User name M Jones
Log entry time 14:32:49 on January 02, 2008
Entry number 148085
keyword=Short term Beam Schedule
In the short term, ACC will do a hot check out of Hall A tonight and then
planned to have 4 pass beam into Hall A Thursday night. Hall A only
needs to have 1 shift of good beam so plan is that Friday DAY shift
ACC will setup for 3 hall operation with Hall C getting 4 pass. So
if things go right we could have 4 pass beam by Friday night.
The plan is still for target cool down on Friday assuming the pumpdown
goes smoothly. The targets have been swapped and the pump down has started.
Thursday we will know if the target pumps down ok.