User name X. Zheng
Log entry time 15:56:06 on January 23,2008
Entry number 149397
keyword=day shift summary
08:00 no beam
09:00 beam restored to 80uA. Took production run 68183
09:30-12:00 Moller measurement
10:00-10:30 DoE safety review of the counting house
12:00-14:30 Beam study
14:35-15:35 Beam energy measurement
15:35 Move target back to LH2, resume production.
Production runs this shift:
68183, good run, 1.9M
68203, ongoing at the end of shift.