio Shift checklist completed
  • 129243 12/12/06 22:02 gzero Run 32829: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129242 12/12/06 21:49 gzero End of Run 32828:
  • 129241 12/12/06 21:36 suleiman Beam: Charge Asymmetry and Position Differences from run 32827 - (IN, RHWP=-30, IA=5.7)
  • 129240 12/12/06 21:01 gzero Run 32828: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129239 12/12/06 21:00 gzero End of Run 32827:
  • 129238 12/12/06 20:56 suleiman Beam: Charge Asymmetry and Position Differences from run 32826 - (IN, RHWP=0, IA=4.2)
  • 129237 12/12/06 20:17 suleiman Beam: Helicity controls
  • 129236 12/12/06 20:14 suleiman Beam: Changed RHWP for IN to -30 degress (7500) before run 32827
  • 129235 12/12/06 20:02 gzero Run 32827: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129234 12/12/06 19:58 gzero End of Run 32826:
  • 129233 12/12/06 19:36 Bosted CODA problem
  • 129232 12/12/06 19:33 Bosted Electronic problem: random latch sector 5 not working runs 32822-23
  • 129231 12/12/06 19:04 gzero Run 32826: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129230 12/12/06 18:50 gzero Run 32825: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129229 12/12/06 18:45 gzero End of Run 32824:
  • 129228 12/12/06 18:45 gzero Run 32824: Fixing electronics
  • 129227 12/12/06 18:33 gzero End of Run 32823:
  • 129226 12/12/06 18:19 Breuer before run 32823 returned BCM1, BCM2 gain to settings 4
  • 129225 12/12/06 18:11 gzero Run 32823: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129224 12/12/06 18:07 Papavassilio Target: Closed JT valve two steps
  • 129223 12/12/06 18:06 gzero End of Run 32822:
  • 129222 12/12/06 18:01 gzero Run 32822: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129221 12/12/06 17:59 gzero End of Run 32821:
  • 129220 12/12/06 17:49 Breuer/Larry add-on: Delay was taken out before run 32813
  • 129219 12/12/06 17:47 gzero Run 32821: Production run, 40 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129218 12/12/06 17:44 gzero End of Run 32820:
  • 129217 12/12/06 17:44 Papavassilio Target: JT valve opened one more step
  • 129216 12/12/06 17:36 gzero Run 32820: Production run, 35 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129215 12/12/06 17:34 gzero End of Run 32819:
  • 129214 12/12/06 17:32 Papavassilio Target: Opened JT valve 1.0 step
  • 129213 12/12/06 17:31 gzero Run 32819: Production run, 30 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129212 12/12/06 17:29 Breuer Beam current gain setting changed from 4 to 3 (BCM1 and 2) before run 32818
  • 129211 12/12/06 17:26 gzero End of Run 32818:
  • 129210 12/12/06 17:20 Breuer Beam current gain setting changed from 4 to 3 (BCM1 and 2) before run 32818
  • 129209 12/12/06 17:16 gzero Run 32818: Production run, 25 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129208 12/12/06 17:14 gzero End of Run 32817:
  • 129207 12/12/06 17:12 Doug Beck Day shift summary for Dec. 12
  • 129206 12/12/06 17:09 cdaq Beam Time Accounting
  • 129205 12/12/06 17:07 gzero Run 32817: Production run, 25 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129204 12/12/06 17:05 gzero End of Run 32816:
  • 129203 12/12/06 16:54 gzero Run 32816: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129202 12/12/06 16:52 gzero End of Run 32815:
  • 129201 12/12/06 16:48 gaskell Short RC update
  • 129200 12/12/06 16:47 Doug Beck Analysis: Correction: proper plots to go with entry 129110
  • 129199 12/12/06 16:42 gzero Run 32815: Production run, 15 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129198 12/12/06 16:40 gzero End of Run 32814:
  • 129197 12/12/06 16:35 Doug Beck Begin Herbert's beam current scan
  • 129196 12/12/06 16:33 gzero Run 32814: Production run, 10 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129195 12/12/06 16:32 gzero End of Run 32813:
  • 129194 12/12/06 16:26 Larry/Herber 6ns delay taken back out from Cerenkov trigger for octants 4 and 8
  • 129193 12/12/06 16:25 gzero Run 32813: Production run, 5 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129192 12/12/06 16:21 gzero End of Run 32812:
  • 129191 12/12/06 15:35 suleiman Beam: Charge Asymmetry and Position Differences from run 32811 - PC OFF -
  • 129190 12/12/06 15:19 Doug Beck/Ri Beam: !! Pockels cell HV back on!!
  • 129189 12/12/06 15:17 gzero Run 32812: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3. RHWP=0
  • 129188 12/12/06 15:15 gzero End of Run 32811:
  • 129187 12/12/06 15:03 Beam: Hall A IA Slope was changed from -1750 DACV/ppm to -300 DACV/ppm
  • 129186 12/12/06 15:00 suleiman Beam: Charge Asymmetry and Position Differences from run 32810 - (IN, RHWP=+20, IA=3.8)
  • 129185 12/12/06 14:55 Doug Beck/Ri Beam: !!Pockells Cell HV OFF!!
  • 129184 12/12/06 14:52 gzero Run 32811: Test run with Pockels cell HV off
  • 129183 12/12/06 14:45 suleiman Beam: Charge Asymmetry and Position Differences from run 32809 - (IN, RHWP=-20, IA=5.3)
  • 129182 12/12/06 14:40 gzero End of Run 32810:
  • 129181 12/12/06 14:18 suleiman Beam: Charge Asymmetry and Position Differences from run 32807 - (IN, RHWP=0, IA=4.2)
  • 129180 12/12/06 14:17 Doug Beck/Ri Beam: Try again to reduce y position differences
  • 129179 12/12/06 14:16 gzero Run 32810: Production run, std settings + RWHP = 1000
  • 129178 12/12/06 14:12 gzero End of Run 32809:
  • 129177 12/12/06 14:02 horn Analysis: checklist shift
  • 129176 12/12/06 13:52 Doug Beck/Ri Beam: Attempt to reduce y position difference
  • 129175 12/12/06 13:47 Breuer Result for Cernenkov delay curve, for mult=2; NA and French
  • 129174 12/12/06 13:45 gzero Run 32809: Production and check of RHWP: 8000, IA to 5.0
  • 129173 12/12/06 13:42 gzero End of Run 32808:
  • 129172 12/12/06 13:42 gzero Run 32808: junk
  • 129171 12/12/06 13:40 gzero End of Run 32807:
  • 129170 12/12/06 13:23 horn shift check list: figures
  • 129169 12/12/06 12:42 gzero Run 32807: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129168 12/12/06 12:38 gzero End of Run 32806:
  • 129167 12/12/06 12:30 gzero Run 32806: Herbert's test run 6 ns added to NA Cerenkov
  • 129166 12/12/06 12:28 gzero End of Run 32805:
  • 129165 12/12/06 12:19 jschaub Analysis: Cleared a File Transfer Error
  • 129164 12/12/06 12:18 gzero Run 32805: Herbert's test run 3 ns added to NA Cerenkov
  • 129163 12/12/06 12:17 Larry NA Cerenkov timing with BPO checked
  • 129162 12/12/06 12:14 gzero End of Run 32804:
  • 129161 12/12/06 12:13 Doug Beck Beam: Working on charge asymmetry widths
  • 129160 12/12/06 12:08 Larry 6 ns Delay added to French Cerenkov trigger for octants 4 and 8
  • 129159 12/12/06 12:08 Doug Beck O7 multiple hits return
  • 129158 12/12/06 12:05 gzero Run 32804: Herbert's test run
  • 129157 12/12/06 12:04 gzero End of Run 32803:
  • 129156 12/12/06 11:58 saw Logbook and Hall C webserver
  • 129155 12/12/06 11:39 gzero Run 32803: Junk
  • 129154 12/12/06 11:36 Doug Beck ROC 2, NA coincidence crates power cycled; Cherenkov
  • 129153 12/12/06 11:02 gzero End of Run 32802:
  • 129152 12/12/06 10:59 gzero Run 32802: Junk
  • 129151 12/12/06 10:53 gzero End of Run 32801:
  • 129150 12/12/06 10:39 Doug Beck Analysis: Multihits for O7
  • 129149 12/12/06 10:36 Doug Beck File server outage
  • 129148 12/12/06 10:30
  • 129147 12/12/06 09:50 gzero Run 32801: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129146 12/12/06 08:43 pking Looked at coincidence board and scaler for Oct7 MH
  • 129145 12/12/06 08:28 gzero Run 32800: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129144 12/12/06 08:26 gzero End of Run 32799:
  • 129143 12/12/06 08:16 cdaq Beam Time Accounting
  • 129142 12/12/06 08:13 jroche owl shift summary
  • 129141 12/12/06 08:12 muether y possition differences and QA widths are quite large (Analysis Check list)
  • 129140 12/12/06 08:06 jroche Analysis: updated golden value for the integrity file
  • 129139 12/12/06 07:27 muether y possition differences and QA widths are quite large (Analysis Check list)
  • 129138 12/12/06 07:26 gzero Run 32799: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129137 12/12/06 07:24 gzero End of Run 32798:
  • 129136 12/12/06 06:55 muether Shift Screen Grabs
  • 129135 12/12/06 05:47 gzero Run 32798: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129134 12/12/06 05:46 gzero End of Run 32797:
  • 129133 12/12/06 05:35 muether NA MH Octant 7 Dead Channels
  • 129132 12/12/06 04:48 gzero Run 32797: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129131 12/12/06 04:46 gzero End of Run 32796:
  • 129130 12/12/06 03:47 gzero Run 32796: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129129 12/12/06 03:44 gzero End of Run 32795:
  • 129128 12/12/06 02:33 gzero Run 32795: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129127 12/12/06 02:32 gzero End of Run 32794:
  • 129126 12/12/06 01:25 gzero Run 32794: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129125 12/12/06 01:22 gzero End of Run 32793:
  • 129124 12/12/06 00:01 cdaq Beam Time Accounting
  • Monday

  • 129123 12/11/06 23:57 Pitt December 11 Swing Shift Summary
  • 129122 12/11/06 23:48 Larry/Herber Octant 1 and 8 anode current checks
  • 129121 12/11/06 23:41 Larry/Herber Cerenkov HV adjusted
  • 129120 12/11/06 23:31 gzero Run 32793: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129119 12/11/06 23:23 Papavassilio Screenshot submission to logbook appears to stall
  • 129118 12/11/06 23:17
  • 129117 12/11/06 23:09 gzero End of Run 32792:
  • 129116 12/11/06 23:07 Papavassilio Screenshots
  • 129115 12/11/06 23:05 Pitt Beam status after FSD problems
  • 129114 12/11/06 22:59 Papavassilio Checklist completed
  • 129113 12/11/06 22:09 gzero Run 32792: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129112 12/11/06 18:35 cdaq Beam Time Accounting
  • 129111 12/11/06 18:30 Doug Beck Analysis: Another try at figures
  • 129110 12/11/06 18:24 Doug Beck Analysis: Additional information regarding beam current optimization
  • 129109 12/11/06 17:40 jschaub Beam: Magnet Problem & New FSD Problem
  • 129108 12/11/06 17:23 jschaub Changed Octant 1 and 8 Triggers to Multiplicity 2
  • 129107 12/11/06 16:56 jschaub Ran Flipper
  • 129106 12/11/06 16:51 jschaub Beam: Beam Down
  • 129105 12/11/06 16:35 gzero End of Run 32791:
  • 129104 12/11/06 16:15 gzero Run 32791: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129103 12/11/06 16:09 gzero End of Run 32790:
  • 129102 12/11/06 15:42 Carissa Target: Shift Checklist -- no beam
  • 129101 12/11/06 15:03 horn Hall C back in beam permit
  • 129100 12/11/06 14:55 Breuer Ferris wheel found at location 5-5/8 inch today
  • 129099 12/11/06 14:18 jschaub French PMT Swap
  • 129098 12/11/06 14:18 Larry/John/M Quartz PMTs installed for Octant 1 and 8 Cerenkovs
  • 129097 12/11/06 13:59
  • 129096 12/11/06 13:59 horn Hall access update
  • 129095 12/11/06 13:40 saw Test of logbook at alternate location
  • 129094 12/11/06 11:25 Breuer Moved paddle to center position
  • 129093 12/11/06 11:22 Breuer Hall entry: exchange of tubes in Cerenkovs of octants 1 and 8
  • 129092 12/11/06 09:04 muether SMS: LN2 Level sensor
  • 129091 12/11/06 08:11 cdaq Beam Time Accounting
  • 129090 12/11/06 08:04 muether Ramping down HV and SMS for tube installation
  • 129089 12/11/06 08:01 muether Analysis check list (32779-32788)
  • 129088 12/11/06 08:00 jroche owl shift summary
  • 129087 12/11/06 07:36 gzero Run 32790: Pedestal run, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129086 12/11/06 07:32 jroche restricted access requested
  • 129085 12/11/06 07:30 gzero End of Run 32789:
  • 129084 12/11/06 07:25 muether Cerenkov Singles rates for all LD2 running
  • 129083 12/11/06 07:01 gzero Run 32789: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129082 12/11/06 07:01 gzero End of Run 32788:
  • 129081 12/11/06 06:27 muether Shift Screen Grabs
  • 129080 12/11/06 06:05 gzero Run 32788: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129079 12/11/06 06:01 gzero End of Run 32787:
  • 129078 12/11/06 04:31 gzero Run 32787: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129077 12/11/06 04:30 gzero End of Run 32786:
  • 129076 12/11/06 03:46 gzero Run 32786: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129075 12/11/06 03:27 gzero End of Run 32785:
  • 129074 12/11/06 02:37 gzero Run 32785: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129073 12/11/06 02:35 gzero End of Run 32784:
  • 129072 12/11/06 01:54 gzero Run 32784: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129071 12/11/06 01:52 gzero End of Run 32783:
  • 129070 12/11/06 00:43 muether Rebooted target IOC
  • 129069 12/11/06 00:27 gzero Run 32783: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129068 12/11/06 00:07 Papavassilio Target: Beam heating values not updating
  • 129067 12/11/06 00:03 gzero End of Run 32782:
  • 129066 12/11/06 00:01 cdaq Beam Time Accounting
  • 129065 12/11/06 00:00 Papavassilio Target: Swing shift summary
  • Sunday

  • 129064 12/10/06 23:52 Pitt Dec. 10 Swing Shift Summary
  • 129063 12/10/06 23:46 Papavassilio Target: Target temperature fluctuations continue
  • 129062 12/10/06 23:21 gzero Run 32782: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129061 12/10/06 23:20 gzero End of Run 32781:
  • 129060 12/10/06 23:10 Papavassilio Target: Also two hours ago
  • 129059 12/10/06 23:01 Papavassilio Target: Temperature spikes
  • 129058 12/10/06 22:45 Papavassilio Analysis: Checklist
  • 129057 12/10/06 22:20 gzero Run 32781: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129056 12/10/06 22:19 gzero End of Run 32780:
  • 129055 12/10/06 21:17 gzero Run 32780: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129054 12/10/06 21:16 gzero End of Run 32779:
  • 129053 12/10/06 21:05 Breuer Octant 1, CED 5 right: mysteriously had low rate for a while, recovered; runs 32739-32744
  • 129052 12/10/06 20:16 gzero Run 32779: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129051 12/10/06 20:14 gzero End of Run 32778:
  • 129050 12/10/06 20:07 Papavassilio Checklist screenshots
  • 129049 12/10/06 18:45 gzero Run 32778: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129048 12/10/06 17:51 gzero End of Run 32777:
  • 129047 12/10/06 16:55 gzero Run 32777: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129046 12/10/06 16:54 gzero End of Run 32776:
  • 129045 12/10/06 16:38 gaskell RC summary: 12/9-12/10
  • 129044 12/10/06 16:37 pking Analysis: Database replication on wmg0 is in-sync with the master copy; please use wmg0 for goat again
  • 129043 12/10/06 16:25 pking Analysis: Restarted wmg0 and resumed database replication; wmg0 is still behind the master copy.
  • 129042 12/10/06 16:24 Breuer Oct 4, Cerenkov tube: the removed base has broken connection
  • 129041 12/10/06 16:19 horn Day Shift Summary
  • 129040 12/10/06 16:19 suleiman Beam: Hall C BPMs Position Differences Widths from run 32773
  • 129039 12/10/06 16:12 suleiman Beam: BCM1 had A Glitch in run 32773
  • 129038 12/10/06 16:08 cdaq Beam Time Accounting
  • 129037 12/10/06 16:05 Sarah Target: Target Operator Day Shift Summary
  • 129036 12/10/06 15:54 suleiman Beam: G0 Cavity Signals from run 32773
  • 129035 12/10/06 15:54 suleiman Beam: Charge Asymmetry and Position Differences from run 32773 - Looks fine
  • 129034 12/10/06 15:53 suleiman Beam: Coil Modulation Cycle from run 32766
  • 129033 12/10/06 15:53 gzero Run 32776: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129032 12/10/06 15:51 gzero End of Run 32775:
  • 129031 12/10/06 15:22 Sarah Analysis: Analysis Checklist
  • 129030 12/10/06 14:53 gzero Run 32775: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129029 12/10/06 14:52 gzero End of Run 32774:
  • 129028 12/10/06 13:55 Sarah Parity Beam Quality Plots
  • 129027 12/10/06 13:51 gzero Run 32774: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129026 12/10/06 13:50 gzero End of Run 32773:
  • 129025 12/10/06 12:58 Sarah Shift Checklist Scanned Pages
  • 129024 12/10/06 12:41 gzero Run 32773: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129023 12/10/06 12:38 gzero End of Run 32772:
  • 129022 12/10/06 12:32 Sarah Shift Check List Screen Grabs
  • 129021 12/10/06 12:29 pking Analysis: Modified target information in DB for runs 32757-32768
  • 129020 12/10/06 12:27 Breuer suggested run plan for beam current scan with new tubes/ mult=2
  • 129019 12/10/06 11:32 gzero Run 32772: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129018 12/10/06 11:31 gzero End of Run 32771:
  • 129017 12/10/06 10:43 Sarah Beam: Halo Strip Chart
  • 129016 12/10/06 10:26 Sarah Reset HV sniper again
  • 129015 12/10/06 10:24 gzero Run 32771: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129014 12/10/06 10:21 gzero End of Run 32770:
  • 129013 12/10/06 10:13 gzero Run 32770: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129012 12/10/06 10:06 Sarah Reset HV sniper
  • 129011 12/10/06 08:24 horn Beam delivery update
  • 129010 12/10/06 08:03 Gericke Owl shift summary
  • 129009 12/10/06 04:27 muether Ramped SMS back to 3500A
  • 129008 12/10/06 04:25 muether Cerenkov Rates since New tube installation
  • 129007 12/10/06 02:14 muether SMS: VCL Flow dropped briefly triggering a slow dump
  • 129006 12/10/06 01:46 muether Using g0dbserver for now...
  • 129005 12/10/06 01:40 muether Target: Target info not read from runs (32757-32768)
  • 129004 12/10/06 01:34 gzero End of Run 32769:
  • 129003 12/10/06 01:33 gzero Run 32769: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 129002 12/10/06 00:57 Larry Beam OFF Cerenkov PMT anode current measurements
  • 129001 12/10/06 00:34 Papavassilio Scrennshots not available for swing shift
  • 129000 12/10/06 00:31 Papavassilio Analysis: Checklist
  • 128999 12/10/06 00:00 cdaq Beam Time Accounting
  • Saturday

  • 128998 12/09/06 23:59 Papavassilio Analysis: Could not run goat++
  • 128997 12/09/06 23:55 Papavassilio Target: Target still OK - Hall A lost theirs
  • 128996 12/09/06 23:50 Pitt Dec. 9 Swing Shift Summary
  • 128995 12/09/06 23:33 gzero End of Run 32768:
  • 128994 12/09/06 23:24 gzero Run 32768: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128993 12/09/06 23:11 gzero End of Run 32767:
  • 128992 12/09/06 23:07 Pitt Run 32767 should be labeled as TEST run - no beam
  • 128991 12/09/06 23:05 gzero Run 32767: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128990 12/09/06 22:51 Pitt Restart CODA with proper config: ts_Fullinj
  • 128989 12/09/06 22:49 Pitt MCC update
  • 128988 12/09/06 22:39 Pitt Power outage affects accelerator
  • 128987 12/09/06 22:38 Breuer Oct 4, Cer 2 base replaced, touched wrong potentiometer
  • 128986 12/09/06 22:36 Pitt CODA restart with ts_full
  • 128985 12/09/06 22:28 gzero End of Run 32766:
  • 128984 12/09/06 22:24 Pitt Coil modulation back on
  • 128983 12/09/06 22:19 horn power outage
  • 128982 12/09/06 22:03 gzero Run 32766: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128981 12/09/06 22:00 gzero End of Run 32765:
  • 128980 12/09/06 20:47 gzero Run 32765: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128979 12/09/06 20:39 mack PMT's activate?
  • 128978 12/09/06 20:32 gzero Run 32764: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128977 12/09/06 20:29 gzero End of Run 32763:
  • 128976 12/09/06 20:25 Larry Cerenkov PMT (quartz) anode current measurements
  • 128975 12/09/06 19:45 Larry Updated NA Cerenkov HV
  • 128974 12/09/06 19:28 gzero Run 32763: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128973 12/09/06 18:46 gzero End of Run 32762:
  • 128972 12/09/06 18:16 ellis New Good For Gui
  • 128971 12/09/06 18:02 pking Analysis: Changed the "analysis" and "run" tables in the 362MeV and 687MeV databases.
  • 128970 12/09/06 17:54 gzero Run 32762: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128969 12/09/06 17:52 gzero End of Run 32761:
  • 128968 12/09/06 16:51 gzero Run 32761: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128967 12/09/06 16:32 gzero End of Run 32760:
  • 128966 12/09/06 16:11 horn beam positions issues
  • 128965 12/09/06 16:02 cdaq Beam Time Accounting
  • 128964 12/09/06 16:02 benesch shift summary
  • 128963 12/09/06 15:43 horn charge feedback high alarm
  • 128962 12/09/06 15:40 gzero Run 32760: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128961 12/09/06 15:32 gzero End of Run 32759:
  • 128960 12/09/06 15:23 gzero Run 32759: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128959 12/09/06 15:17 gzero End of Run 32758:
  • 128958 12/09/06 14:42 gzero Run 32758: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128957 12/09/06 14:39 horn G0 detector HV on
  • 128956 12/09/06 14:34 gzero End of Run 32757:
  • 128955 12/09/06 14:24 benesch improved location at G0B
  • 128954 12/09/06 14:19 benesch Beam: tuning optics with Moller quads off
  • 128953 12/09/06 13:57 gzero Run 32757: new optics Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128952 12/09/06 13:43 horn Target: move LD2 target back in beam
  • 128951 12/09/06 11:33 horn Target: Carbon target is in now
  • 128950 12/09/06 10:26 gaskell Short term plan
  • 128949 12/09/06 10:14 horn/gaskell Moller Summary
  • 128948 12/09/06 10:10 gaskell G0 DETECTOR HV is OFF
  • 128947 12/09/06 10:04 gaskell Moller backout
  • 128946 12/09/06 09:51 cdaq Moller Run 62106: Moller run - IHWP OUT
  • 128945 12/09/06 09:45 cdaq Moller Run 62105: Moller run - IHWP IN
  • 128944 12/09/06 09:41 cdaq Moller Run 62104: Moller run - IHWP IN
  • 128943 12/09/06 09:38 cdaq Moller Run 62103: Moller run - IHWP IN
  • 128942 12/09/06 09:35 cdaq Moller Run 62102: Moller run - IHWP IN
  • 128941 12/09/06 09:28 cdaq Moller Run 62101: Moller run - IHWP OUT
  • 128940 12/09/06 09:25 cdaq Moller Run 62100: Moller run - IHWP OUT
  • 128939 12/09/06 09:21 cdaq Moller Run 62099: Tune test
  • 128938 12/09/06 09:17 cdaq Moller Run 62098: Tune test
  • 128937 12/09/06 09:05 cdaq Moller Run 62097: Tune test
  • 128936 12/09/06 08:54 cdaq Moller Run 62096: Tune test
  • 128935 12/09/06 08:51 cdaq Moller Run 62095: Tune test
  • 128934 12/09/06 08:17 horn moller setup
  • 128933 12/09/06 08:14 cdaq Moller Run 62094: DAQ test
  • 128932 12/09/06 08:13 horn Target: moving out of beam for moller measurement
  • 128931 12/09/06 08:11 Doug Beck Analysis: Beam current optimization for quartz tubes/ML2
  • 128930 12/09/06 08:11 gzero End of Run 32756:
  • 128929 12/09/06 08:08 Pitt Dec. 8 Swing Shift Summary
  • 128928 12/09/06 08:01 cdaq Beam Time Accounting
  • 128927 12/09/06 07:53 muether Analysis Checklist
  • 128926 12/09/06 07:47 Gericke Owl shift summary
  • 128925 12/09/06 07:04 muether Shift check list screen grabs
  • 128924 12/09/06 06:49 gzero Run 32756: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128923 12/09/06 06:48 gzero End of Run 32755:
  • 128922 12/09/06 05:26 gzero Run 32755: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128921 12/09/06 05:24 gzero End of Run 32754:
  • 128920 12/09/06 04:14 gzero Run 32754: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128919 12/09/06 04:11 gzero End of Run 32753:
  • 128918 12/09/06 03:24 gzero Run 32753: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128917 12/09/06 03:18 gzero End of Run 32752:
  • 128916 12/09/06 03:14 gzero Run 32752: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128915 12/09/06 03:01 muether Analysis: Run 32746 did not process
  • 128914 12/09/06 03:00 gzero End of Run 32751:
  • 128913 12/09/06 02:09 gzero Run 32751: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128912 12/09/06 02:07 gzero End of Run 32750:
  • 128911 12/09/06 01:13 gzero Run 32750: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128910 12/09/06 01:11 gzero End of Run 32749:
  • 128909 12/09/06 00:26 gzero Run 32749: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128908 12/09/06 00:24 gzero End of Run 32748:
  • 128907 12/09/06 00:03 Pitt Dec. 8 Swing Shift Summary
  • 128906 12/09/06 00:02 Sarah Target: Target Operator Swing Shift Summary (formatted)
  • 128904 12/09/06 00:02 Sarah Target: Target Operator Swing Shift Summary
  • 128905 12/09/06 00:01 cdaq Beam Time Accounting
  • 128903 12/09/06 00:01 Pitt Elastic rates and random ratios for MULT 2 versus MULT 3
  • Friday

  • 128902 12/08/06 23:34 Pitt Data from integrity files for multiplicty runs
  • 128901 12/08/06 23:34 Pitt Data from integrity files for multiplicty runs
  • 128900 12/08/06 23:33 Sarah Analysis: Analysis Checklist
  • 128899 12/08/06 23:17 Pitt Beam trajectory
  • 128898 12/08/06 23:07 gzero Run 32748: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128897 12/08/06 23:06 gzero End of Run 32747:
  • 128896 12/08/06 23:00 Pitt Coincidence matrices and Cerenkov rates with modified Majority Logic Setting
  • 128895 12/08/06 22:11 Breuer/Pitt Changed octants 3,4,5,7 to MULT 2
  • 128894 12/08/06 21:55 Breuer/Pitt Changed octants 3,4,5,7 to MULT 2
  • 128893 12/08/06 21:54 gzero Run 32747: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: quartz,mult2 borsil,mult3
  • 128892 12/08/06 21:52 gzero End of Run 32746:
  • 128891 12/08/06 21:52 Sarah Shift Checklist Scanned Pages
  • 128890 12/08/06 21:23 Pitt Coincidence matrix and Cerenkov rates with new quartz tubes
  • 128889 12/08/06 21:20 Sarah Shift Check List Screen Grabs
  • 128888 12/08/06 20:33 gzero Run 32746: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128887 12/08/06 19:12 smithg we lose beam AGAIN to hall A
  • 128886 12/08/06 18:59 gzero End of Run 32745:
  • 128885 12/08/06 18:57 ellis/breuer quartz pmt HV settings
  • 128884 12/08/06 18:41 Sarah Target: Closed JT valve by 3 clicks
  • 128883 12/08/06 18:10 gzero Run 32745: Test run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128882 12/08/06 18:01 smithg Run Plan for tonight and tomorrow morning
  • 128881 12/08/06 17:55 Fatiha DataBase locked
  • 128880 12/08/06 17:35 smithg Trigger change tonight
  • 128879 12/08/06 17:34 ellis sms sniper reset
  • 128878 12/08/06 17:33 smithg Bad base in octant 4
  • 128877 12/08/06 17:33 Sarah Target: Opened the JT valve by 3 clicks
  • 128876 12/08/06 16:06 cdaq Beam Time Accounting
  • 128874 12/08/06 16:02 Sarah K Target: LD2 target in beam
  • 128873 12/08/06 15:58 M Jones Half wave plate set to OUT
  • 128872 12/08/06 14:51 ellis sms sniper off
  • 128871 12/08/06 14:40 Alex/Colleen Oct 4 and 3 new PMTs in
  • 128870 12/08/06 12:51 smithg Quartz tubes installed in octant 3, and 2 more in octant 4
  • 128869 12/08/06 11:54 Fatiha HV maps
  • 128868 12/08/06 10:32
  • 128867 12/08/06 09:29 horn BPM display frozen - rebooted vmec15
  • 128866 12/08/06 09:29 horn Hall in controlled access
  • 128865 12/08/06 09:08 gzero End of Run 32744:
  • 128864 12/08/06 09:00 gzero Run 32744: Production run, 1.5 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128863 12/08/06 08:58 gzero End of Run 32743:
  • 128861 12/08/06 08:03 pking December 8th Owl shift summary
  • 128860 12/08/06 08:02 cdaq Beam Time Accounting
  • 128859 12/08/06 07:58 gzero Run 32743: Production run, 1.5 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128858 12/08/06 07:53 gzero End of Run 32742:
  • 128857 12/08/06 07:44 gzero Run 32742: Production run, 5 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128856 12/08/06 07:42 gzero End of Run 32741:
  • 128855 12/08/06 07:37 gzero Run 32741: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128854 12/08/06 07:26 gzero End of Run 32740:
  • 128853 12/08/06 06:58 gzero Run 32740: backgrouind test, 60ns in all FPDs, 20 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128852 12/08/06 06:57 gzero End of Run 32739:
  • 128851 12/08/06 06:56 muether Shift Check List screen grabs
  • 128850 12/08/06 06:54 pking Accept a shift in X position at target to reduce halos
  • 128849 12/08/06 06:39 gzero Run 32739: backgrouind test, 60ns in all FPDs, 20 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128848 12/08/06 06:38 gzero End of Run 32738:
  • 128847 12/08/06 05:38 gzero Run 32738: backgrouind test, 60ns in all FPDs, 20 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128846 12/08/06 05:27 muether Target: Close JT back
  • 128845 12/08/06 05:14 gzero End of Run 32737:
  • 128844 12/08/06 04:39 pking Halo rates went up just after run 32737 started.
  • 128843 12/08/06 04:34 gzero Run 32737: backgrouind test, 60ns in all FPDs, 20 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128842 12/08/06 03:49 pking HV trip at the end of run 32736
  • 128841 12/08/06 03:45 gzero End of Run 32736:
  • 128840 12/08/06 03:42 pking Coincidence matrix with delayed FPD signals at 20 uA
  • 128839 12/08/06 03:32 gzero Run 32736: backgrouind test, 60ns in all FPDs, 20 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128838 12/08/06 03:30 gzero End of Run 32735:
  • 128837 12/08/06 02:42 pking Coincidence matrix with delayed FPD signals at 30 uA
  • 128836 12/08/06 02:35 Breuer some details for background test runs 32731 to about run 32736
  • 128835 12/08/06 02:34 gzero Run 32735: backgrouind test, 60ns in all FPDs, 30 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128834 12/08/06 02:32 gzero End of Run 32734:
  • 128833 12/08/06 02:12 pking Coincidence matrix with delayed FPD signals at 5 uA
  • 128832 12/08/06 02:07 pking Changed the delayed signals to the FPDs before run 32734.
  • 128831 12/08/06 02:02 gzero Run 32734: backgrouind test, 60ns in all FPDs, 5 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128830 12/08/06 01:49 gzero End of Run 32733:
  • 128829 12/08/06 01:47 pking Beam position stability so far tonight
  • 128828 12/08/06 01:24 pking Mysterious bell sound has happened for fifth night
  • 128827 12/08/06 01:22 pking Coincidence matrix with delayed CED signals at 5 uA
  • 128826 12/08/06 01:13 gzero Run 32733: backgrouind test, 60ns in all CEDs, 5 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128825 12/08/06 01:06 gzero End of Run 32732:
  • 128824 12/08/06 00:31 muether Target: Opened the JT value 2 clicks
  • 128823 12/08/06 00:23 gzero Run 32732: backgrouind test, 60ns in all CEDs, 30 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128822 12/08/06 00:20 Ellis/Breuer shift summary
  • 128821 12/08/06 00:19 gzero End of Run 32731:
  • 128820 12/08/06 00:17 cdaq Beam Time Accounting
  • Thursday

  • 128819 12/07/06 23:58 Sarah K Target: Target Operator Shift Summary
  • 128818 12/07/06 23:49 Breuer run 32731 ced-fpd plots; ceds delayed 60 ns, 20 uA beam
  • 128817 12/07/06 23:20 gzero Run 32731: backgrouind test, 60ns in all CEDs, 20 uA LD2, Ps4=1600, SMS 3500 A, NA ML3, Fr ML3
  • 128816 12/07/06 23:17 gzero End of Run 32730:
  • 128815 12/07/06 22:28 ellis coinc & parity snapshots
  • 128814 12/07/06 22:13 cdaq Beam Time Accounting
  • 128813 12/07/06 22:04 gzero Run 32730: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128812 12/07/06 22:03 ellis HV's are on
  • 128811 12/07/06 21:58 ellis Beam is going into Hall
  • 128810 12/07/06 19:31 ellis CER oct7 HV initial settings
  • 128809 12/07/06 19:08 ellis sms sniper reset
  • 128808 12/07/06 19:06 ellis beam permit--expect beam ~7:30
  • 128807 12/07/06 18:49
  • 128806 12/07/06 18:48
  • 128805 12/07/06 18:47
  • 128804 12/07/06 18:46
  • 128803 12/07/06 18:46 Sarah K SMS: Magnet Ramped Up!
  • 128802 12/07/06 18:41
  • 128801 12/07/06 18:40
  • 128800 12/07/06 18:18 Sarah K SMS: Ramping Up Magnet
  • 128799 12/07/06 17:58 ellis sms sniper discounted
  • 128798 12/07/06 17:47 Alex/ellis/j New Cer PMTs intalled on Oct 7
  • 128797 12/07/06 16:53 smithg Run Plan for tonight & tomorrow
  • 128796 12/07/06 16:19 smithg We will install 4 more tubes in octant 3 tomorrow
  • 128795 12/07/06 15:29 smithg Installing quartz tubes in octant 7 today
  • 128794 12/07/06 11:46 jschaub Bigfoot, Unicorns and Phototubes
  • 128793 12/07/06 10:14 muether SMS: SMS Computer Maintenance Complete
  • 128792 12/07/06 08:23 muether SMS: Ramping down the SMS
  • 128791 12/07/06 08:17 pking X-Y correlation in C20A during last night's noisy beam positions
  • 128789 12/07/06 08:06 pking December 7th Owl shift summary
  • 128788 12/07/06 08:05 gzero End of Run 32729:
  • 128787 12/07/06 08:02 cdaq Beam Time Accounting
  • 128786 12/07/06 07:53 gzero Run 32729: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128785 12/07/06 07:51 gzero End of Run 32728:
  • 128784 12/07/06 07:43 muether Brief change in position at G0 and G0B
  • 128783 12/07/06 07:17 muether Analysis Checklist
  • 128782 12/07/06 06:49 gzero Run 32728: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128781 12/07/06 06:47 gzero End of Run 32727:
  • 128780 12/07/06 05:54 muether Shift check list screen grabs
  • 128779 12/07/06 05:52 pking Deactivated the coil modulation flag.
  • 128778 12/07/06 05:35 gzero Run 32727: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128777 12/07/06 05:34 gzero End of Run 32726:
  • 128776 12/07/06 05:32 pking Activated our coil modulation system; modulation should occur during run 32727.
  • 128775 12/07/06 04:35 gzero Run 32726: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128774 12/07/06 04:35 gzero End of Run 32725:
  • 128773 12/07/06 03:38 gzero Run 32725: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128772 12/07/06 03:33 gzero End of Run 32724:
  • 128771 12/07/06 03:30 pking Gas system interlock alarm; switched ethane bottle
  • 128770 12/07/06 02:14 pking Analysis: Reset autoanalyzer status of run 32716.
  • 128769 12/07/06 02:05 gzero Run 32724: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128768 12/07/06 02:02 gzero End of Run 32723:
  • 128767 12/07/06 01:28 pking Mysterious bell sound has happened for fourth night
  • 128765 12/07/06 01:19 muether Same figure with um scale visible
  • 128764 12/07/06 01:17 muether more on improved beam position
  • 128763 12/07/06 00:50 Breuer Analysis: predicted background rate function for Mult-2 Quartz tubes
  • 128762 12/07/06 00:46 gzero Run 32723: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128761 12/07/06 00:44 gzero End of Run 32722:
  • 128760 12/07/06 00:28 cdaq Beam Time Accounting
  • 128759 12/07/06 00:27 jroche swing shift summary
  • 128758 12/07/06 00:25 jroche Beam: simple quantifying of the (past) y wiggling
  • Wednesday

  • 128757 12/06/06 23:29 gzero Run 32722: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128756 12/06/06 23:28 gzero End of Run 32721:
  • 128755 12/06/06 22:53 Breuer anode current for Paddle with LD2 target (687 MeV)
  • 128754 12/06/06 22:44 ellis Weekly and Shift (runs 32710 - 32720) Analysis checklist
  • 128753 12/06/06 22:30 gzero Run 32721: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128752 12/06/06 22:28 gzero End of Run 32720:
  • 128751 12/06/06 22:07 smithg RC Report for Mon/Tue/Wed Dec 4,5,6
  • 128750 12/06/06 21:18 gzero Run 32720: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128749 12/06/06 21:11 ellis target shift scanned checklist
  • 128748 12/06/06 21:10 ellis target checklist snapshots
  • 128747 12/06/06 21:05 gzero End of Run 32719:
  • 128746 12/06/06 20:55 gzero Run 32719: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128745 12/06/06 20:34 gzero End of Run 32718:
  • 128744 12/06/06 20:16 jroche Beam: good beam since 2 hours
  • 128743 12/06/06 19:21 gzero Run 32718: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128742 12/06/06 19:19 gzero End of Run 32717:
  • 128741 12/06/06 18:48 suleiman Beam: The y position of the beam from a bad run - 32715 -
  • 128740 12/06/06 18:40 suleiman Beam: The beam y-motion from run 32714
  • 128739 12/06/06 18:20 gzero Run 32717: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128738 12/06/06 18:18 gzero End of Run 32716:
  • 128736 12/06/06 17:39 jroche Beam: bpm reading along the beam line before, during, after the Hall B polarization measurment
  • 128735 12/06/06 17:37 suleiman Beam: Hall C BPMs Width - The beam y-motion is affecting the y-diff RMS
  • 128734 12/06/06 17:35 suleiman Beam: G0 Cavity Signals from run 32714 - Note the correlation between y_G0B and y_CAV2 - The beam y-motion is real
  • 128733 12/06/06 17:33 suleiman Beam: Charge Asymmetry and Position Differences from run 32714 - IN - It is good.
  • 128732 12/06/06 17:07 gzero Run 32716: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128730 12/06/06 16:55 jroche Beam: the beam is so bad that the detector tripped twice in 15mn
  • 128729 12/06/06 16:54 gzero End of Run 32715:
  • 128726 12/06/06 16:37 jschaub Beam: Shift Summary and Checklist Snapshots
  • 128725 12/06/06 16:37 gzero End of Run 32715:
  • 128724 12/06/06 16:37 jroche Beam: y position gone crasy when hall B off ?
  • 128723 12/06/06 16:35 gzero Run 32715: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128717 12/06/06 16:12 jroche Beam: y position is quiet
  • 128716 12/06/06 16:00 cdaq Beam Time Accounting
  • 128715 12/06/06 15:55 smithg Reactivation of photocathode during day shift tomorrow
  • 128714 12/06/06 15:53 M Jones Day shift summary
  • 128713 12/06/06 15:32 gzero Run 32714: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128712 12/06/06 15:31 gzero End of Run 32713:
  • 128711 12/06/06 14:29 gzero Run 32713: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128710 12/06/06 13:49 M JOnes Beam down for injector optimization after spot move
  • 128709 12/06/06 10:15 M JOnes Beam down for Mott and BCM calibration
  • 128708 12/06/06 10:11 gzero End of Run 32712:
  • 128707 12/06/06 09:51 M Jones Ignore entry 128704
  • 128706 12/06/06 09:07 gzero Run 32712: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128705 12/06/06 08:59 gzero End of Run 32711:
  • 128704 12/06/06 08:55 M Jones Correlation between hallc_MeV and c17.ypos
  • 128703 12/06/06 08:04 pking December 6th Owl shift summary
  • 128702 12/06/06 08:03 cdaq Beam Time Accounting
  • 128701 12/06/06 07:46 gzero Run 32711: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128700 12/06/06 07:44 gzero End of Run 32710:
  • 128699 12/06/06 07:42 pking Beam went away and took HV with it
  • 128698 12/06/06 07:15 gzero Run 32710: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128697 12/06/06 07:14 gzero End of Run 32709:
  • 128696 12/06/06 07:04 pking Some confusion while switching ethane bottles.
  • 128695 12/06/06 07:02 muether Analysis: Analysis Check list
  • 128694 12/06/06 06:34 muether Analysis: Shift Check List Screen Grabs
  • 128693 12/06/06 06:15 gzero Run 32709: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128692 12/06/06 06:14 gzero End of Run 32708:
  • 128691 12/06/06 06:13 pking HV tripped off when beam came back
  • 128690 12/06/06 06:06 gzero Run 32708: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128689 12/06/06 06:05 gzero End of Run 32707:
  • 128688 12/06/06 05:36 pking Strance Y position jump during Hall A dummy tasrget insertion, but not when they put helium tgt back
  • 128687 12/06/06 05:19 gzero Run 32707: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128686 12/06/06 05:17 gzero End of Run 32706:
  • 128685 12/06/06 04:03 gzero Run 32706: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128684 12/06/06 04:02 gzero End of Run 32705:
  • 128683 12/06/06 03:08 muether/king Energy flucations
  • 128682 12/06/06 02:59 gzero Run 32705: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128681 12/06/06 02:59 gzero End of Run 32704:
  • 128680 12/06/06 02:15 pking Our EPICS archiver doesn't have G0/G0B positions since the iocse20 reboot at 23:37.
  • 128679 12/06/06 02:00 gzero Run 32704: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128678 12/06/06 01:57 gzero End of Run 32703:
  • 128677 12/06/06 01:25 pking Beam y positions have gone haywire
  • 128676 12/06/06 01:04 gzero Run 32703: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128675 12/06/06 01:03 gzero End of Run 32702:
  • 128674 12/06/06 00:14 ellis swing shift summary
  • 128673 12/06/06 00:12 cdaq Beam Time Accounting
  • 128672 12/06/06 00:02 Sarah K Target: Target Summary for Swing Shift
  • Tuesday

  • 128671 12/05/06 23:54 Sarah K Analysis: Analysis check list (runs 32692-32698) Summary File Highlights
  • 128670 12/05/06 23:51 Sarah K Analysis: Analysis check list (runs 32692-32698)
  • 128669 12/05/06 23:46 gzero Run 32702: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128668 12/05/06 23:45 ellis IOCSE 20 rebooted --
  • 128667 12/05/06 23:44 gzero End of Run 32701:
  • 128666 12/05/06 23:39 ellis hv tripped off
  • 128665 12/05/06 23:00 gzero Run 32701: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128664 12/05/06 22:57 gzero End of Run 32700:
  • 128663 12/05/06 21:49 ellis restarted CODA
  • 128662 12/05/06 21:48 gzero Run 32700: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128661 12/05/06 21:44 ellis End Run failed for run 32699--readable format
  • 128660 12/05/06 21:43 ellis End Run failed for run 32699--
  • 128659 12/05/06 21:42 gzero End of Run 32699:
  • 128658 12/05/06 21:16 Breuer Analysis: Cerenkov rate (M=3) beam current dependence, fitted
  • 128657 12/05/06 20:25 mack position fluctuations
  • 128656 12/05/06 20:15 Sarah K Shift Check List Screen Grabs
  • 128655 12/05/06 20:15 gzero Run 32699: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128654 12/05/06 20:14 gzero End of Run 32698:
  • 128653 12/05/06 19:12 gzero Run 32698: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128652 12/05/06 19:09 ellis pzt scan
  • 128651 12/05/06 18:58 gzero End of Run 32697:
  • 128650 12/05/06 18:15 gzero Run 32697: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128649 12/05/06 18:15 gzero End of Run 32696:
  • 128648 12/05/06 17:42 benesch Beam: new hall C orbit lock began about 1600
  • 128647 12/05/06 17:35 suleiman Beam: Position Differences are getting better since MCC started to improve the Stability of y-position in Hall C line
  • 128646 12/05/06 17:23 Sarah K Target: Rebooted Target IOC
  • 128645 12/05/06 17:17 gzero Run 32696: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128644 12/05/06 17:03 gzero End of Run 32695:
  • 128643 12/05/06 16:54 suleiman Beam: The Energy Modulation Cycle from run 32679 - After energy lock being moved to Hall A - It looks ok.
  • 128642 12/05/06 16:34 coil modulation off
  • 128641 12/05/06 16:20 ellis coil modulatoin ON starting with run 32695
  • 128640 12/05/06 16:16 cdaq Beam Time Accounting
  • 128639 12/05/06 16:16 ellis Changes being made to beam during this run.
  • 128638 12/05/06 15:51 M Jones Day shift summary
  • 128637 12/05/06 15:31 gzero Run 32695: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128636 12/05/06 15:29 gzero End of Run 32694:
  • 128635 12/05/06 14:27 pate Analysis: Analysis check list (runs 32686-32692)
  • 128634 12/05/06 14:16 Carlini Global fit for axial term
  • 128633 12/05/06 13:57 pate Shift Checklist Screen Shots
  • 128632 12/05/06 13:28 gzero Run 32694: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128631 12/05/06 13:27 gzero End of Run 32693:
  • 128630 12/05/06 12:30 gzero Run 32693: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128629 12/05/06 10:25 M Jones Beam: Y positions at pivot and G0 girder
  • 128628 12/05/06 10:16 M Jones Beam: Start beam studies and investigations
  • 128627 12/05/06 10:12 gzero End of Run 32692:
  • 128626 12/05/06 10:03 gzero Run 32692: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128625 12/05/06 10:02 gzero End of Run 32691:
  • 128624 12/05/06 09:20 gzero Run 32691: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128623 12/05/06 09:19 gzero End of Run 32690:
  • 128622 12/05/06 08:47 M JOnes G0 y bpm are better
  • 128621 12/05/06 08:41 gzero Run 32690: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128620 12/05/06 08:39 gzero End of Run 32689:
  • 128619 12/05/06 08:19 pking Analysis: Correlation exists between G0B Y and Cavity BPM 2 Y during fluctuations.
  • 128618 12/05/06 08:13 pking December 5th Owl shift summary
  • 128617 12/05/06 08:12 cdaq Beam Time Accounting
  • 128616 12/05/06 07:59 gzero Run 32689: run to monitor beam position fluctuations
  • 128615 12/05/06 07:56 gzero End of Run 32688:
  • 128614 12/05/06 07:02 muether A visit from The Chistmas Mouse
  • 128613 12/05/06 07:01 pking OPS is turning off the Moller quads
  • 128612 12/05/06 06:47 muether Analysis Check list
  • 128611 12/05/06 06:36 Run 32688 is a run to monitor beam position fluctuations
  • 128610 12/05/06 06:34 gzero Run 32688: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128609 12/05/06 06:33 gzero End of Run 32687:
  • 128608 12/05/06 06:27 muether Shift Check List Screen Grabs and Check list Scan
  • 128607 12/05/06 05:52 pking Orbit adjustments are done, ramp up to 20 uA
  • 128606 12/05/06 05:51 gzero Run 32687: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128605 12/05/06 05:49 gzero End of Run 32686:
  • 128604 12/05/06 04:55 gzero Run 32686: run to moniotr beam positions
  • 128603 12/05/06 04:47 pking Beam position fluctuations have become unacceptable
  • 128602 12/05/06 04:43 gzero End of Run 32685:
  • 128601 12/05/06 04:16 gzero Run 32685: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128600 12/05/06 04:14 gzero End of Run 32684:
  • 128599 12/05/06 04:14 pking Beam position fluctuations starting to creep back
  • 128598 12/05/06 03:30 pking Beam positions have stabilized; begin taking beam at 03:10
  • 128597 12/05/06 03:10 gzero Run 32684: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128596 12/05/06 03:10 gzero End of Run 32683:
  • 128595 12/05/06 02:50 pking Coil modulation has been disabled from G0DAQ since the beginning of the shift.
  • 128594 12/05/06 02:47 muether gpt5 pressure leveling off
  • 128593 12/05/06 02:37 muether X positions since 1pm (with figures)
  • 128592 12/05/06 02:37 muether X positions since 1pm
  • 128591 12/05/06 02:27 muether Some more BPM plots
  • 128590 12/05/06 02:21 pking Beam positions unstable and unacceptable.
  • 128589 12/05/06 02:10 gzero Run 32683: Run to monitor beam position fluctuations
  • 128588 12/05/06 02:09 gzero End of Run 32682:
  • 128587 12/05/06 00:33 gzero Run 32682: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128586 12/05/06 00:18 cdaq Beam Time Accounting
  • 128585 12/05/06 00:09 Sarah K Target: Target Shift Summary
  • 128584 12/05/06 00:07 ellis owl shift summary
  • Monday

  • 128583 12/04/06 23:49 gzero End of Run 32681:
  • 128582 12/04/06 23:48 ellis MCC is taking beam to try to improve orbit
  • 128581 12/04/06 23:47 gzero Run 32681: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128580 12/04/06 23:45 gzero End of Run 32680:
  • 128579 12/04/06 23:36 Sarah K Target: Changed Alarm Values for gpt5
  • 128578 12/04/06 23:23 Sarah K IOCSE20 Again...
  • 128577 12/04/06 23:21 ellis IOC20 failed
  • 128576 12/04/06 22:56 ellis Y position--Much improved with MCC quad adjustment
  • 128575 12/04/06 22:43 gzero Run 32680: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128574 12/04/06 22:40 gzero End of Run 32679:
  • 128573 12/04/06 22:34 Sarah K Need Batteries for Flashlight!
  • 128572 12/04/06 22:17 ellis correction--add the word "quad"
  • 128571 12/04/06 22:11 Sarah K Shift Check List Screen Grabs
  • 128570 12/04/06 22:07 Breuer Analysis: random's beam current dependence
  • 128569 12/04/06 21:59 ellis MCC working hard to get our Y position more stable
  • 128568 12/04/06 21:50 ellis we're now getting position updates
  • 128567 12/04/06 21:42 ellis mcc is looking at position feedback
  • 128566 12/04/06 21:39 Sarah Target: Alarms on gpt5
  • 128565 12/04/06 21:31 gzero Run 32679: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128564 12/04/06 21:13 ellis no beam until ~9:30 to replace RF power supply
  • 128563 12/04/06 21:12 gzero End of Run 32678:
  • 128562 12/04/06 20:59 ellis Y positions continue to be problematic
  • 128561 12/04/06 20:32 gzero Run 32678: Production run, 19 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128560 12/04/06 20:13 ellis pzt scan followed by MCC dispersion test
  • 128559 12/04/06 20:08 gzero End of Run 32677:
  • 128558 12/04/06 19:16 gzero Run 32677: Production run, 19 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128557 12/04/06 19:14 gzero End of Run 32676:
  • 128556 12/04/06 19:14 ellis mcc has got us good beam at 19uA
  • 128555 12/04/06 18:46 ellis Beam: beam situation
  • 128554 12/04/06 18:40 gzero Run 32676: Production run, 18 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128553 12/04/06 18:39 gzero End of Run 32675:
  • 128552 12/04/06 18:18 Breuer Analysis: Request for several hours of test runs before Quartz tube installation
  • 128551 12/04/06 17:37 ellis Beam not great yet, MCC working on fixing BLM trip
  • 128550 12/04/06 17:36 suleiman Beam: G0 Cavity Signals from run 32673
  • 128549 12/04/06 17:34 suleiman Beam: The Position Differences are Large
  • 128548 12/04/06 17:33 Sarah K Target: Correction
  • 128547 12/04/06 17:28 Sarah K Target: Target Back
  • 128546 12/04/06 17:24 muether SMS: SMS back at 3500A
  • 128545 12/04/06 17:22 suleiman Beam: The Position Differences are Large
  • 128544 12/04/06 17:19 gzero Run 32675: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128543 12/04/06 17:16 Breuer Analysis: types of randoms, suggested extra test configuration runs - soon
  • 128542 12/04/06 17:15 ellis target is back and we've asked for beam
  • 128541 12/04/06 16:18 ellis esr is recovering
  • 128540 12/04/06 16:04 cdaq Beam Time Accounting
  • 128539 12/04/06 15:59 M Jones Day shift summary
  • 128538 12/04/06 15:58 M Jones Problems at ESR
  • 128537 12/04/06 15:54 M Jones Do not mute the magnet monitor!!!
  • 128536 12/04/06 15:51 gzero Run 32674: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128535 12/04/06 15:50 gzero End of Run 32674:
  • 128534 12/04/06 15:42 gzero End of Run 32673:
  • 128533 12/04/06 14:55 M Jones Beam asymmetry plots after tuning
  • 128532 12/04/06 14:46 gzero Run 32673: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128531 12/04/06 14:46 gzero End of Run 32672:
  • 128530 12/04/06 14:38 pate Analysis: analysis checklist: runs 32663-32670
  • 128529 12/04/06 14:05 pate Shift Checklist Screen Shots
  • 128528 12/04/06 13:46 jschaub Analysis: Removed a File Transfer Error
  • 128527 12/04/06 13:46 gzero Run 32672: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128526 12/04/06 13:44 gzero End of Run 32671:
  • 128525 12/04/06 13:29 gzero Run 32671: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128524 12/04/06 12:44 smithg rebooted vmec15
  • 128523 12/04/06 12:00 smithg Beam: IOCSE20 software bug & injector tuning
  • 128522 12/04/06 11:45 pate and jon Beam: IHWP changed from OUT to IN --- FLIPPER OUTPUT CONFUSING
  • 128521 12/04/06 11:44 gzero End of Run 32670:
  • 128520 12/04/06 11:28 gzero Run 32670: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128519 12/04/06 11:12 gzero End of Run 32669:
  • 128518 12/04/06 10:05 gzero Run 32669: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128517 12/04/06 10:02 gzero End of Run 32668:
  • 128516 12/04/06 08:40 gzero Run 32668: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128515 12/04/06 08:38 gzero End of Run 32667:
  • 128514 12/04/06 08:05 pking December 4th Owl shift summary
  • 128513 12/04/06 08:04 cdaq Beam Time Accounting
  • 128512 12/04/06 07:32 gzero Run 32667: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128511 12/04/06 07:31 gzero End of Run 32666:
  • 128510 12/04/06 07:20 muether Analysis: Some results from the mini-field scan
  • 128509 12/04/06 06:30 gzero Run 32666: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128508 12/04/06 06:29 gzero End of Run 32665:
  • 128507 12/04/06 05:48 muether Analysis Check List (32658-32662)
  • 128506 12/04/06 05:33 gzero Run 32665: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128505 12/04/06 05:32 gzero End of Run 32664:
  • 128504 12/04/06 05:18 muether Shift Check List Screen Grabs
  • 128503 12/04/06 05:06 pking Analysis: Ran "flush hosts" on the cdaql6 MySQL server
  • 128502 12/04/06 04:32 gzero Run 32664: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128501 12/04/06 04:30 gzero End of Run 32663:
  • 128500 12/04/06 03:25 gzero Run 32663: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128499 12/04/06 03:24 gzero End of Run 32662:
  • 128498 12/04/06 02:20 pking ER3 was backed up; errors in scaler reads from TS0 and ROC31
  • 128497 12/04/06 02:15 gzero Run 32662: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128496 12/04/06 02:13 gzero End of Run 32661:
  • 128495 12/04/06 02:12 muether Run by Run Postions and Differences for all LD2 (starting in the injector)
  • 128494 12/04/06 01:56 gzero Run 32661: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128493 12/04/06 01:53 gzero End of Run 32660:
  • 128492 12/04/06 00:57 cdaq Beam Time Accounting
  • 128491 12/04/06 00:47 gzero Run 32660: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128490 12/04/06 00:46 gzero End of Run 32659:
  • 128489 12/04/06 00:23 ellis No obvious 1 hz noise
  • 128488 12/04/06 00:12 jroche shift summary
  • Sunday

  • 128487 12/03/06 23:41 gzero Run 32659: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128486 12/03/06 23:39 gzero End of Run 32658:
  • 128485 12/03/06 23:11 smithg RC Report for Sunday, December 3
  • 128484 12/03/06 22:50 ellis analysis check list --- Runs 32648-32657
  • 128483 12/03/06 22:35 gzero Run 32658: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128482 12/03/06 22:34 gzero End of Run 32657:
  • 128481 12/03/06 22:03 jroche Beam: cvxwrks unable to read g0and g0B epics variable but other users can !
  • 128480 12/03/06 21:10 gzero Run 32657: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128479 12/03/06 21:06 gzero End of Run 32656:
  • 128478 12/03/06 20:30 ellis Shift Target Screen Grabs
  • 128477 12/03/06 20:29 gzero Run 32656: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128476 12/03/06 20:27 gzero End of Run 32655:
  • 128475 12/03/06 19:24 gzero Run 32655: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128474 12/03/06 19:11 gzero End of Run 32654:
  • 128473 12/03/06 19:06 gzero Run 32654: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128472 12/03/06 19:03 gzero End of Run 32653:
  • 128471 12/03/06 18:58 Kinsley/ Roc Beam: Y position is noisy
  • 128470 12/03/06 18:46 gzero Run 32653: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128469 12/03/06 18:44 gzero End of Run 32652:
  • 128468 12/03/06 17:45 gzero Run 32652: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128467 12/03/06 17:42 gzero End of Run 32651:
  • 128466 12/03/06 16:42 gzero Run 32651: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128465 12/03/06 16:39 gzero End of Run 32650:
  • 128464 12/03/06 16:08 real Day shift summary
  • 128463 12/03/06 16:01 cdaq Beam Time Accounting
  • 128462 12/03/06 15:30 gzero Run 32650: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128461 12/03/06 15:23 gzero End of Run 32649:
  • 128460 12/03/06 15:22 real Beam off for few minutes, MCC has problem with beam transport somewhere
  • 128459 12/03/06 14:47 real We ask MCC to reboot of the IOCse20 to try to recover the readout of G0BPM
  • 128458 12/03/06 14:15 gzero Run 32649: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128457 12/03/06 14:13 gzero End of Run 32648:
  • 128456 12/03/06 14:05 pate Analysis: Analysis shift check list (32643-32647)
  • 128455 12/03/06 12:51 pate Shift Checklist Screen Shots
  • 128454 12/03/06 12:39 real Lost BPM readback in the counting house
  • 128453 12/03/06 12:37 gzero Run 32648: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128452 12/03/06 12:25 gzero End of Run 32647:
  • 128451 12/03/06 12:24 real MCC lost beam due to IOC se20, they reboot it. No beam for few minutes
  • 128450 12/03/06 10:54 gzero Run 32647: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128449 12/03/06 10:51 gzero End of Run 32646:
  • 128448 12/03/06 10:20 real Total charge accumulated for LD2 is 22.34 Coulomb
  • 128447 12/03/06 09:41 pate 4He gas bottle replaced
  • 128446 12/03/06 08:51 gzero Run 32646: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128445 12/03/06 08:51 real beam excursion, HV tripped, heat load on target.
  • 128444 12/03/06 08:48 gzero End of Run 32645:
  • 128443 12/03/06 08:39 muether Large Charge Asymmetry Width
  • 128442 12/03/06 08:02 cdaq Beam Time Accounting
  • 128441 12/03/06 07:59 Gericke Owl Shift Summary
  • 128440 12/03/06 07:36 gzero Run 32645: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128439 12/03/06 07:34 gzero End of Run 32644:
  • 128438 12/03/06 07:08 muether Analysis Shift Checklist (32633-32642)
  • 128437 12/03/06 06:17 gzero Run 32644: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128436 12/03/06 06:12 gzero End of Run 32643:
  • 128435 12/03/06 05:18 gzero Run 32643: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128434 12/03/06 05:15 gzero End of Run 32642:
  • 128433 12/03/06 04:03 gzero Run 32642: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128432 12/03/06 04:02 gzero End of Run 32641:
  • 128431 12/03/06 03:29 muether (H00* BPMs jumping around) Shift Check List Screen Grabs
  • 128430 12/03/06 03:10 gzero Run 32641: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128429 12/03/06 03:05 gzero End of Run 32640:
  • 128428 12/03/06 03:01 muether Analysis: Increased y position differences
  • 128427 12/03/06 02:18 gzero Run 32640: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128426 12/03/06 02:17 gzero End of Run 32639:
  • 128425 12/03/06 01:47 gzero Run 32639: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128424 12/03/06 01:35 gzero End of Run 32638:
  • 128423 12/03/06 00:17 gzero Run 32638: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128422 12/03/06 00:16 gzero End of Run 32637:
  • 128421 12/03/06 00:01 cdaq Beam Time Accounting
  • Saturday

  • 128420 12/02/06 23:56 ellis Swing Shift
  • 128419 12/02/06 23:46 gzero Run 32637: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128418 12/02/06 23:45 smithg RC Report for Saturday, December 2
  • 128417 12/02/06 23:45 gzero End of Run 32636:
  • 128416 12/02/06 23:36 Carissa Target: Shift Checklist Screen Shots
  • 128415 12/02/06 22:46 Carissa Analysis: Shift Checklist (32626-32633)
  • 128414 12/02/06 22:27 gzero Run 32636: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128413 12/02/06 22:25 gzero End of Run 32635:
  • 128412 12/02/06 21:41 gzero Run 32635: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128411 12/02/06 21:41 gzero End of Run 32635:
  • 128410 12/02/06 20:57 ellis Tune Beam
  • 128409 12/02/06 20:53 gzero Run 32634: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128408 12/02/06 20:35 gzero End of Run 32633:
  • 128407 12/02/06 19:55 gzero Run 32633: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128406 12/02/06 19:52 gzero End of Run 32632:
  • 128405 12/02/06 19:04 gzero Run 32632: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128404 12/02/06 19:03 gzero End of Run 32631:
  • 128403 12/02/06 18:46 ellis halo snapshot
  • 128402 12/02/06 18:34 ellis Very good Y beam position adjustment by MCC
  • 128401 12/02/06 18:16 gzero Run 32631: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128400 12/02/06 18:05 gzero End of Run 32630:
  • 128399 12/02/06 18:01 ellis Beam Y position low
  • 128398 12/02/06 17:59 ellis Charge Asymmetry Width > 500
  • 128397 12/02/06 17:22 ellis Coincidence Matrix snapshot -- LD2 20ua 689Mev
  • 128396 12/02/06 17:17 ellis Run descriptions headings wrong for runs 32627-32629
  • 128395 12/02/06 17:10 real Random measurement for deadtime/random correction
  • 128394 12/02/06 17:08 ellis Fastbus French Octant data
  • 128393 12/02/06 17:07 gzero Run 32630: random/deadtime study 10 uA
  • 128392 12/02/06 17:04 ellis Run 32629: random/deadtime study 20 uA
  • 128391 12/02/06 17:03 gzero End of Run 32629:
  • 128390 12/02/06 16:56 gzero Run 32629: random/deadtime study 10 uA
  • 128389 12/02/06 16:53 gzero End of Run 32628:
  • 128388 12/02/06 16:42 gzero Run 32628: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128387 12/02/06 16:38 gzero End of Run 32627:
  • 128386 12/02/06 16:03 pate Analysis: analysis checklist
  • 128385 12/02/06 16:02 cdaq Beam Time Accounting
  • 128384 12/02/06 15:48 real Day Shift Summary
  • 128383 12/02/06 15:45 gzero Run 32627: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128382 12/02/06 15:43 gzero End of Run 32626:
  • 128381 12/02/06 13:49 gzero Run 32626: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128380 12/02/06 13:47 gzero End of Run 32625:
  • 128379 12/02/06 12:37 pate Shift checklist: screen shots
  • 128378 12/02/06 11:43 gzero Run 32625: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128377 12/02/06 11:40 gzero End of Run 32624:
  • 128376 12/02/06 11:24 real BPM ioc reboot done, beam is back, Fast Feedback is ON.
  • 128375 12/02/06 11:21 real MCC need to reboot the BPM IOC (again)
  • 128374 12/02/06 10:34 real Wells plot analysis results.
  • 128373 12/02/06 10:04 real I'm really unluky with the snapshot. This time this is the good ONE!
  • 128372 12/02/06 09:55 gzero Run 32624: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128371 12/02/06 09:54 real bad snapsshot in the last entry.
  • 128370 12/02/06 09:53 real IHWP state changed from IN to OUT
  • 128369 12/02/06 09:49 gzero End of Run 32623:
  • 128368 12/02/06 08:45 gzero Run 32623: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128367 12/02/06 08:37 gzero End of Run 32622:
  • 128366 12/02/06 08:03 cdaq Beam Time Accounting
  • 128365 12/02/06 08:02 Gericke Owl Shift Summary
  • 128364 12/02/06 07:38 gzero Run 32622: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128363 12/02/06 07:37 gzero End of Run 32621:
  • 128362 12/02/06 06:43 muether Analysis Check List
  • 128361 12/02/06 06:22 muether Shift Check List Screen Grabs (the rest)
  • 128360 12/02/06 06:21 muether Shift Check List Screen Grabs
  • 128359 12/02/06 06:08 gzero Run 32621: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128358 12/02/06 05:53 gzero End of Run 32620:
  • 128357 12/02/06 05:39 gzero Run 32620: Production run, 20 uA LD2 Field Scan, Ps4=1600, SMS 4900 A, Ch trigger: NA ML3, Fr ML3
  • 128356 12/02/06 05:34 gzero End of Run 32619:
  • 128355 12/02/06 05:21 gzero Run 32619: Production run, 20 uA LD2 Field Scan, Ps4=1600, SMS 4500 A, Ch trigger: NA ML3, Fr ML3
  • 128354 12/02/06 05:13 gzero End of Run 32618:
  • 128353 12/02/06 05:07 suleiman Beam: Coil Modulation Cycle from run 32604
  • 128352 12/02/06 05:04 suleiman Beam: G0 Cavity Signals from run 32604
  • 128351 12/02/06 05:03 gzero Run 32618: Production run, 20 uA LD2 Field Scan, Ps4=1600, SMS 4100 A, Ch trigger: NA ML3, Fr ML3
  • 128350 12/02/06 05:00 suleiman Beam: Charge Asymmetry and Position Differences from run 32604 - IN -
  • 128349 12/02/06 04:59 gzero End of Run 32617:
  • 128348 12/02/06 04:58 suleiman Beam: Charge Asymmetry and Position Differences from run 32598 - OUT -
  • 128347 12/02/06 04:45 gzero Run 32617: Production run, 20 uA LD2 Field Scan, Ps4=1600, SMS 3700 A, Ch trigger: NA ML3, Fr ML3
  • 128346 12/02/06 04:35 gzero Run 32616: Production run, 20 uA LD2 Field Scan, Ps4=1600, SMS 3700 A, Ch trigger: NA ML3, Fr ML3
  • 128345 12/02/06 04:32 gzero End of Run 32615:
  • 128344 12/02/06 04:31 gzero End of Run 32615:
  • 128343 12/02/06 04:29 gzero End of Run 32615:
  • 128342 12/02/06 04:16 gzero Run 32615: Production run, 20 uA LD2 Field Scan, Ps4=1600, SMS 3300 A, Ch trigger: NA ML3, Fr ML3
  • 128341 12/02/06 04:13 gzero End of Run 32614:
  • 128340 12/02/06 04:01 gzero Run 32614: Production run, 20 uA LD2 Field Scan, Ps4=1600, SMS 2900 A, Ch trigger: NA ML3, Fr ML3
  • 128339 12/02/06 03:56 gzero End of Run 32613:
  • 128338 12/02/06 03:44 gzero Run 32613: Production run, 20 uA LD2 Field Scan, Ps4=1600, SMS 2500 A, Ch trigger: NA ML3, Fr ML3
  • 128337 12/02/06 03:41 gzero End of Run 32612:
  • 128336 12/02/06 03:36 muether SMS System Backup
  • 128335 12/02/06 03:27 gzero Run 32612: Production run, 20 uA LD2 Field Scan, Ps4=1600, SMS 2100 A, Ch trigger: NA ML3, Fr ML3
  • 128334 12/02/06 03:12 gzero End of Run 32611:
  • 128333 12/02/06 02:41 gzero Run 32611: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128332 12/02/06 02:36 gzero End of Run 32610:
  • 128331 12/02/06 01:08 gzero Run 32610: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128330 12/02/06 01:06 gzero End of Run 32609:
  • 128329 12/02/06 01:01 muether HV trip/ BPM IOC reboot
  • 128328 12/02/06 00:00 cdaq Beam Time Accounting
  • 128327 12/02/06 00:00 real Swing Shift Summary
  • Friday

  • 128326 12/01/06 23:58 gzero Run 32609: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128325 12/01/06 23:56 gzero End of Run 32608:
  • 128324 12/01/06 23:19 gzero Run 32608: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128323 12/01/06 23:17 gzero End of Run 32607:
  • 128322 12/01/06 23:05 gzero Run 32607: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128321 12/01/06 23:03 gzero End of Run 32606:
  • 128320 12/01/06 22:52 M Jones Analysis: Checklist plots
  • 128319 12/01/06 22:50 gzero Run 32606: pzt run
  • 128318 12/01/06 22:47 gzero End of Run 32605:
  • 128317 12/01/06 22:40 M Jones Analysis: Checklist
  • 128316 12/01/06 21:45 M JOnes Scan of shift checklist
  • 128315 12/01/06 21:27 M Jones Shift check list figures
  • 128314 12/01/06 21:19 real beam is back, CW 20 uA
  • 128313 12/01/06 21:19 gzero Run 32605: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128312 12/01/06 20:42 gzero End of Run 32604:
  • 128311 12/01/06 20:27 real RF problem, MCC lost the beam, it should not be too long
  • 128310 12/01/06 19:53 gzero Run 32604: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128309 12/01/06 19:52 gzero End of Run 32603:
  • 128308 12/01/06 19:13 smithg RC Report for Friday December 1
  • 128307 12/01/06 17:59 gzero Run 32603: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128306 12/01/06 17:58 gzero End of Run 32602:
  • 128305 12/01/06 16:55 real IHWP screenshot
  • 128304 12/01/06 16:54 gzero Run 32602: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128303 12/01/06 16:54 real IHWP has been change from OUT to IN before run 32602
  • 128302 12/01/06 16:52 gzero End of Run 32601:
  • 128301 12/01/06 16:28
  • 128300 12/01/06 16:25 gzero Run 32601: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128299 12/01/06 16:24 real CW beam back in the hall
  • 128298 12/01/06 16:12 Beise Day Shift Summary
  • 128297 12/01/06 16:10 cdaq Beam Time Accounting
  • 128296 12/01/06 16:06 pate Analysis: analysis checklist
  • 128295 12/01/06 15:34 beise Beam: RF problems, beam off for 20 min
  • 128294 12/01/06 15:33 gzero End of Run 32600:
  • 128293 12/01/06 14:41 beise Beam: Beam is Back: H00A, etc. IOC rebooted
  • 128292 12/01/06 14:41 beise Beam: Beam is Back: H00A, etc. IOC rebooted
  • 128291 12/01/06 14:40 gzero Run 32600: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128290 12/01/06 13:10 beise Reset the betabrite display
  • 128289 12/01/06 12:45 Beise Beam: problems in accelerator
  • 128288 12/01/06 10:03 Beise Beam: MCC takes beam to measure bunch length
  • 128287 12/01/06 09:59 gzero End of Run 32599:
  • 128286 12/01/06 09:48 gzero Run 32599: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128285 12/01/06 09:45 gzero End of Run 32598:
  • 128284 12/01/06 09:32 smithg Beam: Magic knob for charge asymmetry width improvement
  • 128283 12/01/06 08:24 gzero Run 32598: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128282 12/01/06 08:21 gzero End of Run 32597:
  • 128281 12/01/06 08:21 cdaq Beam Time Accounting
  • 128280 12/01/06 07:29 ellis Owl Shift Summary
  • 128279 12/01/06 06:32 Alex Analysis: analysis checklist
  • 128278 12/01/06 06:17 gzero Run 32597: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128277 12/01/06 06:17 gzero End of Run 32596:
  • 128276 12/01/06 06:16 ellis Charge Asym Width down to ~340 ppm following nice MCC correction
  • 128275 12/01/06 05:43 cdaq Beam Time Accounting
  • 128274 12/01/06 05:23 ellis Charge Asym Width has increased to ~ 510 ppm
  • 128273 12/01/06 05:03 gzero Run 32596: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128272 12/01/06 05:00 gzero End of Run 32595:
  • 128271 12/01/06 04:10 Alex Beam: snapshots for the checklist
  • 128270 12/01/06 03:55 gzero Run 32595: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128269 12/01/06 03:53 gzero End of Run 32594:
  • 128268 12/01/06 03:18 ellis Charge Asymmetry is slowly but steadily increasing
  • 128267 12/01/06 03:02 gzero Run 32594: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128266 12/01/06 03:00 gzero End of Run 32593:
  • 128265 12/01/06 02:04 gzero Run 32593: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128264 12/01/06 02:03 gzero End of Run 32592:
  • 128263 12/01/06 01:02 gzero Run 32592: Production run, 20 uA LD2, Ps4=1600, SMS 3500 A, Ch trigger: NA ML3, Fr ML3
  • 128262 12/01/06 00:59 gzero End of Run 32591:
  • 128261 12/01/06 00:01 cdaq Beam Time Accounting
    Search this logbook:

    This file generated by /group/hallc/www/hallcweb/apps/logbooks/hclog/src/hclogscript version HC2.11
    If you have any comments or problems, please contact:
    Stephen A. Wood
    saw@jlab.org
    (757) 269-7367