150262 01/31/08 11:12 L.Pentchev BigCal HV off
150261 01/31/08 09:24 Bosted Target: Target moved from 15 cm LH2 to MT.
Wednesday
150260 01/30/08 17:11 Bosted Target: Target jas beem war,ed i[
150259 01/30/08 16:53 puckett Actually, made two separate new maps--
150258 01/30/08 16:38 bogdanw BigBite power
150257 01/30/08 16:32 puckett Made separate map for runs with bad S0 cabling:
150256 01/30/08 16:18 R. Lindgren Shift Summary
150255 01/30/08 16:04 cdaq Beam Time Accounting
150254 01/30/08 16:04 vahe Target: Start os shift: Target screenshot
150253 01/30/08 15:53 mbianda Target: Target screen shot.
150252 01/30/08 11:34 R. Lindgren HMS Power Down
150251 01/30/08 11:29
150250 01/30/08 10:59 R. Lindgren SMS: HMS NMR Comunication failed
150249 01/30/08 10:11 hcf ethane supply -- tag confusion??
150248 01/30/08 08:16 R. Lindgren Beam:
150247 01/30/08 07:37 jmaxwell Target: Target Screenshot
150246 01/30/08 00:22 jmaxwell Target: Lowering Heater Power
150245 01/30/08 00:11 cdaq Beam Time Accounting
Tuesday
150244 01/29/08 23:54 mbianda Target: Screen shot for end of swing shift.
150243 01/29/08 19:07 M.M Ethane levels
150242 01/29/08 19:05 Donal Owl Shifts Wednesday January 30
150241 01/29/08 18:42 Donal Down for the night
150240 01/29/08 17:26 Donal Beam line vacuum
150239 01/29/08 16:50 gaskell 3C17 into Moller DAQ
150238 01/29/08 16:19 cdaq End of Run 68564:
150237 01/29/08 16:14 Donal Valve trip
150236 01/29/08 16:08 cdaq Beam Time Accounting
150235 01/29/08 16:08 R. Lindgren Shift Summary
150234 01/29/08 16:08 cdaq Run 68564: WACS production: LH2 15 cm + rad., 40 uA,
150233 01/29/08 16:02 vahe Target: End of shift: Target screenshot
150232 01/29/08 15:53 cdaq End of Run 68563:
150231 01/29/08 15:44 cdaq Run 68563: WACS production: LH2 15 cm + rad., 40 uA,
150230 01/29/08 15:12 cdaq Run 68562: WACS production: LH2 15 cm + rad., 40 uA,
150229 01/29/08 15:08 cdaq End of Run 68561:
150228 01/29/08 15:01 R.Lindgren BPM and BCM
150227 01/29/08 14:20 cdaq Run 68561: WACS production: LH2 15 cm + rad., 40 uA,
150226 01/29/08 14:05 R. Lindgren Beam down
150225 01/29/08 13:31 E.Chudakov New ethane bottle
150224 01/29/08 11:23 L.Pentchev TDC spectra
150223 01/29/08 11:18 Lindgren Lost target IOC
150222 01/29/08 11:14 cdaq End of Run 68560:
150221 01/29/08 11:03 M Jones Increase ROC 12 time window back to 512ns
150220 01/29/08 11:00 cdaq Run 68560: WACS production: LH2 15 cm + rad., 40 uA,
150219 01/29/08 10:59 cdaq End of Run 68559:
150218 01/29/08 10:54 cdaq Run 68559: WACS production: LH2 15 cm + rad., 40 uA,
150217 01/29/08 10:52 cdaq End of Run 68558:
150216 01/29/08 10:14 saw MCC log entries on Ozone
150215 01/29/08 10:12 M Jones Reduced ROC12 TDc time window to 256ns from 512ns
150214 01/29/08 10:05 saw Ozone ppb vs ppm
150213 01/29/08 09:58 cdaq Run 68558: WACS production: LH2 15 cm + rad., 40 uA,
150212 01/29/08 09:53 R. Lindgren Beam Off
150211 01/29/08 09:49 cdaq End of Run 68557:
150210 01/29/08 09:47 vahe Target: Target communication loss and lifter status error
150209 01/29/08 09:35 cdaq Run 68557: WACS production: LH2 15 cm + rad., 40 uA,
150208 01/29/08 09:31 saw Ozone in Hall
150207 01/29/08 09:25 cdaq End of Run 68556:
150206 01/29/08 09:20 E.Chudakov S0 HV increased by 50V after run 68555
150205 01/29/08 09:19 cdaq Run 68556: WACS production: LH2 15 cm + rad., 40 uA,
150204 01/29/08 09:17 cdaq End of Run 68555:
150203 01/29/08 09:12 vahe Hall C ozone level
150202 01/29/08 09:10 vahe Hall C ozone level
150201 01/29/08 09:09 vahe Hall C ozone level
150200 01/29/08 09:04 cdaq Beam Time Accounting
150199 01/29/08 09:03 R. Lindgren Day shift beginning
150198 01/29/08 08:33 cdaq Run 68555: WACS production: LH2 15 cm + rad., 40 uA,
150197 01/29/08 08:32 cdaq End of Run 68554:
150196 01/29/08 08:11 vahe Target: Start of shift: Target screenshoot
150195 01/29/08 08:04 cdaq Beam Time Accounting
150194 01/29/08 07:59 Markowitz owl shift summary
150193 01/29/08 07:49 cdaq Run 68554: WACS production: LH2 15 cm + rad., 40 uA,
150192 01/29/08 07:47 cdaq End of Run 68553:
150191 01/29/08 07:34 jmaxwell Target: Target Screenshot
150190 01/29/08 07:04 cdaq Run 68553: WACS production: LH2 15 cm + rad., 40 uA,
150189 01/29/08 07:02 cdaq End of Run 68552:
150188 01/29/08 06:56 puckett BPM/BCM screenshots
150187 01/29/08 06:18 cdaq Run 68552: WACS production: LH2 15 cm + rad., 40 uA,
150186 01/29/08 06:17 cdaq End of Run 68551:
150185 01/29/08 05:34 cdaq Run 68551: WACS production: LH2 15 cm + rad., 40 uA,
150184 01/29/08 05:31 cdaq End of Run 68550:
150183 01/29/08 04:38 cdaq Run 68550: WACS production: LH2 15 cm + rad., 40 uA,
150182 01/29/08 04:37 cdaq End of Run 68549:
150181 01/29/08 03:54 cdaq Run 68549: WACS production: LH2 15 cm + rad., 40 uA,
150180 01/29/08 03:53 cdaq End of Run 68548:
150179 01/29/08 03:12 cdaq Run 68548: WACS production: LH2 15 cm + rad., 40 uA,
150178 01/29/08 03:10 cdaq End of Run 68547:
150177 01/29/08 02:29 Markowitz ROCs 13 and 14 hung
150176 01/29/08 02:26 cdaq Run 68547: WACS production: LH2 15 cm + rad., 40 uA,
150175 01/29/08 02:18 cdaq End of Run 68546:
150174 01/29/08 02:01 cdaq Run 68546: WACS production: LH2 15 cm + rad., 40 uA,
150173 01/29/08 02:00 cdaq End of Run 68545:
150172 01/29/08 01:24 cdaq Run 68545: WACS production: LH2 15 cm + rad., 40 uA,
150171 01/29/08 01:22 cdaq End of Run 68544:
150170 01/29/08 00:47 cdaq Run 68544: WACS production: LH2 15 cm + rad., 40 uA,
150169 01/29/08 00:46 cdaq End of Run 68543:
150168 01/29/08 00:18 cdaq Run 68543: WACS production: LH2 15 cm + rad., 40 uA,
150167 01/29/08 00:09 Donal shift report reformatted
150166 01/29/08 00:08 cdaq End of Run 68542:
150165 01/29/08 00:02 Donal Shift report
Monday
150164 01/28/08 23:47 mahbub Target: Snapshot at end of swing shift
150163 01/28/08 23:37 cdaq Run 68542: WACS production: LH2 15 cm + rad., 40 uA,
150162 01/28/08 23:35 cdaq End of Run 68541:
150161 01/28/08 23:25 W. Luo channel (15,15) raw adc
150160 01/28/08 23:04 cdaq Run 68541: WACS production: LH2 15 cm + rad., 40 uA,
150159 01/28/08 23:02 cdaq End of Run 68540:
150158 01/28/08 22:35 mahbub Target: Beam back, JT valve adjusted
150157 01/28/08 22:31 cdaq Run 68540: WACS production: LH2 15 cm + rad., 40 uA,
150156 01/28/08 22:30 cdaq End of Run 68539:
150155 01/28/08 22:26 W. Luo One channel in the middle of BigCal no max hit for run 68539
150154 01/28/08 22:02 Donal beam back
150153 01/28/08 21:59 cdaq Run 68539: WACS production: LH2 15 cm + rad., 40 uA,
150152 01/28/08 20:58 Donal Beam update
150151 01/28/08 20:07 W. Luo BCM & BPM
150150 01/28/08 20:05 W. Luo swap Ethane bottle due to high pressure is zero
150149 01/28/08 19:58 mahbub Target: Snapshot, beam is off for a few hours
150148 01/28/08 19:40 Donal Update
150147 01/28/08 19:29 Donal Beam unavailable
150146 01/28/08 18:18 cdaq End of Run 68538:
150145 01/28/08 18:08 cdaq Run 68538: WACS production: LH2 15 cm + rad., 40 uA,
150144 01/28/08 18:00 cdaq End of Run 68536:
150143 01/28/08 17:48 L.Pentchev all TDC spectra for BigCal: TDC time window can be reduced by factor of 2
150142 01/28/08 17:28 cdaq Run 68536: WACS production: LH2 15 cm + rad., 40 uA,
150141 01/28/08 17:27 cdaq End of Run 68535:
150140 01/28/08 16:54 cdaq Run 68535: WACS production: LH2 15 cm + rad., 40 uA,
150139 01/28/08 16:52 cdaq End of Run 68534:
150138 01/28/08 16:21 cdaq Run 68534: WACS production: LH2 15 cm + rad., 40 uA,
150137 01/28/08 16:19 cdaq End of Run 68533:
150136 01/28/08 16:11 mahbub Target: Target status at the beginning of swing shift
150135 01/28/08 16:01 cdaq Beam Time Accounting
150134 01/28/08 15:55 slifer shift summary (day)
150133 01/28/08 15:51 vahe Target: End of shift: Target status screenshot
150132 01/28/08 15:48 slifer power cycled ROCS 13 and 14
150131 01/28/08 15:46 cdaq Run 68533: WACS production: LH2 15 cm + rad., 40 uA,
150130 01/28/08 15:46 E.Chudakov Pedestals at higher beam current
150129 01/28/08 15:42 E.Chudakov Analysis: Replay run 68530 COINCIDENCE
150128 01/28/08 15:34 E.Chudakov Analysis: Replay run 68530 CAL
150127 01/28/08 15:34 cdaq End of Run 68531:
150126 01/28/08 15:27 E.Chudakov Analysis: Replay run 68530 FPP
150125 01/28/08 15:20 E.Chudakov Analysis: Replay run 68530 HMS
150124 01/28/08 15:02 cdaq Run 68531: WACS production: LH2 15 cm + rad., 40 uA,
150123 01/28/08 14:59 cdaq End of Run 68530:
150122 01/28/08 14:37 M Jones Before run 69529 modified ROC12 crl code
150121 01/28/08 14:27 cdaq Run 68530: WACS production: LH2 15 cm + rad., 35 uA,
150120 01/28/08 14:25 cdaq End of Run 68529:
150119 01/28/08 14:09 slifer BPM/BCM
150118 01/28/08 13:48 cdaq Run 68529: WACS production: LH2 15 cm + rad., 35 uA,
150117 01/28/08 13:46 cdaq End of Run 68528:
150116 01/28/08 13:24 cdaq Run 68528: WACS production: LH2 15 cm + rad., 35 uA,
150115 01/28/08 13:18 cdaq End of Run 68527:
150114 01/28/08 12:40 cdaq Run 68527: WACS production: LH2 15 cm + rad., 35 uA,
150113 01/28/08 12:38 cdaq End of Run 68526:
150112 01/28/08 12:32 slifer HWP status
150111 01/28/08 11:59 cdaq Run 68526: WACS production: LH2 15 cm + rad., 35 uA,
150110 01/28/08 11:57 cdaq End of Run 68525:
150109 01/28/08 11:17 cdaq Run 68525: WACS production: LH2 15 cm + rad., 35 uA,
150108 01/28/08 11:16 cdaq End of Run 68524:
150107 01/28/08 10:43 slifer Shift reminder
150106 01/28/08 10:37 cdaq Run 68524: WACS production: LH2 15 cm + rad., 35 uA,
150105 01/28/08 10:27 cdaq End of Run 68523:
150104 01/28/08 10:03 slifer run 68521 and 68522
150103 01/28/08 09:51 vahe Target: Target communication lost
150102 01/28/08 09:49 cdaq Run 68523: WACS production: LH2 15 cm + rad., 35 uA,
150101 01/28/08 09:46 cdaq End of Run 68522:
150100 01/28/08 09:38 cdaq Run 68522: WACS production: LH2 15 cm + rad., 35 uA,
150099 01/28/08 09:36 cdaq End of Run 68521:
150098 01/28/08 08:58 cdaq Run 68521: WACS production: LH2 15 cm + rad., 35 uA,
150097 01/28/08 08:38 cdaq End of Run 68520:
150096 01/28/08 08:25 cdaq Run 68520: WACS production: LH2 15 cm + rad., 35 uA,
150095 01/28/08 08:22 cdaq End of Run 68519:
150094 01/28/08 08:17 slifer Q3 power supply
150093 01/28/08 08:06 cdaq Beam Time Accounting
150092 01/28/08 08:04 Markowitz owl shift summary
150091 01/28/08 08:02 gaskell Late entry: 2 Moller ioc reboots
150090 01/28/08 07:53 vahe Target: Start of shift: Target screenshot
150089 01/28/08 07:43 cdaq Run 68519: WACS production: LH2 15 cm + rad., 35 uA,
150088 01/28/08 07:42 cdaq End of Run 68518:
150087 01/28/08 07:37 jmaxwell Target: Target Screenshot
150086 01/28/08 07:30 dhamilton BPM/BCM screenshots
150085 01/28/08 07:06 cdaq Run 68518: WACS production: LH2 15 cm + rad., 35 uA,
150084 01/28/08 07:04 cdaq End of Run 68517:
150083 01/28/08 06:33 jmaxwell Target: Heater Power Alarms
150082 01/28/08 06:26 cdaq Run 68517: WACS production: LH2 15 cm + rad., 35 uA,
150081 01/28/08 06:25 cdaq End of Run 68516:
150080 01/28/08 05:47 cdaq Run 68516: WACS production: LH2 15 cm + rad., 35 uA,
150079 01/28/08 05:45 cdaq End of Run 68515:
150078 01/28/08 05:05 puckett Mis-cabling of S0 TDC signals dates back to the start of kin. 7 in December
150077 01/28/08 05:04 cdaq Run 68515: WACS production: LH2 15 cm + rad., 35 uA,
150076 01/28/08 04:41 puckett Apparent dead wire is gone in run 68514
150075 01/28/08 04:23 cdaq Run 68514: WACS production: LH2 15 cm + rad., 35 uA,
150074 01/28/08 04:21 cdaq End of Run 68513:
150073 01/28/08 03:59 puckett has FPP chamber 4 x plane developed a dead wire?
150072 01/28/08 03:43 cdaq Run 68513: WACS production: LH2 15 cm + rad., 35 uA,
150071 01/28/08 03:41 Markowitz Hall A needs to take out half-wave plate
150070 01/28/08 03:40 cdaq End of Run 68512:
150069 01/28/08 03:06 cdaq Run 68512: WACS production: LH2 15 cm + rad., 35 uA,
150068 01/28/08 03:04 cdaq End of Run 68511:
150067 01/28/08 02:25 cdaq Run 68511: WACS production: LH2 15 cm + rad., 35 uA,
150066 01/28/08 02:23 cdaq End of Run 68510:
150065 01/28/08 01:46 cdaq Run 68510: WACS production: LH2 15 cm + rad., 35 uA,
150064 01/28/08 01:44 cdaq End of Run 68509:
150063 01/28/08 01:09 cdaq Run 68509: WACS production: LH2 15 cm + rad., 35 uA,
150062 01/28/08 01:05 cdaq Run 68508: WACS production: LH2 15 cm + rad., 35 uA,
150061 01/28/08 01:00 cdaq End of Run 68507:
150060 01/28/08 00:50 cdaq Run 68507: WACS production: LH2 15 cm + rad., 35 uA,
150059 01/28/08 00:48 cdaq Run 68506: WACS production: LH2 15 cm + rad., 35 uA,
150058 01/28/08 00:19 cdaq Run 68505: WACS production: LH2 15 cm + rad., 35 uA,
150057 01/28/08 00:17 cdaq End of Run 68504:
150056 01/28/08 00:03 W. Luo Script to estimate how many events collected in WACS experiment
150055 01/28/08 00:02 cdaq Beam Time Accounting
Sunday
150054 01/27/08 23:47 slifer Shift summary (swing)
150053 01/27/08 23:42 cdaq Run 68504: WACS production: LH2 15 cm + rad., 35 uA,
150052 01/27/08 23:41 Donal Screen Grab
150051 01/27/08 23:38 cdaq End of Run 68503:
150050 01/27/08 23:15 Donal Target Screen Grab
150049 01/27/08 23:10 slifer Increased Bigcal thresholds
150048 01/27/08 23:03 cdaq Run 68503: WACS production: LH2 15 cm + rad., 35 uA,
150047 01/27/08 23:00 cdaq End of Run 68502:
150046 01/27/08 22:30 cdaq Run 68502: WACS production: LH2 15 cm + rad., 35 uA,
150045 01/27/08 22:28 cdaq End of Run 68501:
150044 01/27/08 22:28 cdaq End of Run 68501:
150043 01/27/08 22:09 slifer ion chamber
150042 01/27/08 21:50 cdaq Run 68501: WACS production: LH2 15 cm + rad., 30 uA,
150041 01/27/08 21:49 cdaq End of Run 68500:
150040 01/27/08 21:44 Donal Target Screen Grab
150039 01/27/08 21:19 slifer update
150038 01/27/08 21:10 cdaq Run 68500: WACS production: LH2 15 cm + rad., 30 uA,
150037 01/27/08 21:07 cdaq End of Run 68499:
150036 01/27/08 20:46 W. Luo Roc12 reboot automaticly when we start run with 30uA beam
150035 01/27/08 20:38 Donal Target reboot
150034 01/27/08 20:34 cdaq Run 68499: WACS production: LH2 15 cm + rad., 30 uA,
150033 01/27/08 20:19 cdaq Run 68496: WACS production: LH2 15 cm + rad., 30 uA,
150032 01/27/08 20:17 cdaq End of Run 68495:
150031 01/27/08 19:49 Donal Target Reboot
150030 01/27/08 19:48 cdaq Run 68495: WACS production: LH2 15 cm + rad., 30 uA,
150029 01/27/08 19:37 cdaq End of Run 68494:
150028 01/27/08 19:28 cdaq Run 68494: WACS production: LH2 15 cm + rad., 30 uA,
150027 01/27/08 19:27 cdaq End of Run 68493:
150026 01/27/08 19:11 Donal Target charts
150025 01/27/08 18:58 cdaq Run 68493: WACS production: LH2 15 cm + rad., 30 uA,
150024 01/27/08 18:56 cdaq End of Run 68492:
150023 01/27/08 18:55 slifer Day Shift Summary (format)
150022 01/27/08 18:40 slifer beam down
150021 01/27/08 18:40 Donal Screen Grab
150020 01/27/08 18:30 cdaq Run 68492: WACS production: LH2 15 cm + rad., 30 uA,
150019 01/27/08 18:25 cdaq End of Run 68491:
150018 01/27/08 18:05 cdaq Run 68491: WACS commissioning: LH2 15 cm + rad., 30 uA,
150017 01/27/08 18:02 cdaq End of Run 68490:
150016 01/27/08 17:38 Donal Indicator recovered
150015 01/27/08 17:34 cdaq Run 68490: WACS commissioning: LH2 15 cm + rad., 25 uA,
150014 01/27/08 17:32 cdaq End of Run 68489:
150013 01/27/08 17:18 Donal Continuous ignorable alarm?
150012 01/27/08 17:09 Donal Target reboot
150011 01/27/08 16:59 cdaq Run 68489: WACS commissioning: LH2 15 cm + rad., 25 uA,
150010 01/27/08 16:58 puckett in other words, pedestal positions match the golden run...
150009 01/27/08 16:57 puckett pedestal positions are fine, just the widths are off
150008 01/27/08 16:55 cdaq Run 68488: WACS commissioning: LH2 15 cm + rad., 25 uA,
150007 01/27/08 16:53 W. Luo run 68486: Pedistal events not reliable
150006 01/27/08 16:51 cdaq Run 68487: WACS commissioning: LH2 15 cm + rad., 25 uA,
150005 01/27/08 16:51 Donal Target reboot
150004 01/27/08 16:50 W. Luo run 68486: Roc 14 need to power cycle
150003 01/27/08 16:46 W. Luo How to restore BigCal HV in case we lost HV in the crate
150002 01/27/08 16:38 W. Luo Run 68480 junk, for roc13 error
150001 01/27/08 16:36 cdaq Run 68486: WACS commissioning: LH2 15 cm + rad., 25 uA,
150000 01/27/08 16:29 Donal Target Screen Grab
149999 01/27/08 16:26 cdaq Run 68483: WACS commissioning: LH2 15 cm + rad., 25 uA,
149998 01/27/08 16:23 cdaq Run 68482: WACS commissioning: LH2 15 cm + rad., 25 uA,
149997 01/27/08 16:22 Donal Frequent Alarm
149996 01/27/08 16:19 cdaq End of Run 68481:
149995 01/27/08 16:18 cdaq Run 68481: WACS commissioning: LH2 15 cm + rad., 25 uA,
149994 01/27/08 16:15 cdaq End of Run 68480:
149993 01/27/08 16:09 Hovhannes Day Shift summary
149992 01/27/08 16:07 cdaq Run 68480: WACS commissioning: LH2 15 cm + rad., 25 uA,
149991 01/27/08 16:04 cdaq Beam Time Accounting
149990 01/27/08 16:03 cdaq Run 68479: WACS commissioning: LH2 15 cm + rad., 30 uA,
149989 01/27/08 16:02 cdaq End of Run 68478:
149988 01/27/08 15:34 cdaq Run 68478: WACS commissioning: LH2 15 cm + rad., 25 uA,
149987 01/27/08 15:19 cdaq End of Run 68477:
149986 01/27/08 15:19 cdaq Run 68477: WACS commissioning: LH2 15 cm + rad., 25 uA,
149985 01/27/08 15:18 saw SFIGEP1 bootscript change
149984 01/27/08 15:11 cdaq End of Run 68476:
149983 01/27/08 15:10 cdaq Run 68476: test
149982 01/27/08 14:00 cdaq Run 68468: test
149981 01/27/08 13:54 cdaq Run 68467: test
149980 01/27/08 11:37 R. Lindgren pockel cell high voltages
149979 01/27/08 10:59 cdaq Run 68454: WACS commissioning: LH2 15 cm + rad., 25 uA,
149978 01/27/08 10:58 cdaq End of Run 68453:
149977 01/27/08 10:43 mbianda Target: Alarm
149976 01/27/08 10:29 cdaq Run 68453: WACS commissioning: LH2 15 cm + rad., 25 uA,
149975 01/27/08 10:19 cdaq Run 68451: WACS commissioning: LH2 15 cm + rad., 25 uA,
149974 01/27/08 10:16 cdaq Run 68450: WACS commissioning: LH2 15 cm + rad., 25 uA,
149973 01/27/08 10:09 cdaq Run 68448: WACS commissioning: LH2 15 cm + rad., 25 uA,
149972 01/27/08 10:06 R. Lindgren Reminder of Shift Worker Duties
149971 01/27/08 10:04 cdaq Run 68447: WACS commissioning: LH2 15 cm + rad., 25 uA,
149970 01/27/08 09:53 cdaq Run 68444: WACS commissioning: LH2 15 cm + rad., 25 uA,
149969 01/27/08 09:51 cdaq End of Run 68443:
149968 01/27/08 09:43 mbianda Target: Screen shot.
149967 01/27/08 09:24 cdaq Run 68443: WACS commissioning: LH2 15 cm + rad., 25 uA,
149966 01/27/08 09:20 cdaq Run 68442: WACS commissioning: LH2 15 cm + rad., 25 uA,
149965 01/27/08 09:17 cdaq End of Run 68441:
149964 01/27/08 09:15 Hovhannes Indication of the Problems
149963 01/27/08 09:05 cdaq Beam Time Accounting
149962 01/27/08 09:04 cdaq Run 68441: WACS commissioning: LH2 15 cm + rad., 25 uA,
149961 01/27/08 09:03 cdaq End of Run 68440:
149960 01/27/08 08:32 cdaq Run 68440: WACS commissioning: LH2 15 cm + rad., 25 uA,
149959 01/27/08 08:24 cdaq End of Run 68439:
149958 01/27/08 08:05 Danagoulian Target: Shift summary and checklist
149957 01/27/08 08:04 cdaq Run 68439: WACS commissioning: LH2 15 cm + rad., 25 uA,
149956 01/27/08 08:03 Markowitz Owl shift summary
149955 01/27/08 08:02 cdaq End of Run 68438:
149954 01/27/08 07:25 cdaq Run 68438: WACS commissioning: LH2 15 cm + rad., 25 uA,
149953 01/27/08 07:23 cdaq End of Run 68437:
149952 01/27/08 07:17 cdaq Run 68437: WACS commissioning: LH2 15 cm + rad., 25 uA,
149951 01/27/08 07:15 cdaq End of Run 68436:
149950 01/27/08 06:43 cdaq Run 68436: WACS commissioning: LH2 15 cm + rad., 25 uA,
149949 01/27/08 06:42 cdaq End of Run 68435:
149948 01/27/08 06:38 M.M WACS Goldenrun is 68431
149947 01/27/08 06:27 M.M bpm / bcm
149946 01/27/08 06:09 cdaq Run 68435: WACS commissioning: LH2 15 cm + rad., 25 uA,
149945 01/27/08 06:07 cdaq End of Run 68434:
149944 01/27/08 05:31 cdaq Run 68434: WACS commissioning: LH2 15 cm + rad., 25 uA,
149943 01/27/08 05:27 cdaq End of Run 68433:
149942 01/27/08 05:26 cdaq Run 68433: WACS commissioning: LH2 15 cm + rad., 25 uA,
149941 01/27/08 05:24 cdaq End of Run 68432:
149940 01/27/08 05:14 cdaq Run 68432: WACS commissioning: LH2 15 cm + rad., 25 uA,
149939 01/27/08 05:13 cdaq End of Run 68431:
149938 01/27/08 04:37 cdaq Run 68431: WACS commissioning: LH2 15 cm + rad., 25 uA,
149937 01/27/08 04:35 cdaq End of Run 68430:
149936 01/27/08 04:06 Danagoulian Target: Target IOC reboot
149935 01/27/08 04:02 cdaq Run 68430: WACS commissioning: LH2 15 cm + rad., 25 uA,
149934 01/27/08 03:52 cdaq End of Run 68429:
149933 01/27/08 03:23 cdaq Run 68429: WACS commissioning: LH2 15 cm + rad., 25 uA,
149932 01/27/08 03:20 cdaq Run 68428: WACS commissioning: LH2 15 cm + rad., 25 uA,
149931 01/27/08 03:18 cdaq End of Run 68427:
149930 01/27/08 02:42 cdaq Run 68427: WACS commissioning: LH2 15 cm + rad., 25 uA,
149929 01/27/08 02:28 cdaq Run 68423: WACS commissioning: LH2 15 cm + rad., 35 uA,
149928 01/27/08 02:21 cdaq Run 68422: WACS commissioning: LH2 15 cm + rad., 35 uA,
149927 01/27/08 02:19 cdaq End of Run 68421:
149926 01/27/08 01:48 cdaq Run 68421: WACS commissioning: LH2 15 cm + rad., 25 uA,
149925 01/27/08 01:47 cdaq End of Run 68420:
149924 01/27/08 01:14 cdaq Run 68420: WACS commissioning: LH2 15 cm + rad., 25 uA,
149923 01/27/08 01:12 cdaq End of Run 68419:
149922 01/27/08 00:52 cdaq Run 68419: WACS commissioning: LH2 15 cm + rad., 25 uA,
149921 01/27/08 00:50 cdaq End of Run 68418:
149920 01/27/08 00:30 cdaq Run 68418: WACS commissioning: LH2 15 cm + rad., 25 uA,
149919 01/27/08 00:28 cdaq End of Run 68417:
149918 01/27/08 00:13 Danagoulian Target: target checklist
149917 01/27/08 00:07 cdaq Run 68417: WACS commissioning: LH2 15 cm + rad., 25 uA,
149916 01/27/08 00:06 cdaq Beam Time Accounting
149915 01/27/08 00:05 cdaq End of Run 68416:
Saturday
149914 01/26/08 23:44 cdaq Run 68416: WACS commissioning: LH2 15 cm + rad., 25 uA,
149913 01/26/08 23:42 cdaq End of Run 68415:
149912 01/26/08 23:23 W. Luo BigCal HV crate hctsv12:2002 tripped off, stopped the run
149911 01/26/08 23:20 cdaq Run 68415: WACS commissioning: LH2 15 cm + rad., 20 uA,
149910 01/26/08 23:15 cdaq End of Run 68414:
149909 01/26/08 23:05 R. Lindgren Looking for stability
149908 01/26/08 22:59 cdaq Run 68414: WACS commissioning: LH2 15 cm + rad., 20 uA,
149907 01/26/08 22:56 cdaq End of Run 68413:
149906 01/26/08 22:55 W. Luo BPM & BCM
149905 01/26/08 22:34 W. Luo HMS drift time still looks stange
149904 01/26/08 22:25 Lindgren Running again
149903 01/26/08 22:23 cdaq Run 68413: WACS commissioning: LH2 15 cm + rad., 15 uA,
149902 01/26/08 22:20 R. Lindgren Trigger supervisor crashed
149901 01/26/08 22:18 R. Lindgren Production running
149900 01/26/08 22:11 cdaq Run 68412: WACS commissioning: LH2 15 cm + rad., 15 uA,
149899 01/26/08 22:10 cdaq End of Run 68411:
149898 01/26/08 22:05 W. Luo Rebooted Roc2 and found HMS door was open
149897 01/26/08 22:02 W. Luo Reboot Roc11 and Roc12 in the bunker at around 6pm
149896 01/26/08 21:55 cdaq Run 68411: WACS commissioning: LH2 15 cm + rad., 25 uA,
149895 01/26/08 21:43 slifer target: IOC reboot
149894 01/26/08 21:32 R. LIndgren Roc 2 crashed
149893 01/26/08 20:52 cdaq Run 68410: WACS commissioning: LH2 15 cm + rad., 25 uA,
149892 01/26/08 20:50 cdaq End of Run 68409:
149891 01/26/08 20:40 puckett "GEp switch" rebooting also helped recover DAQ
149890 01/26/08 20:36 puckett S0 TDCs--fixed cabling
149889 01/26/08 20:27 cdaq Run 68409: WACS commissioning: LH2 15 cm + rad., 25 uA,
149888 01/26/08 20:26 cdaq End of Run 68408:
149887 01/26/08 19:58 W. Luo run 68408: HMS drift time looks different
149886 01/26/08 19:46 R.Lindgren lost magnet
149885 01/26/08 19:43 cdaq Run 68408: WACS commissioning: LH2 15 cm + rad., 25 uA,
149884 01/26/08 19:36 slifer target: HPH setting
149883 01/26/08 19:23 cdaq Run 68405: WACS commissioning: LH2 15 cm + rad., 25 uA,
149882 01/26/08 19:22 cdaq End of Run 68404:
149881 01/26/08 19:22 cdaq Run 68404: WACS commissioning: LH2 15 cm + rad., 25 uA,
149880 01/26/08 19:03 cdaq End of Run 68403:
149879 01/26/08 19:00 cdaq Run 68403: TEST
149878 01/26/08 18:49 cdaq Run 68402: TEST
149877 01/26/08 18:42 cdaq End of Run 68401:
149876 01/26/08 18:41 cdaq Run 68401: TEST
149875 01/26/08 18:21 R. Lindgren ROC crashes
149874 01/26/08 18:18 Lindgren ROC 12 crashed
149873 01/26/08 18:18 cdaq Run 68400: junk
149872 01/26/08 18:10 cdaq Run 68399: junk
149871 01/26/08 17:54 cdaq Run 68396: WACS commissioning: LH2 15 cm + rad., 25 uA,
149870 01/26/08 17:36 cdaq Run 68393: junk
149869 01/26/08 17:30 cdaq Run 68392: WACS commissioning: LH2 15 cm + rad., 25 uA,
149868 01/26/08 17:26 cdaq End of Run 68391:
149867 01/26/08 17:06 cdaq Beam Time Accounting
149866 01/26/08 16:44 slifer JT valve
149865 01/26/08 16:41 cdaq Run 68391: WACS commissioning: LH2 15 cm + rad., 25 uA,
149864 01/26/08 16:39 slifer target checklist
149863 01/26/08 16:39 R.Lindgren Control Access
149862 01/26/08 16:19 cdaq End of Run 68390:
149861 01/26/08 16:05 Hovhannes Shift Summary (day)
149860 01/26/08 15:35 Hovhannes ROC 12 problem "resolution"
149859 01/26/08 15:33 Hovhannes ROC 13, 14 power cycle procedure
149858 01/26/08 15:31 cdaq Run 68390: WACS commissioning: LH2 15 cm + rad., 20 uA,
149857 01/26/08 15:30 cdaq End of Run 68389:
149856 01/26/08 14:45 cdaq Run 68389: WACS commissioning: LH2 15 cm + rad., 20 uA,
149855 01/26/08 14:44 cdaq End of Run 68388:
149854 01/26/08 14:34 cdaq Run 68388: WACS commissioning: LH2 15 cm + rad., 20 uA,
149853 01/26/08 14:28 Hovhannes DAQ problems
149852 01/26/08 14:25 cdaq Run 68385: WACS commissioning: LH2 15 cm + rad., 20 uA,
149851 01/26/08 14:21 cdaq Run 68384: WACS commissioning: LH2 15 cm + rad., 20 uA,
149850 01/26/08 14:15 gilman Pockell cell voltages
149849 01/26/08 14:08 cdaq End of Run 68383:
149848 01/26/08 14:06 Hovhannes ROC 12 reboot
149847 01/26/08 14:00 cdaq Run 68383: WACS commissioning: LH2 15 cm + rad., 20 uA,
149846 01/26/08 13:59 cdaq End of Run 68382:
149845 01/26/08 13:56 cdaq Run 68382: WACS commissioning: LH2 15 cm + rad., 20 uA,
149844 01/26/08 13:51 cdaq End of Run 68381:
149843 01/26/08 13:46 cdaq Run 68381: test daq
149842 01/26/08 13:13 cdaq Run 68380: WACS commissioning: LH2 15 cm + rad., 20 uA,
149841 01/26/08 13:11 cdaq End of Run 68379:
149840 01/26/08 13:11 cdaq Run 68379: WACS commissioning: LH2 15 cm + rad., 20 uA,
149839 01/26/08 13:03 Hovhannes Problems with DAQ
149838 01/26/08 12:55 Bosted HV for S02P increased : was too low
149837 01/26/08 12:45 cdaq Run 68376: WACS commissioning: LH2 15 cm + rad., 20 uA,
149836 01/26/08 12:41 cdaq Run 68375: WACS commissioning: LH2 15 cm + rad., 20 uA,
149835 01/26/08 12:39 cdaq End of Run 68374:
149834 01/26/08 12:33 cdaq Run 68374: WACS commissioning: LH2 15 cm + rad., 25 uA,
149833 01/26/08 12:27 gaskell Moller backout
149832 01/26/08 12:26 horn/gaskell Moller Summary
149831 01/26/08 12:12 cdaq End of Run 68373:
149830 01/26/08 12:06 cdaq Moller Run 68373: IHWP=IN
149829 01/26/08 12:06 cdaq End of Run 68372:
149828 01/26/08 12:01 cdaq Moller Run 68372: IHWP=IN
149827 01/26/08 12:00 cdaq End of Run 68371:
149826 01/26/08 11:58 Hovhannes Half wave Plate
149825 01/26/08 11:55 cdaq Moller Run 68371: IHWP=IN
149824 01/26/08 11:55 cdaq End of Run 68370:
149823 01/26/08 11:53 cdaq Moller Run 68370: IHWP=OUT
149822 01/26/08 11:51 Bosted Target snapshot
149821 01/26/08 11:50 cdaq End of Run 68369:
149820 01/26/08 11:45 cdaq Moller Run 68369: IHWP=OUT
149819 01/26/08 11:40 cdaq End of Run 68368:
149818 01/26/08 11:40 horn/gaskell Moller tuned
149817 01/26/08 11:38 cdaq Moller Run 68368: IHWP=OUT
149816 01/26/08 11:38 cdaq End of Run 68367:
149815 01/26/08 11:34 cdaq Moller Run 68367: IHWP=OUT
149814 01/26/08 11:27 Hovhannes Half wave plate Position
149813 01/26/08 11:20 cdaq End of Run 68366:
149812 01/26/08 11:19 cdaq Moller Run 68366: IHWP=OUT, tune run
149811 01/26/08 11:17 cdaq End of Run 68365:
149810 01/26/08 11:16 cdaq Moller Run 68365: IHWP=OUT, tune run
149809 01/26/08 11:14 cdaq End of Run 68364:
149808 01/26/08 11:14 cdaq Moller Run 68364: IHWP=OUT, tune run
149807 01/26/08 10:32 cdaq Beam Time Accounting
149806 01/26/08 10:10 cdaq End of Run 68363:
149805 01/26/08 10:09 cdaq Moller Run 68363: DAQ test
149804 01/26/08 10:08 Hovhannes Magnet Current
149803 01/26/08 10:07 cdaq End of Run 68362:
149802 01/26/08 10:06 cdaq Moller Run 68362: DAQ test
149801 01/26/08 10:04 Bosted Target: Target moved to MT
149800 01/26/08 10:04 Bosted Target: Target moved to 15 cm LH2 + rad
149799 01/26/08 09:59 cdaq End of Run 68361:
149798 01/26/08 09:53 cdaq Run 68361: WACS commissioning: LH2 15 cm + rad., 20 uA,
149797 01/26/08 09:51 cdaq End of Run 68360:
149796 01/26/08 09:45 puckett Updated BigCal, HMS ADC thresholds
149795 01/26/08 09:44 cdaq Run 68360: WACS commissioning: LH2 15 cm + rad., 20 uA, ps5=1
149794 01/26/08 09:42 cdaq End of Run 68359:
149793 01/26/08 09:39 E.Chudakov HV on S0 2p increased to 1700V
149792 01/26/08 09:31 cdaq Run 68359: WACS commissioning: LH2 15 cm + rad., 20 uA, ps5=1
149791 01/26/08 09:29 cdaq End of Run 68358:
149790 01/26/08 09:26 cdaq Run 68358: WACS commissioning: LH2 15 cm + rad., 20 uA, ps4=1
149789 01/26/08 09:24 cdaq End of Run 68357:
149788 01/26/08 09:22 Hovhannes HMS half efficient
149787 01/26/08 09:19 Hovhannes Ion Chambers
149786 01/26/08 09:15 cdaq Run 68357: WACS commissioning: LH2 15 cm + rad., 10 uA, ps4=1, ps5=1
149785 01/26/08 09:13 cdaq End of Run 68356:
149784 01/26/08 09:13 cdaq Run 68356: WACS commissioning: LH2 15 cm + rad., 10 uA, ps5=1
149783 01/26/08 07:58 Danagoulian Target: Shift summary
149782 01/26/08 07:50 Hovhannes Rates
149781 01/26/08 07:35 Hovhannes BigBite magnet is on
149780 01/26/08 07:12 Danagoulian Target: 15 cm Dummy
149779 01/26/08 07:10 Markowitz Beam: Owl shift summary
149778 01/26/08 07:02 cdaq End of Run 68355:
149777 01/26/08 07:01 cdaq Run 68355: WACS commissioning: LH2 15 cm + rad., 20 uA, ps5=1
149776 01/26/08 06:38 cdaq Run 68350: WACS commissioning: LH2 15 cm + rad., 20 uA, ps5=1
149775 01/26/08 06:34 cdaq Run 68349: WACS commissioning: LH2 15 cm + rad., 20 uA, ps5=1
149774 01/26/08 06:32 cdaq Run 68348: WACS commissioning: LH2 15 cm + rad., 20 uA, ps5=1
149773 01/26/08 06:23 cdaq Run 68346: WACS commissioning: LH2 15 cm + rad., 20 uA, ps5=1
149772 01/26/08 06:20 cdaq End of Run 68345:
149771 01/26/08 06:10 cdaq Run 68345: WACS commissioning: LH2 15 cm + rad., 15 uA, ps5=1
149770 01/26/08 06:06 cdaq End of Run 68344:
149769 01/26/08 06:02 M.M bpm / bcm
149768 01/26/08 05:48 cdaq Run 68344: WACS commissioning: LH2 15 cm + rad., 15 uA, ps5=1
149767 01/26/08 05:46 cdaq End of Run 68343:
149766 01/26/08 05:34 Danagoulian Target: 15 cm LH2
149765 01/26/08 05:31 cdaq Run 68343: WACS commissioning: LH2 15 cm + rad., 10 uA, ps5=1
149764 01/26/08 05:28 cdaq End of Run 68342:
149763 01/26/08 04:56 cdaq Run 68342: WACS commissioning: LH2 15 cm + rad., 5 uA, ps5=1
149762 01/26/08 04:44 cdaq End of Run 68341:
149761 01/26/08 04:08 cdaq Run 68341: WACS commissioning: LH2 20 cm, 30 uA, ps5=1
149760 01/26/08 04:07 cdaq End of Run 68340:
149759 01/26/08 03:32 cdaq Run 68340: WACS commissioning: LH2 20 cm, 10 uA, ps5=1
149758 01/26/08 03:24 cdaq End of Run 68339:
149757 01/26/08 03:19 cdaq Run 68339: WACS commissioning: LH2 20 cm, 10 uA, ps5=1
149756 01/26/08 03:16 cdaq End of Run 68338:
149755 01/26/08 03:04 cdaq Run 68338: WACS commissioning: LH2 20 cm, 10 uA, ps5=1
149754 01/26/08 03:02 cdaq End of Run 68337:
149753 01/26/08 02:58 cdaq Run 68337: WACS commissioning: LH2 20 cm, 10 uA, ps3=100
149752 01/26/08 02:57 cdaq End of Run 68336:
149751 01/26/08 02:56 cdaq Run 68336: WACS commissioning: LH2 20 cm, 10 uA, ps3=1
149750 01/26/08 02:55 cdaq End of Run 68335:
149749 01/26/08 02:51 cdaq Run 68335: WACS commissioning: LH2 20 cm, 10 uA, ps3=1
149748 01/26/08 02:46 cdaq End of Run 68334:
149747 01/26/08 02:44 cdaq Run 68334: WACS commissioning: LH2 20 cm, 50 uA, ps3=1
149746 01/26/08 02:43 cdaq End of Run 68333:
149745 01/26/08 02:42 cdaq Run 68333: WACS commissioning: LH2 20 cm, 50 uA, ps3=1
149744 01/26/08 02:39 cdaq End of Run 68332:
149743 01/26/08 02:32 cdaq Run 68332: WACS commissioning: Optics C target, 40 uA, ps2=1
149742 01/26/08 02:24 cdaq End of Run 68331:
149741 01/26/08 02:21 cdaq Run 68331: WACS commissioning: Optics C target, 40 uA, ps2=1
149740 01/26/08 02:19 cdaq End of Run 68330:
149739 01/26/08 02:07 cdaq Run 68330: WACS commissioning: LH2 20 cm target, 50 uA, ps5=1
149738 01/26/08 02:04 cdaq End of Run 68329:
149737 01/26/08 01:53 Danagoulian Target: Target at the start of the shift
149736 01/26/08 01:48 cdaq Run 68329: WACS commissioning: LH2 20 cm target, 50 uA, ps5=1
149735 01/26/08 01:39 cdaq End of Run 68328:
149734 01/26/08 01:13 mahbub Target: target alarm problem
149733 01/26/08 00:54 cdaq Run 68328: WACS commissioning: LH2 20 cm target, 50 uA, ps5=1
149732 01/26/08 00:43 cdaq End of Run 68327:
149731 01/26/08 00:42 dhamilton plan for next 2 - 3 hours
149730 01/26/08 00:15 cdaq Run 68327: WACS commissioning: 20 cm LH2, 10 uA, ps5=1
149729 01/26/08 00:07 cdaq Beam Time Accounting
149728 01/26/08 00:03 slifer shift summary
149727 01/26/08 00:02 cdaq End of Run 68326:
Friday
149726 01/25/08 23:52 L.Pentchev two ADCs BigCal modules changed during controlled access today
149725 01/25/08 23:47 cdaq Run 68326: WACS commissioning: 20 cm LH2, 10 uA, ps5=1
149724 01/25/08 23:14 mahbub Target: changed to 20 cm LH2
149723 01/25/08 23:11 dhamilton Change prescale factors
149722 01/25/08 23:03 cdaq End of Run 68325:
149721 01/25/08 22:48 dhamilton Beam Position - Harpsacn completed
149720 01/25/08 22:46 cdaq Run 68325: WACS commissioning: Optics C target, 40 uA, ps2=1
149719 01/25/08 22:46 slifer update
149718 01/25/08 22:26 mahbub Target: change to 2 foil C optics target
149717 01/25/08 22:05 dhamilton discriminator and prescale changes
149716 01/25/08 22:02 cdaq Beam Time Accounting
149715 01/25/08 21:30 cdaq End of Run 68324:
149714 01/25/08 20:57 cdaq Run 68324: WACS cosmic: ps2=1,ps3=1
149713 01/25/08 20:03 M Jones S0 scalers
149712 01/25/08 19:57 M Jones Change to HMS trigger
149711 01/25/08 19:42 dhamilton BigCal Move
149710 01/25/08 19:40 dhamilton BigCal threshold change
149709 01/25/08 19:36 mahbub Target: Target screen shots
149708 01/25/08 19:24 L.Pentchev LED run replay: BigCal is OK after movement
149707 01/25/08 19:04 L.Pentchev HV 2006 crate reset
149706 01/25/08 19:00 L.Pentchev took one glass bar out of BigCal
149705 01/25/08 18:41 L.Pentchev BigCal thrsholds set to 700mV
149704 01/25/08 18:37 cdaq End of Run 68323:
149703 01/25/08 18:35 cdaq Run 68323: LED BigCal test
149702 01/25/08 17:38 beaufait big bite power supply
149701 01/25/08 16:51 puckett Added "drift time by wire" to FPP onlineGUI config
149700 01/25/08 16:31 cdaq End of Run 68322:
149699 01/25/08 16:11 gaskell water in alcove from BSY?
149698 01/25/08 15:08 Bosted Target snapshot
149697 01/25/08 14:58 cdaq Run 68322: BIGCAL TEST
149696 01/25/08 14:57 cdaq End of Run 68321:
149695 01/25/08 14:34 frw analysis: fixed HMS code for hstart
149694 01/25/08 14:30 cdaq Run 68321: BIGCAL TEST
149693 01/25/08 14:15 M Jones Changed HMS trigger timing
149692 01/25/08 14:01 cdaq End of Run 68320:
149691 01/25/08 13:50 puckett Raw ADCs for rows 29-30 during test run
149690 01/25/08 13:35 puckett BigCal pedestals for test run 68320
149689 01/25/08 13:18 Bosted Target: Target moved to MT
149688 01/25/08 12:54 cdaq Run 68320: BIGCAL TEST
149687 01/25/08 11:56 Bosted S0 removed from HMS
149686 01/25/08 11:20 cdaq End of Run 68318:
149685 01/25/08 11:05 W. Luo Turn off HMS HV
149684 01/25/08 11:01 W. Luo Turn of S0 HV
149683 01/25/08 11:00 cdaq Run 68318: WACS cosmic, ps1=1,ps2=1,ps3=1
149682 01/25/08 10:51 cdaq End of Run 68317:
149681 01/25/08 10:48 dhamilton ROC13 and ROC14 power cycle
149680 01/25/08 10:43 bogdanw Beam line valve air
149679 01/25/08 10:41 cdaq Run 68317: WACS Cosmics, ps1=1, ps2=1,ps3=3
149678 01/25/08 10:20 cdaq End of Run 68316:
149677 01/25/08 09:54 cdaq Run 68316: WACS cosmic run: ps1=1,ps2=1,ps3+1
149676 01/25/08 09:28 bogdanw HMS angle 38 deg.
149675 01/25/08 09:20 Bosted Radiation survey done
149674 01/25/08 09:16 Bosted Target: Target parked
149673 01/25/08 08:54 Bosted HMS magnets off
149672 01/25/08 08:52 Bosted HMS angle
149671 01/25/08 08:22 YaLi Owl shift summary
149670 01/25/08 08:22 cdaq Beam Time Accounting
149669 01/25/08 07:12 YaLi ROC13, ROC14 problem
149668 01/25/08 06:54 cdaq End of Run 68315:
149667 01/25/08 06:48 mbianda run 68314 FPP wire hit
149666 01/25/08 06:46 cdaq Run 68315: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149665 01/25/08 06:45 mbianda FPP wire hit
149664 01/25/08 06:44 Phil Carter Target: yellow alarms
149663 01/25/08 06:42 cdaq End of Run 68314:
149662 01/25/08 06:25 cdaq Run 68314: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149661 01/25/08 06:24 cdaq End of Run 68313:
149660 01/25/08 06:22 Phil Carter Target: overall power graph weirdness
149659 01/25/08 06:03 cdaq Run 68313: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149658 01/25/08 06:02 cdaq End of Run 68312:
149657 01/25/08 05:41 YaLi BPM\BCM screenshot
149656 01/25/08 05:39 cdaq Run 68312: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149655 01/25/08 05:38 cdaq End of Run 68311:
149654 01/25/08 05:21 YaLi Roc2 error, rebooted
149653 01/25/08 05:16 cdaq Run 68311: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149652 01/25/08 05:11 cdaq Run 68310: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149651 01/25/08 05:10 Phil Carter Target: IOC reboot
149650 01/25/08 05:07 cdaq Run 68309: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149649 01/25/08 04:59 cdaq Run 68308: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149648 01/25/08 04:58 cdaq End of Run 68307:
149647 01/25/08 04:36 cdaq Run 68307: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149646 01/25/08 04:35 cdaq End of Run 68306:
149645 01/25/08 04:14 cdaq Run 68306: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149644 01/25/08 04:13 cdaq End of Run 68305:
149643 01/25/08 03:50 cdaq Run 68305: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149642 01/25/08 03:49 cdaq End of Run 68304:
149641 01/25/08 03:27 cdaq Run 68304: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149640 01/25/08 03:26 cdaq End of Run 68303:
149639 01/25/08 03:05 cdaq Run 68303: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149638 01/25/08 03:04 cdaq End of Run 68302:
149637 01/25/08 02:40 cdaq Run 68302: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149636 01/25/08 02:39 cdaq End of Run 68301:
149635 01/25/08 02:23 Phil Carter Target: GUI problems. no reboot yet
149634 01/25/08 02:18 cdaq Run 68301: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149633 01/25/08 02:17 cdaq End of Run 68300:
149632 01/25/08 01:53 cdaq Run 68300: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149631 01/25/08 01:52 cdaq End of Run 68299:
149630 01/25/08 01:30 cdaq Run 68299: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149629 01/25/08 01:30 cdaq End of Run 68298:
149628 01/25/08 01:08 cdaq Run 68298: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149627 01/25/08 01:07 cdaq End of Run 68297:
149626 01/25/08 00:46 cdaq Run 68297: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149625 01/25/08 00:45 cdaq End of Run 68296:
149624 01/25/08 00:41 Phil Carter Target: lost communication. no reboot
149623 01/25/08 00:30 Phil Carter Target: screen shot
149622 01/25/08 00:26 Phil Carter Target: IOC reboot
149621 01/25/08 00:23 cdaq Run 68296: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149620 01/25/08 00:16 cdaq End of Run 68295:
Thursday
149619 01/24/08 23:59 cdaq Run 68295: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149618 01/24/08 23:58 cdaq Beam Time Accounting
149617 01/24/08 23:57 cdaq End of Run 68294:
149616 01/24/08 23:53 keppel evening shift summary
149615 01/24/08 23:35 cdaq Run 68294: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149614 01/24/08 23:34 cdaq End of Run 68293:
149613 01/24/08 23:17 ejensen hv crate hctsv12:2005
149612 01/24/08 23:13 cdaq Run 68293: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149611 01/24/08 23:09 cdaq End of Run 68292:
149610 01/24/08 22:49 cdaq Run 68292: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149609 01/24/08 22:48 cdaq End of Run 68291:
149608 01/24/08 22:26 cdaq Run 68291: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149607 01/24/08 22:25 cdaq End of Run 68290:
149606 01/24/08 22:16 ejensen bcm and bpm
149605 01/24/08 22:06 puckett pedestals are unstable, unfortunately.
149604 01/24/08 22:03 cdaq Run 68290: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149603 01/24/08 22:03 cdaq End of Run 68289:
149602 01/24/08 21:55 ejensen BigCal ADC and row hits
149601 01/24/08 21:41 cdaq Run 68289: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149600 01/24/08 21:40 cdaq End of Run 68288:
149599 01/24/08 21:19 cdaq Run 68288: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149598 01/24/08 21:14 cdaq End of Run 68287:
149597 01/24/08 20:53 cdaq Run 68287: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149596 01/24/08 20:52 cdaq End of Run 68286:
149595 01/24/08 20:36 smithg Target: disabled hcHe_Supply_1_R alarm
149594 01/24/08 20:31 cdaq Run 68286: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149593 01/24/08 20:30 smithg Target: rebooted IOC
149592 01/24/08 20:26 cdaq End of Run 68285:
149591 01/24/08 20:19 cdaq Run 68285: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149590 01/24/08 20:18 cdaq End of Run 68284:
149589 01/24/08 19:55 cdaq Run 68284: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149588 01/24/08 19:36 cdaq End of Run 68283:
149587 01/24/08 19:22 cdaq Run 68283: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149586 01/24/08 19:21 cdaq End of Run 68282:
149585 01/24/08 18:59 cdaq Run 68282: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149584 01/24/08 18:58 cdaq End of Run 68281:
149583 01/24/08 18:36 cdaq Run 68281: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149582 01/24/08 18:35 cdaq End of Run 68280:
149581 01/24/08 18:13 cdaq Run 68280: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149580 01/24/08 18:12 cdaq End of Run 68279:
149579 01/24/08 17:49 cdaq Run 68279: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149578 01/24/08 17:48 cdaq End of Run 68278:
149577 01/24/08 17:27 cdaq Run 68278: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149576 01/24/08 17:26 cdaq End of Run 68277:
149575 01/24/08 17:05 cdaq Run 68277: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149574 01/24/08 17:00 cdaq Run 68276: junk
149573 01/24/08 16:58 smithg Target: checklist
149572 01/24/08 16:46 cdaq End of Run 68275:
149571 01/24/08 16:45 cdaq Run 68275: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149570 01/24/08 16:40 cdaq Run 68274: crap
149569 01/24/08 16:32 cdaq End of Run 68272:
149568 01/24/08 16:10 smithg Target: rebooted ioc
149567 01/24/08 16:10 cdaq Run 68272: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149566 01/24/08 16:03 cdaq End of Run 68271:
149565 01/24/08 16:03 cdaq Beam Time Accounting
149564 01/24/08 15:58 X. Zheng day shift summary
149563 01/24/08 15:41 cdaq Run 68271: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149562 01/24/08 15:40 cdaq End of Run 68270:
149561 01/24/08 15:19 X. Zheng fire alarm cleared
149560 01/24/08 15:18 cdaq Run 68270: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149559 01/24/08 15:17 cdaq End of Run 68269:
149558 01/24/08 15:15 X. Zheng fire alarm update
149557 01/24/08 14:58 X Zheng fire alarm flashing
149556 01/24/08 14:56 cdaq Run 68269: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149555 01/24/08 14:37 cdaq Run 68268: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149554 01/24/08 14:36 cdaq End of Run 68267:
149553 01/24/08 14:18 puckett changed Analyzer code back to normal
149552 01/24/08 14:14 cdaq Run 68267: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149551 01/24/08 14:13 cdaq End of Run 68266:
149550 01/24/08 13:58 puckett jumpy pedestals: comparison of raw ADCs
149549 01/24/08 13:52 cdaq Run 68266: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149548 01/24/08 13:51 cdaq End of Run 68265:
149547 01/24/08 13:30 cdaq Run 68265: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149546 01/24/08 13:24 cdaq End of Run 68264:
149545 01/24/08 13:22 cdaq End of Run 68263:
149544 01/24/08 12:59 cdaq Run 68263: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149543 01/24/08 12:58 cdaq End of Run 68262:
149542 01/24/08 12:58 cdaq Run 68262: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149541 01/24/08 12:56 cdaq End of Run 68261:
149540 01/24/08 12:36 cdaq Run 68261: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149539 01/24/08 12:35 cdaq End of Run 68260:
149538 01/24/08 12:13 cdaq Run 68260: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149537 01/24/08 12:12 cdaq End of Run 68259:
149536 01/24/08 11:50 cdaq Run 68259: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149535 01/24/08 11:50 cdaq End of Run 68258:
149534 01/24/08 11:34 X. Zheng BCM and BPM snap shots
149533 01/24/08 11:27 cdaq Run 68258: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149532 01/24/08 11:19 cdaq End of Run 68257:
149531 01/24/08 11:05 cdaq Run 68257: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149530 01/24/08 11:04 cdaq End of Run 68256:
149529 01/24/08 10:38 mbianda Target: L1 hp power read back alarm
149528 01/24/08 10:35 cdaq Run 68256: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149527 01/24/08 10:33 cdaq End of Run 68255:
149526 01/24/08 10:25 mbianda Target: Transient error as indicated be entry 149508
149525 01/24/08 10:11 cdaq Run 68255: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149524 01/24/08 10:10 cdaq End of Run 68254:
149523 01/24/08 09:49 mbianda Target: IOC rebooted due to loss of network connection.
149522 01/24/08 09:49 cdaq Run 68254: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149521 01/24/08 09:43 cdaq End of Run 68253:
149520 01/24/08 09:37 cdaq Run 68253: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149519 01/24/08 09:36 cdaq End of Run 68252:
149518 01/24/08 09:15 cdaq Run 68252: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149517 01/24/08 09:14 cdaq End of Run 68251:
149516 01/24/08 08:54 cdaq Run 68251: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149515 01/24/08 08:53 cdaq End of Run 68250:
149514 01/24/08 08:31 cdaq Run 68250: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149513 01/24/08 08:29 cdaq End of Run 68249:
149512 01/24/08 08:17 puckett use "kirby" or cdaql3 or cdaql5
149511 01/24/08 08:10 cdaq Beam Time Accounting
149510 01/24/08 08:09 cdaq Run 68249: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149509 01/24/08 08:03 cdaq End of Run 68248:
149508 01/24/08 07:54 J Mulholland Target: transient errors
149507 01/24/08 07:53 cdaq Run 68248: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149506 01/24/08 07:50 cdaq End of Run 68247:
149505 01/24/08 07:43 ccbutu Shift Summary
149504 01/24/08 07:32 cdaq Run 68247: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149503 01/24/08 07:21 cdaq End of Run 68246:
149502 01/24/08 06:52 cdaq Run 68246: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149501 01/24/08 06:50 cdaq End of Run 68245:
149500 01/24/08 06:29 cdaq Run 68245: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149499 01/24/08 06:29 cdaq End of Run 68244:
149498 01/24/08 06:09 ccbutu DAQ Reboot
149497 01/24/08 06:08 cdaq Run 68244: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149496 01/24/08 06:04 cdaq End of Run 68243:
149495 01/24/08 06:03 cdaq Run 68243: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149494 01/24/08 05:55 cdaq End of Run 68242:
149493 01/24/08 05:55 cdaq Run 68242: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149492 01/24/08 05:51 cdaq End of Run 68241:
149491 01/24/08 05:50 ccbutu ROC13 &ROC14 Power Cycled!
149490 01/24/08 05:50 cdaq Run 68241: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149489 01/24/08 05:44 cdaq End of Run 68240:
149488 01/24/08 05:18 cdaq Run 68240: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149487 01/24/08 05:17 cdaq End of Run 68239:
149486 01/24/08 05:02 cdaq Run 68239: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149485 01/24/08 04:58 J Mulholland Target: network connection lost and IOC reboot
149484 01/24/08 04:49 cdaq End of Run 68238:
149483 01/24/08 04:27 cdaq Run 68238: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149482 01/24/08 04:26 cdaq End of Run 68237:
149481 01/24/08 04:05 cdaq Run 68237: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149480 01/24/08 04:04 cdaq End of Run 68236:
149479 01/24/08 03:43 cdaq Run 68236: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149478 01/24/08 03:41 cdaq Run 68235: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149477 01/24/08 03:34 cdaq Run 68233: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149476 01/24/08 03:28 cdaq End of Run 68232:
149475 01/24/08 03:19 cdaq Run 68232: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149474 01/24/08 03:06 cdaq End of Run 68231:
149473 01/24/08 03:00 Hovhannes Replay
149472 01/24/08 02:43 cdaq Run 68231: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149471 01/24/08 02:43 cdaq End of Run 68230:
149470 01/24/08 02:22 cdaq Run 68230: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149469 01/24/08 02:20 cdaq End of Run 68229:
149468 01/24/08 02:00 cdaq Run 68229: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149467 01/24/08 01:54 cdaq End of Run 68228:
149466 01/24/08 01:42 cdaq Run 68228: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149465 01/24/08 01:40 cdaq End of Run 68227:
149464 01/24/08 01:20 cdaq Run 68227: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149463 01/24/08 01:18 cdaq End of Run 68226:
149462 01/24/08 00:57 cdaq Run 68226: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149461 01/24/08 00:53 cdaq End of Run 68225:
149460 01/24/08 00:35 J Mulholland Target: trend in transient alarm?
149459 01/24/08 00:30 cdaq Run 68225: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149458 01/24/08 00:26 cdaq End of Run 68224:
149457 01/24/08 00:22 J Mulholland Target: GUI scrnshot and note on transients
149456 01/24/08 00:06 cdaq Beam Time Accounting
149455 01/24/08 00:04 cdaq Run 68224: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149454 01/24/08 00:03 cdaq End of Run 68223:
Wednesday
149453 01/23/08 23:49 E. Frlez target: yellow/red alarms
149452 01/23/08 23:43 cdaq Run 68223: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149451 01/23/08 23:42 cdaq End of Run 68222:
149450 01/23/08 23:35 Ramesh Trippy beam
149449 01/23/08 23:24 Ramesh Power cycled ROC 13/14 again
149448 01/23/08 23:16 cdaq Run 68222: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149447 01/23/08 23:11 cdaq End of Run 68221:
149446 01/23/08 23:11 YaLi Run 68220 histogram
149445 01/23/08 23:10 cdaq Run 68221: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149444 01/23/08 23:09 cdaq End of Run 68220:
149443 01/23/08 22:59 Ramesh ROC 13/14 reboot
149442 01/23/08 22:55 cdaq Run 68220: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149441 01/23/08 22:53 frw SHIFT CREW: deal with problems promptly!
149440 01/23/08 22:47 cdaq End of Run 68217:
149439 01/23/08 22:44 cdaq Run 68217: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149438 01/23/08 22:43 cdaq End of Run 68216:
149437 01/23/08 22:18 cdaq Run 68216: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149436 01/23/08 22:17 cdaq End of Run 68215:
149435 01/23/08 21:54 cdaq Run 68215: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149434 01/23/08 21:53 cdaq End of Run 68214:
149433 01/23/08 21:31 cdaq Run 68214: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149432 01/23/08 21:30 cdaq End of Run 68213:
149431 01/23/08 21:09 cdaq Run 68213: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149430 01/23/08 21:08 cdaq End of Run 68212:
149429 01/23/08 20:55 Ramesh Power cycling fixed the missing histogram problem
149428 01/23/08 20:49 puckett Also, please try to do the replay ASAP for every run.
149427 01/23/08 20:47 puckett power cycle ROC14
149426 01/23/08 20:46 cdaq Run 68212: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149425 01/23/08 20:44 Ramesh ROC13/14 power cycled
149424 01/23/08 20:40 cdaq End of Run 68211:
149423 01/23/08 20:35 YaLi Problem with FPP histogram
149422 01/23/08 20:17 cdaq Run 68211: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149421 01/23/08 20:16 cdaq End of Run 68210:
149420 01/23/08 19:56 Ramesh TS1 is now ok
149419 01/23/08 19:54 cdaq Run 68210: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149418 01/23/08 19:42 Ramesh TS1 failed
149417 01/23/08 19:29 cdaq Run 68209: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149416 01/23/08 19:28 cdaq End of Run 68208:
149415 01/23/08 19:08 cdaq Run 68208: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149414 01/23/08 19:06 cdaq End of Run 68207:
149413 01/23/08 18:46 cdaq Run 68207: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149412 01/23/08 18:45 cdaq End of Run 68206:
149411 01/23/08 18:03 E. Frlez target: SC pressure changes
149410 01/23/08 18:02 cdaq Run 68206: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149409 01/23/08 18:00 cdaq End of Run 68205:
149408 01/23/08 17:53 smithg Target: turbopump tripped
149407 01/23/08 17:39 cdaq Run 68205: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149406 01/23/08 17:29 cdaq End of Run 68204:
149405 01/23/08 17:09 cdaq Run 68204: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149404 01/23/08 17:01 Ramesh Access finished, asked for beam
149403 01/23/08 16:51 Ramesh Controlled access due to target vacuum problem
149402 01/23/08 16:42 E. Frlez target: screenshots
149401 01/23/08 16:09 E. Frlez target: Scattering chamber vacuum
149400 01/23/08 16:06 Margaziotis Sc Chamber vacuum alarm
149399 01/23/08 16:05 cdaq End of Run 68203:
149398 01/23/08 16:04 cdaq Beam Time Accounting
149397 01/23/08 15:56 X. Zheng day shift summary
149396 01/23/08 15:50 cdaq Run 68203: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149395 01/23/08 15:45 Margaziotis Target: Moved to LH2
149394 01/23/08 15:34 horn Beam Energy Measurement Result
149393 01/23/08 14:14 X. Zheng pulsed beam
149392 01/23/08 13:40 cdaq Beam Time Accounting
149391 01/23/08 11:59 gaskell Moller backout
149390 01/23/08 11:52 horn/gaskell Moller Summary (part 2)
149389 01/23/08 11:42 cdaq End of Run 68202:
149388 01/23/08 11:38 cdaq Moller Run 68202: IHWP=OUT
149387 01/23/08 11:24 cdaq End of Run 68201:
149386 01/23/08 11:22 cdaq Moller Run 68201: IHWP=OUT
149385 01/23/08 11:21 cdaq End of Run 68200:
149384 01/23/08 11:19 cdaq Moller Run 68200: IHWP=OUT
149383 01/23/08 11:18 cdaq End of Run 68199:
149382 01/23/08 11:13 cdaq Moller Run 68199: IHWP=OUT
149381 01/23/08 11:11 cdaq End of Run 68198:
149380 01/23/08 11:09 cdaq Moller Run 68198: IHWP=OUT
149379 01/23/08 11:09 cdaq End of Run 68197:
149378 01/23/08 11:06 cdaq Moller Run 68197: IHWP=OUT
149377 01/23/08 11:05 cdaq End of Run 68196:
149376 01/23/08 11:02 cdaq Moller Run 68196: IHWP=OUT
149375 01/23/08 11:02 cdaq End of Run 68195:
149374 01/23/08 10:59 cdaq Moller Run 68195: IHWP=OUT
149373 01/23/08 10:56 cdaq End of Run 68194:
149372 01/23/08 10:52 cdaq Moller Run 68194: IHWP=OUT
149371 01/23/08 10:51 cdaq End of Run 68193:
149370 01/23/08 10:47 cdaq Moller Run 68193: IHWP=OUT
149369 01/23/08 10:33 gaskell/horn Moller summary (part 1)
149368 01/23/08 10:26 cdaq End of Run 68192:
149367 01/23/08 10:23 cdaq Moller Run 68192: IHWP=OUT
149366 01/23/08 10:23 cdaq End of Run 68191:
149365 01/23/08 10:20 cdaq Moller Run 68191: IHWP=OUT
149364 01/23/08 10:20 cdaq End of Run 68190:
149363 01/23/08 10:17 cdaq Moller Run 68190: IHWP=OUT
149362 01/23/08 10:15 cdaq End of Run 68189:
149361 01/23/08 10:12 cdaq Moller Run 68189: IHWP=OUT
149360 01/23/08 10:12 cdaq End of Run 68188:
149359 01/23/08 10:09 cdaq Moller Run 68188: IHWP=OUT
149358 01/23/08 10:08 cdaq End of Run 68187:
149357 01/23/08 10:07 cdaq Moller Run 68187: IHWP=OUT, tune test
149356 01/23/08 10:05 cdaq End of Run 68186:
149355 01/23/08 10:04 cdaq Moller Run 68186: IHWP=OUT, tune test
149354 01/23/08 09:45 cdaq End of Run 68185:
149353 01/23/08 09:41 Margaziotis Target: Moved to Empty
149352 01/23/08 09:37 cdaq Moller Run 68185: daq test
149351 01/23/08 09:34 cdaq Moller Run 68184: daq test
149350 01/23/08 09:30 cdaq End of Run 68183:
149349 01/23/08 09:26 Margaziotis Target: Screen shot-beam on
149348 01/23/08 09:10 cdaq Run 68183: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149347 01/23/08 08:42 X. Zheng beam is back
149346 01/23/08 08:17 Margaziotis Target: screen shot-beam off
149345 01/23/08 07:57 J Mulholland Target: Transients throughout
149344 01/23/08 07:52 ccbutu Shift Summary
149343 01/23/08 07:50 Baghdasaryan Software backup
149342 01/23/08 05:56 cdaq End of Run 68182:
149341 01/23/08 05:54 cdaq Run 68182: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149340 01/23/08 05:27 ccbutu Beam Delivery!
149339 01/23/08 05:23 cdaq End of Run 68181:
149338 01/23/08 05:01 cdaq Run 68181: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149337 01/23/08 04:53 cdaq End of Run 68180:
149336 01/23/08 04:33 cdaq Run 68180: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149335 01/23/08 04:31 cdaq End of Run 68179:
149334 01/23/08 04:10 cdaq Run 68179: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149333 01/23/08 04:09 cdaq End of Run 68178:
149332 01/23/08 03:47 cdaq Run 68178: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149331 01/23/08 03:46 cdaq End of Run 68177:
149330 01/23/08 03:25 cdaq Run 68177: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149329 01/23/08 03:23 cdaq End of Run 68176:
149328 01/23/08 03:02 cdaq Run 68176: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149327 01/23/08 03:01 cdaq End of Run 68175:
149326 01/23/08 02:39 cdaq Run 68175: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149325 01/23/08 02:38 cdaq End of Run 68174:
149324 01/23/08 02:21 cdaq Run 68174: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149323 01/23/08 02:15 cdaq End of Run 68173:
149322 01/23/08 01:56 cdaq Run 68173: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149321 01/23/08 01:53 J Mulholland Target: transient alarm
149320 01/23/08 01:53 cdaq End of Run 68172:
149319 01/23/08 01:37 J Mulholland Target: transient
149318 01/23/08 01:30 cdaq Run 68172: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149317 01/23/08 01:28 cdaq End of Run 68171:
149316 01/23/08 01:08 cdaq Run 68171: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149315 01/23/08 01:07 cdaq End of Run 68170:
149314 01/23/08 00:50 J Mulholland Target: transient alarms
149313 01/23/08 00:43 cdaq Run 68170: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149312 01/23/08 00:42 cdaq End of Run 68169:
149311 01/23/08 00:41 cdaq Beam Time Accounting
149310 01/23/08 00:19 cdaq Run 68169: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149309 01/23/08 00:18 cdaq End of Run 68168:
149308 01/23/08 00:10 J Mulholland Target: Gui Screenshot
Tuesday
149307 01/22/08 23:58 cdaq Run 68168: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149306 01/22/08 23:57 cdaq End of Run 68167:
149305 01/22/08 23:46 E. Frlez target: scattering chamber vacuum
149304 01/22/08 23:35 cdaq Run 68167: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149303 01/22/08 23:32 Ramesh BPM/BCM
149302 01/22/08 23:16 Ramesh Beam away due to manet trip
149301 01/22/08 22:54 cdaq End of Run 68166:
149300 01/22/08 22:22 cdaq Run 68166: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149299 01/22/08 22:21 cdaq End of Run 68165:
149298 01/22/08 22:00 cdaq Run 68165: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149297 01/22/08 21:59 cdaq End of Run 68164:
149296 01/22/08 21:47 Ramesh Smooth data taking
149295 01/22/08 21:37 cdaq Run 68164: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149294 01/22/08 21:36 cdaq End of Run 68163:
149293 01/22/08 21:15 cdaq Run 68163: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149292 01/22/08 21:14 cdaq End of Run 68162:
149291 01/22/08 20:52 cdaq Run 68162: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149290 01/22/08 20:51 cdaq End of Run 68161:
149289 01/22/08 20:30 cdaq Run 68161: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149288 01/22/08 20:29 cdaq End of Run 68160:
149287 01/22/08 20:08 cdaq Run 68160: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149286 01/22/08 20:08 cdaq End of Run 68159:
149285 01/22/08 19:46 cdaq Run 68159: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149284 01/22/08 19:44 cdaq End of Run 68158:
149283 01/22/08 19:24 cdaq Run 68158: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149282 01/22/08 19:23 cdaq End of Run 68157:
149281 01/22/08 19:14 M.M HMS time offsets HMS, Trigger Time Offsets and HMS drift map
149280 01/22/08 19:02 cdaq Run 68157: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149279 01/22/08 19:01 cdaq End of Run 68156:
149278 01/22/08 18:43 Ramesh Error due to TS1
149277 01/22/08 18:40 cdaq Run 68156: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149276 01/22/08 18:28 cdaq Run 68155: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149275 01/22/08 18:27 cdaq End of Run 68154:
149274 01/22/08 18:23 E. Frlez target: transient yellow alarm
149273 01/22/08 18:17 Ramesh Beam is now 80 uA
149272 01/22/08 18:02 cdaq Run 68154: Kinematics 5: LH2 20 cm, 50 uA, ps5=1
149271 01/22/08 17:54 cdaq End of Run 68153:
149270 01/22/08 17:36 cdaq Run 68153: Kinematics 5: LH2 20 cm, 50 uA, ps5=1
149269 01/22/08 17:35 Ramesh BBU problem for more than 50 uA
149268 01/22/08 17:35 E. Frlez target: red alarm
149267 01/22/08 17:35 cdaq End of Run 68152:
149266 01/22/08 16:45 cdaq Run 68152: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149265 01/22/08 16:44 E. Frlez target: screenshots
149264 01/22/08 16:42 Ramesh hms dipole recovering (Steve Lassiter working on)
149263 01/22/08 16:28 Ramesh Dipole NMR srewed up
149262 01/22/08 16:19 cdaq End of Run 68151:
149261 01/22/08 16:18 cdaq Run 68151: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149260 01/22/08 16:15 cdaq End of Run 68150:
149259 01/22/08 16:12 cdaq Run 68150: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149258 01/22/08 16:11 cdaq End of Run 68149:
149257 01/22/08 16:02 Jonathan Mil Shift Summary
149256 01/22/08 16:02 cdaq Beam Time Accounting
149255 01/22/08 15:50 cdaq Run 68149: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149254 01/22/08 15:49 cdaq End of Run 68148:
149253 01/22/08 15:35 Bosted Target snapshots
149252 01/22/08 15:26 cdaq Run 68148: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149251 01/22/08 15:15 cdaq Run 68147: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149250 01/22/08 14:45 W. Luo restored HV for (29,29)
149249 01/22/08 14:28 cdaq End of Run 68146:
149248 01/22/08 14:09 puckett Channel 29,29 after fixing pedestal analysis
149247 01/22/08 14:07 cdaq Run 68146: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149246 01/22/08 14:03 cdaq End of Run 68145:
149245 01/22/08 13:51 puckett pedestal shift problem for 29, 29
149244 01/22/08 13:49 cdaq Run 68145: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149243 01/22/08 13:43 cdaq End of Run 68144:
149242 01/22/08 13:08 W. Luo (29,29) still very noisy
149241 01/22/08 13:01 W. Luo Stop run 68143, decrease HV on BigCal (29,29) to 1200V
149240 01/22/08 13:00 Jonathan Mil bpm/bcm screenshot
149239 01/22/08 12:59 cdaq Run 68144: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149238 01/22/08 12:58 cdaq End of Run 68143:
149237 01/22/08 12:15 cdaq Run 68143: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149236 01/22/08 12:14 cdaq End of Run 68142:
149235 01/22/08 11:32 cdaq Run 68142: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149234 01/22/08 11:29 cdaq End of Run 68141:
149233 01/22/08 10:42 cdaq Run 68141: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149232 01/22/08 10:39 cdaq End of Run 68140:
149231 01/22/08 10:39 cdaq Run 68140: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149230 01/22/08 10:35 cdaq End of Run 68139:
149229 01/22/08 10:35 cdaq Run 68139: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149228 01/22/08 10:31 cdaq End of Run 68138:
149227 01/22/08 10:03 cdaq Run 68138: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149226 01/22/08 09:20 cdaq Beam Time Accounting
149225 01/22/08 09:18 Bosted Target: Target problems
149224 01/22/08 08:47 cdaq End of Run 68137:
149223 01/22/08 08:35 cdaq Run 68137: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149222 01/22/08 08:34 cdaq End of Run 68136:
149221 01/22/08 08:09 Hovhannes Alcohol bubbling
149220 01/22/08 08:01 J Mulholland Target: High Power Heater Problem
149219 01/22/08 07:48 cdaq Run 68136: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149218 01/22/08 07:46 J Mulholland Target: IOC Reboot
149217 01/22/08 07:41 Hovhannes Alcohol in Gas-Shed
149216 01/22/08 07:41 cdaq End of Run 68135:
149215 01/22/08 07:37 ccbutu Target IOC crashed!
149214 01/22/08 07:37 cdaq Run 68135: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149213 01/22/08 07:32 J Mulholland Target: IOC Reboot
149212 01/22/08 07:28 J Mulholland Target: more transients
149211 01/22/08 07:27 cdaq End of Run 68134:
149210 01/22/08 07:19 J Mulholland Target: Transient Alarms
149209 01/22/08 07:09 cdaq Run 68134: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149208 01/22/08 07:08 cdaq End of Run 68133:
149207 01/22/08 06:32 ccbutu ROC 13 & ROC 14 tripped!
149206 01/22/08 06:28 cdaq Run 68133: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149205 01/22/08 06:19 cdaq End of Run 68132:
149204 01/22/08 05:57 J Mulholland Target: Heater Power Transient Alarm
149203 01/22/08 05:21 cdaq Run 68132: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149202 01/22/08 05:20 cdaq End of Run 68131:
149201 01/22/08 04:37 cdaq Run 68131: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149200 01/22/08 04:36 cdaq End of Run 68130:
149199 01/22/08 03:52 cdaq Run 68130: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149198 01/22/08 03:51 cdaq End of Run 68129:
149197 01/22/08 03:40 J Mulholland Target: transient heater power alarm
149196 01/22/08 03:05 cdaq Run 68129: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149195 01/22/08 02:27 cdaq End of Run 68128:
149194 01/22/08 02:24 cdaq Run 68128: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149193 01/22/08 02:13 cdaq End of Run 68127:
149192 01/22/08 01:40 cdaq Beam Time Accounting
149191 01/22/08 01:23 cdaq Run 68127: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149190 01/22/08 01:18 cdaq End of Run 68125:
149189 01/22/08 00:37 cdaq Run 68125: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149188 01/22/08 00:36 cdaq End of Run 68124:
149187 01/22/08 00:35 cdaq Run 68124: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149186 01/22/08 00:23 cdaq End of Run 68122:
149185 01/22/08 00:19 cdaq Run 68122: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149184 01/22/08 00:18 cdaq End of Run 68121:
149183 01/22/08 00:17 cdaq Run 68121: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149182 01/22/08 00:09 cdaq End of Run 68120:
149181 01/22/08 00:03 J Mulholland Target: screenshot owl shift
149180 01/22/08 00:01 cdaq Run 68120: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
Monday
149179 01/21/08 23:50 Margaziotis Target: IOC reboot
149178 01/21/08 23:41 puckett reboot hall c switch
149177 01/21/08 23:26 Ramesh ROC 13/14 froze, web power cycling problem too
149176 01/21/08 23:20 cdaq End of Run 68119:
149175 01/21/08 23:04 cdaq Run 68119: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149174 01/21/08 22:53 cdaq End of Run 68118:
149173 01/21/08 22:31 Ramesh Beam will be away for 10 min
149172 01/21/08 21:53 cdaq Run 68118: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149171 01/21/08 21:52 cdaq End of Run 68117:
149170 01/21/08 21:09 Ramesh Q1 com. err. fixed
149169 01/21/08 21:06 Ramesh ROC 1 error
149168 01/21/08 21:04 cdaq Run 68117: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149167 01/21/08 20:55 cdaq End of Run 68115:
149166 01/21/08 20:44 Ramesh Q1 communication error
149165 01/21/08 20:40 cdaq Run 68115: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149164 01/21/08 20:36 Ramesh Q1 tripped
149163 01/21/08 20:29 cdaq End of Run 68114:
149162 01/21/08 20:16 HcF switched ON full argon bottle
149161 01/21/08 20:00 cdaq Run 68114: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149160 01/21/08 19:59 cdaq End of Run 68113:
149159 01/21/08 19:32 Ramesh No alcohol bubbling, no FPP/HMS gas
149157 01/21/08 19:18 cdaq Run 68113: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149156 01/21/08 19:17 cdaq End of Run 68112:
149155 01/21/08 18:45 Margaziotis Target: Red alarm-Transient
149154 01/21/08 18:41 Ramesh No problem from the data analysis
149153 01/21/08 18:40 Margaziotis Target screen shot
149152 01/21/08 18:36 Margaziotis Target: IOC reboot
149151 01/21/08 18:31 cdaq Run 68112: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149150 01/21/08 18:23 Ramesh Rebooted all ROCs and TS
149149 01/21/08 18:19 cdaq End of Run 68111:
149148 01/21/08 18:12 cdaq Run 68111: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149147 01/21/08 18:07 cdaq End of Run 68110:
149146 01/21/08 17:36 cdaq Run 68110: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149145 01/21/08 17:30 cdaq End of Run 68109:
149144 01/21/08 17:19 Ramesh ROC 13/14 info (problematic??)
149143 01/21/08 16:31 cdaq Run 68109: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149142 01/21/08 16:27 cdaq Run 68108: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149141 01/21/08 16:21 cdaq End of Run 68106:
149140 01/21/08 16:20 cdaq Run 68106: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149139 01/21/08 16:18 cdaq End of Run 68105:
149138 01/21/08 16:04 Abdellah Swing shift summary
149137 01/21/08 16:03 cdaq Beam Time Accounting
149136 01/21/08 16:01 puckett temporary Analyzer code change--set ADC threshold for BigCal rows 29 and 30 to 10 channels
149135 01/21/08 15:34 Abdellah ROC13 power cycled again
149134 01/21/08 15:34 cdaq Run 68105: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149133 01/21/08 15:30 cdaq End of Run 68104:
149132 01/21/08 15:29 cdaq Run 68104: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149131 01/21/08 15:25 cdaq End of Run 68103:
149130 01/21/08 15:13 cdaq Run 68103: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149129 01/21/08 15:12 cdaq End of Run 68102:
149128 01/21/08 14:53 puckett BigCal rows 29,30--shift workers please read
149127 01/21/08 14:29 cdaq Run 68102: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149126 01/21/08 14:28 cdaq End of Run 68101:
149125 01/21/08 14:08 dhamilton Routine BCM and BPM screenshots
149124 01/21/08 13:46 cdaq Run 68101: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149123 01/21/08 13:45 cdaq End of Run 68100:
149122 01/21/08 13:04 cdaq Run 68100: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149121 01/21/08 13:02 cdaq End of Run 68099:
149120 01/21/08 12:34 puckett pedestals for run 68098
149119 01/21/08 12:22 W. Luo Roc13 crashed the run
149118 01/21/08 12:21 abdellah ROC 13 power cycled
149117 01/21/08 12:21 Run 68098, BigCal row 29, 30 cluster finding ok
149116 01/21/08 12:20 puckett bad pedestal examples:
149115 01/21/08 12:20 cdaq Run 68099: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149114 01/21/08 12:04 cdaq End of Run 68098:
149113 01/21/08 11:56 cdaq Run 68098: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149112 01/21/08 11:50 gaskell/horn Moller backout
149111 01/21/08 11:49 E. Frlez target: out for Moller
149110 01/21/08 11:48 horn/gaskell Moller summary
149109 01/21/08 11:38 puckett more on rows 29,30
149108 01/21/08 11:32 cdaq End of Run 68097:
149107 01/21/08 11:30 puckett updated BigCal ADC thresholds from replay of run 68088
149106 01/21/08 11:30 cdaq Moller Run 68097: IHWP=OUT
149105 01/21/08 11:29 cdaq End of Run 68096:
149104 01/21/08 11:28 cdaq Moller Run 68096: IHWP=OUT
149103 01/21/08 11:27 cdaq End of Run 68095:
149102 01/21/08 11:25 cdaq Moller Run 68095: IHWP=OUT
149101 01/21/08 11:24 cdaq End of Run 68094:
149100 01/21/08 11:22 cdaq Moller Run 68094: IHWP=OUT
149099 01/21/08 11:22 cdaq End of Run 68093:
149098 01/21/08 11:18 cdaq Moller Run 68093: IHWP=OUT
149097 01/21/08 11:18 cdaq End of Run 68092:
149096 01/21/08 11:16 cdaq Moller Run 68092: IHWP=OUT
149095 01/21/08 11:16 cdaq End of Run 68091:
149094 01/21/08 11:13 cdaq Moller Run 68091: IHWP=OUT
149093 01/21/08 11:12 cdaq End of Run 68090:
149092 01/21/08 11:12 cdaq Moller Run 68090: IHWP=OUT, tune test
149091 01/21/08 10:25 W. Luo Run 68088, BigCal row 29,30 problem
149090 01/21/08 10:08 cdaq End of Run 68089:
149089 01/21/08 10:07 cdaq Moller Run 68089: DAQ test
149088 01/21/08 10:04 cdaq End of Run 68088:
149087 01/21/08 09:46 cdaq Run 68088: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149086 01/21/08 09:44 cdaq End of Run 68087:
149085 01/21/08 09:30 E. Frlez target: Loop 1 temperature
149084 01/21/08 08:55 cdaq Run 68087: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149083 01/21/08 08:33 E. Frlez target: red alarm on hcHe_Supply_1_R
149082 01/21/08 08:31 E. Frlez target: screenshots
149081 01/21/08 08:14 cdaq Beam Time Accounting
149080 01/21/08 07:51 Huber Swing shift summary
149079 01/21/08 07:14 cdaq End of Run 68086:
149078 01/21/08 06:56 cdaq Run 68086: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149077 01/21/08 06:55 cdaq End of Run 68085:
149076 01/21/08 06:55 Huber Beam status
149075 01/21/08 06:15 Huber Run 68083 - ROC2
149074 01/21/08 06:11 cdaq Run 68085: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149073 01/21/08 06:07 cdaq Run 68084: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149072 01/21/08 05:38 mbianda IOC reboot
149071 01/21/08 05:36 cdaq Run 68083: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149070 01/21/08 05:27 cdaq End of Run 68082:
149069 01/21/08 05:14 Hovhannes Problem with GAS shed and Yard
149068 01/21/08 04:59 cdaq Run 68082: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149067 01/21/08 04:56 cdaq End of Run 68081:
149066 01/21/08 04:56 cdaq Run 68081: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149065 01/21/08 04:53 cdaq End of Run 68080:
149064 01/21/08 04:29 Huber FPP: Runs 68076-68078
149063 01/21/08 04:26 cdaq Run 68080: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149062 01/21/08 04:25 mbianda IOC reboot
149061 01/21/08 04:22 cdaq End of Run 68079:
149060 01/21/08 03:40 cdaq Run 68079: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149059 01/21/08 03:33 cdaq End of Run 68078:
149058 01/21/08 03:28 cdaq Run 68078: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149057 01/21/08 03:22 cdaq End of Run 68077:
149056 01/21/08 03:20 Huber High deadtime in Run 68076
149055 01/21/08 03:16 cdaq Run 68077: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149054 01/21/08 03:15 cdaq End of Run 68076:
149053 01/21/08 02:22 cdaq Run 68076: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149052 01/21/08 02:20 cdaq End of Run 68075:
149051 01/21/08 01:35 cdaq Run 68075: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149050 01/21/08 01:29 mbianda Target
149049 01/21/08 01:23 Huber Initial beam test
149048 01/21/08 00:35 mbianda Target
149047 01/21/08 00:03 cdaq Beam Time Accounting
Sunday
149046 01/20/08 23:49 Solvignon Radiation monitor update
149045 01/20/08 23:19 Solvignon Radiation monitor problem
149044 01/20/08 22:13 abdellah Target: Power reduced to 50 w
149043 01/20/08 21:57 Solvignon Beam update
149042 01/20/08 21:32 Ramesh Status update
149041 01/20/08 21:15 Ramesh No beam due to vacuum problem
149040 01/20/08 21:02 cdaq End of Run 68074:
149039 01/20/08 20:11 Ramesh Vacuum problem stotry still persists
149038 01/20/08 19:58 cdaq Run 68074: Kinematics 5: LH2 20 cm, 80 uA, ps5=1
149037 01/20/08 17:58 Ramesh Status update
149036 01/20/08 17:12 cdaq End of Run 68073:
149035 01/20/08 16:58 Ramesh Beam Status
149034 01/20/08 16:03 jensen bpm and bcm
149033 01/20/08 16:01 cdaq Beam Time Accounting
149032 01/20/08 16:00 cdaq Run 68073: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
149031 01/20/08 15:59 hamlet Day Shift Summary, 20 January 2008
149030 01/20/08 15:39 hamlet Going Back to Beam Permit
149029 01/20/08 15:39 Solvignon Target vacuum value with new controller
149028 01/20/08 15:22 hamlet Again Controlled Access. Scattering Chamber vacuum
149027 01/20/08 14:58 A. Shahinyan Target move
149026 01/20/08 14:41 cdaq End of Run 68072:
149025 01/20/08 14:40 cdaq Run 68072: DAQ test
149024 01/20/08 14:27 jensen Ethane tank
149023 01/20/08 14:20 hamlet Hall C at Beam Permit
149022 01/20/08 14:13 Fowler HMS Dipole JT5
149021 01/20/08 14:00 smithg Target: Vacuum issue: status & summary
149020 01/20/08 13:19 hamlet HMS Dipole
149019 01/20/08 12:54 hamlet HMS valve JT5 stuck again, now at 24.3%
149018 01/20/08 12:52 A.Shahinyan Target status
149017 01/20/08 12:51 hamlet HMS Dipole tripped OFF, He level below 16%
149016 01/20/08 11:27 A. Shahinyan Target High Power Heater status
149015 01/20/08 11:19 hamlet JT5 valve problem fixed. HMS dipole ON.
149014 01/20/08 11:13 Fowler HMS Dipole JT5
149013 01/20/08 10:42 hamlet HMS Dipole OFF.
149012 01/20/08 10:16 hamlet Experts working to fix problems
149011 01/20/08 09:05 Solvignon Dipole He overflow update
149010 01/20/08 09:02 Solvignon Beam/vacuum situation
149009 01/20/08 08:29 cdaq Beam Time Accounting
149008 01/20/08 07:31 Huber Vacuum valve update
149007 01/20/08 07:02 Huber HMS dipole communication errors
149006 01/20/08 07:01 Huber Hall access
149005 01/20/08 05:44 Solvignon Vacuum issue in the beamline
149004 01/20/08 04:45 Huber Beam update
149003 01/20/08 04:24 mbianda Target: Target moved.
149002 01/20/08 04:14 Huber Try to increase beam current
149001 01/20/08 04:09 cdaq End of Run 68071:
149000 01/20/08 02:20 Huber Beam status update
148999 01/20/08 02:06 cdaq Run 68071: Kinematics 5: LH2 20 cm, 25uA, ps4 = 99999, ps5=1
148998 01/20/08 02:04 cdaq End of Run 68070:
148997 01/20/08 00:29 cdaq Run 68070: Kinematics 5: LH2 20 cm, 50 uA, ps4 = 99999, ps5=1
148996 01/20/08 00:27 cdaq End of Run 68069:
148995 01/20/08 00:16 Huber HMS Dipole JT5 status
148994 01/20/08 00:10 Abdellah Swing shift summary
148993 01/20/08 00:06 cdaq Beam Time Accounting
Saturday
148992 01/19/08 23:52 Abdellah Called for controlled access
148991 01/19/08 23:42 Ramesh Empty histo (run 68069)
148990 01/19/08 22:40 abdellah Dipole He Overflow, cont'd
148989 01/19/08 22:34 cdaq Run 68069: Kinematics 5: LH2 20 cm, 40 uA, ps4 = 99999, ps5=1
148988 01/19/08 22:08 Abdellah Dipole He overflow
148987 01/19/08 22:07 Ramesh ROC 13/14 power cycled from the web
148986 01/19/08 21:54 cdaq End of Run 68067:
148985 01/19/08 21:54 cdaq Run 68067: Kinematics 5: LH2 20 cm, 40 uA, ps4 = 99999, ps5=1
148984 01/19/08 21:41 cdaq End of Run 68065:
148983 01/19/08 21:30 Ye IOC Rebooted
148982 01/19/08 21:26 Ye IOC Reboot 09:20
148981 01/19/08 21:25 cdaq Run 68065: Kinematics 5: LH2 20 cm, 40 uA, ps4 = 99999, ps5=1
148980 01/19/08 21:24 cdaq End of Run 68064:
148979 01/19/08 20:39 Ramesh Empty ethane cylinder in the gas shade
148978 01/19/08 20:16 cdaq Run 68064: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148977 01/19/08 20:14 cdaq End of Run 68063:
148976 01/19/08 19:48 Ramesh BPM/BCM
148975 01/19/08 18:53 cdaq Run 68063: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148974 01/19/08 18:50 cdaq End of Run 68062:
148973 01/19/08 18:03 abdellah MCC and beam trips/current
148972 01/19/08 17:43 cdaq Run 68062: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148971 01/19/08 17:41 cdaq End of Run 68061:
148970 01/19/08 17:25 W. Luo Modify one typo in /replay/TEMPLATE/gstats.template
148969 01/19/08 17:17 Danagoulian Shift summary
148968 01/19/08 16:49 cdaq Beam Time Accounting
148967 01/19/08 15:40 cdaq Run 68061: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148966 01/19/08 15:13 jensen BPM and BCM
148965 01/19/08 13:30 Danagoulian Hall C vacuum problem
148964 01/19/08 13:28 L.Pentchev changed BigCal thresholds from 166/153 to 150/138 mV
148963 01/19/08 12:32 cdaq End of Run 68060:
148962 01/19/08 12:25 cdaq Run 68060: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148961 01/19/08 12:04 gaskell water in the beamline alcove
148960 01/19/08 11:38 smithg Target: repairs completed
148959 01/19/08 11:11 smithg Target: repairs in progress
148958 01/19/08 10:29 Danagoulian Vacuum problem
148957 01/19/08 09:40 smithg Target: repair plan
148956 01/19/08 09:01 Danagoulian Vacuum problem at target region?
148955 01/19/08 08:36 cdaq End of Run 68059:
148954 01/19/08 08:14 cdaq Run 68059: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148953 01/19/08 08:11 cdaq Beam Time Accounting
148952 01/19/08 08:08 puckett shift summary part 2...
148951 01/19/08 08:07 cdaq End of Run 68058:
148950 01/19/08 08:02 Phil Carter target screen shot
148949 01/19/08 08:00 cdaq Run 68058: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148948 01/19/08 08:00 puckett beam trips on vacuum faults...
148947 01/19/08 07:56 cdaq End of Run 68057:
148946 01/19/08 07:53 cdaq Run 68057: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148945 01/19/08 07:49 cdaq End of Run 68056:
148944 01/19/08 07:48 cdaq Run 68056: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148943 01/19/08 07:47 cdaq End of Run 68055:
148942 01/19/08 07:32 cdaq Run 68055: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148941 01/19/08 06:20 puckett shit summary
148940 01/19/08 06:08 Phil Carter target woes
148939 01/19/08 04:30 cdaq End of Run 68054:
148938 01/19/08 04:20 puckett HMS dipole recovered, going back to beam permit
148937 01/19/08 04:18 cdaq Run 68054: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148936 01/19/08 02:47 puckett Cannot do anything with HMS dipole PSU.
148935 01/19/08 02:44 puckett still waiting for help with dipole. Beam off.
148934 01/19/08 02:37 puckett Beam is off while magnet not working. No point in running.
148933 01/19/08 01:58 puckett HMS dipole is fubar---Got in touch with Steve L
148932 01/19/08 01:55 Phil Carter Target: IOC reboot; disabling one alarm
148931 01/19/08 01:52 cdaq End of Run 68053:
148930 01/19/08 01:43 cdaq Run 68053: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148929 01/19/08 00:52 puckett Run 68051 is junk
148928 01/19/08 00:52 cdaq End of Run 68052:
148927 01/19/08 00:46 cdaq Run 68052: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148926 01/19/08 00:40 cdaq End of Run 68051:
148925 01/19/08 00:34 puckett changed ps4 to 99999
148924 01/19/08 00:31 cdaq Run 68051: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148923 01/19/08 00:29 cdaq End of Run 68050:
148922 01/19/08 00:28 cdaq Run 68050: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148921 01/19/08 00:27 cdaq End of Run 68049:
148920 01/19/08 00:05 Donal Shift Report
148919 01/19/08 00:03 cdaq Beam Time Accounting
Friday
148918 01/18/08 23:45 cdaq Run 68049: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148917 01/18/08 23:36 Abdellah Traget screen snapshot
148916 01/18/08 23:28 Ramesh "HMS dipole interlocks" problem again
148915 01/18/08 23:22 cdaq End of Run 68048:
148914 01/18/08 22:52 cdaq Run 68048: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148913 01/18/08 22:40 Ramesh "HMS dipole interlocks" problem very frequently
148912 01/18/08 22:31 cdaq End of Run 68047:
148911 01/18/08 22:21 Ramesh hms dipole came back
148910 01/18/08 22:17 cdaq Run 68047: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148909 01/18/08 22:06 Ramesh HMS dipole power supply interlock problem
148908 01/18/08 22:02 cdaq End of Run 68046:
148907 01/18/08 21:27 abdellah Target: lost connection then came back
148906 01/18/08 21:24 cdaq Run 68046: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148905 01/18/08 21:18 cdaq End of Run 68045:
148904 01/18/08 20:57 Ramesh BPM/BCM
148903 01/18/08 20:37 cdaq Run 68045: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148902 01/18/08 20:32 Ramesh lost HMS dipole
148901 01/18/08 20:21 cdaq End of Run 68044:
148900 01/18/08 20:17 cdaq Run 68044: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148899 01/18/08 20:16 cdaq End of Run 68043:
148898 01/18/08 19:32 cdaq Run 68043: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148897 01/18/08 19:31 Ramesh hctsv12:2004 tripping
148896 01/18/08 19:24 cdaq End of Run 68042:
148895 01/18/08 19:06 cdaq Run 68042: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148894 01/18/08 19:05 cdaq End of Run 68041:
148893 01/18/08 18:24 cdaq Run 68041: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148892 01/18/08 18:23 cdaq End of Run 68040:
148891 01/18/08 17:51 Ramesh Dipole is back, taking data
148890 01/18/08 17:39 cdaq Run 68040: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148889 01/18/08 17:33 Ramesh lost HMS dipole, coming back
148888 01/18/08 17:17 cdaq End of Run 68039:
148887 01/18/08 16:52 cdaq Run 68039: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148886 01/18/08 16:51 cdaq End of Run 68038:
148885 01/18/08 16:34 L.Pentchev BigCal thresholds changed before run 68038 to 166/153 mV
148884 01/18/08 16:10 cdaq Run 68038: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148883 01/18/08 16:08 Lassiter Dipole PSU commication error
148882 01/18/08 16:03 cdaq Beam Time Accounting
148881 01/18/08 15:59 jensen Power cycled the power supply
148880 01/18/08 15:56 Shabestari Target screens
148879 01/18/08 15:52 jensen Day shift summary
148878 01/18/08 15:44 jensen Dipole power supply communication error
148877 01/18/08 15:29 Danagoulian online replay
148876 01/18/08 15:19 Danagoulian BPM-BCM screen snapshot
148875 01/18/08 15:12 cdaq End of Run 68037:
148874 01/18/08 14:42 cdaq Run 68037: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148873 01/18/08 14:36 cdaq End of Run 68036:
148872 01/18/08 14:02 jensen ROC13 crash
148871 01/18/08 13:57 cdaq Run 68036: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148870 01/18/08 13:53 cdaq Run 68035: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148869 01/18/08 13:52 Shabestari Target screens
148868 01/18/08 13:49 cdaq Run 68034: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148867 01/18/08 13:38 Shabestari Target: Problem with "hcHe_supply" thermometer
148866 01/18/08 13:22 jensen Roc13 crash
148865 01/18/08 13:14 cdaq Run 68033: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148864 01/18/08 12:55 cdaq Run 68031: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148863 01/18/08 12:07 cdaq Run 68030: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148862 01/18/08 11:53
148861 01/18/08 11:24 cdaq End of Run 68029:
148860 01/18/08 10:58 Shabestari Target: IOC reboot
148859 01/18/08 10:57 eric jensen beam current monitor
148858 01/18/08 10:48 cdaq Run 68029: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148857 01/18/08 10:26 cdaq End of Run 68028:
148856 01/18/08 09:46 gaskell Polarization 0.3% larger!
148855 01/18/08 09:45 cdaq Run 68028: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148854 01/18/08 09:26 cdaq End of Run 68027:
148853 01/18/08 09:26 cdaq Run 68027: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148852 01/18/08 09:23 eric jensen dipole trip
148851 01/18/08 09:19 cdaq End of Run 68026:
148850 01/18/08 09:09 cdaq Run 68026: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148849 01/18/08 09:07 cdaq End of Run 68025:
148848 01/18/08 09:06 cdaq Run 68025: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148847 01/18/08 09:06 cdaq End of Run 68024:
148846 01/18/08 08:19 W. Luo Load new HV before run:68010
148845 01/18/08 08:15 cdaq Run 68024: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148844 01/18/08 08:13 cdaq End of Run 68023:
148843 01/18/08 08:05 cdaq Beam Time Accounting
148842 01/18/08 07:59 puckett Owl shift summary
148841 01/18/08 07:21 cdaq Run 68023: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148840 01/18/08 07:20 cdaq End of Run 68022:
148839 01/18/08 06:29 cdaq Run 68022: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148838 01/18/08 06:20 cdaq End of Run 68021:
148837 01/18/08 05:56 cdaq Run 68021: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148836 01/18/08 05:32 puckett trigger rates higher near top left of BigCal
148835 01/18/08 05:12 cdaq Run 68020: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148834 01/18/08 05:06 puckett run 68018 ended on ROC14 crash... power cycled both crates
148833 01/18/08 05:03 cdaq Run 68019: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148832 01/18/08 04:32 cdaq Run 68018: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148831 01/18/08 04:31 cdaq End of Run 68017:
148830 01/18/08 03:39 cdaq Run 68017: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148829 01/18/08 03:38 cdaq End of Run 68016:
148828 01/18/08 03:25 Phil Carter target screen shot
148827 01/18/08 03:17 puckett Runs 68014, 68015 are JUNK
148826 01/18/08 03:02 puckett ROC14 failure, lost time
148825 01/18/08 02:49 cdaq Run 68016: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148824 01/18/08 02:38 cdaq End of Run 68015:
148823 01/18/08 02:37 cdaq Run 68015: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148822 01/18/08 02:31 cdaq End of Run 68014:
148821 01/18/08 02:18 cdaq Run 68014: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148820 01/18/08 02:17 cdaq End of Run 68013:
148819 01/18/08 01:22 L.Pentchev no route to gepslo1, can't change thresholds
148818 01/18/08 01:18 cdaq Run 68013: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148817 01/18/08 01:16 cdaq End of Run 68012:
148816 01/18/08 01:02 puckett for the time being, running without Hall C fast feedback for beam energy
148815 01/18/08 00:54 cdaq Run 68012: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148814 01/18/08 00:37 puckett removed ntuples from online replay
148813 01/18/08 00:36 puckett MCC called--RF problem, expect 15-20 minutes delay
148812 01/18/08 00:34 cdaq End of Run 68011:
148811 01/18/08 00:27 cdaq Run 68011: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148810 01/18/08 00:03 cdaq Beam Time Accounting
148809 01/18/08 00:02 cdaq End of Run 68010:
148808 01/18/08 00:01 Donal Shift Summary
Thursday
148807 01/17/08 23:46 cdaq Run 68010: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148806 01/17/08 23:38 cdaq End of Run 68009:
148805 01/17/08 23:37 cdaq Run 68009: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148804 01/17/08 23:20 M.M FPP: Analysers IN!!!!
148803 01/17/08 23:00 cdaq End of Run 68008:
148802 01/17/08 22:52 M.M Run 68008 is the straight through run!
148801 01/17/08 22:36 cdaq Run 68008: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148800 01/17/08 22:22 M.M FPP Analyser open!!!
148799 01/17/08 21:58 cdaq End of Run 68007:
148798 01/17/08 21:58 cdaq Run 68007: junk
148797 01/17/08 21:55 cdaq End of Run 68006:
148796 01/17/08 21:36 W. Luo 1st step calibration result for kinematics 5
148795 01/17/08 21:10 W. Luo BigCal Stopped run:68005, increased threshold again. 0, 1: 185; 2,3: 170
148794 01/17/08 21:05 cdaq Run 68006: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148793 01/17/08 21:03 W. Luo Stopped run:68004 for high dead time, increased BigCal threshold by 15mv, 0,1: 168mv; 2,3: 155mv
148792 01/17/08 21:03 cdaq End of Run 68005:
148791 01/17/08 21:02 cdaq Run 68005: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148790 01/17/08 20:59 cdaq End of Run 68004:
148789 01/17/08 20:46 Donal Dipole lNMR lost communication
148788 01/17/08 20:44 gaskell/horn Moller backout
148787 01/17/08 20:43 cdaq Run 68004: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148786 01/17/08 20:15 W. Luo Increased BigCal threshold by 15% due to the new HV increased
148785 01/17/08 20:13 mbianda Target: Target moved from empty to 20 cm LH2 to.
148784 01/17/08 20:10 horn/gaskell Moller Summary
148783 01/17/08 20:02 cdaq End of Run 68003:
148782 01/17/08 20:01 cdaq Moller Run 68003: IHWP=OUT
148781 01/17/08 20:00 cdaq End of Run 68002:
148780 01/17/08 19:58 cdaq Moller Run 68002: IHWP=OUT
148779 01/17/08 19:58 cdaq End of Run 68001:
148778 01/17/08 19:56 W. Luo Load new HV for BigCal
148777 01/17/08 19:55 gaskell/horn Moller tuned
148776 01/17/08 19:55 cdaq Moller Run 68001: IHWP=OUT
148775 01/17/08 19:54 cdaq End of Run 68000:
148774 01/17/08 19:52 cdaq Moller Run 68000: IHWP=OUT
148773 01/17/08 19:52 cdaq End of Run 67999:
148772 01/17/08 19:50 cdaq Moller Run 67999: IHWP=OUT
148771 01/17/08 19:23 cdaq End of Run 67998:
148770 01/17/08 19:22 cdaq Moller Run 67998: Moller tune test
148769 01/17/08 19:19 cdaq End of Run 67997:
148768 01/17/08 19:19 cdaq Moller Run 67997: Moller tune test
148767 01/17/08 18:13 cdaq End of Run 67996:
148766 01/17/08 18:13 cdaq Moller Run 67996: DAQ test
148765 01/17/08 18:12 cdaq End of Run 67995:
148764 01/17/08 18:11 M Jones Lowered BIGCAL thresholds to 133 and 122 to reflected drop in gain
148763 01/17/08 18:11 cdaq Moller Run 67995: DAQ test
148762 01/17/08 18:10 Donal Status
148761 01/17/08 18:05 gaskell Moller Q1 problems
148760 01/17/08 17:56 mbianda Target: Target moved from 20 cm LH2 to empty.
148759 01/17/08 17:09 cdaq End of Run 67994:
148758 01/17/08 17:04 Ramesh Online replay GUI crash
148757 01/17/08 16:47
148756 01/17/08 16:46 cdaq Run 67994: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148755 01/17/08 16:42 Donal Beam off
148754 01/17/08 16:37 cdaq End of Run 67993:
148753 01/17/08 16:16 cdaq Beam Time Accounting
148752 01/17/08 16:15 cdaq Run 67993: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148751 01/17/08 16:04 Danagoulian Shift summary
148750 01/17/08 16:01 smithg Target: fan running a little hotter
148749 01/17/08 15:59 cdaq End of Run 67992:
148748 01/17/08 15:50 Danagoulian BPM screen
148746 01/17/08 15:45 cdaq Run 67992: Kinematics 5: LH2 20 cm, 80 uA, ps4 = 100, ps5=1
148745 01/17/08 15:39 cdaq End of Run 67991:
148744 01/17/08 15:21 Bosted Target: Target Fan problems
148743 01/17/08 15:13 cdaq Run 67991: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148742 01/17/08 13:57 Danagoulian Beam status
148741 01/17/08 13:11 Bosted Target: Target moved from MT to 20 cm LH2
148740 01/17/08 12:02 cdaq End of Run 67990:
148739 01/17/08 11:54 W. Luo Update BigCal angle and distance at this kinematics in KINEMATICS.db
148738 01/17/08 11:52 yprok beam coming back
148737 01/17/08 11:15 Danagoulian Cryo flow glitch
148736 01/17/08 08:02 Phil Carter Owl shift summary
148735 01/17/08 06:28 Phil Carter Dipole communication error
148734 01/17/08 00:17 puckett owl TO is here
Wednesday
148733 01/16/08 22:23 puckett Watching target until owl shift
148732 01/16/08 22:00 smithg Hall is in controlled access
148731 01/16/08 20:51 smithg Target: missing target operator
148730 01/16/08 19:15 smithg Target: Cooldown finished
148729 01/16/08 17:57 smithg Target: On cold return now.
148728 01/16/08 17:31 smithg Target: turbo controller replaced. Vacuum reading bad.
148727 01/16/08 17:02 puckett HMS cosmic run looks OK
148726 01/16/08 16:56 smithg Target: turbo controller sick
148725 01/16/08 16:03 smithg Target: began opening JT
148724 01/16/08 13:50 smithg Target: preparing to start cooldown
148723 01/16/08 13:36 puckett Updated BigCal ADC thresholds--lowered "nsparse" to 7 channels
148722 01/16/08 12:37 M Jones Moved HMS to 14.495 deg
148721 01/16/08 12:21 cdaq Run 67990: cosmic run
148720 01/16/08 12:21 L.Pentchev reading the BigCal thresholds
148719 01/16/08 12:20 cdaq End of Run 67989:
148718 01/16/08 12:17 L.Pentchev BigCal thresholds set to 191/175mV for (0,1)/(2,3) discriminators
148717 01/16/08 12:03 gaskell ESR back up - Moller recovered
148716 01/16/08 12:02 L.Pentchev BigCal ADC gate changed from 250ns to 170ns
148715 01/16/08 11:59 cdaq Run 67989: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148714 01/16/08 11:56 M Jones Changed HMS trigger delay
148713 01/16/08 10:38 gaskell ESR crash - no flow to Hall C
Tuesday
148712 01/15/08 13:25 M Jones Free space in ntup_all directory
148711 01/15/08 12:04 hcf GasMaster Calibration
148710 01/15/08 11:49 saw Freeing some space
148709 01/15/08 09:27 puckett I wonder if we need to delete some ntuples?
148708 01/15/08 08:49 W. Luo Disk space run out on /net/cdaqfs/scratch
148707 01/15/08 08:36 cdaq End of Run 67988:
148706 01/15/08 08:34 cdaq Run 67988: led test
Monday
148705 01/14/08 17:01 W. Luo LED test result
148704 01/14/08 16:14 cdaq End of Run 67987:
148703 01/14/08 16:12 cdaq Run 67987: led test
148702 01/14/08 15:54 cdaq End of Run 67986:
148701 01/14/08 15:39 cdaq Run 67986: led test
148700 01/14/08 15:36 cdaq End of Run 67985:
148699 01/14/08 15:33 cdaq Run 67985: led test
148698 01/14/08 12:03 W. Luo Turn off HV of BigCal, including booster
148697 01/14/08 11:47 cdaq End of Run 67984:
148696 01/14/08 11:34 M Jones Rebooted ROC2 (sfihms)
148695 01/14/08 11:32 cdaq Run 67984: led test
148694 01/14/08 11:29 cdaq Run 67983: led test
148693 01/14/08 11:04 W. Luo Failed to start a LED run
148692 01/14/08 10:59 cdaq Run 67982: JUNK
148691 01/14/08 10:56 cdaq Run 67981: JUNK
148690 01/14/08 10:52 cdaq Run 67980: Junk
148689 01/14/08 10:48 cdaq Run 67979: junk
148688 01/14/08 10:44 cdaq Run 67978: junk
Saturday
148687 01/12/08 16:14 M.M Gas Check
148686 01/12/08 16:14 M.M Gas Check
Friday
148685 01/11/08 10:14 Perdrisat all HMS magnet ramped to 0
148684 01/11/08 08:20 dhamilton Owl Shift Summary
148683 01/11/08 08:18 cdaq Beam Time Accounting
148682 01/11/08 06:54 cdaq Run 67977: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148681 01/11/08 06:53 cdaq End of Run 67976:
148680 01/11/08 06:04 horn Moller summary
148679 01/11/08 06:01 cdaq Run 67976: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148678 01/11/08 05:56 horn Moller done
148677 01/11/08 05:39 cdaq End of Run 67975:
148676 01/11/08 05:34 cdaq Moller Run 67975: IHWP=OUT
148675 01/11/08 05:34 cdaq End of Run 67974:
148674 01/11/08 05:29 cdaq Moller Run 67974: IHWP=OUT
148673 01/11/08 05:28 cdaq End of Run 67973:
148672 01/11/08 05:23 cdaq Moller Run 67973: IHWP=OUT
148671 01/11/08 05:23 cdaq End of Run 67972:
148670 01/11/08 05:17 cdaq Moller Run 67972: IHWP=OUT
148669 01/11/08 05:17 cdaq End of Run 67971:
148668 01/11/08 05:10 cdaq Moller Run 67971: IHWP=OUT
148667 01/11/08 05:10 cdaq End of Run 67970:
148666 01/11/08 05:03 cdaq Moller Run 67970: IHWP=OUT
148665 01/11/08 05:03 cdaq End of Run 67969:
148664 01/11/08 04:57 cdaq Moller Run 67969: IHWP=OUT
148663 01/11/08 04:57 cdaq End of Run 67968:
148662 01/11/08 04:55 cdaq Moller Run 67968: IHWP=OUT
148661 01/11/08 04:32 cdaq End of Run 67967:
148660 01/11/08 04:31 cdaq Moller Run 67967: DAQ test
148659 01/11/08 04:30 cdaq End of Run 67966:
148658 01/11/08 04:29 cdaq Moller Run 67966: DAQ test
148657 01/11/08 04:21 cdaq End of Run 67965:
148656 01/11/08 04:21 cdaq Run 67965: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148655 01/11/08 04:19 cdaq End of Run 67964:
148654 01/11/08 03:33 eip fpp chambers
148653 01/11/08 03:19 cdaq Run 67964: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148652 01/11/08 03:18 cdaq End of Run 67963:
148651 01/11/08 03:00 eip chamber efficiencies
148650 01/11/08 02:25 cdaq Run 67963: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148649 01/11/08 02:24 cdaq End of Run 67962:
148648 01/11/08 01:30 cdaq Run 67962: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148647 01/11/08 01:29 cdaq End of Run 67961:
148646 01/11/08 00:34 cdaq Run 67961: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148645 01/11/08 00:33 cdaq End of Run 67960:
148644 01/11/08 00:02 cdaq Beam Time Accounting
Thursday
148643 01/10/08 23:59 jensen Swing shift summary
148642 01/10/08 23:42 cdaq Run 67960: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148641 01/10/08 23:40 cdaq End of Run 67959:
148640 01/10/08 22:52 jmaxwell Target: Screenshot
148639 01/10/08 22:50 cdaq Run 67959: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148638 01/10/08 22:48 cdaq End of Run 67958:
148637 01/10/08 22:11 jensen Max and cluster distributions
148636 01/10/08 21:57 cdaq Run 67958: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148635 01/10/08 21:56 cdaq End of Run 67957:
148634 01/10/08 21:54 W. Luo For these runs, max hit ok
148633 01/10/08 21:43 puckett Check "max" and "cluster" distribution for rows 29-30
148632 01/10/08 21:32 puckett BigCal hits distribution
148631 01/10/08 21:09 YaLi Strange hits on bigcal Stats 2
148630 01/10/08 21:02 cdaq Run 67957: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148629 01/10/08 21:00 cdaq End of Run 67956:
148628 01/10/08 20:43 cdaq Run 67956: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148627 01/10/08 20:42 cdaq End of Run 67955:
148626 01/10/08 19:52 puckett updated BigCal and HMS ADC thresholds from ped events for run 67954
148625 01/10/08 19:50 cdaq Run 67955: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148624 01/10/08 19:49 cdaq End of Run 67954:
148623 01/10/08 18:57 cdaq Run 67954: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148622 01/10/08 18:55 cdaq End of Run 67953:
148621 01/10/08 18:06 jmaxwell Target: Moved to 20cm LH2
148620 01/10/08 18:01 cdaq Run 67953: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148619 01/10/08 18:00 puckett explanation for BigCal pedestal/ADC hits shift
148618 01/10/08 17:50 cdaq End of Run 67952:
148617 01/10/08 17:45 puckett this happens any time beam is off during the ped. events
148616 01/10/08 17:23 jmaxwell Target: Move to 20cm Dummy
148615 01/10/08 17:21 cdaq Run 67952: Kinematics 7: 20 cm Al Dummy, 40 uA, ps4 = 1
148614 01/10/08 17:09 cdaq End of Run 67951:
148613 01/10/08 16:23 cdaq Beam Time Accounting
148612 01/10/08 16:18 cdaq Run 67951: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148611 01/10/08 16:16 cdaq End of Run 67950:
148610 01/10/08 16:02 X. Zheng day shift summary
148609 01/10/08 15:49 cdaq Run 67950: S0&S1&Bigcal trigger test, Kinematics 7: LH2 20 cm, 80 uA, ps4 = 99999, ps5=1
148608 01/10/08 15:47 cdaq End of Run 67949:
148607 01/10/08 14:54 cdaq Run 67949: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148606 01/10/08 14:50 cdaq Beam Time Accounting
148605 01/10/08 14:49 cdaq End of Run 67948:
148604 01/10/08 14:43 L.Pentchev bad pedestals/thrshollds is a possible explanation
148603 01/10/08 14:29 cdaq Run 67948: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148602 01/10/08 14:28 cdaq End of Run 67947:
148601 01/10/08 14:14 E. Frlez Bigcal: a problem?
148600 01/10/08 13:35 cdaq Run 67947: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148599 01/10/08 13:34 cdaq End of Run 67946:
148598 01/10/08 13:33 Bosted Target screen shots
148597 01/10/08 13:29 E. Frlez BPM /BCM screenshots
148596 01/10/08 12:42 cdaq Run 67946: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148595 01/10/08 12:41 cdaq End of Run 67945:
148594 01/10/08 11:53 X. Zheng ROC 13 power cycled
148593 01/10/08 11:51 cdaq Run 67945: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148592 01/10/08 11:36 puckett try rebooting hall C switch?
148591 01/10/08 11:33 Bosted Target: Target: rebooted IOC
148590 01/10/08 11:28 X. Zheng Need power cycle ROC13 but cannot connect to the weblink
148589 01/10/08 11:24 cdaq End of Run 67943:
148588 01/10/08 11:08 cdaq Run 67943: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148587 01/10/08 11:07 E. Frlez FPP Wire hit, run 67743
148586 01/10/08 10:49 cdaq End of Run 67942:
148585 01/10/08 09:59 cdaq Run 67942: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148584 01/10/08 09:58 cdaq End of Run 67941:
148583 01/10/08 09:07 cdaq Run 67941: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148582 01/10/08 08:07 cdaq Run 67940: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148581 01/10/08 08:06 cdaq End of Run 67939:
148580 01/10/08 08:00 Jonathan Mil Shift Summary
148579 01/10/08 07:21 Phil Carter target screen shot
148578 01/10/08 07:17 Phil Carter Target: rebooted target IOC at 4:30 am
148577 01/10/08 07:13 cdaq Run 67939: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148576 01/10/08 07:05 cdaq End of Run 67937:
148575 01/10/08 06:15 cdaq Run 67937: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148574 01/10/08 05:29 cdaq Run 67936: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148573 01/10/08 05:28 cdaq End of Run 67935:
148572 01/10/08 05:25 Jonathan Mil bcm/bpm
148571 01/10/08 04:41 cdaq Run 67935: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148570 01/10/08 04:25 cdaq End of Run 67934:
148569 01/10/08 04:09 cdaq Run 67934: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148568 01/10/08 04:04 cdaq End of Run 67933:
148567 01/10/08 03:44 yprok Spike in BigCal ADC hits
148566 01/10/08 03:12 cdaq Run 67933: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148565 01/10/08 03:11 cdaq End of Run 67932:
148564 01/10/08 02:53 cdaq Run 67932: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148563 01/10/08 02:49 cdaq End of Run 67931:
148562 01/10/08 02:46 cdaq Run 67931: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148561 01/10/08 02:42 cdaq End of Run 67930:
148560 01/10/08 02:21 cdaq Run 67930: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148559 01/10/08 02:20 cdaq End of Run 67929:
148558 01/10/08 01:25 cdaq Run 67929: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148557 01/10/08 01:19 cdaq End of Run 67928:
148556 01/10/08 01:09 Phil Carter New script to create log entries
148555 01/10/08 00:27 cdaq Run 67928: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148554 01/10/08 00:23 cdaq End of Run 67927:
148553 01/10/08 00:20 cdaq Run 67927: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148552 01/10/08 00:13 cdaq End of Run 67926:
148551 01/10/08 00:13 cdaq Run 67926: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148550 01/10/08 00:09 Jonathan Mil Problem with ROC13
148549 01/10/08 00:08 cdaq End of Run 67925:
148548 01/10/08 00:01 Shabestari Target screens
148547 01/10/08 00:01 cdaq Beam Time Accounting
Wednesday
148546 01/09/08 23:59 hamlet Swing Shift summary, 09 January 2008
148545 01/09/08 23:57 Shabestari Target: rebooted IOC
148544 01/09/08 23:56 W. Luo run 67921, FPP chamber probelm
148543 01/09/08 23:43 cdaq End of Run 67924:
148542 01/09/08 23:10 Shabestari Target: IOC reboot!
148541 01/09/08 23:08 cdaq Run 67924: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148540 01/09/08 22:59 cdaq End of Run 67923:
148539 01/09/08 22:58 Shabestari Target: rebooted IOC
148538 01/09/08 22:50 cdaq Run 67923: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148537 01/09/08 22:42 cdaq End of Run 67921:
148536 01/09/08 22:36 cdaq Run 67921: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148535 01/09/08 21:57 cdaq End of Run 67920:
148534 01/09/08 21:31 cdaq Run 67920: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148533 01/09/08 21:30 cdaq End of Run 67919:
148532 01/09/08 21:19 Shabestari Target screens
148531 01/09/08 20:41 cdaq Run 67919: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148530 01/09/08 20:15 cdaq End of Run 67918:
148529 01/09/08 19:37 cdaq Run 67918: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148528 01/09/08 19:36 cdaq End of Run 67917:
148527 01/09/08 18:45 cdaq Run 67917: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148526 01/09/08 18:44 cdaq End of Run 67916:
148525 01/09/08 18:01 Shabestari Target screens
148524 01/09/08 17:42 cdaq Run 67916: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148523 01/09/08 17:41 cdaq End of Run 67915:
148522 01/09/08 16:50 cdaq Run 67915: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148521 01/09/08 16:49 cdaq End of Run 67914:
148520 01/09/08 16:32 cdaq Run 67914: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148519 01/09/08 16:02 cdaq Beam Time Accounting
148518 01/09/08 15:52 YaLi Day shift summary
148517 01/09/08 14:55 YaLi NMR communication problem, fixed.
148516 01/09/08 13:39 YaLi Beam Line vaccum problem.
148515 01/09/08 13:35 YaLi Roc13 problem again. Reboot Roc13 & Roc14.
148514 01/09/08 13:24 cdaq End of Run 67913:
148513 01/09/08 13:21 cdaq Run 67913: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148512 01/09/08 12:41 YaLi Roc13 power cycled
148511 01/09/08 12:39 cdaq Run 67912: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148510 01/09/08 12:33 cdaq End of Run 67910:
148509 01/09/08 12:22 YaLi Roc13 was Rebooted
148508 01/09/08 12:13 cdaq Run 67910: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148507 01/09/08 12:09 cdaq End of Run 67909:
148506 01/09/08 12:00 YaLi MNR communication problem
148505 01/09/08 11:59 cdaq Run 67909: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148504 01/09/08 11:58 cdaq End of Run 67908:
148503 01/09/08 11:35 YaLi run 67876 is junk
148502 01/09/08 11:10 cdaq Run 67908: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148501 01/09/08 11:01 M.M FPP Hit rate problems
148500 01/09/08 10:30 cdaq End of Run 67907:
148499 01/09/08 10:05 YaLi beam position and beam current screenshot
148498 01/09/08 10:04 E. Frlez target: transient/yellow alarms
148497 01/09/08 09:53 E. Frlez target: screenshots
148496 01/09/08 09:40 cdaq Run 67907: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148495 01/09/08 09:38 E. Frlez target: Moller measurement, target out
148494 01/09/08 09:35 horn/gaskell Moller done
148493 01/09/08 09:34
148492 01/09/08 09:31 horn/gaskell Moller Summary
148491 01/09/08 09:23 cdaq End of Run 67906:
148490 01/09/08 09:18 cdaq Moller Run 67906: IHWP=OUT
148489 01/09/08 09:16 cdaq End of Run 67905:
148488 01/09/08 09:11 cdaq Moller Run 67905: IHWP=OUT
148487 01/09/08 09:11 cdaq End of Run 67904:
148486 01/09/08 09:06 cdaq Moller Run 67904: IHWP=OUT
148485 01/09/08 09:06 cdaq End of Run 67903:
148484 01/09/08 09:00 cdaq Moller Run 67903: IHWP=OUT
148483 01/09/08 09:00 cdaq End of Run 67902:
148482 01/09/08 08:54 cdaq Moller Run 67902: IHWP=OUT
148481 01/09/08 08:52 cdaq End of Run 67901:
148480 01/09/08 08:50 cdaq Moller Run 67901: IHWP=OUT
148479 01/09/08 08:48 cdaq End of Run 67900:
148478 01/09/08 08:47 cdaq Moller Run 67900: IHWP=OUT TUNE test
148477 01/09/08 08:19 cdaq End of Run 67899:
148476 01/09/08 08:19 cdaq Moller Run 67899: DAQ test
148475 01/09/08 08:18 cdaq End of Run 67898:
148474 01/09/08 08:17 cdaq Moller Run 67898: DAQ test
148473 01/09/08 08:16 Eric Jensen Owl shift summary
148472 01/09/08 08:12 cdaq Beam Time Accounting
148471 01/09/08 07:53 Phil Carter test entry -- ignore
148470 01/09/08 07:33 cdaq End of Run 67897:
148469 01/09/08 06:44 Phil Carter rebooted target IOC
148468 01/09/08 06:43 cdaq Run 67897: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148467 01/09/08 06:34 cdaq End of Run 67896:
148466 01/09/08 05:44 Eric Jensen HV crate alarm
148465 01/09/08 05:41 cdaq Run 67896: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148464 01/09/08 05:38 cdaq End of Run 67895:
148463 01/09/08 04:51 cdaq Run 67895: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148462 01/09/08 04:50 cdaq End of Run 67894:
148461 01/09/08 04:00 cdaq Run 67894: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148460 01/09/08 03:59 cdaq End of Run 67893:
148459 01/09/08 03:11 cdaq Run 67893: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148458 01/09/08 03:09 cdaq End of Run 67892:
148457 01/09/08 03:04 Phil Carter target screenshot
148456 01/09/08 02:22 cdaq Run 67892: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148455 01/09/08 02:20 cdaq End of Run 67891:
148454 01/09/08 01:42 Phil Carter Able to start runs now. Thanks Ramesh Subedi.
148453 01/09/08 01:30 cdaq Run 67891: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148452 01/09/08 01:29 cdaq End of Run 67890:
148451 01/09/08 01:21 cdaq Run 67890: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148450 01/09/08 00:44 Phil Carter can't start new runs -- ROCs 13 and 14 won't respond
148449 01/09/08 00:18 cdaq End of Run 67884:
148448 01/09/08 00:06 cdaq Beam Time Accounting
148447 01/09/08 00:01 YaLi Evening shift summary
Tuesday
148446 01/08/08 23:59 Shabestari Target screens
148445 01/08/08 23:59 cdaq Run 67884: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148444 01/08/08 23:58 cdaq End of Run 67883:
148443 01/08/08 23:08 cdaq Run 67883: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148442 01/08/08 23:07 cdaq End of Run 67882:
148441 01/08/08 23:06 cdaq Run 67882: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148440 01/08/08 23:05 cdaq End of Run 67881:
148439 01/08/08 22:31 saw Run number fix
148438 01/08/08 22:24 YaLi Run number fixed
148437 01/08/08 22:13 cdaq Run 67881: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148436 01/08/08 22:07 cdaq End of Run 4:
148435 01/08/08 22:02 cdaq Run 4: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148434 01/08/08 22:00 cdaq End of Run 3:
148433 01/08/08 21:21 YaLi Run number !!! START WITH 3
148432 01/08/08 21:08 cdaq Run 3: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148431 01/08/08 21:02 cdaq End of Run 2:
148430 01/08/08 21:02 cdaq Run 2: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148429 01/08/08 20:54 cdaq End of Run 67876:
148428 01/08/08 20:21 cdaq Run 67876: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148427 01/08/08 20:20 cdaq End of Run 67875:
148426 01/08/08 19:57 YaLi Beam position and current screenshot
148425 01/08/08 19:53 Shabestari Target screens
148424 01/08/08 19:35 YaLi Beam: Harp Scan result: 3H00: 85*77; 3H00A: 94*74
148423 01/08/08 19:34 Shabestari Target: LH2
148422 01/08/08 19:29 cdaq Run 67875: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148421 01/08/08 18:54 YaLi HMS Magnets Control System Reset
148420 01/08/08 18:49 cdaq End of Run 67874:
148419 01/08/08 17:57 Shabestari Target: empty
148418 01/08/08 16:11 cdaq Beam Time Accounting
148417 01/08/08 11:36 cdaq Run 67874: test run
148416 01/08/08 11:31 cdaq End of Run 67872:
148415 01/08/08 11:30 M Jones Added roc20 (vmec3) back to coin DAQ configuration
148414 01/08/08 11:28 cdaq Run 67872: test run
148413 01/08/08 11:20 M Jones Moved ROC20 to different ethernet port
148412 01/08/08 10:17 frw Re: FPP wire hit plot run67864-67870
148411 01/08/08 10:03 W. Luo FPP wire hit plot run67864-67870
148410 01/08/08 09:53 Perdrisat kinematics 7, inventory
148409 01/08/08 09:52 W. Luo Checked BigCal channel (46,16), no problem
148408 01/08/08 09:15 cdaq Run 67871: HMS Cosmic run
148407 01/08/08 08:27 cdaq End of Run 67870:
148406 01/08/08 08:04 cdaq Beam Time Accounting
148405 01/08/08 07:56 Phil Carter target screenshot
148404 01/08/08 07:52 Eric Jensen Owl Shift Summary
148403 01/08/08 07:42 cdaq Run 67870: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148402 01/08/08 07:40 Phil Carter rebooted target IOC; some target alarms
148401 01/08/08 07:27 cdaq End of Run 67869:
148400 01/08/08 07:04 cdaq Beam Time Accounting
148399 01/08/08 06:54 cdaq Run 67869: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148398 01/08/08 06:53 cdaq End of Run 67868:
148397 01/08/08 06:03 cdaq Run 67868: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148396 01/08/08 06:01 cdaq End of Run 67867:
148395 01/08/08 05:12 cdaq Run 67867: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148394 01/08/08 05:10 cdaq End of Run 67866:
148393 01/08/08 04:14 cdaq Run 67866: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148392 01/08/08 04:12 cdaq End of Run 67865:
148391 01/08/08 03:13 cdaq Run 67865: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148390 01/08/08 03:12 cdaq End of Run 67864:
148389 01/08/08 02:22 cdaq Run 67864: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148388 01/08/08 02:20 cdaq End of Run 67863:
148387 01/08/08 01:30 cdaq Run 67863: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148386 01/08/08 01:27 cdaq End of Run 67862:
148385 01/08/08 00:37 cdaq Run 67862: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148384 01/08/08 00:35 cdaq End of Run 67861:
148383 01/08/08 00:32 Phil Carter target screenshot
148382 01/08/08 00:00 YaLi 01/07/08 Evening shift summary
Monday
148381 01/07/08 23:47 E. Frlez target: yellow alarm
148380 01/07/08 23:45 cdaq Run 67861: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148379 01/07/08 23:44 cdaq End of Run 67860:
148378 01/07/08 22:57 W. Luo Stopped run 67859, power cycled roc14.
148377 01/07/08 22:55 cdaq Run 67860: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148376 01/07/08 22:51 cdaq End of Run 67859:
148375 01/07/08 22:46 W. Luo 4 FPP wires at the edge get hot
148374 01/07/08 22:44 YaLi Roc14 Error, end run 67857, reboot Roc13 & Roc14
148373 01/07/08 22:42 YaLi Roc11 Error, stopped run 67856
148372 01/07/08 22:31 cdaq Run 67859: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148371 01/07/08 22:22 cdaq End of Run 67857:
148370 01/07/08 22:21 cdaq Run 67857: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148369 01/07/08 22:15 YaLi Roc14 Error, end run 67854, reboot Roc13 & Roc14
148368 01/07/08 21:44 cdaq Run 67856: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148367 01/07/08 21:38 cdaq End of Run 67854:
148366 01/07/08 21:36 cdaq Run 67854: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148365 01/07/08 21:35 cdaq End of Run 67853:
148364 01/07/08 20:44 cdaq Run 67853: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148363 01/07/08 20:43 cdaq End of Run 67852:
148362 01/07/08 20:42 E. Frlez target: hcL1_hp_power_R red alarm
148361 01/07/08 20:18 W. Luo One HMS DC2 wire got hot
148360 01/07/08 20:10 W. Luo This reboot happenned after run67850, run 67852 is good.
148359 01/07/08 19:53 W. Luo Reboot all the rocs
148358 01/07/08 19:52 E. Frlez target: alh problem
148357 01/07/08 19:51 cdaq Run 67852: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148356 01/07/08 19:11 cdaq End of Run 67850:
148355 01/07/08 18:58 cdaq Run 67850: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148354 01/07/08 18:56 cdaq End of Run 67849:
148353 01/07/08 18:03 cdaq Run 67849: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148352 01/07/08 18:03 cdaq End of Run 67848:
148351 01/07/08 17:15 cdaq Run 67848: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148350 01/07/08 17:14 cdaq End of Run 67847:
148349 01/07/08 16:53 M.M HMS trig time offsets, time offsets, drifmap.
148348 01/07/08 16:17 E. Frlez target: ioc reboot
148347 01/07/08 16:16 cdaq Run 67847: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148346 01/07/08 16:11 cdaq Beam Time Accounting
148345 01/07/08 16:10 ccbutu Shift Summary (The end)
148344 01/07/08 15:56 cdaq End of Run 67846:
148343 01/07/08 15:13 cdaq Run 67846: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148342 01/07/08 15:10 cdaq End of Run 67845:
148341 01/07/08 14:44 kumbartzki target screens
148340 01/07/08 14:29 kumbartzki target status
148339 01/07/08 14:23 cdaq Run 67845: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148338 01/07/08 14:22 cdaq End of Run 67844:
148337 01/07/08 13:37 cdaq Run 67844: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148336 01/07/08 13:35 cdaq End of Run 67843:
148335 01/07/08 12:46 cdaq Run 67843: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148334 01/07/08 12:45 cdaq End of Run 67842:
148333 01/07/08 12:38 W. Luo Updated the KINEMATICS.db for the BigCal move
148332 01/07/08 12:02 ccbutu Shift Summary (continuation)
148331 01/07/08 11:59 cdaq Run 67842: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148330 01/07/08 11:20 cdaq End of Run 67841:
148329 01/07/08 11:18 ccbutu BigCal Move Ended!
148328 01/07/08 11:17 cdaq Run 67841: LED run
148327 01/07/08 10:01 ccbutu Hall C access for BigCal move!
148326 01/07/08 09:35 cdaq End of Run 67840:
148325 01/07/08 09:10 ccbutu Hall C switch Rebooted!
148324 01/07/08 09:10 ccbutu Hall C switch Rebooted!
148323 01/07/08 08:58 cdaq Run 67840: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148322 01/07/08 08:44 W. Luo run: 67839 Missing wires in FPP chamber C
148321 01/07/08 08:37 cdaq End of Run 67839:
148320 01/07/08 08:16 cdaq Beam Time Accounting
148319 01/07/08 07:56 Eric Jensen Owl Shift Summary
148318 01/07/08 07:44 cdaq Run 67839: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148317 01/07/08 07:34 cdaq End of Run 67838:
148316 01/07/08 07:11 Phil Carter target screenshot
148315 01/07/08 06:36 cdaq Run 67838: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148314 01/07/08 06:29 cdaq End of Run 67837:
148313 01/07/08 05:33 cdaq Run 67837: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148312 01/07/08 05:30 cdaq End of Run 67836:
148311 01/07/08 04:33 cdaq Run 67836: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148310 01/07/08 04:32 cdaq End of Run 67835:
148309 01/07/08 03:36 cdaq Run 67835: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148308 01/07/08 03:33 cdaq End of Run 67834:
148307 01/07/08 03:27 puckett please end old run and start a new one when problems occur.
148306 01/07/08 03:10 ejensen hctsv12 problem, run 67834
148305 01/07/08 03:04 cdaq Run 67834: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148304 01/07/08 02:58 cdaq End of Run 67833:
148303 01/07/08 02:02 cdaq Run 67833: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148302 01/07/08 01:59 cdaq End of Run 67832:
148301 01/07/08 01:12 Phil Carter opened target JT valve to 32%
148300 01/07/08 01:03 cdaq Run 67832: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148299 01/07/08 00:53 Shabestari Target: IOC reboot
148298 01/07/08 00:27 YaLi 01/06/08 Evening shift summary
148297 01/07/08 00:03 cdaq Beam Time Accounting
148296 01/07/08 00:02 cdaq End of Run 67831:
Sunday
148295 01/06/08 23:31 cdaq Run 67831: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148294 01/06/08 23:29 cdaq End of Run 67830:
148293 01/06/08 22:32 cdaq Run 67830: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148292 01/06/08 22:31 cdaq End of Run 67829:
148291 01/06/08 21:34 cdaq Run 67829: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148290 01/06/08 21:33 cdaq End of Run 67828:
148289 01/06/08 20:43 Shabestari Target screens
148288 01/06/08 20:36 cdaq Run 67828: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148287 01/06/08 20:35 cdaq End of Run 67827:
148286 01/06/08 19:39 cdaq Run 67827: Kinematics 7: LH2 20 cm, 80 uA, ps4 = 1
148285 01/06/08 19:38 cdaq End of Run 67826:
148284 01/06/08 18:49 M.M FPP: Hit time problem, run 67825
148283 01/06/08 18:40 cdaq Run 67826: LH2 20 cm, 80 uA, ps4 = 1
148282 01/06/08 18:36 cdaq End of Run 67825:
148281 01/06/08 18:33 Shabestari Target screens
148280 01/06/08 18:04 W. Luo BigCal HV problems, one or two crates off.
148279 01/06/08 18:03 W. Luo This run, HV crate hctsv12:2003, 2004 was off
148278 01/06/08 17:58 cdaq Run 67825: LH2 20 cm, 80 uA, ps4 = 1
148277 01/06/08 17:57 cdaq End of Run 67824:
148276 01/06/08 17:38 cdaq Run 67824: LH2 20 cm, 80 uA, ps4 = 1
148275 01/06/08 17:23 cdaq End of Run 67823:
148274 01/06/08 17:22 cdaq Run 67823: LH2 20 cm, 80 uA, ps4 = 1
148273 01/06/08 17:20 cdaq End of Run 67822:
148272 01/06/08 16:24 cdaq Run 67822: LH2 20 cm, 80 uA, ps4 = 1
148271 01/06/08 16:22 cdaq End of Run 67821:
148270 01/06/08 16:04 cdaq Beam Time Accounting
148269 01/06/08 15:54 Abdellah Day shift summary
148268 01/06/08 15:41 H. Bghdasary Screen Snapshot of BPM and BMC
148267 01/06/08 15:27 cdaq Run 67821: LH2 20 cm, 80 uA, ps4 = 1
148266 01/06/08 15:27 Abdellah Beam back
148265 01/06/08 14:53 kumbartzki Target screens
148264 01/06/08 14:53 Abdellah Energy measurement done
148263 01/06/08 14:48 kumbartzki target moved in
148262 01/06/08 14:44 horn Beam energy measurement results
148261 01/06/08 13:14 abdellah MCC lost arc 2 PS
148260 01/06/08 13:00 horn/gaskell Moller Summary
148259 01/06/08 13:00 gaskell/horn Moller backout
148258 01/06/08 12:49 horn/gaskell Moller tuned
148257 01/06/08 12:49 kumbartzki LH2 target in
148256 01/06/08 12:44 cdaq End of Run 67820:
148255 01/06/08 12:38 cdaq Moller Run 67820: IHWP=OUT
148254 01/06/08 12:38 cdaq End of Run 67819:
148253 01/06/08 12:33 cdaq Moller Run 67819: IHWP=OUT
148252 01/06/08 12:33 cdaq End of Run 67818:
148251 01/06/08 12:28 cdaq Moller Run 67818: Moller run
148250 01/06/08 12:28 cdaq End of Run 67817:
148249 01/06/08 12:24 cdaq Moller Run 67817: Moller run
148248 01/06/08 12:23 cdaq End of Run 67816:
148247 01/06/08 12:19 cdaq Moller Run 67816: Moller run
148246 01/06/08 11:18 cdaq End of Run 67815:
148245 01/06/08 11:18 cdaq Moller Run 67815: Moller tune test
148244 01/06/08 10:52 gaskell/horn Moller setup
148243 01/06/08 10:23 gaskell Bad MHZ clock signal on Moller DAQ
148242 01/06/08 09:56 kumbartzki Change target to empty
148241 01/06/08 09:55 cdaq End of Run 67814:
148240 01/06/08 09:54 cdaq Moller Run 67814: Moller DAQ test
148239 01/06/08 09:50 Abdellah Moller measurement started
148238 01/06/08 09:50 cdaq End of Run 67813:
148237 01/06/08 09:49 cdaq Moller Run 67813: Moller DAQ test
148236 01/06/08 09:41 cdaq End of Run 67812:
148235 01/06/08 09:25 cdaq Run 67812: LH2 20 cm, 80 uA, ps4 = 1
148234 01/06/08 09:23 cdaq End of Run 67811:
148233 01/06/08 08:28 cdaq Run 67811: LH2 20 cm, 80 uA, ps4 = 1
148232 01/06/08 08:26 cdaq End of Run 67810:
148231 01/06/08 08:03 cdaq Beam Time Accounting
148230 01/06/08 08:03 Jonathan Mil Shift Summary
148229 01/06/08 07:32 cdaq Run 67810: LH2 20 cm, 80 uA, ps4 = 1
148228 01/06/08 07:31 cdaq End of Run 67809:
148227 01/06/08 06:37 cdaq Run 67809: LH2 20 cm, 80 uA, ps4 = 1
148226 01/06/08 06:36 cdaq End of Run 67808:
148225 01/06/08 06:07 puckett updated HMS and BigCal ADC thresholds
148224 01/06/08 05:57 puckett target snapshots with beam back
148223 01/06/08 05:54 Jonathan Mil BPM and BCM
148222 01/06/08 05:44 puckett beam back
148221 01/06/08 05:40 cdaq Run 67808: LH2 20 cm, 80 uA, ps4 = 1
148220 01/06/08 04:45 puckett HMS problems, Steve Lassiter is helping...
148219 01/06/08 04:19 puckett target "de--parked" in anticipation of beam
148218 01/06/08 03:36 puckett still waiting for beam though
148217 01/06/08 03:36 puckett HMS is back up and running
148216 01/06/08 01:36 Jonathan Mil Spectrometer off
148215 01/06/08 01:20 Jonathan Mil Cryo Crash
148214 01/06/08 01:12 puckett MCC informed us of CHL crash
148213 01/06/08 00:58 cdaq End of Run 67807:
148212 01/06/08 00:38 cdaq Run 67807: LH2 20 cm, 80 uA, ps4 = 1
148211 01/06/08 00:35 cdaq End of Run 67806:
148210 01/06/08 00:02 cdaq Beam Time Accounting
148209 01/06/08 00:01 Shabestari Target screens
148208 01/06/08 00:00 abdellah Swing shift Summary
Saturday
148207 01/05/08 23:59 abdellah Swing shift Summary
148206 01/05/08 23:40 cdaq Run 67806: LH2 20 cm, 80 uA, ps4 = 1
148205 01/05/08 23:39 cdaq End of Run 67805:
148204 01/05/08 23:31 puckett hot HDC wires
148203 01/05/08 22:45 cdaq Run 67805: LH2 20 cm, 80 uA, ps4 = 1
148202 01/05/08 22:43 cdaq End of Run 67804:
148201 01/05/08 22:20 W. Luo I used some bad cut.
148200 01/05/08 21:52 cdaq Run 67804: LH2 20 cm, 80 uA, ps4 = 1
148199 01/05/08 21:49 cdaq End of Run 67803:
148198 01/05/08 21:48 W. Luo BigCal cued itself
148197 01/05/08 21:10 Shabestari Target screens
148196 01/05/08 20:54 cdaq Run 67803: Second run of this year. LH2 20 cm target.
148195 01/05/08 20:51 cdaq End of Run 67802:
148194 01/05/08 20:30 W. Luo Two HMS DC got hot
148193 01/05/08 20:00 M Jones Removed roc20 (vmec3) from the coin configuration
148192 01/05/08 19:52 cdaq Run 67802: LH2 20 cm target.
148191 01/05/08 19:42 M Jones Fixed ROC 14 DAQ problems
148190 01/05/08 19:33 cdaq Run 67801: First run of this year. LH2 20 cm target.
148189 01/05/08 19:07 W. Luo Updated HMS angle in kinematics.db to 36.105
148188 01/05/08 18:50 Abdellah update on DAQ problems
148187 01/05/08 18:33 cdaq Run 67800: First run of this year. LH2 20 cm target.
148186 01/05/08 18:12 W. Luo I restarted the LED display
148185 01/05/08 18:08 cdaq Run 67799: First run of this year. LH2 20 cm target.
148184 01/05/08 18:04 cdaq Run 67798: First run of this year. LH2 20 cm target.
148183 01/05/08 18:03 Shabestari Target screens
148182 01/05/08 17:47 Perdrisat
148181 01/05/08 17:45 Perdrisat horizontal shift in population of bigcal
148180 01/05/08 17:44 cdaq Run 67797: First run of this year. LH2 20 cm target.
148179 01/05/08 17:33 cdaq Run 67796: First run of this year. LH2 20 cm target.
148178 01/05/08 16:52 W. Luo One channel of BigCal got hot
148177 01/05/08 16:24 cdaq Run 67795: First run of this year. LH2 20 cm target.
148176 01/05/08 16:14 cdaq Run 67794: First run of this year. LH2 20 cm target.
148175 01/05/08 16:08 YaLi Target: 20cm LH2 target is in, screenshot
148174 01/05/08 16:05 cdaq Run 67793: First run of this year. LH2 20 cm target.
148173 01/05/08 16:04 cdaq Beam Time Accounting
148172 01/05/08 15:56 kumbartzki Day shift summary
148171 01/05/08 15:56 cdaq Run 67792: Production Run After long stop
148170 01/05/08 10:35 M Jones Run plan for day shift
148169 01/05/08 10:35 M Jones Run plan for day shift
148168 01/05/08 09:12 M Jones Harp 3H00 won't retract, MCC pages for assistance
148167 01/05/08 09:09 M Jones HMS Dipole Communication error
148166 01/05/08 08:02 cdaq End of Run 67791:
148165 01/05/08 08:01 cdaq Beam Time Accounting
148164 01/05/08 07:59 puckett transient alarm, hcHe_Supply_1_R
148163 01/05/08 07:57 puckett end of shit, target snapshots
148162 01/05/08 07:51 hamlet Owl Shift Summary, 05 January 2008
148161 01/05/08 07:04 puckett rebooted tgt IOC
148160 01/05/08 06:51 puckett "5 sec scantask" still not blinking
148159 01/05/08 06:17 puckett MCC has called to send tune beam
148158 01/05/08 04:32 puckett Calibration of a subsection of BigCal
148157 01/05/08 03:23 puckett Target is "parked" at about 150 W
148156 01/05/08 02:58 puckett target cooldown finished
148155 01/05/08 02:32 puckett Target is cool--IOC reboot needed.
148154 01/05/08 02:27 puckett both GUI value and strip chart are updating, but "5 sec scantask" still stuck
148153 01/05/08 02:02 puckett L1 temp stripchart is updating OK, but value in GUI is stuck...
148152 01/05/08 01:55 puckett Target is getting cool, HMS magnets set
148151 01/05/08 00:29 puckett Dave Meekins is in Hall C for cooldown
Friday
148150 01/04/08 23:49 Shabestari HMS
148149 01/04/08 23:30 M JOnes CHL crash at around 21:45
148148 01/04/08 23:29 gaskell Moller cryo recovered
148147 01/04/08 23:24 Shabestari CHL crash
148146 01/04/08 19:13 M.M HMS is good too.
148145 01/04/08 19:09 M.M FPP is in good shape so far...
148144 01/04/08 19:01 abdellah Correction: Beam on for Hall A until 20:00
148143 01/04/08 19:00 abdellah Beam on for Hall B until 20:00
148142 01/04/08 18:35 W. Luo HV chaned since Oct 27
148141 01/04/08 18:32 W. Luo HV changed since Oct. 27
148140 01/04/08 18:30 cdaq Run 67791: HMS cosmic run
148139 01/04/08 18:22 cdaq Run 67790: HMS cosmic run
148138 01/04/08 18:13 L.Pentchev BigCal thresholds set to 550mV/515mV for discrim. no. (0 and 1)/(2 and 3)
148137 01/04/08 17:47 cdaq Run 67789: HMS cosmic run
148136 01/04/08 16:55 abdellah Sweep of Hall
148135 01/04/08 15:59 M JOnes Swing Shift
148134 01/04/08 14:53 M Jones ACC will do a sweep at 4:30 to set the Hall in controlled access
148133 01/04/08 14:46 M Jones Present beam and target situation
148132 01/04/08 13:24 saw HMS Hall Probe EPICS
148131 01/04/08 12:29 cdaq Run 67788: HMS cosmic run
148130 01/04/08 12:25 cdaq Run 67787: HMS cosmic run
148129 01/04/08 12:25 M.M FPP: HV ON!!!!
148128 01/04/08 12:21 frw FPP: chamber C threshold back in LOCAL control
148127 01/04/08 11:13 frw HMS gas
148126 01/04/08 11:12 Lassiter HMS up and running
148125 01/04/08 11:09 cdaq End of Run 67786:
148124 01/04/08 11:09 M Jones Turned on the HMS DC
148123 01/04/08 10:56 Lassiter HMS moved to 36.10 degrees
148122 01/04/08 09:31 M Jones Gas Shed argon/ethane flow rate and pressure
148121 01/04/08 09:26 cdaq Run 67786: HMS cosmic run
148120 01/04/08 09:12 M Jones Steve Lassiter will come and rotate the HMS spectrometer to 36.10
148119 01/04/08 09:00 M JOnes Problems with beam to Hall A, delay in Hall C target cooldown
Thursday
148118 01/03/08 14:43 hcf GasMaster Calibration
148117 01/03/08 14:38
148116 01/03/08 14:34 M Jones Restored vmec3 to coin configuration
148115 01/03/08 14:32 cdaq End of Run 67785:
148114 01/03/08 14:31 cdaq Run 67785: LED test run
148113 01/03/08 14:11 M Jones power supply of VME crate for TS0 fixed
148112 01/03/08 14:08 M Jones Close hall at 6pm for ACC hot checkout
148111 01/03/08 11:48 M Jones target pumpdown successful
148110 01/03/08 10:50 puckett same entry with better formatting...
148109 01/03/08 10:44 puckett added third option for BigCal ADC histograms...
148108 01/03/08 09:43 puckett switched back to old detector map in database
148107 01/03/08 08:24 M Jones Gas Alarm so switched ethane bottles
Wednesday
148106 01/02/08 17:11 L.Pentchev few fixes and changes in BigCal
148105 01/02/08 17:00 W. Luo Increase HV for (42,18) for 300v
148104 01/02/08 16:53 M Jones Fixed offset in cable for HMS C1V1 wires 61-76
148103 01/02/08 16:18 cdaq End of Run 67784:
148102 01/02/08 16:15 cdaq Run 67784: LED test run
148101 01/02/08 16:14 cdaq End of Run 67783:
148100 01/02/08 16:05 cdaq Run 67783: led run
148099 01/02/08 15:40 cdaq End of Run 67782:
148098 01/02/08 15:39 cdaq Run 67782: led run
148097 01/02/08 15:38 cdaq End of Run 67781:
148096 01/02/08 15:32 cdaq Run 67781: led run
148095 01/02/08 15:28 cdaq End of Run 67780:
148094 01/02/08 15:27 cdaq Run 67780: led run
148093 01/02/08 15:27 cdaq End of Run 67779:
148092 01/02/08 15:26 cdaq Run 67779: led run
148091 01/02/08 14:58 cdaq End of Run 67776:
148090 01/02/08 14:58 M Jones Turn HMS scintillator HV on
148089 01/02/08 14:48 cdaq Run 67776: Kinematic 7 HMS: LH2 20cm, theta=35.395 deg, 70uA
148088 01/02/08 14:41 cdaq Run 67775: Kinematic 7 HMS: LH2 20cm, theta=35.395 deg, 70uA
148087 01/02/08 14:35 cdaq End of Run 67773:
148086 01/02/08 14:34 cdaq Run 67773: Kinematic 7 HMS: LH2 20cm, theta=35.395 deg, 70uA
148085 01/02/08 14:32 M Jones Short term Beam Schedule
148084 01/02/08 14:20 saw crl make fixed
148083 01/02/08 12:13 M Jones Problem with executing the make for the crl, so can't start the DAQ
148082 01/02/08 12:08 M Jones Leave HV for HMS and FPP chambers OFF !
148081 01/02/08 12:06 frw HMS: greedy use of trigger signals
148080 01/02/08 11:50 M Jones Problem with voltage on TS0 crate in the counting house
148079 01/02/08 11:48 frw HMS chamber gas flow, pressure
148078 01/02/08 11:27 M Jones Modified HMS trigger
148077 01/02/08 11:12 hcf Drift Chamber gas flow restored
148076 01/02/08 11:09 L.Pentchev BigCal and bunker power ON