User name Donal

Log entry time 00:05:22 on January 19, 2008

Entry number 148920

keyword=Shift Report

Swing Shift Report

January 18, 2008

Donal Day (SL) Abdellah Amhidouch (TO) Ramesh Subedi (3rd)

Shift starts with Dipole PS communicaiton error

Steve Lassister and Mike Fowler attending

Run 68038 Start 16:10 Stop 16:52 Run 68039 Start 16:52 Stop 17:17

HMS main PS Interlock problem, PSU reset cleared

Run 68040 Start 17:39 Stop 18:23

Run 68041 Start 18:24 Stop 19:05

Run 68042 Start 19:06 Stop 19:24 Due to a HV alarm on BigCal

HCTSV12:2004 HV problem solved by turning off and turning on

Run 68043 Start 19:32 Stop 20:16

Run 68044 Start 20:16 Stop 20:21 due to HMS dipole NMR problem

Run 68045 Start 20:36 Stop 21:18 Stopped to loss of target. It went "white" but seemed to come back by itself

Run 68046 Start 21:24 Stopped 21:02 due to HMS problem

Run 68047 Start 22:16 Stop 22:31 due to HMS dipole problem. As before PSU drops out.

Run 68048 Start 22:52 Stop 23:23 due to HMS problems

HMS problems take about 20 minutes to clear. But that is for 30 minutes of data taking

Shift ends with 68049 in progress

Besides the HMS tripping off there were minimal problems.