Jefferson Lab Hall C Logbook for October 09 - Full Listing
Main INDEX
Saturday
194121 10/31/09 23:51 bono fission pressure
194120 10/31/09 23:50 cdaq Run 77072: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194119 10/31/09 23:48 cdaq End of Run 77071:
194118 10/31/09 23:44 amour Pressure for FFD
194117 10/31/09 23:43 cdaq E02017 Run 1621: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.98Torr. Low voltages:+7.13V and -9.13V.
194116 10/31/09 23:38 cdaq E02017 End of Run 1620:
194115 10/31/09 23:27 shichijo histogram check for run 77071
194114 10/31/09 23:22 bono 77071 beam screen shot
194113 10/31/09 23:17 shichijo run 77070 was junk
194112 10/31/09 23:11 shichijo Many DAQ warnings
194111 10/31/09 23:10 cdaq Run 77071: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194110 10/31/09 23:04 cdaq End of Run 77069:
194109 10/31/09 23:02 shichijo histogram check for run 77069
194108 10/31/09 22:52 Nue Zeros for sieve slits' positions are OK.
194107 10/31/09 22:50 shichijo EDC/HDC HV screen shot (run 77069)
194106 10/31/09 22:47 cdaq E02017 Run 1620: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.07Torr. Low voltages:+7.13V and -9.13V.
194105 10/31/09 22:43 bono 77069 magnet screen shot
194104 10/31/09 22:42 bono 77069 beam screen shot
194103 10/31/09 22:37 cdaq Run 77069: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194102 10/31/09 22:36 cdaq End of Run 77068:
194101 10/31/09 22:34 cdaq E02017 End of Run 1619:
194100 10/31/09 22:27 maruta Late entry: HES-Q2 PS current records every 2second in data stream after the 2nd power outage.
194099 10/31/09 22:09 shichijo histogram check for run 77068
194098 10/31/09 22:09 bono precisely, we made them scream shots
194097 10/31/09 22:07 bono 76068 HV screen shot
194096 10/31/09 22:05 bono 77068 beam screen shot
194095 10/31/09 22:00 cdaq Run 77068: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194094 10/31/09 21:59 cdaq End of Run 77067:
194093 10/31/09 21:53 Tang !!!!!!!!! Is this because of Hal...low....een night??????
194092 10/31/09 21:44 cdaq E02017 Run 1619: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.05Torr. Low voltages:+7.13V and -9.13V.
194091 10/31/09 21:43 shichijo histogram check for run 77067
194090 10/31/09 21:35 maruta EHOD2-17 inefficiency recovered.
194089 10/31/09 21:31 bono 77067 target screen shot!!!!!!!
194088 10/31/09 21:28 cdaq E02017 End of Run 1618:
194087 10/31/09 21:28 shichijo FFB and Ion chamber screen!!
194086 10/31/09 21:26 maruta EHOD discriminator threshold reduced to -100mV from -200mV
194085 10/31/09 21:25 shichijo HDC/EDC HV screen shot (run 77067)
194084 10/31/09 21:25 bono 77067 beam screen shot
194083 10/31/09 21:23 cdaq Run 77067: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194082 10/31/09 21:21 cdaq End of Run 77066:
194081 10/31/09 20:59 shichijo histogram check for run 77066
194080 10/31/09 20:52 shichijo EHOD rate meter screen shot
194079 10/31/09 20:47 bono 77066 magnet screen shot
194078 10/31/09 20:46 bono 77066 beam screen shot
194077 10/31/09 20:42 cdaq Run 77066: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194076 10/31/09 20:41 cdaq End of Run 77065:
194075 10/31/09 20:34 cdaq E02017 Run 1618: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.09Torr. Low voltages:+7.13V and -9.13V.
194074 10/31/09 20:31 shichijo EHOD rate meter screen shot
194073 10/31/09 20:20 shichijo this is EHOD test run
194072 10/31/09 20:19 cdaq E02017 End of Run 1617:
194071 10/31/09 20:13 shichijo stop run to check EHOD 17
194070 10/31/09 20:11 cdaq Run 77065: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194069 10/31/09 20:05 shichijo histogram check for run 77064
194068 10/31/09 19:54 bono 7706 magnet screen shot
194067 10/31/09 19:53 bono 77064 screen shot
194066 10/31/09 19:52 cdaq Run 77064: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194065 10/31/09 19:48 cdaq End of Run 77063:
194064 10/31/09 19:47 shichijo EHOD hit pattern change
194063 10/31/09 19:31 shichijo histogram check for run 77063
194062 10/31/09 19:19 cdaq E02017 Run 1617: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.11Torr. Low voltages:+7.13V and -9.13V.
194061 10/31/09 19:14 bono 77063 magnet screen shot
194060 10/31/09 19:12 bono 77063 beam screenshot
194059 10/31/09 19:08 cdaq Run 77063: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194058 10/31/09 19:07 cdaq End of Run 77062:
194057 10/31/09 19:07 cdaq E02017 End of Run 1616:
194056 10/31/09 19:06 cdaq E02017 Run 1616: junk
194055 10/31/09 19:05 cdaq E02017 End of Run 1615:
194054 10/31/09 18:40 shichijo HDC/EDC HV screen shot
194053 10/31/09 18:29 cdaq Run 77062: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194052 10/31/09 18:28 cdaq End of Run 77061:
194051 10/31/09 18:09 cdaq E02017 Run 1615: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.09Torr. Low voltages:+7.13V and -9.13V.
194050 10/31/09 17:57 bono 77061 magnet screen shot
194049 10/31/09 17:56 bono beam 77061 screen shot
194048 10/31/09 17:55 cdaq E02017 End of Run 1614:
194047 10/31/09 17:50 cdaq Run 77061: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194046 10/31/09 17:49 cdaq End of Run 77060:
194045 10/31/09 17:15 shichijo HDC/EDC HV screen shot(run 77060)
194044 10/31/09 17:15 bono beam screen shot
194043 10/31/09 17:14 shichijo HDC/EDC HV screen shot (run 77060)
194042 10/31/09 17:11 cdaq Run 77060: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194041 10/31/09 17:10 cdaq End of Run 77059:
194040 10/31/09 16:58 cdaq E02017 Run 1614: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.11Torr. Low voltages:+7.13V and -9.13V.
194039 10/31/09 16:58 bono beam snapshot
194038 10/31/09 16:57 bono target snapshot
194037 10/31/09 16:52 Tang The enlarged band width and later drift
194036 10/31/09 16:47 bono magnet snapshot
194035 10/31/09 16:46 shichijo Visual scalers run#77059
194034 10/31/09 16:45 bono target controller snap shot
194033 10/31/09 16:44 bono magnet snapshot
194032 10/31/09 16:42 cdaq E02017 End of Run 1613:
194031 10/31/09 16:31 cdaq Run 77059: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194030 10/31/09 16:30 cdaq End of Run 77058:
194029 10/31/09 16:02 cdaq Beam Time Accounting
194028 10/31/09 15:56 chench Screenshot of Target controller and magnets controller
194027 10/31/09 15:56 csamanta Histogram check for run no. 77058
194026 10/31/09 15:54 chench Visual scalers run#77058
194025 10/31/09 15:51 cdaq Run 77058: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194024 10/31/09 15:51 chench day shift summary
194023 10/31/09 15:49 cdaq End of Run 77057:
194022 10/31/09 15:46 chench call to MCC because we miss one of SLI signal
194021 10/31/09 15:34 cdaq E02017 Run 1613: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.15Torr. Low voltages:+7.13V and -9.13V.
194020 10/31/09 15:21 cdaq E02017 End of Run 1612:
194019 10/31/09 15:18 chench Visual scalers run#77057
194018 10/31/09 15:18 csamanta Histogram check for run no. 77057
194017 10/31/09 15:12 chench screenshot of target controller and magnet controller
194016 10/31/09 15:10 cdaq Run 77057: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194015 10/31/09 15:10 chench BPM and BCM for run#77056
194014 10/31/09 15:09 cdaq End of Run 77056:
194013 10/31/09 14:39 chench screenshot of target controller and magnets controller for run#77056
194012 10/31/09 14:38 chench The signal of BPM looks wider than normal
194011 10/31/09 14:36 chench Visual scalers run#77056
194010 10/31/09 14:35 csamanta Histogram check for run no. 77056
194009 10/31/09 14:30 cdaq Run 77056: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194008 10/31/09 14:29 cdaq End of Run 77055:
194007 10/31/09 14:29 chench BPM and BCM for run#77055
194006 10/31/09 14:12 cdaq E02017 Run 1612: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.31Torr. Low voltages:+7.13V and -9.13V.
194005 10/31/09 13:59 cdaq E02017 End of Run 1611:
194004 10/31/09 13:53 chench Visual scalers run#77055
194003 10/31/09 13:53 csamanta Histogram check for run no. 77055
194002 10/31/09 13:46 chench screenshot of target controller and magnet controller for run77055
194001 10/31/09 13:43 cdaq Run 77055: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
194000 10/31/09 13:42 chench ROC13 errors during ru#77054
193999 10/31/09 13:34 csamanta Histogram check for run no. 77054
193998 10/31/09 13:32 chench Visual scalers run#77054
193997 10/31/09 13:24 chench screenshot of target controller and magnets controller
193996 10/31/09 13:20 chench BPM and BCM at the beginning of 77054
193995 10/31/09 13:20 cdaq Run 77054: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193994 10/31/09 13:18 cdaq End of Run 77053:
193993 10/31/09 12:57 Reinhold Re: Energy lock was off since 9:28AM for about 1.5 hours
193992 10/31/09 12:45 csamanta Histogram check for run no. 77053
193991 10/31/09 12:45 chench Visual scalers run#77053
193990 10/31/09 12:41 chench screenshot for magnets controller and target controller for run#77053
193989 10/31/09 12:40 cdaq Run 77053: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193988 10/31/09 12:40 chench BPM and BCM for run#77052
193987 10/31/09 12:38 cdaq End of Run 77052:
193986 10/31/09 12:08 chench Visual scalers run#77052
193985 10/31/09 12:05 csamanta Histogram check for run no. 77052
193984 10/31/09 12:04 chench The DAQ rate of fission comes back to 170 after pump to 50mtorr and refill the gas to 2.24torr
193983 10/31/09 12:01 cdaq E02017 Run 1611: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.27Torr. Low voltages:+7.13V and -9.13V.
193982 10/31/09 12:00 chench Screenshot of Target controller and magnet controll for run77052
193981 10/31/09 11:59 cdaq Run 77052: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193980 10/31/09 11:58 cdaq End of Run 77051:
193979 10/31/09 11:58 chench BPM and BCM at the end run of 77051
193978 10/31/09 11:43 cdaq E02017 End of Run 1610:
193977 10/31/09 11:25 csamanta Histogram check for run no. 77051
193976 10/31/09 11:24 chench Visual scalers run#77051
193975 10/31/09 11:20 cdaq Run 77051: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193974 10/31/09 11:20 chench screenshot of Target controller and magnet controller
193973 10/31/09 11:19 cdaq End of Run 77050:
193972 10/31/09 11:14 chench Visual scalers run#77050
193971 10/31/09 11:12 Tang Energy lock was off since 9:28AM for about 1.5 hours
193970 10/31/09 11:09 cdaq E02017 Run 1610: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.75Torr. Low voltages:+7.13V and -9.13V.
193969 10/31/09 11:08 chench BPM becomes normal after call to MCC
193968 10/31/09 11:00 chench BPM at the middle of run#7705
193967 10/31/09 10:53 csamanta Histogram check for run no. 77050
193966 10/31/09 10:43 cdaq E02017 End of Run 1609:
193965 10/31/09 10:41 cdaq Run 77050: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193964 10/31/09 10:39 chench run#77049 end is failed, we got 4M data from this run
193963 10/31/09 10:36 chench BPM after beam tripped
193962 10/31/09 10:30 chench beam was tripped around 10mins from 10:20-10:30
193961 10/31/09 10:30 Tang 9th dipole NMR reading and Hall C Arc
193960 10/31/09 10:06 Reinhold HCNMR signal
193959 10/31/09 10:01 chench Visual scalers run#77049
193958 10/31/09 09:59 chench Screen shot of Target controller and magentes controller
193957 10/31/09 09:59 cdaq E02017 Run 1609: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.54Torr. Low voltages:+7.13V and -9.13V.
193956 10/31/09 09:58 csamanta Histogram check for run no. 77049
193955 10/31/09 09:52 chench run77048 end run is failed , we got 4M events
193954 10/31/09 09:51 cdaq Run 77049: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193953 10/31/09 09:30 chench From run77047 we got around 2.4M events
193952 10/31/09 09:26 cdaq E02017 End of Run 1608:
193951 10/31/09 09:19 yez Visual scalers run#77048
193950 10/31/09 09:17 csamanta Histogram check for run no. 77048
193949 10/31/09 09:11 chench screenshot of HKS-HES magnets controller and target controller
193948 10/31/09 09:10 chench Screenshot of HV of DCs
193947 10/31/09 09:07 cdaq Run 77048: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193946 10/31/09 09:05 chench roc13 crashed
193945 10/31/09 09:04 cdaq End of Run 77047:
193944 10/31/09 09:04 cdaq E02017 Run 1608: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 3.0Torr. Low voltages:+7.13V and -9.13V.
193943 10/31/09 09:03 chench Called MCC about about the of HCNMR and 9 th dipole
193942 10/31/09 08:49 cdaq E02017 End of Run 1607:
193941 10/31/09 08:46 csamanta Histogram check for run #77047
193940 10/31/09 08:42 yez bpm&bcm screen shot for run#77047
193939 10/31/09 08:41 yez Visual scalers run#77047
193938 10/31/09 08:39 cdaq Run 77047: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193937 10/31/09 08:37 cdaq End of Run 77046:
193936 10/31/09 08:20 cdaq Beam Time Accounting
193935 10/31/09 08:09 yez The value of IPM3C07 also dropped. MCC is discussing both of the problems
193934 10/31/09 08:04 xqiu run check for #77046
193933 10/31/09 08:01 yez bpm&bcm screen shot for run#77046->HallC 9th Dipole histogram still show problem
193932 10/31/09 07:59 yez Visual scalers run#77046
193931 10/31/09 07:58 cdaq Run 77046: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193930 10/31/09 07:56 cdaq End of Run 77045:
193929 10/31/09 07:55 cdaq E02017 Run 1607: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.93Torr. Low voltages:+7.13V and -9.13V.
193928 10/31/09 07:44 yez Hall C 9th Dipole histogram shows problems. MCC is rebooting its IOC
193927 10/31/09 07:43 cdaq E02017 End of Run 1606:
193926 10/31/09 07:35 cdaq E02017 Run 1606: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.92Torr. Low voltages:+7.13V and -9.13V.
193925 10/31/09 07:30 xqiu run check for #77045
193924 10/31/09 07:26 yez The histogram of HallC 9th dipole NMR looks too flat,Called MCC, they said it should be OK. IOC problem?
193923 10/31/09 07:23 xqiu target and magnet screen shot
193922 10/31/09 07:22 xqiu DC HV in the run #77045
193921 10/31/09 07:20 yez bpm&bcm screent shot for run#77045
193920 10/31/09 07:19 yez Visual scalers run#77045
193919 10/31/09 07:16 cdaq Run 77045: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193918 10/31/09 07:16 cdaq E02017 End of Run 1605:
193917 10/31/09 07:15 cdaq End of Run 77044:
193916 10/31/09 07:06 xqiu run check for #77044
193915 10/31/09 06:59 xqiu target andmagnets controller screen shot during the run #77044
193914 10/31/09 06:58 xqiu DC HV in run #77044
193913 10/31/09 06:34 yez Visual scalers run#77044
193912 10/31/09 06:33 yez bpm&bcm screen shot for run#77044
193911 10/31/09 06:32 cdaq Run 77044: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193910 10/31/09 06:31 cdaq End of Run 77043:
193909 10/31/09 06:08 xqiu run check for #77043
193908 10/31/09 05:54 xqiu target and magnets controller in run #77043
193907 10/31/09 05:54 yez bpm&bcm screen shot for run#77043
193906 10/31/09 05:53 yez Visual scalers run#77043
193905 10/31/09 05:53 xqiu DC HV in run #77043
193904 10/31/09 05:51 cdaq Run 77043: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193903 10/31/09 05:50 cdaq End of Run 77042:
193902 10/31/09 05:40 cdaq E02017 Run 1605: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 3.01Torr. Low voltages:+7.13V and -9.13V.
193901 10/31/09 05:26 cdaq E02017 End of Run 1604:
193900 10/31/09 05:24 xqiu run check for #77042
193898 10/31/09 05:21 xqiu bpm &bcm screen shot during #77042
193897 10/31/09 05:18 yez Visual scalers run#77042
193896 10/31/09 05:10 xqiu DC HV in run #77042
193895 10/31/09 05:09 xqiu target and magnets controller in run #77042
193894 10/31/09 05:07 cdaq Run 77042: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193893 10/31/09 05:06 cdaq End of Run 77041:
193892 10/31/09 04:32 xqiu run check for #77041
193891 10/31/09 04:28 yez bpm&bcm screen shot for run#77041
193890 10/31/09 04:28 yez Visual scalers run#77041
193889 10/31/09 04:27 xqiu target and magnets controller in run #77041
193888 10/31/09 04:26 xqiu DC HV for run #77041
193887 10/31/09 04:26 cdaq Run 77041: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193886 10/31/09 04:25 cdaq End of Run 77040:
193885 10/31/09 04:22 cdaq E02017 Run 1604: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 3.52Torr. Low voltages:+7.13V and -9.13V.
193884 10/31/09 04:20 cdaq E02017 End of Run 1603:
193883 10/31/09 03:55 xqiu run check for #77040
193882 10/31/09 03:48 xqiu DC HV in run #77040
193881 10/31/09 03:47 yez BPM&BCM screen shot for run#77040
193880 10/31/09 03:47 yez Visual scalers run#77040
193879 10/31/09 03:46 xqiu target and magnets controller in run #77040
193878 10/31/09 03:45 cdaq Run 77040: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193877 10/31/09 03:44 cdaq End of Run 77039:
193876 10/31/09 03:13 xqiu run check for #77039
193875 10/31/09 03:07 yez BPM&BCM screen shot for run#77039
193874 10/31/09 03:07 xqiu target and magnets controller in run #77039
193873 10/31/09 03:06 yez Visual scalers run#77039
193872 10/31/09 03:05 xqiu DC HV in run #77039
193871 10/31/09 03:04 cdaq Run 77039: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193870 10/31/09 03:03 cdaq End of Run 77038:
193869 10/31/09 02:48 cdaq E02017 Run 1603: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.96Torr. Low voltages:+7.13V and -9.13V.
193868 10/31/09 02:42 xqiu run check for #77038
193867 10/31/09 02:36 cdaq E02017 End of Run 1602:
193866 10/31/09 02:32 xqiu DC HV in run #77038
193865 10/31/09 02:31 chench BCM and BPM for run#77038
193864 10/31/09 02:30 xqiu target and magnets controller during the run #77038
193863 10/31/09 02:30 yez Visual scalers run#77038
193862 10/31/09 02:26 cdaq Run 77038: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193861 10/31/09 02:24 cdaq End of Run 77037:
193860 10/31/09 01:58 xqiu run check for #77037
193859 10/31/09 01:50 yez BPM&BCM screen shot for run#77037
193858 10/31/09 01:50 yez Visual scalers run#77037
193857 10/31/09 01:49 xqiu DC HV for run #77037
193856 10/31/09 01:48 xqiu screen shot for target and magnets controller in run #77037
193855 10/31/09 01:46 cdaq Run 77037: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193854 10/31/09 01:43 yez ROC7 failed again. Try to reboot one more-->Run#77036 is JUNK
193853 10/31/09 01:42 cdaq Run 77036: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193852 10/31/09 01:39 yez ROC7 error->Reboot ROC7->Restart codamaster
193851 10/31/09 01:37 cdaq End of Run 77035:
193850 10/31/09 01:37 xqiu run check for #77035
193849 10/31/09 01:20 yez bpm&bcm screen shot for run#77035
193848 10/31/09 01:20 yez Visual scalers run#77035
193847 10/31/09 01:19 xqiu target and magnets controller screen shot in run 77035
193846 10/31/09 01:18 xqiu screen shot for DC HV in run #77035
193845 10/31/09 01:16 cdaq Run 77035: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193844 10/31/09 01:15 cdaq End of Run 77034:
193843 10/31/09 00:59 cdaq E02017 Run 1602: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.96Torr. Low voltages:+7.13V and -9.13V.
193842 10/31/09 00:56 xqiu run check for #77034
193841 10/31/09 00:47 cdaq E02017 End of Run 1601:
193840 10/31/09 00:40 xqiu screen shot for target and magnets controller in run #77034
193839 10/31/09 00:38 yez Visual scalers run#77034
193838 10/31/09 00:37 yez BPM&BCM screen shot for run#77034
193837 10/31/09 00:37 xqiu screen shot for DC HV in run #77034
193836 10/31/09 00:36 cdaq Run 77034: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193835 10/31/09 00:34 cdaq End of Run 77033:
193834 10/31/09 00:08 yez bpm&bcm screen shot for run#77033
193833 10/31/09 00:06 cdaq Beam Time Accounting
193832 10/31/09 00:05 chench Swing shift summary
193831 10/31/09 00:04 xqiu run check for #77033
193830 10/31/09 00:03 chench Visual scalers run#77033
Friday
193829 10/30/09 23:58 chench BPM after MCC reboot the IOC
193828 10/30/09 23:57 cdaq Run 77033: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193827 10/30/09 23:55 cdaq End of Run 77032:
193826 10/30/09 23:52 chench IOC was lost and BPM just before target is unnormal
193825 10/30/09 23:43 csamanta Histogram check for run no. 77032
193824 10/30/09 23:35 chench Visual scalers run#77032
193823 10/30/09 23:34 chench BCM and BPM at the beginning of run77032
193822 10/30/09 23:28 cdaq Run 77032: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193821 10/30/09 23:27 cdaq End of Run 77031:
193820 10/30/09 23:16 cdaq E02017 Run 1601: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.88Torr. Low voltages:+7.13V and -9.13V.
193819 10/30/09 23:04 csamanta Histogram check for run no. 77031
193818 10/30/09 23:04 cdaq E02017 End of Run 1600:
193817 10/30/09 22:56 chench Visual scalers run#77031
193816 10/30/09 22:48 cdaq Run 77031: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193815 10/30/09 22:47 chench BCM and BPM for run#77030
193814 10/30/09 22:47 cdaq End of Run 77030:
193813 10/30/09 22:38 csamanta Histogram check for run no. 77030
193812 10/30/09 22:12 chench Visual scalers run#77030
193811 10/30/09 22:08 cdaq Run 77030: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193810 10/30/09 22:08 chench BCM and BPM for run#77029
193809 10/30/09 22:07 cdaq End of Run 77029:
193808 10/30/09 21:51 csamanta Histogram check for run no. 77029
193807 10/30/09 21:38 chench Visual scalers run#77029
193806 10/30/09 21:37 chench Visual scalers run#77028
193805 10/30/09 21:30 cdaq E02017 Run 1600: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.96Torr. Low voltages:+7.13V and -9.13V.
193804 10/30/09 21:29 chench BCM and BPM for run#77028
193803 10/30/09 21:29 cdaq Run 77029: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193802 10/30/09 21:28 cdaq End of Run 77028:
193801 10/30/09 21:16 cdaq E02017 End of Run 1599:
193800 10/30/09 21:01 csamanta Histogram check for run no. 77028
193799 10/30/09 20:58 chench BCM and BPM for run#77027
193798 10/30/09 20:53 chench end run77027 because of the error from ROC14 we got 3.4M events
193797 10/30/09 20:51 cdaq Run 77028: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193796 10/30/09 20:51 csamanta Histogram check for run no. 77027
193795 10/30/09 20:50 chench Roc14 crashed
193794 10/30/09 20:49 cdaq End of Run 77027:
193793 10/30/09 20:35 csamanta Correction:Histogram check for run no. 77026
193792 10/30/09 20:26 csamanta Histogram check for run no. 77026
193791 10/30/09 20:20 chench Visual scalers run#77027
193790 10/30/09 20:14 cdaq Run 77027: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193789 10/30/09 20:12 cdaq End of Run 77026:
193788 10/30/09 20:12 chench BCM and BPM for run#77026
193787 10/30/09 19:52 csamanta Histogram check for run no. 77025
193786 10/30/09 19:45 cdaq E02017 Run 1599: Run with 7.72 uA beam 2344MeV, Cr target, with pressure 2.90Torr. Low voltages:+7.13V and -9.13V.
193785 10/30/09 19:40 chench Visual scalers run#77026
193784 10/30/09 19:35 cdaq Run 77026: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193783 10/30/09 19:35 chench BCM and BPM for rn#77025
193782 10/30/09 19:34 cdaq End of Run 77025:
193781 10/30/09 19:31 cdaq E02017 End of Run 1598:
193780 10/30/09 19:09 chench Visual scalers run#77025
193779 10/30/09 19:02 chench BCM and BPM for run#77024
193778 10/30/09 18:57 cdaq Run 77025: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193777 10/30/09 18:56 cdaq End of Run 77024:
193776 10/30/09 18:38 csamanta Histogram check for run no. 77024
193775 10/30/09 18:27 chench Visual scalers run#77024
193774 10/30/09 18:21 chench BCM and BPM for run#77023
193773 10/30/09 18:20 cdaq Run 77024: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193772 10/30/09 18:19 cdaq End of Run 77023:
193771 10/30/09 18:17 cdaq E02017 Run 1598: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.89Torr. Low voltages:+7.13V and -9.13V.
193770 10/30/09 18:08 cdaq E02017 End of Run 1597:
193769 10/30/09 18:06 chench beam energy lock and FFB were off for around ten mins during run#77023
193768 10/30/09 18:06 csamanta Histogram check for run no. 77023
193767 10/30/09 17:49 chench The visual scaler rate of HES is OK and from the camera the HES-D is alive
193766 10/30/09 17:48 chench Visual scalers run#77023
193765 10/30/09 17:43 cdaq Run 77023: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193764 10/30/09 17:42 chench end run77022 is failed
193763 10/30/09 17:40 chench BCM and BPM at the end of run#77022
193762 10/30/09 17:37 mack Unser electronics path (aka, ibcm3)
193761 10/30/09 17:37 chench HES-D Access Error
193760 10/30/09 17:23 csamanta Histogram check for run no. 77022
193759 10/30/09 17:20 chench Screenshot of HV for Drift chambers
193758 10/30/09 17:15 chench Visual scalers run#77022
193757 10/30/09 17:12 chench BCM and BPM at the end of run77021
193756 10/30/09 17:04 cdaq Run 77022: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193755 10/30/09 17:03 cdaq End of Run 77021:
193754 10/30/09 16:54 cdaq Beam Time Accounting
193753 10/30/09 16:38 chench During run#77021 there is around 20mins beam unstable (tripped+pulsed)
193752 10/30/09 16:05 saw Day shift summary
193751 10/30/09 16:05 Chiba Visual scalers and histograms for run#77021
193750 10/30/09 15:59 cdaq Run 77021: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193749 10/30/09 15:58 cdaq End of Run 77020:
193748 10/30/09 15:58 Chiba Fission chember`s gas was refilled. 3.67Torr -> 2.88Torr
193747 10/30/09 15:56 cdaq E02017 Run 1597: Run with 7.62 uA beam 2344MeV, Cr target, with pressure 2.88Torr. Low voltages:+7.13V and -9.13V.
193746 10/30/09 15:50 Chiba BPM screen shot
193745 10/30/09 15:44 cdaq E02017 End of Run 1596:
193744 10/30/09 15:40 Chiba AC3-1T ADC distribution change again and again...
193743 10/30/09 15:28 Chiba Visual scalers and histograms for run#77020
193742 10/30/09 15:22 cdaq Run 77020: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193741 10/30/09 15:18 cdaq End of Run 77019:
193740 10/30/09 15:12 Chiba AC3-1T ADC distribution change again...
193739 10/30/09 14:59 Chiba Visual scalers and histograms for run#77019
193738 10/30/09 14:45 Chiba 1X11+ recovered in run#77018
193737 10/30/09 14:44 saw Blank BPM is an IOC problem
193736 10/30/09 14:43 cdaq Run 77019: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193735 10/30/09 14:37 cdaq End of Run 77018:
193734 10/30/09 14:37 Chiba histgrams for run#77018
193733 10/30/09 14:28 chench BCM and BPM during the run#77018
193732 10/30/09 14:25 cdaq Run 77018: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193731 10/30/09 14:24 cdaq End of Run 77017:
193729 10/30/09 14:23 chench histogram check for run#77017
193728 10/30/09 14:22 chench 1y9- TDC comes back but 1x11+ TDC is missing during run#77017
193727 10/30/09 14:21 saw 3H03A and 3H03B BPMs blank on local display
193726 10/30/09 14:08 cdaq Run 77017: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193725 10/30/09 14:03 saw Run ended for hS1Y9- checkout
193724 10/30/09 13:56 cdaq E02017 Run 1596: Run with 7.62 uA beam 2344MeV, Cr target, with pressure 3.03Torr. Low voltages:+7.13V and -9.13V.
193723 10/30/09 13:54 cdaq End of Run 77016:
193722 10/30/09 13:53 Chiba 1Y9T TDC is strange
193721 10/30/09 13:46 cdaq E02017 End of Run 1595:
193720 10/30/09 13:39 Chiba Visual scalers and histograms for run#77016
193719 10/30/09 13:19 cdaq Run 77016: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193718 10/30/09 13:18 cdaq End of Run 77015:
193717 10/30/09 13:11 Reinhold Chaneg in Hall C ARC trajectory
193716 10/30/09 12:56 Chiba BPM & BCM screen shot
193715 10/30/09 12:46 Chiba Visual scalers and histograms for run#77015
193714 10/30/09 12:38 cdaq Run 77015: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193713 10/30/09 12:37 cdaq End of Run 77014:
193712 10/30/09 12:29 Chiba BPM & BCM screen shot
193711 10/30/09 12:26 Chiba Visual scalers and histgrams for run#77014
193710 10/30/09 12:13 cdaq E02017 Run 1595: Run with 7.62 uA beam 2344MeV, Cr target, with pressure 2.84Torr. Low voltages:+7.13V and -9.13V.
193709 10/30/09 12:13 Chiba Fission chember gas was refilled. 3.44Torr -> 2.84Torr
193708 10/30/09 12:05 yez Never mind...It looks 'normal' by looking at previous screen shots
193707 10/30/09 12:02 cdaq Run 77014: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193706 10/30/09 12:01 cdaq End of Run 77013:
193705 10/30/09 12:00 yez HES Q2 Field error?
193704 10/30/09 11:58 cdaq E02017 End of Run 1594:
193703 10/30/09 11:51 Chiba magnet & target controler screen shot
193702 10/30/09 11:32 Chiba histgram for run#77013
193701 10/30/09 11:31 Chiba BPM & BCM screen shot
193700 10/30/09 11:30 yez Here is the histograms for Run#77005 bad events
193699 10/30/09 11:28 yez I analyzed the last 40K events of run#77005, It looks like the HED Dipole already crashed before the end of the run#77005
193698 10/30/09 11:25 cdaq Run 77013: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193697 10/30/09 11:21 saw Beam off for MCC to restart FFB server
193696 10/30/09 11:20 cdaq End of Run 77012:
193695 10/30/09 11:17 Chiba histgram for run#77012
193694 10/30/09 11:10 cdaq Run 77012: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193693 10/30/09 11:09 cdaq End of Run 77011:
193692 10/30/09 11:09 Chiba histgram for run#77011
193691 10/30/09 10:35 Chiba Fission chember gas was refilled. 3.73Torr -> 2.90Torr
193690 10/30/09 10:32 cdaq Run 77011: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193689 10/30/09 10:30 cdaq End of Run 77010:
193688 10/30/09 10:27 cdaq E02017 Run 1594: Run with 7.62 uA beam 2344MeV, Cr target, with pressure 2.90Torr. Low voltages:+7.13V and -9.13V.
193687 10/30/09 10:14 cdaq E02017 End of Run 1593:
193686 10/30/09 10:05 Chiba BPM & BCM screen shot
193685 10/30/09 09:56 Chiba histgram for run#77010
193684 10/30/09 09:52 cdaq Run 77010: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193683 10/30/09 09:50 cdaq End of Run 77009:
193682 10/30/09 09:44 xqiu sorry for upload the wrong runcheck file, re-upload here, I'm very sorry
193681 10/30/09 09:41 Chiba magnet & target screen shot
193680 10/30/09 09:22 maruta HKS-D field still increase after run77009 started
193679 10/30/09 09:16 Chiba histgram for run#77009
193678 10/30/09 09:12 cdaq E02017 Run 1593: Run with 7.62 uA beam 2344MeV, Cr target, with pressure 2.95Torr. Low voltages:+7.13V and -9.13V.
193677 10/30/09 09:09 saw Dipoles cycled and run 77009 started
193676 10/30/09 09:08 cdaq Run 77009: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193675 10/30/09 09:03 saw Hall Entry: Reset HES-D and accidentally turned off HKS-D
193674 10/30/09 09:02 Tang Might be affected by beam check when beam recovered after couple of hours down
193673 10/30/09 08:58 yez HES Dipole crashed during this two runs(so they are JUNK)--> Asked Control Access to let Steve go down to turn off and on the power of HESD-->Beam Permit now-->Tomo now is cycling the HES Dipole&HKS Dipole
193672 10/30/09 08:55 saw HES Dipole tripped of around 6AM
193669 10/30/09 08:44 Chiba 77006&77007 hitpat is quit strange
193668 10/30/09 08:39 yez It is because HES Dipole crashed
193667 10/30/09 08:24 cdaq End of Run 77008:
193666 10/30/09 08:17 cdaq Run 77008: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193665 10/30/09 08:15 cdaq Beam Time Accounting
193664 10/30/09 08:14 yez Owl Shift Summery
193663 10/30/09 08:07 yez Lost Target BPM GUI, MCC said they need to reboot IOC
193662 10/30/09 08:06 cdaq End of Run 77007:
193661 10/30/09 08:02 cdaq E02017 End of Run 1592:
193660 10/30/09 07:51 yez Visual scalers for run#77007 ---> Rate looks lower for HES side after beam back,
193659 10/30/09 07:45 yez BPM&BCM screen shot for run#77007
193658 10/30/09 07:45 yez Beam is not stable for run#77007
193657 10/30/09 07:44 xqiu runcheck #77007
193656 10/30/09 07:39 xqiu target and magnets controller screen shot
193655 10/30/09 07:38 xqiu screen shot for DC HV during the run #77007
193654 10/30/09 07:37 cdaq E02017 Run 1592: Run with 7.62 uA beam 2344MeV, Cr target, with pressure 3.57Torr. Low voltages:+7.13V and -9.13V.
193653 10/30/09 07:37 cdaq Run 77007: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193652 10/30/09 07:36 yez MCC called: 8uA beam is back
193651 10/30/09 07:36 cdaq E02017 End of Run 1591:
193650 10/30/09 07:36 cdaq End of Run 77006:
193649 10/30/09 07:35 cdaq Run 77006: 2344 MeV,buffered, 52Cr target@ 2.3 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193648 10/30/09 07:35 cdaq E02017 Run 1591: Run with 2.3 uA beam 2344MeV, Cr target, with pressure 2.95Torr. Low voltages:+7.13V and -9.13V.
193647 10/30/09 07:33 yez MCC called: Low current CW beam will be sent
193646 10/30/09 07:32 cdaq E02017 End of Run 1590:
193645 10/30/09 07:01 cdaq E02017 Run 1590: Run with 0.0 uA beam 2344MeV, Cr target, with pressure 3.36Torr. Low voltages:+7.13V and -9.13V.
193644 10/30/09 07:00 cdaq E02017 End of Run 1589:
193643 10/30/09 06:48 yez MCC called: Another one hour to get beam back, they need to fix the Electron-Gun problem
193642 10/30/09 06:05 yez MCC called to reboot IOC--No Beam for few minute
193641 10/30/09 06:03 cdaq End of Run 77005:
193640 10/30/09 05:58 cdaq E02017 Run 1589: Run with 7.62 uA beam 2344MeV, Cr target, with pressure 2.97Torr. Low voltages:+7.13V and -9.13V.
193639 10/30/09 05:47 cdaq E02017 End of Run 1588:
193638 10/30/09 05:12 xqiu runcheck #77005
193637 10/30/09 05:01 xqiu target and magnets controller during run #77005
193636 10/30/09 05:01 yez BPM&BCM for run#77005
193635 10/30/09 05:00 yez Visual scalers and histograms for run#77005
193634 10/30/09 05:00 xqiu DC HV in run #77005
193633 10/30/09 04:58 cdaq Run 77005: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193632 10/30/09 04:55 yez Run#77004: EB1error-End Run failed-Reboot Codamaster
193631 10/30/09 04:45 cdaq E02017 Run 1588: Run with 7.62 uA beam 2344MeV, Cr target, with pressure 3.52Torr. Low voltages:+7.13V and -9.13V.
193630 10/30/09 04:43 cdaq E02017 End of Run 1587:
193629 10/30/09 04:24 xqiu checklist for run #77004
193628 10/30/09 04:19 xqiu DC HV screen shot in the run #77004
193627 10/30/09 04:18 xqiu target and magnets controller screen shot in the run #77004
193626 10/30/09 04:16 yez BPM&BCM for run#77004
193625 10/30/09 04:15 yez Visual scalers and histograms for run#77004
193624 10/30/09 04:13 cdaq Run 77004: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193623 10/30/09 04:12 cdaq End of Run 77003:
193622 10/30/09 03:42 xqiu checklist for run #77003
193621 10/30/09 03:37 yez BPM&BCM for run#77003
193620 10/30/09 03:36 yez Visual scalers and histograms for run#77003
193619 10/30/09 03:36 xqiu screen shot for target controller and magnets conroller in run #77003
193618 10/30/09 03:34 xqiu screen shot for DC HV during run #77003
193617 10/30/09 03:34 cdaq Run 77003: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193616 10/30/09 03:33 cdaq End of Run 77002:
193615 10/30/09 03:14 xqiu checklist for run #77002
193614 10/30/09 03:12 cdaq E02017 Run 1587: Run with 7.62 uA beam 2344MeV, Cr target, with pressure 2.95Torr. Low voltages:+7.13V and -9.13V.
193613 10/30/09 02:56 cdaq E02017 End of Run 1586:
193612 10/30/09 02:56 yez BPM&BCM for run77002
193611 10/30/09 02:55 yez Visual scalers and histograms for run#77002
193610 10/30/09 02:55 xqiu target controller and magnets screen shot in run #77002
193609 10/30/09 02:54 xqiu DC HV screen shot in run #77002
193608 10/30/09 02:53 cdaq Run 77002: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193607 10/30/09 02:52 cdaq End of Run 77001:
193606 10/30/09 02:32 xqiu checklist for run #77001
193605 10/30/09 02:17 xqiu screen shot for DC HV in run #77001
193604 10/30/09 02:17 yez BPM&BCM screen for run#77001
193603 10/30/09 02:16 xqiu screen shot for target controller and magnets during the run #77001
193602 10/30/09 02:16 shichijo Visual scalers and histograms for run#77001
193601 10/30/09 02:14 cdaq Run 77001: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193600 10/30/09 02:11 yez codamaster error again- ROC1 lost - End Run failed-- Reboot ROC1
193599 10/30/09 01:50 cdaq E02017 Run 1586: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 3.58Torr. Low voltages:+7.13V and -9.13V.
193598 10/30/09 01:46 cdaq E02017 End of Run 1585:
193597 10/30/09 01:44 xqiu checklist for run #77000
193596 10/30/09 01:28 yez BCM&BPM screen for run#77000
193595 10/30/09 01:27 shichijo Visual scalers and histograms for run#77000
193594 10/30/09 01:27 xqiu target controller and magnets screen shot for run #77000
193593 10/30/09 01:25 xqiu screen shot for DC HV In run #77000
193592 10/30/09 01:25 yez End Run failed. EB1 error. Reboot Codamaster
193591 10/30/09 01:24 cdaq Run 77000: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193590 10/30/09 00:58 xqiu checklist for run #76999
193589 10/30/09 00:51 yez Well, it is me...
193588 10/30/09 00:46 yez BPM&BCM screen for run#76999
193587 10/30/09 00:45 shichijo Visual scalers and histograms for run#76999
193586 10/30/09 00:44 xqiu screen shot for DC HV in run #76999
193585 10/30/09 00:43 xqiu screen shot for target controller and magnets during run #76999
193584 10/30/09 00:42 cdaq Run 76999: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193583 10/30/09 00:41 cdaq End of Run 76998:
193582 10/30/09 00:37 xqiu screen shot for target controller abd magnet in run #76998
193581 10/30/09 00:34 Reinhold Done moving E02017 ntuple and root files to /net/cdaqfs/scratch/cdaq/e02017/
193580 10/30/09 00:32 xqiu screen shot for DC HV in run #76998
193579 10/30/09 00:13 Reinhold Moving E02017 ntuple, hbook, and root files to /net/cdaqfs/scratch/cdaq/e02017/
193578 10/30/09 00:12 shichijo Visual scalers and histograms for run#76998
193577 10/30/09 00:09 chench correction: I Put the wrong sreenshot, here is the correct one
193576 10/30/09 00:09 shichijo ibcm3 returns strange value
193575 10/30/09 00:05 cdaq Beam Time Accounting
193574 10/30/09 00:04 cdaq E02017 Run 1585: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.93Torr. Low voltages:+7.13V and -9.13V.
193573 10/30/09 00:03 chench swing shift summary
193572 10/30/09 00:02 Reinhold Disk usage in cdaq home directory; someone needs to clean up
193571 10/30/09 00:02 chench BPM for run#76697
193570 10/30/09 00:01 cdaq Run 76998: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193569 10/30/09 00:00 cdaq End of Run 76997:
Thursday
193568 10/29/09 23:52 cdaq E02017 End of Run 1584:
193567 10/29/09 23:49 yez Actually the X-Server of cdaql6 was restarted, which was crashed due to no space left
193566 10/29/09 23:45 shichijo HDC/EDC HV screen shot (run 76997)
193565 10/29/09 23:41 maruta Copy hbook and root files to scratch directory
193564 10/29/09 23:35 shichijo Visual scalers and histograms for run#76997
193563 10/29/09 23:34 chench after log out and log in again, coda works again
193562 10/29/09 23:31 shichijo Visual scalers and histograms for run#76996
193561 10/29/09 23:24 Reinhold CH reports CODA not running
193560 10/29/09 23:22 saw Scratch disk for ntuples
193559 10/29/09 23:21 cdaq Run 76997: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193558 10/29/09 22:58 shichijo Daq error ER1:cannot write event
193557 10/29/09 22:51 cdaq End of Run :
193556 10/29/09 22:43 cdaq Run 76996: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193555 10/29/09 22:42 cdaq End of Run 76995:
193554 10/29/09 22:12 shichijo FFB and ion chamber screen shot
193553 10/29/09 22:12 chench BCM and BMP after beam comes back (run#=76695)
193552 10/29/09 22:10 shichijo Visual scalers and histograms for run#76995
193551 10/29/09 22:07 shichijo HDC/EDC HV screen shot (run 76995)
193550 10/29/09 22:05 cdaq Run 76995: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193549 10/29/09 22:05 cdaq E02017 Run 1584: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.95Torr. Low voltages:+7.13V and -9.13V.
193548 10/29/09 22:04 chench mcc called beam will come back soon
193547 10/29/09 21:46 chench We got 2.7M events from run#76994
193546 10/29/09 21:44 chench MCC called beam was lost because of some camera problems
193545 10/29/09 21:44 cdaq E02017 End of Run 1583:
193544 10/29/09 21:43 cdaq End of Run 76994:
193543 10/29/09 21:19 shichijo Visual scalers and histograms for run#76994
193542 10/29/09 21:18 chench We got 3.2M events from run#76993
193541 10/29/09 21:14 cdaq Run 76994: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193540 10/29/09 21:12 chench Roc7 crashed again
193539 10/29/09 21:10 cdaq End of Run 76993:
193538 10/29/09 20:53 shichijo magnets and target controller screen shot
193537 10/29/09 20:51 shichijo HDC/EDC HV screen shot (run 76993)
193536 10/29/09 20:50 shichijo Visual scalers and histograms for run#76993
193535 10/29/09 20:45 chench BCM and BPM for run#76992
193534 10/29/09 20:43 cdaq Run 76993: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193533 10/29/09 20:13 shichijo Visual scalers and histograms for run#76992
193532 10/29/09 20:11 cdaq E02017 Run 1583: Run with 8.0 uA beam 2344MeV, Cr target, with pressure 2.89Torr. Low voltages:+7.13V and -9.13V.
193531 10/29/09 20:07 cdaq Run 76992: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193530 10/29/09 20:05 cdaq End of Run 76991:
193529 10/29/09 20:05 chench BCM and BPMM and BPM for run#76991
193528 10/29/09 19:59 cdaq E02017 End of Run 1582:
193527 10/29/09 19:40 shichijo HDC / EDC HV screen shot (run76991)
193526 10/29/09 19:34 shichijo Visual scalers and histograms for run#76991
193525 10/29/09 19:25 cdaq Run 76991: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193524 10/29/09 19:24 cdaq End of Run 76990:
193523 10/29/09 19:24 chench BCM and BPM for run#76990
193522 10/29/09 18:51 shichijo Visual scalers and histograms for run#76990
193521 10/29/09 18:46 cdaq Run 76990: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193520 10/29/09 18:46 chench BCM and BPM for run#76990
193519 10/29/09 18:45 cdaq End of Run 76989:
193518 10/29/09 18:21 shichijo HDC / EDC HV screen shot (run 76989)
193517 10/29/09 18:16 shichijo Visual scalers and histograms for run#76989
193516 10/29/09 18:07 cdaq Run 76989: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193515 10/29/09 18:07 cdaq E02017 Run 1582: Run with 8 uA beam 2344MeV, Cr target, with pressure 2.96Torr. Low voltages:+7.13V and -9.13V.
193514 10/29/09 18:05 chen DAQ error:ER1 can not write events
193513 10/29/09 18:03 cdaq End of Run 76988:
193512 10/29/09 18:03 shichijo Visual scalers for run#76988 and run histogram checklist
193511 10/29/09 18:01 chench Screenshot for HV of DCs
193510 10/29/09 17:59 cdaq Run 76988: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193509 10/29/09 17:59 shichijo BCM and BPM for run#76987
193508 10/29/09 17:58 cdaq End of Run 76987:
193507 10/29/09 17:56 cdaq E02017 End of Run 1581:
193506 10/29/09 17:24 shichijo Visual scalers for run#76987 and run histogram checklist
193505 10/29/09 17:21 shichijo HDC / EDC HV screen shot. (run#76987)
193504 10/29/09 17:18 cdaq Run 76987: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193503 10/29/09 17:18 chench BCM and BPM at the end of run#76986
193502 10/29/09 17:17 cdaq End of Run 76986:
193501 10/29/09 16:55 shichijo histogram for run#76986
193500 10/29/09 16:54 Chiba day shift summury
193499 10/29/09 16:45 shichijo BPM and BCM snapshot (run#76986)
193498 10/29/09 16:42 shichijo Visual scalers for run#76986
193497 10/29/09 16:38 cdaq Run 76986: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193496 10/29/09 16:36 chench roc7 crashed
193495 10/29/09 16:35 cdaq End of Run 76985:
193494 10/29/09 16:28 cdaq Beam Time Accounting
193493 10/29/09 16:13 Chiba Fission chember gas is now refilled up to ~2.87 Torr
193492 10/29/09 16:12 cdaq E02017 Run 1581: Run with 7.5 uA beam 2344MeV, Cr target, with pressure 2.87Torr. Low voltages:+7.13V and -9.13V.
193491 10/29/09 16:12 Chiba check hists for run#76985
193490 10/29/09 16:10 Chiba Visual scalers for run#76985
193489 10/29/09 16:01 cdaq E02017 End of Run 1580:
193488 10/29/09 15:57 cdaq Run 76985: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193487 10/29/09 15:55 cdaq End of Run 76984:
193486 10/29/09 15:38 Chiba HDC & EDC current screen shot
193485 10/29/09 15:37 Chiba target and magnet control screen shot
193484 10/29/09 15:32 Chiba BPM & BCM screen shot
193483 10/29/09 15:30 Chiba check hists for run#76984
193482 10/29/09 15:29 Chiba Visual scalers for run#76984
193481 10/29/09 15:23 Chiba Run#76983 end with error
193480 10/29/09 15:17 cdaq Run 76984: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193479 10/29/09 14:52 Chiba BPM & BCM screen shot
193478 10/29/09 14:44 Chiba check hists for run#76983
193477 10/29/09 14:42 Chiba Visual scalers for run#76983
193476 10/29/09 14:39 Chiba symply we restarted
193475 10/29/09 14:32 Chiba Run 76982 ended due to ROC 11 error
193474 10/29/09 14:30 cdaq Run 76983: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193473 10/29/09 14:26 cdaq End of Run 76982:
193472 10/29/09 14:22 Chiba target and magnet control screen shot
193471 10/29/09 14:19 Chiba BPM and BCM screen shot
193470 10/29/09 14:18 Chiba check hists for run#76982
193469 10/29/09 14:16 Chiba Visual scalers for run#76982
193467 10/29/09 14:09 cdaq E02017 Run 1580: Run with 7.5 uA beam 2344MeV, Cr target, with pressure 2.92Torr. Low voltages:+7.13V and -9.13V.
193466 10/29/09 14:07 cdaq Run 76982: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193465 10/29/09 14:06 cdaq End of Run 76981:
193464 10/29/09 13:57 cdaq E02017 End of Run 1579:
193463 10/29/09 13:45 Chiba HDC & EDC current screen shot
193462 10/29/09 13:39 Chiba BPM & BCM screen shot
193461 10/29/09 13:33 Chiba check hists for run#76981
193460 10/29/09 13:32 Chiba Visual scalers for run#76981
193459 10/29/09 13:24 cdaq Run 76981: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193458 10/29/09 13:23 cdaq End of Run 76980:
193457 10/29/09 12:52 Chiba BPM screen shot for run#76980
193456 10/29/09 12:50 Chiba check hists for run#76980
193455 10/29/09 12:49 Chiba Visual scalers for run#76980
193454 10/29/09 12:44 cdaq Run 76980: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193453 10/29/09 12:42 cdaq End of Run 76979:
193452 10/29/09 12:18 Reinhold Checked for Hall A dithering: it is off
193451 10/29/09 12:18 Reinhold Checked for Hall A dithering: it is off
193450 10/29/09 12:14 Chiba BPM screen shot for run#76979
193449 10/29/09 12:09 Chiba check hists for run#76979
193448 10/29/09 12:09 Chiba Visual scalers for run#76979
193447 10/29/09 12:00 Chiba Fission chember gas is now refilled up to ~2.92 Torr
193446 10/29/09 12:00 cdaq Run 76979: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193445 10/29/09 12:00 cdaq E02017 Run 1579: Run with 7.5 uA beam 2344MeV, Cr target, with pressure 2.90Torr. Low voltages:+7.13V and -9.13V.
193444 10/29/09 11:59 cdaq End of Run 76978:
193443 10/29/09 11:57 Chiba HDC and EDC current screen shot
193442 10/29/09 11:48 cdaq E02017 End of Run 1578:
193441 10/29/09 11:38 Chiba current SLI monitor
193440 10/29/09 11:33 Chiba check hists for run#76978
193439 10/29/09 11:32 Chiba Visual scalers for run#76978
193438 10/29/09 11:23 Reinhold Re: BPM display file changed by someone?
193437 10/29/09 11:22 cdaq Run 76978: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193436 10/29/09 11:21 Chiba BPM screen shot for run#76978
193435 10/29/09 11:15 cdaq End of Run 76977:
193434 10/29/09 11:09 Chiba Re:BPM display file changed by someone?
193433 10/29/09 10:48 Chiba check hists for run#76977
193432 10/29/09 10:47 Chiba Visual scalers for run#76977
193431 10/29/09 10:44 Reinhold BPM display file changed by someone?
193430 10/29/09 10:36 cdaq Run 76977: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193429 10/29/09 10:34 Chiba check hists for run#76976
193428 10/29/09 10:34 cdaq End of Run 76976:
193427 10/29/09 10:24 Chiba HDC & EDC HV screen shot
193426 10/29/09 10:13 Chiba BPM minitor restarted
193425 10/29/09 10:09 Chiba Visual scalers for run#76976
193424 10/29/09 09:54 cdaq Run 76976: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193423 10/29/09 09:52 cdaq End of Run 76975:
193422 10/29/09 09:45 cdaq E02017 Run 1578: Run with 7.5 uA beam 2344MeV, Cr target, with pressure 2.96Torr. Low voltages:+7.13V and -9.13V.
193421 10/29/09 09:44 Chiba HDC & EDC HV screen shot
193420 10/29/09 09:40 Chiba BPM&BCM screen shot for run#76975
193419 10/29/09 09:32 Chiba Run #1576 (e02017) ended to refill heptan
193418 10/29/09 09:29 cdaq E02017 End of Run 1577:
193417 10/29/09 09:25 Chiba check hists for run#76975
193416 10/29/09 09:19 Chiba Visual scalers for run#76975
193415 10/29/09 09:14 cdaq Run 76975: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193414 10/29/09 09:11 Tang Beam stability
193413 10/29/09 09:11 cdaq End of Run 76974:
193412 10/29/09 09:09 Chiba BPM& BCM screen shot at 9:08
193411 10/29/09 08:57 Chiba magnet control and sieve slit screan shot for run76974
193410 10/29/09 08:49 Chiba check hists for run#76974
193409 10/29/09 08:43 Chiba BPM&BCM screen shot for run#76974
193408 10/29/09 08:41 Reinhold Re: Beam was not that stable in last one hour but not that bad. Ask MCC to keep eyes on it
193407 10/29/09 08:41 Reinhold Re: Beam was not that stable in last one hour but not that bad. Ask MCC to keep eyes on it
193406 10/29/09 08:37 Chiba Visual scalers for run#76974
193405 10/29/09 08:30 cdaq Run 76974: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193404 10/29/09 08:30 Reinhold Re: This is the BPM&BCM screen shot for run#76963 - Beam position looks not stable in last 80 minuts
193403 10/29/09 08:29 cdaq End of Run 76973:
193402 10/29/09 08:14 xqiu screen shot for target controller and magnets during run #76973
193401 10/29/09 08:12 cdaq Beam Time Accounting
193400 10/29/09 08:12 xqiu screen shot for DC HV in run #76973
193399 10/29/09 08:10 xqiu run check for #76973
193398 10/29/09 07:53 yez BPM&BCM screen shot for run#76973
193397 10/29/09 07:52 yez Visual scalers for run#76973
193396 10/29/09 07:50 cdaq Run 76973: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193395 10/29/09 07:48 cdaq End of Run 76972:
193394 10/29/09 07:35 cdaq E02017 Run 1577: Run with 7.8 uA beam 2344MeV, Cr target, with pressure 2.97Torr. Low voltages:+7.13V and -9.13V.
193393 10/29/09 07:22 cdaq E02017 End of Run 1576:
193392 10/29/09 07:17 xqiu run check for #76972
193391 10/29/09 07:11 xqiu screen shot for target controller and magnets during the run #76972
193390 10/29/09 07:10 yez BPM&BCM screen shot for run#76972
193389 10/29/09 07:09 yez Visual scalers for run#76972
193388 10/29/09 07:09 xqiu screen shot for DC HV during run #76972
193387 10/29/09 07:07 cdaq Run 76972: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193386 10/29/09 07:06 cdaq End of Run 76971:
193385 10/29/09 06:38 xqiu run check for #76971
193384 10/29/09 06:27 xqiu screen shot of DC HV in run #76971
193383 10/29/09 06:26 yez Visual scalers for run#76971
193382 10/29/09 06:26 xqiu target controller and magnets screen shot during run #76971
193381 10/29/09 06:24 cdaq Run 76971: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193380 10/29/09 06:22 cdaq End of Run 76970:
193379 10/29/09 06:19 yez Forgot to put the graph, here is
193378 10/29/09 06:18 yez Beam was not that stable in last one hour but not that bad. Ask MCC to keep eyes on it
193377 10/29/09 05:58 xqiu run check for #76970
193376 10/29/09 05:46 yez BPM&BCM screen shot for run#76970
193375 10/29/09 05:46 yez Visual scalers for run#76970
193374 10/29/09 05:45 xqiu target controller and magnets screen shot in run #76970
193373 10/29/09 05:44 xqiu screen shot for HV of DC during run #76970
193372 10/29/09 05:43 cdaq Run 76970: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193371 10/29/09 05:41 cdaq End of Run 76969:
193370 10/29/09 05:27 xqiu run check for #76969
193368 10/29/09 05:24 cdaq E02017 Run 1576: Run with 7.5 uA beam 2344MeV, Cr target, with pressure 2.96Torr. Low voltages:+7.13V and -9.13V.
193367 10/29/09 05:08 cdaq E02017 End of Run 1575:
193366 10/29/09 05:06 yez Visual scalers for run#76969
193365 10/29/09 05:06 xqiu screen shot for DC HV in run #76969
193364 10/29/09 05:05 xqiu target controller and magnets screen shot during run #76969
193363 10/29/09 05:05 yez BPM&BCM screen shot for run#76969
193362 10/29/09 05:04 cdaq Run 76969: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193361 10/29/09 05:03 cdaq End of Run 76968:
193360 10/29/09 04:42 xqiu run check for #76968
193359 10/29/09 04:34 yez BPM&BCM screen shot for run#76968
193358 10/29/09 04:33 yez Visual scalers for run#76968
193357 10/29/09 04:32 xqiu target controller and magnets screen shot for run #76968
193356 10/29/09 04:31 xqiu DC HV screen shot for run #76968
193355 10/29/09 04:30 cdaq Run 76968: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193354 10/29/09 04:29 yez restart codamaster failed due to ROC7 lost connection. Reboot ROC7
193353 10/29/09 04:24 yez ROC7 error- Restart codamaster
193352 10/29/09 04:16 xqiu run check for #76967
193351 10/29/09 03:59 yez Visual scalers for run#76967
193350 10/29/09 03:59 xqiu HV for DC screen shot
193349 10/29/09 03:58 xqiu target controller and magnets screen shot
193348 10/29/09 03:55 yez BPM&BCM screen shot for run#76967
193347 10/29/09 03:54 cdaq Run 76967: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193346 10/29/09 03:52 cdaq End of Run 76966:
193345 10/29/09 03:24 xqiu run check for #76966
193344 10/29/09 03:18 xqiu SS and Target controller screen shot
193343 10/29/09 03:16 cdaq E02017 Run 1575: Run with 8 uA beam 2344MeV, Cr target, with pressure 3.01Torr. Low voltages:+7.13V and -9.13V.
193342 10/29/09 03:16 yez BPM&BCM screen shot for run#76966
193341 10/29/09 03:16 xqiu screen shot for DC
193340 10/29/09 03:15 yez Visual scalers for run#76966
193339 10/29/09 03:09 cdaq Run 76966: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193338 10/29/09 03:01 Nue Water cell target pump was stopped and flow meter FSD was masked. H2O target cannot be used
193337 10/29/09 02:30 cdaq E02017 End of Run 1574:
193336 10/29/09 02:29 yez Controlled Access : Nue and Tomo will go into the hall and shut down water pump
193335 10/29/09 02:26 cdaq End of Run 76965:
193334 10/29/09 02:20 Nue Water flow is not essential for Cr runs
193333 10/29/09 02:16 xqiu run check for #76965
193332 10/29/09 02:11 yez BPM&BCM screen shot for #76965
193331 10/29/09 02:10 yez Visual scalers for run#76965
193330 10/29/09 02:09 xqiu screen shot for DC
193329 10/29/09 02:02 yez Water Fault again but recovered soon again. Beam is back. --Called Nue and Tang
193328 10/29/09 02:00 cdaq E02017 Run 1574: Run with 8 uA beam 2344MeV, Cr target, with pressure 3.63Torr. Low voltages:+7.13V and -9.13V.
193327 10/29/09 01:59 cdaq Run 76965: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193326 10/29/09 01:51 cdaq E02017 End of Run 1573:
193325 10/29/09 01:50 cdaq End of Run 76964:
193324 10/29/09 01:46 xqiu run check for #76964
193323 10/29/09 01:36 yez MCC called there is a Water fault near our splitter but soon it is clear. Is that an old issue?
193322 10/29/09 01:27 yez Target&Magnets' screen-shot
193321 10/29/09 01:25 yez DCs' HV screen-shot for run76964
193320 10/29/09 01:25 yez Visual scalers for run#76964
193319 10/29/09 01:22 cdaq Run 76964: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193318 10/29/09 01:21 cdaq End of Run 76963:
193317 10/29/09 01:16 yez This is the BPM&BCM screen shot for run#76963 - Beam position looks not stable in last 80 minuts
193316 10/29/09 01:14 xqiu run check for #76963
193315 10/29/09 01:12 yzz bppm
193314 10/29/09 00:48 xqiu screen shot for DC
193313 10/29/09 00:47 yez Visual scalers for run#76963
193312 10/29/09 00:44 cdaq Run 76963: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193311 10/29/09 00:43 cdaq End of Run 76962:
193310 10/29/09 00:24 xqiu run check for #76962
193309 10/29/09 00:16 yez Target and Magnets screen shot for run#76962
193308 10/29/09 00:15 yez HDC&EDC screen shot for run#76962
193307 10/29/09 00:13 yez Visual scalers for run#76962
193306 10/29/09 00:09 cdaq Run 76962: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193305 10/29/09 00:08 cdaq Beam Time Accounting
193304 10/29/09 00:08 cdaq End of Run 76961:
193303 10/29/09 00:08 maruta Shift summary, 10/28 Swing
193302 10/29/09 00:02 cdaq E02017 Run 1573: Run with 8 uA beam 2344MeV, Cr target, with pressure 2.92Torr. Low voltages:+7.13V and -9.13V.
Wednesday
193301 10/28/09 23:51 cdaq E02017 End of Run 1572:
193300 10/28/09 23:44 maruta HDC/EDC HV screen shot
193299 10/28/09 23:42 maruta Mag/sst controller screen shot
193298 10/28/09 23:40 maruta Visual scalers for run#76961
193297 10/28/09 23:32 maruta BPM/BCM screen shot
193296 10/28/09 23:32 cdaq Run 76961: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193295 10/28/09 22:49 maruta Visual scalers for run#76960
193294 10/28/09 22:44 cdaq Run 76960: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193293 10/28/09 22:43 cdaq End of Run 76959:
193292 10/28/09 22:10 maruta Visual scalers for run#76959
193291 10/28/09 22:03 cdaq Run 76959: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193290 10/28/09 22:02 cdaq End of Run 76958:
193289 10/28/09 21:42 maruta 3H004 (water flow) fault once
193288 10/28/09 21:42 cdaq E02017 Run 1572: Run with 8 uA beam 2344MeV, Cr target, with pressure 3.00Torr. Low voltages:+7.13V and -9.13V.
193287 10/28/09 21:33 maruta BPM/BCM screen shot
193286 10/28/09 21:27 cdaq E02017 End of Run 1571:
193285 10/28/09 21:13 vmaxwell Visual scalers for run#76958
193284 10/28/09 21:08 cdaq Run 76958: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193283 10/28/09 21:08 cdaq E02017 Run 1571: Run with 8 uA beam 2344MeV, Cr target, with pressure 3.55Torr. Low voltages:+11V and -9.2V.
193282 10/28/09 21:08 maruta beam back
193281 10/28/09 20:51 maruta Beam stop again for injector issue
193280 10/28/09 20:50 cdaq End of Run 76957:
193279 10/28/09 20:50 cdaq E02017 End of Run 1570:
193278 10/28/09 20:43 vmaxwell Visual scalers for run#76957
193277 10/28/09 20:39 cdaq E02017 Run 1570: Run with 8 uA beam 2344MeV, Cr target, with pressure 3.37Torr. Low voltages:+11V and -9.2V.
193276 10/28/09 20:37 maruta beam come back
193275 10/28/09 20:36 Chiba last figure
193274 10/28/09 20:36 cdaq Run 76957: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193273 10/28/09 20:31 Chiba Some comparison before and after power outage
193272 10/28/09 20:29 vmaxwell Visual scalers for run#76956
193271 10/28/09 20:25 maruta Injector problem again.
193270 10/28/09 20:24 cdaq End of Run 76956:
193269 10/28/09 20:24 cdaq E02017 End of Run 1569:
193268 10/28/09 20:24 chench Betabrite works properly
193267 10/28/09 20:18 cdaq Run 76956: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193266 10/28/09 20:15 cdaq End of Run 76955:
193265 10/28/09 19:41 cdaq E02017 Run 1569: Run with 8 uA beam 2344MeV, Cr target, with pressure 3.04Torr. Low voltages:+7.13V and -9.13V.
193264 10/28/09 19:40 maruta Beam back
193263 10/28/09 19:39 maruta mag/sst controller screen shot
193262 10/28/09 19:38 maruta HDC/EDC HV screen shot
193261 10/28/09 19:33 cdaq Run 76955: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193260 10/28/09 19:31 Tang Four working planes in EDC2
193259 10/28/09 19:26 cdaq E02017 End of Run 1568:
193258 10/28/09 18:21 maruta another 2 hours for recovery
193257 10/28/09 17:01 maruta mag/sst controller screen shot
193256 10/28/09 16:59 cdaq E02017 Run 1568: Run with NO BEAM.
193255 10/28/09 16:59 maruta Injector problem, it will recover within a few minutes hopefully.
193254 10/28/09 16:45 chench EDC2 comes back
193253 10/28/09 16:35 maruta Power permit now
193252 10/28/09 16:30 cdaq E02017 End of Run 1567:
193251 10/28/09 16:30 cdaq Beam Time Accounting
193250 10/28/09 15:26 Nue Controlled access
193249 10/28/09 14:35 saw Restarted betabrite display
193248 10/28/09 14:16 chench DOE TOUR, NO BEAM FOR AROUND ONE HOUR
193247 10/28/09 14:14 chench Beta Brite gives us wrong information
193246 10/28/09 14:14 cdaq E02017 Run 1567: no beam run
193245 10/28/09 14:13 cdaq End of Run 76954:
193244 10/28/09 14:10 chench This is visual scalers is for run#76954
193243 10/28/09 14:08 chench histogram check for run#76954
193242 10/28/09 14:02 cdaq E02017 End of Run 1566:
193241 10/28/09 14:02 chench Visual scalers for run#76953
193240 10/28/09 13:57 cdaq Run 76954: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193239 10/28/09 13:56 cdaq End of Run 76953:
193238 10/28/09 13:33 Chiba Comparison of before and after power outage (quick check)
193237 10/28/09 13:23 chench Visual scalers for run#76953
193236 10/28/09 13:15 chench histogram check for run#76953
193235 10/28/09 13:14 chench BPM and BCM at the beginning of run#76953 after the controlled access
193234 10/28/09 13:11 cdaq E02017 Run 1566: Run with 8 uA beam 2344MeV, Cr target, with pressure 3.08Torr. Low voltages:+7.13V and -9.13V.
193233 10/28/09 13:11 cdaq Run 76953: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193232 10/28/09 13:03 cdaq E02017 End of Run 1565:
193231 10/28/09 12:45 Gogami Hall C controlled access- iochlc3 down
193230 10/28/09 12:40 cdaq E02017 Run 1565: No beam run, pressure 3.19Torr
193229 10/28/09 12:39 cdaq E02017 End of Run 1564:
193228 10/28/09 12:38 cdaq End of Run 76952:
193227 10/28/09 12:12 Gogami Fast FB and Magnet Controller screenshot
193226 10/28/09 12:11 Gogami DC HV screenshot[52Cr@8uA]
193225 10/28/09 12:09 chench histogram check for run#76952
193224 10/28/09 12:07 cdaq E02017 Run 1564: Run with 8 uA beam 2344MeV, Cr target, with pressure 3.08Torr. Low voltages:+7.13V and -9.13V.
193223 10/28/09 12:04 Gogami Visual scaler rate[52Cr@8uA/Run76952]
193222 10/28/09 11:59 cdaq Run 76952: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193221 10/28/09 11:58 cdaq End of Run 76951:
193220 10/28/09 11:50 cdaq E02017 End of Run 1563:
193219 10/28/09 11:32 Gogami Visual scaler rate[52Cr@8uA/Run76951]
193218 10/28/09 11:30 chench histogram check for run#76951
193217 10/28/09 11:26 Nue SLI screenshot
193216 10/28/09 11:24 chench BPM at the beginning of rrun#76951
193215 10/28/09 11:11 Gogami SLI works well now.
193214 10/28/09 11:11 cdaq Run 76951: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193213 10/28/09 11:09 chench extra events problem from roc13
193212 10/28/09 11:07 cdaq End of Run 76950:
193211 10/28/09 11:05 Nue Still EDC2 is off
193210 10/28/09 10:58 Gogami Magnets controller screenshot
193209 10/28/09 10:57 Gogami Fast FB and Ion chamber screenshot
193208 10/28/09 10:55 Gogami DC HVs screenshot[52Cr@8uA]
193207 10/28/09 10:52 chench histogram check for run#76950
193206 10/28/09 10:51 Gogami //Visual scaler rate[52Cr@8uA/Run76949] ==>//COIN: 1.86[ Hz] ==> 1584[ Hz]
193205 10/28/09 10:50 Nue EDC1 HVs are on
193204 10/28/09 10:49 Nue Water falut forDW2 or CO
193203 10/28/09 10:48 Gogami Visual scaler rate[52Cr@8uA/Run76950]
193202 10/28/09 10:42 cdaq Run 76950: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193201 10/28/09 10:25 cdaq E02017 Run 1563: Run with 8 uA beam 2344MeV, Cr target, with pressure 3.08Torr. Low voltages:+7.13V and -9.13V.
193200 10/28/09 10:01 Nue EDC1 HVs are off
193199 10/28/09 10:00 cdaq E02017 End of Run 1562:
193198 10/28/09 09:54 chench histogram check for run#76949
193197 10/28/09 09:53 cdaq End of Run 76949:
193196 10/28/09 09:53 Gogami Asked MCC, quick controlled access to see Drift chamber
193195 10/28/09 09:50 Gogami //Visual scaler rate[52Cr@8uA/Run76949]
193194 10/28/09 09:46 Nue SLI does not work properly
193193 10/28/09 09:43 cdaq Run 76949: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193192 10/28/09 09:40 cdaq End of Run 76948:
193191 10/28/09 09:31 Tang DAQ rate is fixed around 200Hz
193190 10/28/09 09:28 Nue Magnet, SS, target snapshot
193189 10/28/09 09:27 chench file for the histogram for run#76948
193188 10/28/09 09:26 Nue DAQ rate is now 1.8kHz
193187 10/28/09 09:19 chench histogram check for run#76948
193186 10/28/09 09:19 Gogami Fast FB and Ion Chambers screenshot
193185 10/28/09 09:18 Tang HKS target changed from BeO to Cr during this run 1562 - also super good photon position
193184 10/28/09 09:18 Gogami DC HVs screenshot[52Cr@8[uA]]
193183 10/28/09 09:14 Gogami Visual scaler rate[52Cr@8uA/Run76948]
193182 10/28/09 09:02 Gogami Target: Moved from BeO to 52Cr
193181 10/28/09 09:01 cdaq Run 76948: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193180 10/28/09 08:55 cdaq End of Run 76947:
193179 10/28/09 08:51 cdaq Run 76947: junk test the beam
193178 10/28/09 08:46 cdaq E02017 Run 1562: Run with 2 uA beam 2344MeV, BeO target, with pressure 3.08Torr.
193177 10/28/09 08:43 Gogami Target: Move to BeO
193176 10/28/09 08:12 Nue Controll access is canceled for now
193175 10/28/09 08:04 cdaq Beam Time Accounting
193174 10/28/09 07:28 yez Move out Beo to empty
193173 10/28/09 07:08 cdaq End of Run 76946:
193172 10/28/09 07:08 cdaq Run 76946: JUNK
193171 10/28/09 07:07 cdaq End of Run 76945:
193170 10/28/09 07:03 cdaq Run 76945: JUNK
193169 10/28/09 07:03 chench ROC1 is crashed
193168 10/28/09 06:58 yez 3uA tune beam is avaliable now
193167 10/28/09 06:57 cdaq E02017 End of Run 1561:
193166 10/28/09 06:57 cdaq End of Run 76943:
193165 10/28/09 06:50 chench HVs of EDC2 are tripped
193164 10/28/09 06:22 yez Ask Controlled Access: Chunhua goes down the hall to check EDC2 HV
193163 10/28/09 06:01 shichijo this run is empty target and no beam
193162 10/28/09 05:47 shichijo this run is empty target and no beam
193161 10/28/09 05:46 cdaq Run 76943: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0 - Without EDC2
193160 10/28/09 05:46 cdaq E02017 Run 1561: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.08Torr.
193159 10/28/09 05:35 yez Beam: MCC called -> Beam may be ready in two hours
193158 10/28/09 05:30 yez EDC2 channels still have too high current and trip now. Called Chunhua and she is coming
193157 10/28/09 05:29 yez Fission DAQ freezes again so I kill the codamaster again.
193155 10/28/09 05:08 yez A late update about beam-->May be back in the morning
193154 10/28/09 05:04 yez Put all HVs on again but all EDC2 HVs can not be rampped up
193153 10/28/09 04:47 yez Turn off HDC&EDC HVs and EHodo HVs before manually turn Crate31&36 on and off
193152 10/28/09 04:40 cdaq E02017 End of Run 1560:
193151 10/28/09 04:40 cdaq End of Run 76942:
193150 10/28/09 04:26 yez EDC2 might has poblem
193149 10/28/09 04:19 yez Screen-shot for HDCs
193148 10/28/09 04:19 yez HDC&EDC screen-shot --> EDC2-F2 Overcurrent
193147 10/28/09 03:07 cdaq E02017 Run 1560: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.06Torr.
193146 10/28/09 03:07 shichijo sorry, run# is 1558
193145 10/28/09 03:05 shichijo E02017: stop run 1559
193144 10/28/09 03:01 cdaq E02017 End of Run 1559:
193143 10/28/09 02:59 shichijo E02017 : DAQ was freezed when stop the Run #1559 -> Kill all
193142 10/28/09 02:56 cdaq E02017 Run 1559: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.02Torr.
193141 10/28/09 02:44 cdaq E02017 End of Run 1558:
193140 10/28/09 01:40 shichijo MCC is now sweeping the Hall
193139 10/28/09 00:21 cdaq E02017 Run 1558: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.06Torr.
193138 10/28/09 00:18 cdaq Beam Time Accounting
193137 10/28/09 00:01 cdaq E02017 End of Run 1557:
Tuesday
193136 10/27/09 23:29 maruta mag/sst controller screen shot
193135 10/27/09 23:27 maruta HDC/EDC HV screen shot
193134 10/27/09 22:57 Tang I drunk old tea all the time but never sick...
193133 10/27/09 22:44 Nue What Nue means...
193132 10/27/09 22:42 Nue We will have beam tomorrow even if no extension is approved
193131 10/27/09 22:32 Tang He is Hall B proved
193130 10/27/09 22:10 bono gogami down!
193129 10/27/09 21:56 saw How to Spell "Nue"
193128 10/27/09 21:51 cdaq E02017 Run 1557: no beam, no target, with pressure 3.06Torr.
193127 10/27/09 21:47 Reinhold How to spell "Nue" ;-)
193126 10/27/09 21:43 Reinhold Re:Beam: Accelerator is waiting for pump
193125 10/27/09 21:37 cdaq E02017 End of Run 1556:
193124 10/27/09 19:53 Nue Beam: Accelerator is waiting for pump
193123 10/27/09 18:55 cdaq E02017 Run 1556: no beam, no target, with pressure 3.01Torr.
193122 10/27/09 18:47 Gogami E02017 : DAQ was freezed when stop the Run #1555 .==> Kill all ==> looks recoverd
193121 10/27/09 18:39 cdaq E02017 End of Run 1555:
193120 10/27/09 18:14 Reinhold Run #76942: histograms look OK
193119 10/27/09 17:22 Reinhold Turned on some pumps in Hall C
193118 10/27/09 16:46 beaufait dw power supply
193117 10/27/09 16:43 Gogami Asked MCC to turn ON all magnet in Hall C.
193116 10/27/09 16:36 Reinhold Some pump in 3C17 area not on
193115 10/27/09 16:20 cdaq Run 76942: DAQ test: cosmic
193114 10/27/09 16:17 chench turn on all the HV
193113 10/27/09 16:16 Reinhold Set prescale pactors for cosmics (singles) and tunr off LED trigger
193112 10/27/09 16:12 Reinhold Run 76941: led trigger; all ROCs reading something
193111 10/27/09 16:11 cdaq End of Run 76941:
193110 10/27/09 16:07 Reinhold Restart pedestal trigger generator; DAQ starts taking data
193109 10/27/09 16:04 cdaq Beam Time Accounting
193108 10/27/09 15:58 cdaq Run 76941: DAQ test; LED trigger
193107 10/27/09 15:55 Reinhold TS EN & TRGS not giving signals; reset TS
193106 10/27/09 15:53 cdaq End of Run 76940:
193105 10/27/09 15:49 cdaq Run 76940: Cosmic test after second test
193104 10/27/09 15:49 cdaq E02017 Run 1555: Run with No beam, with pressure 3.02Torr, after power outage.
193103 10/27/09 15:45 cdaq End of Run 76939:
193102 10/27/09 15:45 cdaq Run 76939: DAQ test with LED trigger; no triggers!?
193101 10/27/09 15:41 Reinhold Turn on LED trigger as random trigger at ~ 100 Hz
193100 10/27/09 15:39 Reinhold Set hks09.flags to LED trigger
193099 10/27/09 15:33 Reinhold Checked all magnets
193098 10/27/09 15:27 Reinhold Call from Joe (answers page)
193097 10/27/09 15:19 xqiu the FFD DAQ is started right now
193096 10/27/09 14:56 saw Coda background tasks started on cdaql3 (Fission DAQ)
193095 10/27/09 14:46 xqiu problem for FFD DAQ
193094 10/27/09 13:56 Reinhold Power cycled HES Fastbus
193093 10/27/09 13:15 Nue HKS, HES sieve slits should not be moved.
193092 10/27/09 13:05 maruta HES-D PS fault
193091 10/27/09 12:56 Reinhold Started gas flow to wire chambers; all chambers bubbling
193090 10/27/09 11:32 saw DAQ status
193089 10/27/09 11:31 cdaq Beam Time Accounting
193088 10/27/09 10:18 xqiu HV crate 37 power supply has been replaced
193087 10/27/09 09:09 saw CAEN HV crate 37 won't turn on
193086 10/27/09 09:02 beaufait counting house ups
193085 10/27/09 08:35 saw Computer status
193084 10/27/09 08:20 yez Shift Summary: Power outage in the whole shift
193083 10/27/09 08:11 yez Power was back around 05:17
193082 10/27/09 06:38 yez MCC called that Power is back to normal and they are going to sweep the hall. I request a control access after sweeping
193081 10/27/09 06:09 yez And Back Again....
193080 10/27/09 06:08 yez Power Outage !!! Again!!!!!!!!!!!!
193079 10/27/09 05:47 Reinhold Smell seems to have subsided
193078 10/27/09 05:19 Reinhold Slight smell of smoke or hot electronics in electronics room
193077 10/27/09 05:15 yez A Elog from MCC -- limited power to support CHL and may need 8 hours to get power full recover
193076 10/27/09 05:11 maruta Updated
193075 10/27/09 04:12 yez Power is back but I don't know whether they fixed all problem or not, so we need to watch for a while before we turn on everything
193074 10/27/09 03:07 maruta Copy from the ELOG
193073 10/27/09 03:04 yez Update: MCC called that we need another 2~3 hours to get power back :<
193072 10/27/09 01:52 yez Keep on cdaqfs on counting house and second floor till the APC battery gone as Stew said
193071 10/27/09 01:38 shichijo turned off all NIM and FB crates
193070 10/27/09 01:37 maruta Turn off all CAEN HVs in G0 cage
193069 10/27/09 01:20 shichijo cdaq l2, l3, l6 shut down
193068 10/27/09 01:16 Reinhold Power outgage: some instructions
193067 10/27/09 01:00 Tang Another power outage - this one may kill this experiment
193066 10/27/09 00:46 Nue Power Outage Again
193065 10/27/09 00:45 yez All Gas have been turned off. No any update from MCC
193064 10/27/09 00:43 yez Power Outage!!! Everything is power off.
193063 10/27/09 00:34 yez ROC7 error while taking Run#76938 - Reboot Codamaster
193062 10/27/09 00:33 cdaq Run 76938: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193061 10/27/09 00:29 cdaq End of Run 76937:
193060 10/27/09 00:10 maruta Shift summary 10/26 swing
193059 10/27/09 00:01 cdaq Beam Time Accounting
Monday
193058 10/26/09 23:55 cdaq Run 76937: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193057 10/26/09 23:54 cdaq End of Run 76936:
193056 10/26/09 23:34 vmaxwell 8 uA (nominal) beam on 52 Cr target .... visual scalers run # 76936
193055 10/26/09 23:31 vmaxwell AC3 - 1T signal change again!
193054 10/26/09 23:19 cdaq Run 76936: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193053 10/26/09 23:17 cdaq End of Run 76935:
193052 10/26/09 23:11 vmaxwell shift takers: please keep in mind that helium is flowing from two tanks...
193051 10/26/09 23:08 maruta BPM/BCM screen shot while Run76935
193050 10/26/09 22:51 vmaxwell 8 uA (nominal) beam on 52 Cr target .... visual scalers run # 76933 -76935 ...event rate back up!
193049 10/26/09 22:41 cdaq Run 76935: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193048 10/26/09 22:39 cdaq End of Run 76934:
193047 10/26/09 22:35 cdaq E02017 End of Run 1554:
193046 10/26/09 22:23 Chiba AC3-1T ADC distribution change?
193045 10/26/09 21:59 cdaq Run 76934: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193044 10/26/09 21:58 cdaq End of Run 76933:
193043 10/26/09 21:35 vmaxwell 8 uA (nominal) beam on 52 Cr target .... visual scalers run # 76933... event rate decreasing!?!
193042 10/26/09 21:19 maruta magnet and sst controller screen shot
193041 10/26/09 21:17 maruta BPM/BCM screen shot
193040 10/26/09 21:16 cdaq Run 76933: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193039 10/26/09 21:15 cdaq End of Run 76932:
193038 10/26/09 20:55 vmaxwell 8 uA (nominal) beam on 52 Cr target .... visual scalers run # 76932
193037 10/26/09 20:38 cdaq E02017 Run 1554: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.07Torr.
193036 10/26/09 20:37 cdaq Run 76932: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193035 10/26/09 20:36 cdaq End of Run 76931:
193034 10/26/09 20:24 cdaq E02017 End of Run 1553:
193033 10/26/09 20:00 cdaq Run 76931: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193032 10/26/09 19:58 cdaq End of Run 76930:
193031 10/26/09 19:43 vmaxwell 8 uA (nominal) beam on 52 Cr target .... visual scalers run # 76930
193030 10/26/09 19:37 vmaxwell AC3- 1T funny signal
193029 10/26/09 19:21 cdaq Run 76930: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193028 10/26/09 19:20 maruta BPM/BCM screen shot
193027 10/26/09 19:19 cdaq End of Run 76929:
193026 10/26/09 18:58 vmaxwell 8 uA (nominal) beam on 52 Cr target .... visual scalers run # 76929
193025 10/26/09 18:56 maruta HDC/EDC HV screen shot
193024 10/26/09 18:49 maruta magnet, sst controller screen shot
193023 10/26/09 18:45 cdaq Run 76929: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193022 10/26/09 18:43 cdaq End of Run 76928:
193021 10/26/09 18:34 vmaxwell 8 uA (nominal) beam on 52 Cr target .... visual scalers run # 76928
193020 10/26/09 18:17 cdaq E02017 Run 1553: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.03Torr.
193019 10/26/09 18:09 cdaq Run 76928: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193018 10/26/09 18:07 cdaq End of Run 76927:
193017 10/26/09 18:05 cdaq E02017 End of Run 1552:
193016 10/26/09 17:43 vmaxwell 8 uA (nominal) at 52 Cr .... run# 76927
193015 10/26/09 17:42 maruta magnet, target and sieve slit controller screen shot
193014 10/26/09 17:30 cdaq Run 76927: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193013 10/26/09 17:28 cdaq End of Run 76926:
193012 10/26/09 17:20 vmaxwell 8 uA (nominal) beam to 52 Cr target ... visual scalers run # 76926
193011 10/26/09 16:53 maruta BPM/BCM screen shot
193010 10/26/09 16:52 maruta EDC/HDC HV screen shot
193009 10/26/09 16:50 cdaq Run 76926: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193008 10/26/09 16:48 cdaq End of Run 76925:
193007 10/26/09 16:26 vmaxwell 8 uA (nominal) at 52 Cr target .. Run#76925 viual scaler rates
193006 10/26/09 16:25 vmaxwell 8 uA (nominal) at 52 Cr target .. Run#76925 viual scaler rates
193005 10/26/09 16:14 cdaq Run 76925: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
193004 10/26/09 16:13 cdaq End of Run 76924:
193003 10/26/09 16:07 cdaq E02017 Run 1552: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.06Torr.
193002 10/26/09 16:06 Gogami Shift_summury[Day-26Oct2009]
193001 10/26/09 16:06 cdaq Beam Time Accounting
193000 10/26/09 15:54 cdaq E02017 End of Run 1551:
192999 10/26/09 15:49 maruta PS current information exists but every 30sec
192998 10/26/09 15:37 Gogami Fast FB and Magnet controller screenshot
192997 10/26/09 15:37 seva Run#76924 viual scaler rates
192996 10/26/09 15:36 Gogami DC HVs screenshot[52Cr@8uA]
192995 10/26/09 15:36 seva BPM&BCM screens
192994 10/26/09 15:35 cdaq Run 76924: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192993 10/26/09 15:34 cdaq End of Run 76923:
192992 10/26/09 15:22 cdaq E02017 Run 1551: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.45Torr.
192991 10/26/09 15:21 cdaq E02017 End of Run 1550:
192990 10/26/09 15:02 seva Run#76923 viual scaler rates
192989 10/26/09 15:01 Gogami Fast FB and Ion chambers screenshot
192988 10/26/09 15:00 Gogami DC HVs screenshot[52Cr@8uA]
192987 10/26/09 15:00 seva BPM&BCM screens
192986 10/26/09 14:59 cdaq Run 76923: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192985 10/26/09 14:58 cdaq End of Run 76922:
192984 10/26/09 14:22 cdaq Run 76922: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192983 10/26/09 14:22 seva Run#76922 viual scaler rates
192982 10/26/09 14:21 Gogami Fast FB and Magnet controller screenshot
192981 10/26/09 14:20 Gogami DC HVs screenshot[52Cr@8uA]
192980 10/26/09 14:18 cdaq End of Run 76921:
192979 10/26/09 14:07 cdaq E02017 Run 1550: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.03Torr.
192978 10/26/09 13:56 cdaq E02017 End of Run 1549:
192977 10/26/09 13:38 seva BCM&BPM screens
192976 10/26/09 13:37 seva Run#76921 viual scaler rates
192975 10/26/09 13:35 Gogami Fast FB and Ion chambers screenshot
192974 10/26/09 13:34 Gogami DC HVs screenshot[52Cr@8uA]
192973 10/26/09 13:33 cdaq Run 76921: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192972 10/26/09 13:32 cdaq End of Run 76920:
192971 10/26/09 13:03 seva BCM&BPM screens
192970 10/26/09 13:02 seva Run#76920 viual scaler rates
192969 10/26/09 13:00 Gogami Fast FB and Ion chambers control screenshot
192968 10/26/09 12:59 Gogami DC HVs screenshot
192967 10/26/09 12:59 cdaq E02017 Run 1549: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.06Torr.
192966 10/26/09 12:58 cdaq Run 76920: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192965 10/26/09 12:58 cdaq E02017 End of Run 1548:
192964 10/26/09 12:58 cdaq End of Run 76919:
192963 10/26/09 12:24 seva BCM&BPM screens
192962 10/26/09 12:23 Gogami Fast FB and Magnet controller screenshot
192961 10/26/09 12:23 seva Run#76919 viual scaler rates
192960 10/26/09 12:23 cdaq Run 76919: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192959 10/26/09 12:22 Gogami DC HVs screenshot[52Cr@8uA]
192958 10/26/09 12:20 cdaq End of Run 76918:
192957 10/26/09 12:11 cdaq Beam Time Accounting
192956 10/26/09 12:08 cdaq Beam Time Accounting
192955 10/26/09 11:58 cdaq E02017 Run 1548: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.02Torr.
192954 10/26/09 11:48 seva BPM&BCM screens
192953 10/26/09 11:47 seva Run#76918 viual scaler rates
192952 10/26/09 11:46 cdaq E02017 End of Run 1547:
192951 10/26/09 11:45 Gogami Fast FB and HKS Grphical Layout screenshot
192950 10/26/09 11:44 Gogami DC HVs screenshot[52Cr@8uA]
192949 10/26/09 11:43 cdaq Run 76918: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192948 10/26/09 11:42 cdaq End of Run 76917:
192947 10/26/09 11:27 Nue Analysis: Run76911 has ED field until 8:03
192946 10/26/09 11:12 seva BCM&BPM screens
192945 10/26/09 11:11 seva Run#76917 viual scaler rates
192944 10/26/09 11:10 Nue Late entry : I power cycled HES-D PS
192943 10/26/09 11:09 Gogami Fast FB and Ion chambers control screenshot
192942 10/26/09 11:08 Gogami DC HVs screenshot[52Cr@8uA]
192941 10/26/09 11:08 cdaq Run 76917: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192940 10/26/09 11:07 cdaq End of Run 76916:
192939 10/26/09 11:05 cdaq E02017 Run 1547: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.40Torr.
192938 10/26/09 11:03 cdaq E02017 End of Run 1546:
192937 10/26/09 10:35 seva Run#76916 viual scaler rates
192936 10/26/09 10:32 Gogami Fast FB and Magnet controller screenshot
192935 10/26/09 10:31 seva BCM&BPM screens
192934 10/26/09 10:31 Gogami DC HVs screenshot[52Cr@8uA]
192933 10/26/09 10:31 cdaq Run 76916: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192932 10/26/09 10:30 cdaq End of Run 76915:
192931 10/26/09 10:13 seva Run#76915 viual scaler rates
192930 10/26/09 10:09 Reinhold Re: Beam: Called MCC and they are trying to re-lock the BPMs
192929 10/26/09 10:03 cdaq E02017 Run 1546: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.02Torr.
192928 10/26/09 09:57 Gogami Fast FB and Ion chambers screenshot
192927 10/26/09 09:57 cdaq Run 76915: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192926 10/26/09 09:56 Gogami DC HVs screenshot[52Cr@8uA]
192925 10/26/09 09:54 cdaq End of Run 76914:
192924 10/26/09 09:52 cdaq E02017 End of Run 1545:
192923 10/26/09 09:39 Gogami DC HVs screenshot[52Cr@8uA]
192922 10/26/09 09:38 Gogami Fast FB and Ion chambers control screenshot
192921 10/26/09 09:37 Gogami HKS HES magnet controller screenshot(after HES-D was recovered)
192920 10/26/09 09:27 seva BPM&BCM screens
192919 10/26/09 09:26 seva Run#76914 viual scaler rates
192918 10/26/09 09:21 cdaq E02017 Run 1545: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.88Torr.
192917 10/26/09 09:20 cdaq Run 76914: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192916 10/26/09 09:20 Gogami Beam is back
192915 10/26/09 09:19 cdaq E02017 End of Run 1544:
192914 10/26/09 08:56 Gogami Hall C is going to controlled access to work on HES-D power suply.
192913 10/26/09 08:55 cdaq E02017 Run 1544: Run without beam with pressure 3.74Torr.
192912 10/26/09 08:54 cdaq E02017 End of Run 1543:
192911 10/26/09 08:51 seva this run started OK at some point rates droppped
192910 10/26/09 08:50 seva JUNK due to HES failure and 90% drop in HES single rates
192909 10/26/09 08:49 Gogami HES HKS magnet controller screenshot (after some operation)
192908 10/26/09 08:49 cdaq End of Run 76913:
192907 10/26/09 08:48 cdaq Run 76913: test if HES dipole is ON
192906 10/26/09 08:48 seva apparently HES dipole is OFF
192905 10/26/09 08:46 Gogami Visual scaler rate[52Cr@8uA] ==>DAQ rate
192904 10/26/09 08:37 Gogami HES HKS magnet control screenshot
192903 10/26/09 08:36 seva 90% drop in HES rates
192902 10/26/09 08:31 Gogami Visual scaler rate[52Cr@8uA] ==> HES side rate dropped !
192901 10/26/09 08:31 Gogami Visual scaler rate[52Cr@8uA] ==> HES side rate dropped !
192900 10/26/09 08:29 cdaq End of Run 76912:
192899 10/26/09 08:13 Gogami Faset FB control and HKS Graphical Layout screenshot
192898 10/26/09 08:12 cdaq Run 76912: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192897 10/26/09 08:11 Gogami DC HVs screenshot[ 52Cr@8[uA] ]
192896 10/26/09 08:10 cdaq End of Run 76911:
192895 10/26/09 08:02 cdaq Beam Time Accounting
192894 10/26/09 07:57 cdaq E02017 Run 1543: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.41Torr.
192893 10/26/09 07:55 cdaq E02017 End of Run 1542:
192892 10/26/09 07:37 shichijo run check (run#76911)
192891 10/26/09 07:29 yez BPM&BCM screen shot for run#76911
192890 10/26/09 07:29 yez visual scaler rate (run#76911)
192889 10/26/09 07:28 shichijo HDC & EDC screen shot (run#76911)
192888 10/26/09 07:26 cdaq Run 76911: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192887 10/26/09 07:24 cdaq End of Run 76910:
192886 10/26/09 07:01 shichijo HDC & EDC screen shot
192885 10/26/09 06:57 cdaq E02017 Run 1542: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.04Torr.
192884 10/26/09 06:57 shichijo run check (run#76910)
192883 10/26/09 06:56 shichijo run check (run#76910)
192882 10/26/09 06:48 shichijo Refill gas for Fission chamber.
192881 10/26/09 06:48 yez BPM&BCM screen shot for run#76910
192880 10/26/09 06:47 yez visual scaler rate (run#76910)
192879 10/26/09 06:46 cdaq Run 76910: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192878 10/26/09 06:45 cdaq E02017 End of Run 1541:
192877 10/26/09 06:42 cdaq End of Run 76909:
192876 10/26/09 06:20 shichijo run check (run#76909)
192875 10/26/09 06:19 shichijo run check (run#76909)
192874 10/26/09 06:19 shichijo run check (run#76909)
192873 10/26/09 06:14 yez visual scaler rate (run#76907)
192872 10/26/09 06:12 shichijo HDC & EDC screen shot
192871 10/26/09 06:12 yez MCC sent beam back after rebooting IOC20, things look normal now
192870 10/26/09 06:08 cdaq Run 76909: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192869 10/26/09 06:02 shichijo stop run and MCC reboot IOC
192868 10/26/09 05:58 yez MCC called to take beam away and going to reboot IOC20 since Target BPMs lost communication
192867 10/26/09 05:56 cdaq End of Run 76908:
192866 10/26/09 05:53 shichijo Visual Scalers for run#76908
192865 10/26/09 05:46 yez Here is the new BPM&BCM screen shot after calling MCC
192864 10/26/09 05:44 yez Beam: Called MCC and they are trying to re-lock the BPMs
192863 10/26/09 05:41 shichijo HDC and EDC screen shot
192862 10/26/09 05:40 shichijo Fast FB and Ion chambers screen shot (run#76908)
192861 10/26/09 05:38 shichijo run 76907 was ended because beam become unstable.
192860 10/26/09 05:37 cdaq Run 76908: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192859 10/26/09 05:27 shichijo run check (run#76907)
192858 10/26/09 05:25 yez BPM&BCM screen shot -- Same offsets!
192857 10/26/09 05:17 yez BPM&BCM screen shot for run#76907
192856 10/26/09 05:16 yez visual scaler rate (run#76907)
192855 10/26/09 05:15 shichijo HDC & EDC screen shot (run#76907)
192854 10/26/09 05:14 cdaq Run 76907: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192853 10/26/09 05:13 cdaq End of Run 76906:
192852 10/26/09 05:10 cdaq E02017 Run 1541: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.43Torr.
192851 10/26/09 05:09 cdaq E02017 End of Run 1540:
192850 10/26/09 04:47 shichijo run check (run#76906)
192849 10/26/09 04:42 yez BPM&BCM screen shot for run#76906
192848 10/26/09 04:40 yez visual scaler rate (run#76906)
192847 10/26/09 04:40 shichijo HDC & EDC screen shot (run#76096)
192846 10/26/09 04:38 cdaq Run 76906: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192845 10/26/09 04:37 cdaq End of Run 76905:
192844 10/26/09 04:14 shichijo run check (run#76905)
192843 10/26/09 04:09 yez BPM&BCM screen shot for run#76905
192842 10/26/09 04:08 shichijo run check (run#76904)
192841 10/26/09 04:08 yez visual scaler rate (run#76905)
192840 10/26/09 04:04 yez Codamaster error at run#76904,ER1 cannot write events
192839 10/26/09 04:04 cdaq Run 76905: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192838 10/26/09 04:03 cdaq E02017 Run 1540: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.02Torr.
192837 10/26/09 03:51 shichijo Refill gas for Fission chamber.
192836 10/26/09 03:49 cdaq E02017 End of Run 1539:
192835 10/26/09 03:49 yez BPM&BCP screen shot for run#76904
192834 10/26/09 03:49 yez visual scaler rate (run#76904)
192833 10/26/09 03:47 shichijo Fast FB and Ion Chambers screen shot
192832 10/26/09 03:46 shichijo HDC & EDC screen shots (run#76904)
192831 10/26/09 03:45 yez reboot codamaster after 76903
192830 10/26/09 03:45 cdaq Run 76904: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192829 10/26/09 03:43 cdaq End of Run 76903:
192828 10/26/09 03:27 shichijo run check (run#76903)
192827 10/26/09 03:11 yez BCP&BPM screen shot for run#76903
192826 10/26/09 03:10 yez visual scaler rate (run#76903)
192825 10/26/09 03:10 shichijo HDC & EDC screen shots (run#76903)
192824 10/26/09 03:08 cdaq Run 76903: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192823 10/26/09 03:07 cdaq End of Run 76902:
192822 10/26/09 02:48 shichijo run check (run#76902)
192821 10/26/09 02:35 yez BPM&BCM screen shot for run#76902
192820 10/26/09 02:35 yez visual scaler rate (run#76902)
192819 10/26/09 02:34 shichijo HDC & EDC screen shots (run#76902)
192818 10/26/09 02:32 cdaq Run 76902: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192817 10/26/09 02:29 cdaq End of Run 76901:
192816 10/26/09 02:09 cdaq E02017 Run 1539: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.41Torr.
192815 10/26/09 02:08 cdaq E02017 End of Run 1538:
192814 10/26/09 02:07 shichijo run check (run#76901)
192813 10/26/09 01:54 shichijo EDC & HDC screen shots (run#76901)
192812 10/26/09 01:53 yez BPM&BCM for run#76901
192811 10/26/09 01:53 yez visual scaler rate (run#76901)
192810 10/26/09 01:50 cdaq Run 76901: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192809 10/26/09 01:48 cdaq End of Run 76900:
192808 10/26/09 01:21 shichijo checklist for run#76900
192807 10/26/09 01:14 yez BPM&BCM screen shot for run76900
192806 10/26/09 01:13 yez visual scaler rate (run#76900)
192805 10/26/09 01:12 shichijo EDC & HDC screen shots (run#76900)
192804 10/26/09 01:09 cdaq Run 76900: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192803 10/26/09 01:08 cdaq End of Run 76899:
192802 10/26/09 01:00 cdaq E02017 Run 1538: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 2.99Torr.
192801 10/26/09 00:54 yez run check for run 76899
192800 10/26/09 00:53 shichijo Refill gas for Fission chamber
192799 10/26/09 00:48 cdaq E02017 End of Run 1537:
192798 10/26/09 00:37 shichijo visual scaler rate (run#76899)
192797 10/26/09 00:32 cdaq Run 76899: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192796 10/26/09 00:31 cdaq End of Run 76898:
192795 10/26/09 00:26 shichijo visual scaler rate (run#76898)
192794 10/26/09 00:25 yez BPM&BCM screen shot for run#76898
192793 10/26/09 00:23 yez HDC&EDC HV screen shot for run#76898
192792 10/26/09 00:13 kawama Swing shift summary
192791 10/26/09 00:07 cdaq Beam Time Accounting
192790 10/26/09 00:06 kawama 2X-5T problem; Cable connection was wrong
192789 10/26/09 00:00 vmaxwell double peak gone
Sunday
192788 10/25/09 23:56 cdaq Run 76898: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192787 10/25/09 23:55 Chiba palse form of 2X5T
192786 10/25/09 23:42 cdaq End of Run 76897:
192785 10/25/09 23:37 cdaq Run 76897: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192784 10/25/09 23:31 cdaq End of Run 76896:
192783 10/25/09 23:29 cdaq Run 76896: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192782 10/25/09 23:29 kawama double peak in 2x-5B
192781 10/25/09 23:12 cdaq End of Run 76895:
192780 10/25/09 23:12 cdaq Run 76895: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192779 10/25/09 23:06 cdaq End of Run 76894:
192778 10/25/09 23:05 cdaq Run 76894: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192777 10/25/09 22:57 Reinhold Re: double peak in tof persists
192776 10/25/09 22:57 cdaq End of Run 76893:
192775 10/25/09 22:54 cdaq Run 76893: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192774 10/25/09 22:44 vmaxwell double peak in tof persists
192773 10/25/09 22:44 cdaq Run 76892: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192772 10/25/09 22:41 cdaq End of Run 76891:
192771 10/25/09 22:35 vmaxwell double peak in time of flight counter back
192770 10/25/09 22:34 cdaq Run 76891: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192769 10/25/09 22:31 cdaq End of Run 76890:
192768 10/25/09 22:22 kawama EDC & HDC screen shot
192767 10/25/09 22:21 kawama BPM & BCM screen shot
192766 10/25/09 22:20 kawama Visual Scalers for run# 76890 beam current 8.0uA, target 52Cr
192765 10/25/09 22:18 cdaq Run 76890: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192764 10/25/09 22:18 cdaq End of Run 76889:
192763 10/25/09 22:12 cdaq E02017 Run 1537: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.08Torr.
192762 10/25/09 22:00 cdaq E02017 End of Run 1536:
192761 10/25/09 21:45 kawama EDC & HDC screen shot
192760 10/25/09 21:44 kawama Visual Scalers for run# 76889 beam current 8.0uA, target 52Cr
192759 10/25/09 21:43 kawama BCM & BPM screen shot
192758 10/25/09 21:42 cdaq Run 76889: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192757 10/25/09 21:41 cdaq End of Run 76888:
192756 10/25/09 21:01 kawama run76887; terminated because of ROC11 failure
192755 10/25/09 21:00 kawama This is run76885
192754 10/25/09 21:00 kawama This is run76886
192753 10/25/09 20:59 kawama This is run76887
192752 10/25/09 20:56 cdaq Run 76888: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192751 10/25/09 20:49 kawama EDC & HDC screen shot
192750 10/25/09 20:49 kawama BCM & BPM screen shot
192749 10/25/09 20:48 kawama Visual Scalers for run# 7688シ beam current 8.0uA, target 52Cr
192748 10/25/09 20:43 cdaq E02017 Run 1536: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.56Torr.
192747 10/25/09 20:42 cdaq Run 76887: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192746 10/25/09 20:42 cdaq E02017 End of Run 1535:
192745 10/25/09 20:42 cdaq End of Run 76886:
192744 10/25/09 20:26 Reinhold Re: BPM is exactly same (all runs in this condition suspect)
192743 10/25/09 20:09 kawama EDC & HDC screen shot
192742 10/25/09 20:08 kawama BCM & BPM screen shot
192741 10/25/09 20:07 kawama Visual Scalers for run# 76883 beam current 8.0uA, target 52Cr
192740 10/25/09 20:05 cdaq Run 76886: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192739 10/25/09 20:03 cdaq End of Run 76885:
192738 10/25/09 19:52 kawama BPM fixed
192737 10/25/09 19:27 kawama Visual Scalers for run# 76882 beam current 8.0uA, target 52Cr
192736 10/25/09 19:24 cdaq Run 76885: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192735 10/25/09 19:22 cdaq End of Run 76884:
192734 10/25/09 19:18 cdaq E02017 Run 1535: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.05Torr.
192733 10/25/09 19:14 kawama BPM is exactly same
192732 10/25/09 19:06 cdaq E02017 End of Run 1534:
192731 10/25/09 18:47 kawama ER1 failed becasue /home of cdaql6 was full
192730 10/25/09 18:43 cdaq Run 76884: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192729 10/25/09 18:42 kawama Moved root files under /net/cdaqfs/scratch/cdaq/hks09/
192728 10/25/09 18:40 shoh The comparison for SS=-330 & =-300 mm run (Cr target)
192727 10/25/09 18:34 kawama ER1 failed during run76881
192726 10/25/09 18:27 kawama EDC & HDC screen shot
192725 10/25/09 18:26 kawama BPM & BCM screen shot
192724 10/25/09 18:26 kawama Visual Scalers for run# 76881 beam current 8.0uA, target 52Cr
192723 10/25/09 18:21 cdaq Run 76881: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192722 10/25/09 18:21 cdaq End of Run 76880:
192721 10/25/09 17:48 kawama EDC & HDC screen shot
192720 10/25/09 17:47 kawama Visual Scalers for run# 76880 beam current 8.0uA, target 52Cr
192719 10/25/09 17:46 kawama BPM & BCM screen shot
192718 10/25/09 17:44 cdaq Run 76880: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192717 10/25/09 17:43 cdaq End of Run 76879:
192716 10/25/09 17:25 cdaq E02017 Run 1534: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.49Torr.
192715 10/25/09 17:25 cdaq E02017 End of Run 1533:
192714 10/25/09 17:13 kawama Visual Scalers for run# 76878 beam current 8.0uA, target 52Cr
192713 10/25/09 17:11 kawama BPM &BCM screen shot
192712 10/25/09 17:10 kawama EDC & HDC screen shot
192711 10/25/09 17:08 cdaq Run 76879: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192710 10/25/09 17:07 cdaq End of Run 76878:
192709 10/25/09 16:44 vmaxwell double peak gone
192708 10/25/09 16:42 kawama The signal of 2X-5B was fixed at run76878
192707 10/25/09 16:41 kawama Visual Scalers for run# 76878 beam current 8.0uA, target 52Cr
192706 10/25/09 16:33 kawama 2x-5B signal has been strange during 76877
192705 10/25/09 16:33 cdaq Run 76878: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192704 10/25/09 16:26 cdaq End of Run 76877:
192703 10/25/09 16:23 kawama BPM & BCM screen shot
192702 10/25/09 16:22 kawama EDC & HDC screen shot
192701 10/25/09 16:20 vmaxwell strange double peak in time of flight counter
192700 10/25/09 16:15 kawama Visual Scalers for run# 76877 beam current 8.0uA, target 52Cr
192699 10/25/09 16:13 cdaq E02017 Run 1533: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.05Torr.
192698 10/25/09 16:07 cdaq Beam Time Accounting
192697 10/25/09 16:04 cdaq Run 76877: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192695 10/25/09 16:02 cdaq End of Run 76876:
192694 10/25/09 16:01 cdaq E02017 End of Run 1532:
192693 10/25/09 15:55 bono run check #76786
192692 10/25/09 15:52 shoh sorry, rate was too complex to see
192691 10/25/09 15:48 shoh CH2 target comparison (before and after power down)
192690 10/25/09 15:38 bono run check for run 76875
192689 10/25/09 15:28 chench Visual Scalers for run# 76876
192688 10/25/09 15:23 cdaq Run 76876: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192687 10/25/09 15:22 chencn BCM and BPM for run#76875
192686 10/25/09 15:20 cdaq End of Run 76875:
192685 10/25/09 14:56 chench Visual Scalers for run# 76875
192684 10/25/09 14:50 cdaq Run 76875: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192683 10/25/09 14:45 cdaq End of Run 76874:
192682 10/25/09 14:44 chench BPM for run#76874
192681 10/25/09 14:42 Reinhold SVN COMMIT: special map for run 76871 only
192680 10/25/09 14:13 chench Visual Scalers for Run# 76874
192679 10/25/09 14:11 Reinhold AC3 ADC connector set wrong for run 76871, but not before
192678 10/25/09 14:09 cdaq Run 76874: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192677 10/25/09 14:09 chench Beam comes back
192676 10/25/09 13:56 chench End the run because the beam tripped
192675 10/25/09 13:55 chench MCC called beam will be tripped for around 5mins
192674 10/25/09 13:53 cdaq End of Run 76873:
192673 10/25/09 13:49 cdaq Run 76873: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192672 10/25/09 13:48 cdaq End of Run 76872:
192671 10/25/09 13:19 Reinhold Run 76872: AC3-1T again in data
192670 10/25/09 13:17 chench Visual scalers is around 10% less than previous runs
192669 10/25/09 13:16 chench Visual Scalers for Run# 76872
192668 10/25/09 13:14 cdaq E02017 Run 1532: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.06Torr.
192667 10/25/09 13:13 chench Refill gas for Fission chamber
192666 10/25/09 13:04 Reinhold Run 76872: before reset AC3 ADC conncetor
192665 10/25/09 13:03 cdaq Run 76872: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192664 10/25/09 13:00 cdaq E02017 End of Run 1531:
192663 10/25/09 13:00 cdaq End of Run 76871:
192662 10/25/09 12:56 chench BCM and BPM for run#76871
192661 10/25/09 12:31 chench Visual Scalers for Run# 76871
192660 10/25/09 12:21 bono signal looks ok
192659 10/25/09 12:18 cdaq Run 76871: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192658 10/25/09 12:17 cdaq Run 76870: junk
192657 10/25/09 12:17 cdaq End of Run 76870:
192656 10/25/09 12:12 cdaq End of Run 76869:
192655 10/25/09 12:10 chench BCM and BPM for run#76869
192654 10/25/09 11:44 chench Visual Scalers for Run# 76868
192653 10/25/09 11:41 chench AC3-1T is missing
192652 10/25/09 11:36 bono run check for run 76869
192651 10/25/09 11:35 bono checked the cables
192650 10/25/09 11:32 cdaq Run 76869: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192649 10/25/09 11:27 cdaq End of Run 76868:
192648 10/25/09 11:01 chench run check for run#76868
192647 10/25/09 10:52 chench Visual Scalers for Run# 76868
192646 10/25/09 10:51 Reinhold Re: AC 3-1T ADC missing
192645 10/25/09 10:48 cdaq Run 76868: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192644 10/25/09 10:47 cdaq End of Run 76867:
192643 10/25/09 10:47 chench BCM and BPM for run#76867
192642 10/25/09 10:38 Reinhold Re: MCC called IOCHLC3 need to reboot, but they can not find where it is
192641 10/25/09 10:17 cdaq E02017 Run 1531: Run with 8 uA beam 2344MeV, 52Cr target, with pressure 3.06Torr.
192640 10/25/09 10:17 chench Refill gas for fission chamber
192639 10/25/09 10:16 cdaq E02017 End of Run 1530:
192638 10/25/09 10:16 cdaq E02017 Run 1530: junk
192637 10/25/09 10:09 chench Visual Scalers for Run# 76867
192636 10/25/09 10:09 bono run check for run 76867
192635 10/25/09 10:05 cdaq Run 76867: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192634 10/25/09 10:04 cdaq End of Run 76866:
192633 10/25/09 10:02 chench BCM and BPM for run#76866
192632 10/25/09 09:58 cdaq E02017 End of Run 1529:
192631 10/25/09 09:29 chench Visual Scalers for Run# 76866
192630 10/25/09 09:28 bono run check for run 76866
192629 10/25/09 09:27 bono run check for run 76865
192628 10/25/09 09:25 cdaq Run 76866: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192627 10/25/09 09:23 cdaq End of Run 76865:
192626 10/25/09 09:14 chench BCM and BPM for run#76865
192625 10/25/09 08:52 chench Visual Scalers for Run# 76865
192624 10/25/09 08:47 cdaq Run 76865: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192623 10/25/09 08:45 cdaq End of Run 76864:
192622 10/25/09 08:36 bono run check for run 76864
192619 10/25/09 08:21 chench Visual Scalers for Run# 76864
192618 10/25/09 08:08 cdaq Run 76864: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192617 10/25/09 08:07 cdaq End of Run 76863:
192616 10/25/09 08:06 cdaq Beam Time Accounting
192615 10/25/09 07:43 xqiu run check for 76863
192614 10/25/09 07:34 yez HDC&EDC HV screen for run#76863
192613 10/25/09 07:33 yez BCM&BPM screen for run#76863
192612 10/25/09 07:33 yez Visual Scalers for Run# 76863
192611 10/25/09 07:31 cdaq Run 76863: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192610 10/25/09 07:29 cdaq End of Run 76862:
192609 10/25/09 07:20 cdaq E02017 Run 1529: Run with 8 uA beam 2344MeV, c target, with pressure 2.98Torr.
192608 10/25/09 07:16 xqiu run check #76862
192607 10/25/09 07:08 cdaq E02017 End of Run 1528:
192606 10/25/09 06:58 yez HDC&EDC HV screen for run76862
192605 10/25/09 06:57 yez BPM&BCM screen for run#76862
192604 10/25/09 06:56 yez Visual Scalers for Run# 76862
192603 10/25/09 06:54 cdaq Run 76862: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192602 10/25/09 06:52 cdaq End of Run 76861:
192601 10/25/09 06:32 xqiu checklist for run #76861
192600 10/25/09 06:20 yez Visual Scalers for Run# 76861
192599 10/25/09 06:18 yez HDC&EDC HV for run#76861
192598 10/25/09 06:16 yez BPM&BCM screen for run#76861
192597 10/25/09 06:15 cdaq Run 76861: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192596 10/25/09 06:14 cdaq End of Run 76860:
192595 10/25/09 06:02 xqiu run check #76860
192594 10/25/09 05:37 yez HDC&EDC HV for run#76860
192593 10/25/09 05:36 yez BPM&BCM screen for run76860
192592 10/25/09 05:35 yez Visual Scalers for Run# 76860
192591 10/25/09 05:32 cdaq Run 76860: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192589 10/25/09 05:30 cdaq End of Run 76859:
192587 10/25/09 05:05 xqiu run check #76859
192586 10/25/09 04:52 yez HDC&EDC for run#76859
192585 10/25/09 04:50 cdaq Run 76859: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192584 10/25/09 04:50 yez BCM&BPM for run#76859
192583 10/25/09 04:48 cdaq End of Run 76858:
192582 10/25/09 04:35 cdaq E02017 Run 1528: Run with 8 uA beam 2344MeV, c target, with pressure 2.97Torr. Change LV to 7.0v, -9.0v.
192581 10/25/09 04:32 xqiu run check #76858
192580 10/25/09 04:24 cdaq Run 76858: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192579 10/25/09 04:16 cdaq E02017 End of Run 1527:
192578 10/25/09 04:15 yez Visual Scalers for Run# 76858
192577 10/25/09 04:13 yez BPM&BCM screen for run#76858
192576 10/25/09 04:11 cdaq End of Run 76857:
192575 10/25/09 03:49 xqiu run check #76857
192574 10/25/09 03:38 yez HDC&EDC HV screen for run#76857
192573 10/25/09 03:37 yez Visual Scalers for Run# 76857
192572 10/25/09 03:34 cdaq Run 76857: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192571 10/25/09 03:34 yez BPM&BCM screen for Run76857
192570 10/25/09 03:32 cdaq End of Run 76856:
192569 10/25/09 03:16 yez Analysis: Some quick analysis results for new CH2 data (Run#76813~76824)
192568 10/25/09 03:14 xqiu checklist for run #76855 and #76856
192567 10/25/09 03:02 yez HDC&EDC Screen for run#76856
192566 10/25/09 03:01 yez Visual Scalers for Run# 76856
192565 10/25/09 03:00 yez BCM&BPM Screem for run#76856
192564 10/25/09 02:58 cdaq Run 76856: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192563 10/25/09 02:57 cdaq Run 76856: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192562 10/25/09 02:57 cdaq End of Run 76855:
192561 10/25/09 02:55 cdaq E02017 Run 1527: Run with 8 uA beam 2344MeV, c target, with pressure 3.37Torr.
192560 10/25/09 02:48 cdaq E02017 End of Run 1526:
192559 10/25/09 02:41 Chiba ratio of good particle vs bad prticle before and after power outage
192558 10/25/09 02:24 yez BPM&BCM for Run#76855
192557 10/25/09 02:23 yez HDC&EDC HV for Run#76855
192556 10/25/09 02:23 yez Visual Scalers for Run# 76855
192555 10/25/09 02:19 yez Run#76854 End Run fail, reboot codamaster
192554 10/25/09 02:18 Chiba AC 3-1T ADC missing
192553 10/25/09 02:17 yez Reboot codamaster due to EB1 disconnect
192552 10/25/09 02:15 xqiu During the run #76853 and #76854 , the HAC3-1 raw adc looks strange
192551 10/25/09 01:50 cdaq E02017 Run 1526: Run with 8 uA beam 2344MeV, c target, with pressure 2.96Torr.
192550 10/25/09 01:38 cdaq E02017 End of Run 1525:
192549 10/25/09 01:36 yez Visual Scalers for Run# 76854
192548 10/25/09 01:33 yez HDC&EDC for Run#76854
192547 10/25/09 01:33 yez BPM&BCM for Run#76854
192546 10/25/09 01:30 cdaq Run 76854: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192545 10/25/09 01:30 yez ROC13 Rebooted due to many extra events
192544 10/25/09 01:27 cdaq End of Run 76853:
192543 10/25/09 01:07 cdaq E02017 Run 1525: Run with 20 uA beam 2344MeV, c target, with pressure 2.88Torr.
192542 10/25/09 01:04 xqiu checklist for run #76853
192541 10/25/09 01:02 cdaq E02017 End of Run 1524:
192540 10/25/09 00:59 yez HDC&EDC HV Screen for 76853
192539 10/25/09 00:58 yez Visual scaler rate run76853
192538 10/25/09 00:54 yez BPM&BCM
192537 10/25/09 00:54 cdaq Run 76853: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192536 10/25/09 00:52 yez Beam is back
192535 10/25/09 00:42 Nue Beam: IOC was rebooted successfully. Hall goes to beam permit
192534 10/25/09 00:14 Nue Power cycle does not solve the problem, Hall will go to controlled access
192533 10/25/09 00:05 yez MCC called IOCHLC3 need to reboot, but they can not find where it is
192532 10/25/09 00:04 cdaq Beam Time Accounting
Saturday
192531 10/24/09 23:59 cdaq End of Run 76852:
192530 10/24/09 23:56 kawama Swing shift summary
192529 10/24/09 23:50 kawama bcm & bpm screen shot
192528 10/24/09 23:48 kawama During this run, beam is very unstable
192527 10/24/09 23:46 kawama This is run76852
192526 10/24/09 23:33 kawama bcm & bpm screen shot
192525 10/24/09 23:26 kawama Visual scaler rate run76849
192524 10/24/09 23:25 kawama EDC & HDC screen shot
192523 10/24/09 23:21 cdaq Run 76852: 2344 MeV,buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192522 10/24/09 23:17 shoh HES momentum dipendence for collimetor position
192521 10/24/09 22:57 kawama This is run76851
192520 10/24/09 22:55 cdaq E02017 Run 1524: Run with 8.0 uA beam 2344MeV, 52Cr target, with pressure 3.02Torr.
192519 10/24/09 22:51 vmaxwell ethane bottle changed
192518 10/24/09 22:50 kawama EDC & HDC screen shot
192517 10/24/09 22:49 kawama Visual scaler rate run76849
192516 10/24/09 22:47 kawama bcm & bpm screen shot
192515 10/24/09 22:44 cdaq E02017 End of Run 1523:
192514 10/24/09 22:44 cdaq Run 76851: 2344 MeV,buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192513 10/24/09 22:43 cdaq End of Run 76850:
192512 10/24/09 22:19 kawama Vsual scaler rate run76850
192511 10/24/09 22:19 kawama Vsual scaler rate run76850
192510 10/24/09 22:15 kawama EDC & HDC screen shot
192509 10/24/09 22:14 vmaxwell re: run # 76849 ...beam current @ 7.5 uA
192508 10/24/09 22:14 kawama bcm & bpm screen shot
192507 10/24/09 22:11 cdaq Run 76850: 2344 MeV,buffered, 52Cr target starting @ 8.5 uA current changed to 8.0 uA @ 150k events beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192506 10/24/09 22:08 cdaq End of Run 76849:
192505 10/24/09 21:38 kawama Visual scaler rate run76849
192504 10/24/09 21:37 kawama collimator position of run76849 run info is wrong
192503 10/24/09 21:31 kawama bcm & bpm screen shot
192502 10/24/09 21:30 kawama EDC & HDC screen shot
192501 10/24/09 21:28 cdaq E02017 Run 1523: Run with 7.0 uA beam 2344MeV, 52Cr target, with pressure 3.56Torr.
192500 10/24/09 21:27 cdaq Run 76849: 2344 MeV,buffered, 52Cr target@ 7.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192499 10/24/09 21:22 Nue HES Collimator Position move up to -330.20mm
192498 10/24/09 21:12 cdaq E02017 End of Run 1522:
192497 10/24/09 21:09 kawama Change collomator position
192496 10/24/09 21:06 cdaq Run 76848: junk
192495 10/24/09 21:05 cdaq End of Run 76847:
192494 10/24/09 20:36 kawama bcm & bpm screen shot
192493 10/24/09 20:33 kawama EDC & HDC screen shot
192492 10/24/09 20:33 kawama Visual scaler rate run76847
192491 10/24/09 20:30 cdaq Run 76847: 2344 MeV,buffered, 52Cr target@ 7.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192490 10/24/09 20:27 cdaq End of Run 76846:
192489 10/24/09 20:18 kawama Visual scaler rate run76846
192488 10/24/09 20:05 cdaq E02017 Run 1522: Run with 7.0 uA beam 2344MeV, 52Cr target, with pressure 3.08Torr.
192487 10/24/09 19:51 cdaq Run 76846: 2344 MeV,buffered, 52Cr target@ 7.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192486 10/24/09 19:51 chench change the HV of HDC1 from 1970V to 1920V during run#76845.
192485 10/24/09 19:49 kawama run76845 ROC14 error
192484 10/24/09 19:46 kawama bpm & bcm screen shot
192483 10/24/09 19:45 chench screen shot of HV of DCs
192482 10/24/09 19:44 chench The leakage current of drift chambers before change the HV
192481 10/24/09 19:41 kawama HDC HV current increased
192480 10/24/09 19:40 vmaxwell run # 76845 HDC raw TDC
192479 10/24/09 19:37 kawama This is rate for run76845, 7.0uA
192478 10/24/09 19:34 kawama HDC & EDC screen shot
192477 10/24/09 19:33 kawama This is rate for run76845, 7.5uA
192476 10/24/09 19:32 kawama This is rate for run76844
192475 10/24/09 19:32 kawama Visual scaler rate run76845
192474 10/24/09 19:30 vmaxwell run # 76845 beam current changed
192473 10/24/09 19:29 kawama Changed to Cr target
192472 10/24/09 19:28 vmaxwell Re: Re: Fast FB and Ion chambers control screenshot
192471 10/24/09 19:25 kawama Visual scaler rate run76843
192470 10/24/09 19:22 cdaq Run 76845: 2344 MeV,buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192469 10/24/09 19:16 kawama We will change target and ps factor from run76845
192468 10/24/09 19:15 Reinhold Re: Fast FB and Ion chambers control screenshot
192467 10/24/09 19:14 cdaq End of Run 76844:
192466 10/24/09 19:12 maruta hcpc10401 connection was closed
192465 10/24/09 18:56 Tang Total C data, 20uA runs and overall
192464 10/24/09 18:38 cdaq E02017 End of Run 1521:
192463 10/24/09 18:32 kawama bpm & bcm screen shot
192462 10/24/09 18:19 kawama EDC & HDC screen shot
192461 10/24/09 18:16 kawama Visual scaler rate run76843
192460 10/24/09 18:14 cdaq Run 76844: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192459 10/24/09 18:12 cdaq End of Run 76843:
192458 10/24/09 17:51 Nue Comments on Shoh's analysis
192457 10/24/09 17:51 kawama EDC & HDC screen shot
192456 10/24/09 17:51 shoh revision of S/N ratio at 10uA run
192455 10/24/09 17:46 kawama Visual scaler rate run76843
192454 10/24/09 17:37 Nue Run76097 was 35uA Carbon, not 10uA
192453 10/24/09 17:14 cdaq Run 76843: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192452 10/24/09 17:12 cdaq End of Run 76842:
192451 10/24/09 17:11 shoh The S/N ratio in several carbon run (present run is better than old run)
192450 10/24/09 16:50 cdaq E02017 Run 1521: Run with 20 uA beam 2344MeV, c target, with pressure 3.05 Torr.
192449 10/24/09 16:42 kawama bpm screen shot
192448 10/24/09 16:39 cdaq E02017 End of Run 1520:
192447 10/24/09 16:19 kawama Visual scaler rate run76842
192446 10/24/09 16:15 cdaq Run 76842: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192445 10/24/09 16:13 cdaq Run 76841: junk
192444 10/24/09 16:12 cdaq End of Run 76840:
192443 10/24/09 16:11 kawama I will change ps factor from run 76841
192442 10/24/09 16:00 Gogami Shift_check[24Sep2009_Day]
192441 10/24/09 16:00 cdaq Beam Time Accounting
192440 10/24/09 15:51 Tang Can you compare also the S/A ratios from kaon coin_time for high and low current runs?
192439 10/24/09 15:38 Seva Visual Scalers for run#76840
192438 10/24/09 15:36 Gogami Fast FB and Ion chambers screenshot
192437 10/24/09 15:35 Gogami DC HVs screenshot[carbon@20uA]
192436 10/24/09 15:35 seva BCM&BPM screen
192435 10/24/09 15:34 cdaq Run 76840: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192434 10/24/09 15:34 cdaq End of Run 76839:
192433 10/24/09 14:58 Seva Visual Scalers for run#76839
192432 10/24/09 14:57 seva BCM&BPM screen
192431 10/24/09 14:56 Gogami Fast FB and Ion chambers screenshot
192430 10/24/09 14:55 Gogami DC HVs screenshot[Carbon@20uA]
192429 10/24/09 14:55 cdaq Run 76839: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192428 10/24/09 14:54 cdaq End of Run 76838:
192427 10/24/09 14:53 cdaq E02017 Run 1520: Run with 20 uA beam 2344MeV, c target, with pressure 3.41 Torr.
192426 10/24/09 14:52 cdaq E02017 End of Run 1519:
192425 10/24/09 14:47 shoh rate of QF is strange
192424 10/24/09 14:20 Seva Visual Scalers for run#76838
192423 10/24/09 14:19 seva BCM&BPM screen
192422 10/24/09 14:18 Gogami target and magnet controller screenshot
192421 10/24/09 14:16 Gogami Fast FB and Ion chambers control screenshot
192420 10/24/09 14:15 Gogami DC HVs screenshot[Carbon@20uA]
192419 10/24/09 14:14 cdaq Run 76838: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192418 10/24/09 14:13 cdaq End of Run 76837:
192417 10/24/09 14:04 Reinhold Comparison scaler rates now and old 12C data; not quite consistent
192416 10/24/09 13:45 cdaq E02017 Run 1519: Run with 20 uA beam 2344MeV, c target, with pressure 2.99Torr.
192415 10/24/09 13:44 Gogami I changed from ps5=1000 to ps=500.
192414 10/24/09 13:37 Seva Visual Scalers for run#76837
192413 10/24/09 13:34 seva BCM&BPM screens
192412 10/24/09 13:34 cdaq Run 76837: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192411 10/24/09 13:33 Gogami Fast FB and Ion chambers control screenshot
192410 10/24/09 13:32 cdaq End of Run 76836:
192409 10/24/09 13:32 cdaq E02017 End of Run 1518:
192408 10/24/09 13:31 cdaq Run 76836: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192407 10/24/09 13:30 Gogami DC HVs screenshot[Carbon@20[uA]]
192406 10/24/09 13:30 cdaq End of Run 76835:
192405 10/24/09 13:20 Gogami Track of Rates [Carbon target @ 20[uA]]~Run76825==>Run76835
192404 10/24/09 13:03 cdaq E02017 Run 1518: Run with 20 uA beam 2344MeV, c target, with pressure 3.82Torr.
192403 10/24/09 13:03 cdaq E02017 End of Run 1517:
192402 10/24/09 12:37 Seva Visual Scalers for run#76835
192401 10/24/09 12:35 seva BCM&BPM screen
192400 10/24/09 12:32 cdaq Run 76835: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192399 10/24/09 12:28 cdaq End of Run 76834:
192398 10/24/09 12:26 Gogami Fast FB control scrreenshot
192397 10/24/09 12:25 Gogami DC HVs screenshot[Carbon@20[uA]]
192396 10/24/09 12:22 Reinhold SLI looks borderline but still OK
192395 10/24/09 12:02 cdaq E02017 Run 1517: Run with 20 uA beam 2344MeV, c target, with pressure 3.48Torr.
192394 10/24/09 12:01 cdaq E02017 End of Run 1516:
192393 10/24/09 11:53 Reinhold The comparison of the number of lambda
192392 10/24/09 11:35 Gogami E02017 : 2.88[Torr] ==> 3.03[Torr] (correct value)
192391 10/24/09 11:32 Gogami HKS-HES Magnets Controller screenshot
192390 10/24/09 11:31 Gogami DC HVs screenshot[Carbon@20[uA]]
192389 10/24/09 11:31 Seva Visual Scalers for run#76834
192388 10/24/09 11:30 Gogami Fast FB and Ion chamber control screenshot
192387 10/24/09 11:28 cdaq Run 76834: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192386 10/24/09 11:28 seva Run#76833 BCM&BPM
192385 10/24/09 11:26 cdaq End of Run 76833:
192384 10/24/09 10:48 cdaq E02017 Run 1516: Run with 20 uA beam 2344MeV, c target, with pressure 2.88Torr.
192383 10/24/09 10:38 cdaq E02017 End of Run 1515:
192382 10/24/09 10:29 Seva Visual Scalers for run#76833
192381 10/24/09 10:26 cdaq Run 76833: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192380 10/24/09 10:25 cdaq End of Run 76832:
192379 10/24/09 10:22 seva Run#76832 BCM&BPM
192378 10/24/09 10:21 Gogami Fast FB and Ion chambers control screenshot
192377 10/24/09 10:18 Gogami DC HVs screenshot[Carbon@20uA]
192376 10/24/09 09:59 shoh The comparison of the number of lambda
192375 10/24/09 09:58 cdaq E02017 Run 1515: Run with 20 uA beam 2344MeV, c target, with pressure 3.78 Torr.
192374 10/24/09 09:58 cdaq E02017 End of Run 1514:
192373 10/24/09 09:27 Gogami FFB and Ion chambers control screenshot
192372 10/24/09 09:25 Gogami DC HVs screen shot
192371 10/24/09 09:24 Seva Visual Scalers for run#76832
192370 10/24/09 09:21 cdaq Run 76832: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192369 10/24/09 09:21 seva Run#76831 BCM&BPM
192368 10/24/09 09:20 cdaq End of Run 76831:
192367 10/24/09 08:59 cdaq E02017 Run 1514: Run with 20 uA beam 2344MeV, c target, with pressure 3.44 Torr.
192366 10/24/09 08:56 cdaq E02017 End of Run 1513:
192365 10/24/09 08:23 Seva Visual Scalers for run#76831
192364 10/24/09 08:18 cdaq Run 76831: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192363 10/24/09 08:17 cdaq End of Run 76830:
192362 10/24/09 08:13 seva Run#76830 BCM&BPM
192361 10/24/09 08:02 chench owl shift summary
192360 10/24/09 08:01 cdaq Beam Time Accounting
192359 10/24/09 07:46 cdaq E02017 Run 1513: Run with 20 uA beam 2344MeV, c target, with pressure 3.00Torr.
192358 10/24/09 07:35 cdaq E02017 End of Run 1512:
192357 10/24/09 07:32 xqiu checklist for run #76830
192356 10/24/09 07:22 chench Visual Scalers for run#76830
192355 10/24/09 07:18 cdaq Run 76830: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192354 10/24/09 07:17 chench BCM and BPM at the end of run#76829
192353 10/24/09 07:17 cdaq End of Run 76829:
192352 10/24/09 06:41 chench screenshot for HV of drift chambers during run#76829
192351 10/24/09 06:40 chench Change HV of HDC1 from 1920V to 1970V during run#76829
192350 10/24/09 06:35 chench HDC and HTOF tot hits from run#76829
192349 10/24/09 06:32 chench HKS Hodo dec tot hits compare run#76828 and run#76827
192348 10/24/09 06:30 chench The tothits from HDC and HHODO of run#76828 is different from the previous runs is because of the wrong Beam Position
192346 10/24/09 06:29 chench BCM and BPM during run#76829.
192345 10/24/09 06:22 chench Visual Scalers for run#76829
192344 10/24/09 06:20 chench beam position for run#76828 is wrong
192343 10/24/09 06:15 chench Sorry for no visual scalers record for run#76828
192342 10/24/09 06:14 xqiu checklist for run #76828 , something strange
192341 10/24/09 06:12 chench Beam comes back
192340 10/24/09 06:09 cdaq Run 76829: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192339 10/24/09 06:03 chench MCC called they lost the beam for HALLC for some reason they do not know
192338 10/24/09 06:02 cdaq End of Run 76828:
192337 10/24/09 05:49 cdaq Run 76828: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192336 10/24/09 05:48 chench BCM and BPM for run#76827
192335 10/24/09 05:48 cdaq End of Run 76827:
192333 10/24/09 05:17 cdaq E02017 Run 1512: Run with 20 uA beam 2344MeV, c target, with pressure 2.97Torr.
192332 10/24/09 05:04 xqiu checklist for run #76827
192331 10/24/09 05:02 chench correction:COIN=97.3HZ
192330 10/24/09 05:00 chench Visual Scalers for run#76827
192329 10/24/09 04:55 cdaq E02017 End of Run 1511:
192328 10/24/09 04:49 chench SLI does not work for last run and called MCC it works now
192327 10/24/09 04:48 cdaq Run 76827: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192326 10/24/09 04:48 chench BCM and BPM for run#76726
192325 10/24/09 04:44 cdaq End of Run 76826:
192324 10/24/09 04:02 chench The reason to change ps5 from 2000 to 1000
192323 10/24/09 04:00 xqiu checklist for run #76826
192322 10/24/09 03:54 chench change the ps5 from 2000 to 1000
192321 10/24/09 03:53 chench Visual Scalers for run#76826
192320 10/24/09 03:43 cdaq Run 76826: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192319 10/24/09 03:40 cdaq End of Run 76825:
192318 10/24/09 03:22 xqiu checklist for run #76825
192317 10/24/09 03:12 chench updated screenshot of FFB and fast raster
192316 10/24/09 03:00 chench correction: The target is carbon
192315 10/24/09 02:52 chench Visual Scalers for run#76825
192314 10/24/09 02:50 cdaq E02017 Run 1511: Run with 20 uA beam 2344MeV, c target, with pressure 2.88Torr.
192313 10/24/09 02:43 cdaq Run 76825: 2344 MeV,buffered, C target@ 20 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192312 10/24/09 02:38 chench screenshot of FFB after change the target to carbon and turn off the fast raster
192311 10/24/09 02:36 cdaq E02017 End of Run 1510:
192310 10/24/09 02:35 xqiu checklist for run #76824
192309 10/24/09 02:35 chench move the target to #6 carbon
192308 10/24/09 02:31 cdaq End of Run 76824:
192307 10/24/09 02:31 chench BCM and BPM for run#76824
192306 10/24/09 02:28 chench fast raster analysis for run#76824
192305 10/24/09 02:27 chench fast raster analysis for run#76824
192304 10/24/09 02:24 Tang End the CH2 data taking after this run no matter if this is a short run
192303 10/24/09 02:18 chench correction:beam current is 2.0uA
192302 10/24/09 02:17 chench correction:beam current is 2.0uA
192301 10/24/09 02:17 chench Visual Scalers for run#76824
192300 10/24/09 02:11 cdaq Run 76824: 2344 MeV,buffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192299 10/24/09 02:10 chench beam is back, 2uA
192298 10/24/09 01:53 chench run# 76823 is a junk
192297 10/24/09 01:51 chench Beam left again, and mcc called the beam will be down for hopefully another couple minnutes
192296 10/24/09 01:48 cdaq End of Run 76823:
192295 10/24/09 01:47 chench beam is back, and the current is 2uA
192294 10/24/09 01:46 cdaq E02017 Run 1510: Run with 2.0 uA beam 2344MeV, CH2 target, with pressure 3.49Torr.
192293 10/24/09 01:46 cdaq Run 76823: 2344 MeV,buffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192292 10/24/09 01:37 xqiu checklist for run #76822
192291 10/24/09 01:36 chench MCC called beam will be down for half an hour
192290 10/24/09 01:33 chench Beam is very unstable in this run
192289 10/24/09 01:31 cdaq E02017 End of Run 1509:
192288 10/24/09 01:31 cdaq End of Run 76822:
192287 10/24/09 01:24 chench BCM and BPM during run# 76822
192286 10/24/09 01:24 cdaq Run 76822: 2344 MeV,buffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192285 10/24/09 01:20 cdaq End of Run 76821:
192284 10/24/09 01:06 chenh FAST RASTER analysis for run#76821
192283 10/24/09 01:05 xqiu checklist for run #76820 and #76821
192282 10/24/09 01:01 cdaq E02017 Run 1509: Run with 2.0 uA beam 2344MeV, CH2 target, with pressure 2.97Torr.
192281 10/24/09 01:00 chench Visual Scalers for run#76821
192280 10/24/09 00:58 chench BPM and BCM during run#76821
192279 10/24/09 00:56 cdaq E02017 End of Run 1508:
192278 10/24/09 00:54 xqiu checklist for run #76820
192277 10/24/09 00:51 cdaq Run 76821: 2344 MeV,buffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192276 10/24/09 00:44 cdaq End of Run 76820:
192275 10/24/09 00:32 chench fast raster analysis for run#76820
192274 10/24/09 00:25 chench Visual Scalers for run#76820
192273 10/24/09 00:17 chench BCM and BPM at the beginning of run#76820
192272 10/24/09 00:16 cdaq Run 76820: 2344 MeV,buffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192271 10/24/09 00:11 cdaq End of Run 76819:
192270 10/24/09 00:03 Chiba add EHODO hittpat
192269 10/24/09 00:03 cdaq Beam Time Accounting
192268 10/24/09 00:02 doi Run 76819 fast raster analysis
Friday
192267 10/23/09 23:50 vmaxwell Visual scalers for run # 76819
192266 10/23/09 23:49 Tang Another 7.5 million triggers will satisfy our need for the statistics of Sigma from CH2 target
192265 10/23/09 23:49 Chiba correction
192264 10/23/09 23:46 Chiba Kaon rate and so on come back in current run
192263 10/23/09 23:32 cdaq Run 76819: 2344 MeV,buffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192262 10/23/09 23:23 cdaq End of Run 76818:
192261 10/23/09 23:15 doi Run 76818 fast raster analysis
192260 10/23/09 23:07 vmaxwell Visual scalers for run # 76818
192259 10/23/09 23:00 doi Run 76817 fast raster analysis
192258 10/23/09 22:54 cdaq Run 76818: 2344 MeV,buffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192257 10/23/09 22:53 doi Run 76816 fast raster analysis
192256 10/23/09 22:50 cdaq End of Run 76817:
192255 10/23/09 22:49 vmaxwell Visual scalers for run#76816
192254 10/23/09 22:46 Nue Instruction to change CH2 runs to Carbon 20uA run
192253 10/23/09 22:43 cdaq Run 76817: 2344 MeV,buffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192252 10/23/09 22:40 cdaq End of Run 76816:
192251 10/23/09 22:30 cdaq E02017 Run 1508: Run with 2.0 uA beam 2344MeV, ch2 target, with pressure 2.85Torr.
192250 10/23/09 22:24 Nue We are taking data in buffered mode. Simply comment was wrong.
192249 10/23/09 22:20 cdaq E02017 End of Run 1507:
192248 10/23/09 22:13 cdaq Run 76816: 2344 MeV,buffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192247 10/23/09 22:08 cdaq End of Run 76815:
192246 10/23/09 22:04 Tang Low LT but less rates, should we change to buffered mode?
192245 10/23/09 22:02 Tang Why are we running unbuffered mode?
192244 10/23/09 22:00 doi Run 76815 fast raster analysis
192243 10/23/09 21:44 vmaxwell visual scalers run # 76814/76815
192242 10/23/09 21:39 cdaq Run 76815: 2344 MeV,unbuffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192241 10/23/09 21:37 cdaq End of Run 76814:
192240 10/23/09 21:36 cdaq Run 76814: 2344 MeV,unbuffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192239 10/23/09 21:32 Chiba WC threshold changed (100,120) (low,high) => (80,100)(low,high)
192238 10/23/09 21:27 cdaq End of Run 76813:
192237 10/23/09 21:19 doi Run 76813 fast raster analysis
192236 10/23/09 21:14 vmaxwell bpm and bcm for run # 76813
192235 10/23/09 21:13 vmaxwell Visual scalers for run # 76813 ... comparison to run # 76565
192234 10/23/09 20:58 maruta How we moved HES-SS after the power outage.
192233 10/23/09 20:47 cdaq Run 76813: 2344 MeV,unbuffered, CH2 target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192232 10/23/09 20:45 Nue FR on for CH2 runs
192231 10/23/09 20:37 yez SS Distribution for Run76811 with Raster On
192230 10/23/09 20:22 cdaq End of Run 76812:
192229 10/23/09 20:21 chench Analysis: HKS sieve slit analysis reslults from run#76808 which with fast raster on.
192228 10/23/09 20:09 maruta
192227 10/23/09 20:09 cdaq E02017 Run 1507: Run with 2.0 uA beam 2344MeV, c-12 target, with pressure 3.19Torr.
192226 10/23/09 20:08 Nue FR is off
192225 10/23/09 20:06 cdaq Run 76812: 2344 MeV,unbuffered, 12C target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192224 10/23/09 19:59 cdaq E02017 End of Run 1506:
192223 10/23/09 19:46 yez HES SS Distribution for Run#76810- Look Correct now!
192222 10/23/09 19:44 cdaq End of Run 76811:
192221 10/23/09 19:41 cdaq Beam Time Accounting
192220 10/23/09 19:33 doi run information
192219 10/23/09 19:22 cdaq Run 76811: 2344 MeV,unbuffered, 12C target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192218 10/23/09 19:20 Nue FR is on
192217 10/23/09 19:18 cdaq End of Run 76810:
192216 10/23/09 18:59 cdaq Run 76810: 2344 MeV,unbuffered, 12C target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192215 10/23/09 18:45 yez Last entry is for HES. Here is the comparation of HKS SS between old and new -- Looks OK
192214 10/23/09 18:41 Nue HES sieve slit postion look wrong
192213 10/23/09 18:04 yez Sieve Slit data comparation between new data and old data
192212 10/23/09 17:46 Nue Beam: Beam position was checked with BeO with Raster 3x1
192211 10/23/09 17:35 cdaq End of Run 76809:
192210 10/23/09 17:35 Nue Run76809 FFB on FR off
192209 10/23/09 17:29 cdaq Run 76809: 2344 MeV,unbuffered, 12C target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192208 10/23/09 17:23 cdaq End of Run 76808:
192207 10/23/09 17:16 Reinhold Run 76807 fast raster
192206 10/23/09 17:12 Reinhold Run 76808 fast raster analysis
192205 10/23/09 17:11 Nue During this run, HES SS was moved by 0.5" up
192204 10/23/09 17:10 cdaq E02017 Run 1506: Run with 5.0 uA beam 2344MeV, c-12 target, with pressure 2.99Torr.
192203 10/23/09 16:58 cdaq E02017 End of Run 1505:
192202 10/23/09 16:46 cdaq Run 76808: 2344 MeV,unbuffered, 12C target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HKS0
192201 10/23/09 16:42 cdaq End of Run 76807:
192200 10/23/09 16:20 cdaq Run 76807: 2344 MeV,unbuffered, 12C target@ 2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192199 10/23/09 16:20 Nue Fast raster 1x3 for us (MCC 3x1) On
192198 10/23/09 16:15 cdaq End of Run 76806:
192197 10/23/09 16:06 saw HES sieve slit settings for runs 76805 and 76806
192196 10/23/09 16:06 cdaq Run 76806: 2344 MeV,Buffered, 12C target@ 5.2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192195 10/23/09 16:00 cdaq End of Run 76805:
192194 10/23/09 15:58 saw Day shift summary
192193 10/23/09 15:53 cdaq E02017 Run 1505: Run with 2.0 uA beam 2344MeV, c-12 target, with pressure 3.49Torr.
192192 10/23/09 15:53 cdaq Run 76805: 2344 MeV,Buffered, 12C target@ 5.2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192191 10/23/09 15:52 cdaq E02017 End of Run 1504:
192190 10/23/09 15:49 cdaq End of Run 76804:
192189 10/23/09 15:46 saw Sieve slits in
192188 10/23/09 15:44 saw Errors in run 76804
192187 10/23/09 15:43 Nue Sieve Slit Scan started from Run76803
192186 10/23/09 15:35 cdaq Run 76804: 2344 MeV,Buffered, 12C target@ 5.2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192185 10/23/09 15:33 cdaq End of Run 76803:
192184 10/23/09 15:22 cdaq Run 76803: 2344 MeV,Buffered, 12C target@ 5.2 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192183 10/23/09 15:19 saw Target: Changed to Carbon target
192182 10/23/09 15:10 cdaq E02017 Run 1504: Run with 20 uA beam 2344MeV, C target, with pressure 3.49Torr.
192181 10/23/09 15:08 cdaq E02017 End of Run 1503:
192180 10/23/09 15:08 cdaq End of Run 76802:
192179 10/23/09 15:06 Tang Run plan through weekend
192178 10/23/09 14:46 Nue Beam: Photon position was checked by YAG
192177 10/23/09 14:30 seva Run#76802 BCM&BPM
192176 10/23/09 14:27 seva Visual scalers for run#76802
192175 10/23/09 14:22 cdaq Run 76802: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192174 10/23/09 14:21 cdaq End of Run 76801:
192173 10/23/09 14:04 cdaq E02017 Run 1503: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.00Torr.
192172 10/23/09 13:53 cdaq E02017 End of Run 1502:
192171 10/23/09 13:53 saw End of run sound moved to cdaql1
192170 10/23/09 13:43 seva Visual scalers for run#76801
192169 10/23/09 13:42 seva Run#76801 BCM&BPM
192168 10/23/09 13:36 cdaq Run 76801: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192167 10/23/09 13:35 cdaq End of Run 76800:
192166 10/23/09 13:21 Reinhold Verified beam tune after harp and viewer repair
192165 10/23/09 13:07 seva Run 76800 BPM&BCM
192164 10/23/09 13:06 seva Visual scalers for run#76800
192163 10/23/09 13:01 saw Beam: Feedback now on
192162 10/23/09 12:56 cdaq E02017 Run 1502: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.49Torr.
192161 10/23/09 12:54 cdaq E02017 End of Run 1501:
192160 10/23/09 12:54 cdaq Run 76800: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192159 10/23/09 12:51 saw Target: Cr52 target in
192158 10/23/09 11:40 seva target change from Empty to BeO; beam tune
192157 10/23/09 11:24 seva magnets snapshot; HES-D access error
192156 10/23/09 11:10 cdaq E02017 Run 1501: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.00Torr.Beam tuning.
192155 10/23/09 11:06 shoh lambda of Cr (not enough statisrics)
192154 10/23/09 11:01 seva Beam permit
192153 10/23/09 10:51 cdaq E02017 End of Run 1500:
192152 10/23/09 10:39 Reinhold Harps and dump viever fixed
192151 10/23/09 10:14 Reinhold Re: In Controlled access
192150 10/23/09 09:41 saw In Controlled access
192149 10/23/09 09:32 cdaq E02017 Run 1500: Run with NO beam 2344MeV, with pressure 3.49Torr.
192148 10/23/09 09:31 cdaq E02017 End of Run 1499:
192147 10/23/09 08:51 seva BPMs back
192146 10/23/09 08:48 cdaq E02017 Run 1499: Run with pulsed beam 2344MeV, BeO target, with pressure 3.28Torr.
192145 10/23/09 08:47 seva Moved target to BeO; MCC is sending pulsed beam
192144 10/23/09 08:45 cdaq E02017 End of Run 1498:
192143 10/23/09 08:45 cdaq End of Run 76799:
192142 10/23/09 08:41 seva Run#76799 BCM&BPM
192141 10/23/09 08:26 cdaq Run 76799: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192140 10/23/09 08:26 seva Beam gone for a few minutes to reset BPM IOC
192139 10/23/09 08:22 cdaq End of Run 76798:
192138 10/23/09 08:17 saw Switched Argon bottle
192137 10/23/09 08:10 cdaq E02017 Run 1498: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.04Torr.
192136 10/23/09 08:03 kawama Owl shift summary
192135 10/23/09 08:03 cdaq Beam Time Accounting
192134 10/23/09 08:00 cdaq E02017 End of Run 1497:
192133 10/23/09 07:54 kawama Everything seems to be better now, suddenly
192132 10/23/09 07:49 shoh rate & checklist #76798 (rate decreace)
192131 10/23/09 07:48 kawama bpm screen shot
192130 10/23/09 07:46 kawama H1X ADC shape become better
192129 10/23/09 07:42 kawama EDC & HDC screen shot
192128 10/23/09 07:41 cdaq Run 76798: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192127 10/23/09 07:39 cdaq End of Run 76797:
192126 10/23/09 07:38 kawama BPM is not available now
192125 10/23/09 07:16 shoh rate & checklist #76797
192124 10/23/09 07:16 kawama bpm screen shot
192123 10/23/09 07:06 cdaq Run 76797: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192122 10/23/09 07:05 cdaq End of Run 76796:
192121 10/23/09 06:52 shoh BPM & BCM Screen Shot
192120 10/23/09 06:44 shoh rate & checklist #76796
192119 10/23/09 06:30 kawama EDC & HDC screen shot
192118 10/23/09 06:29 cdaq Run 76796: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192117 10/23/09 06:27 cdaq End of Run 76795:
192116 10/23/09 06:22 cdaq E02017 Run 1497: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.42Torr.
192115 10/23/09 06:21 cdaq E02017 End of Run 1496:
192114 10/23/09 06:03 kawama Beam current is unstable during 76795
192113 10/23/09 06:00 shoh rate & checklist #76795
192112 10/23/09 05:50 cdaq Run 76795: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192112 10/23/09 05:50 kawama EDC & HDC screen shot
192111 10/23/09 05:49 kawama bpm screen shot
192110 10/23/09 05:46 cdaq End of Run 76794:
192109 10/23/09 05:19 shoh rate & checklist #76790
192108 10/23/09 05:17 cdaq E02017 Run 1496: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.03Torr.
192107 10/23/09 05:17 kawama EDC & HDC screen shot
192106 10/23/09 05:10 cdaq Run 76794: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192105 10/23/09 05:08 cdaq End of Run 76793:
192104 10/23/09 05:04 cdaq E02017 End of Run 1495:
192103 10/23/09 04:48 shoh BPM & BCM positon
192102 10/23/09 04:46 shoh rate & checklist #76793
192101 10/23/09 04:46 kawama bpm screen shot
192100 10/23/09 04:38 kawama EDC & HDC screen shot
192099 10/23/09 04:37 cdaq Run 76793: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192098 10/23/09 04:36 cdaq End of Run 76792:
192097 10/23/09 04:16 shoh rate & checklist #76792
192095 10/23/09 04:10 chench correction: the forth figure again
192094 10/23/09 04:04 cdaq Run 76792: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192093 10/23/09 04:04 chench correction: previous entry's fouth figure is not correct and here put all of them again
192092 10/23/09 04:03 cdaq End of Run 76791:
192091 10/23/09 03:52 chench EDC2 relate to EDC1 geometry alignment has been done and the new parameters have been commit to ver280
192090 10/23/09 03:45 kawama H1X hitpat and ADC in run76737
192089 10/23/09 03:42 shoh rate & checklist #76791
192088 10/23/09 03:39 kawama H1X hitpat & ADC
192087 10/23/09 03:31 cdaq E02017 Run 1495: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.47Torr.
192086 10/23/09 03:31 cdaq Run 76791: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192084 10/23/09 03:30 cdaq End of Run 76790:
192083 10/23/09 03:26 cdaq E02017 End of Run 1494:
192082 10/23/09 03:11 shoh rate & checklist #76790
192081 10/23/09 02:58 shoh BPM position
192080 10/23/09 02:57 kawama HallC chicane X value looks changed
192079 10/23/09 02:56 cdaq Run 76790: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192078 10/23/09 02:55 cdaq End of Run 76789:
192077 10/23/09 02:50 shoh EDC HV condition
192076 10/23/09 02:50 kawama bpm screen shot
192075 10/23/09 02:37 shoh rate & checklist #76789
192074 10/23/09 02:29 kawama The number of kaon is decreased in run76785 compared to run76736
192073 10/23/09 02:26 chench Change the HV of HDC1 to 1920V at beginning of run#76789
192072 10/23/09 02:24 cdaq Run 76789: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192071 10/23/09 02:22 cdaq End of Run 76788:
192070 10/23/09 02:17 cdaq E02017 Run 1494: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.01Torr.
192069 10/23/09 02:10 shoh rate & checklist #76788
192068 10/23/09 02:08 chench HV of drift chambers at targer Cr52 and beam current 7.5uA
192067 10/23/09 02:08 kawama Is really the correct BPM 3H03B-x value -6.59?
192066 10/23/09 02:06 cdaq E02017 End of Run 1493:
192065 10/23/09 01:57 shoh The rate of HKS & HES when beam position was BPM=-6.16
192064 10/23/09 01:51 kawama I was wrong; correct value is -6.59.
192063 10/23/09 01:50 shoh bpm position
192062 10/23/09 01:50 cdaq Run 76788: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192061 10/23/09 01:46 cdaq End of Run 76787:
192060 10/23/09 01:44 kawama MCC called; BPM value should be OK now
192059 10/23/09 01:37 shoh AC2-2B TDC became good
192058 10/23/09 01:32 kawama x of IPM3H03B value changed
192057 10/23/09 01:25 cdaq Run 76787: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192056 10/23/09 01:22 shoh rate & checklist #76786 (S/N of AC2-2B became bad)
192055 10/23/09 01:22 kawama ROC14 error, rebooted
192054 10/23/09 01:20 cdaq End of Run 76786:
192053 10/23/09 01:15 shoh BPM picture
192052 10/23/09 01:00 shoh The S/N ratio of AC2-2B became bad
192051 10/23/09 00:57 shoh The S/N ratio of AC2-2B became bad
192050 10/23/09 00:56 kawama EDC & HDC screen shot
192049 10/23/09 00:45 cdaq Run 76786: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192048 10/23/09 00:43 cdaq End of Run 76785:
192047 10/23/09 00:43 Reinhold Re: run 76780 visual scaler rate is decreasing
192046 10/23/09 00:33 cdaq E02017 Run 1493: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.47 Torr.
192045 10/23/09 00:32 cdaq E02017 End of Run 1492:
192044 10/23/09 00:29 shoh rate & checklist #76785
192043 10/23/09 00:10 cdaq Run 76785: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192042 10/23/09 00:09 cdaq End of Run 76784:
192041 10/23/09 00:04 shichijo swing shift summary
192040 10/23/09 00:04 cdaq Beam Time Accounting
Thursday
192039 10/22/09 23:49 Petkovic Target 52Cr current 7.5 uA, HES Coll Position: - 330.20 mm --> VISUAL SCALERS Run # 76784
192038 10/22/09 23:48 shichijo BCM and BPM screen shot
192037 10/22/09 23:39 cdaq Run 76784: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192036 10/22/09 23:35 cdaq End of Run 76783:
192035 10/22/09 23:30 cdaq E02017 Run 1492: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.09 Torr.
192034 10/22/09 23:19 cdaq E02017 End of Run 1491:
192033 10/22/09 23:16 shichijo beam current change
192032 10/22/09 23:11 Petkovic Current 7.5 uA on 52Cr target --> VISUAL SCALERS, Run # 76783 (HES Collimator Position = 330.20 mm)
192031 10/22/09 23:09 chench The remaining Argon can hold around another 10hours according to the previous record
192030 10/22/09 23:09 shichijo This run is ended due to increase the beam current to 8uA.
192029 10/22/09 23:01 cdaq Run 76783: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192028 10/22/09 22:59 cdaq End of Run 76782:
192027 10/22/09 22:58 cdaq Run 76782: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192026 10/22/09 22:56 cdaq End of Run 76781:
192025 10/22/09 22:55 Petkovic 22:00 Warning: Argon Bottle 500/50 (PSI)
192024 10/22/09 22:48 shichijo visual scaler rate is decreasing
192023 10/22/09 22:46 cdaq Run 76781: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192022 10/22/09 22:44 cdaq End of Run 76780:
192021 10/22/09 22:12 Petkovic Current 7.5 uA on 52Cr target --> VISUAL SCALERS, Run # 76780 (HES Collimator Position = 330.20 mm)
192020 10/22/09 22:01 cdaq Run 76780: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192019 10/22/09 22:00 cdaq End of Run 76779:
192018 10/22/09 21:47 maruta HES butterfly before and after HES SS movement
192017 10/22/09 21:44 cdaq E02017 Run 1491: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.44Torr.
192016 10/22/09 21:44 cdaq E02017 End of Run 1490:
192015 10/22/09 21:27 Petkovic Current 7.5 uA on 52Cr target --> VISUAL SCALERS, Run # 76779 (HES Collimator Position = 330.20 mm)
192014 10/22/09 21:21 Tang What is the hit pattern for Run#76737?
192013 10/22/09 21:20 cdaq Run 76779: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192012 10/22/09 21:19 cdaq End of Run 76778:
192011 10/22/09 21:14 shichijo beam was unstable during this run
192010 10/22/09 20:46 Petkovic/Aya Current 7.5 uA on 52Cr target --> VISUAL SCALERS, Run # 76778 (HES Collimator Position = 330.20 mm)
192009 10/22/09 20:43 cdaq E02017 Run 1490: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.06 Torr.
192008 10/22/09 20:36 cdaq Run 76778: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192007 10/22/09 20:35 cdaq End of Run 76777:
192006 10/22/09 20:32 cdaq E02017 End of Run 1489:
192005 10/22/09 20:20 shichijo BPM and BCM screen shot
192004 10/22/09 20:10 Petkovic Current 7.5 uA on 52Cr target --> VISUAL SCALERS, Run # 76777 (HES Collimator Position = 330.20 mm)
192003 10/22/09 20:02 cdaq Run 76777: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
192002 10/22/09 20:01 cdaq End of Run 76776:
192001 10/22/09 19:33 Petkovic Current 7.5 microamps on 52Cr VISUAL SCALERS, Run # 76776 HES Collimator Position = 330.20 mm
192000 10/22/09 19:26 cdaq Run 76776: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191999 10/22/09 19:25 cdaq End of Run 76775:
191998 10/22/09 19:05 cdaq E02017 Run 1489: Run with 7.5 uA beam 2344MeV, 52Cr target, with pressure 3.49Torr.
191997 10/22/09 19:03 Petkovic Current 7.5 microamps on 52Cr VISUAL SCALERS, Run # 76775 HES Collimator POsitin = 330.20 mm
191996 10/22/09 18:54 cdaq Run 76775: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191995 10/22/09 18:52 maruta HES Sieve Slit scan result.
191994 10/22/09 18:52 shichijo EHOD hit pattern
191993 10/22/09 18:51 cdaq E02017 End of Run 1488:
191992 10/22/09 18:50 cdaq End of Run 76774:
191991 10/22/09 18:45 Nue Snapshot of HallC parameters
191990 10/22/09 18:44 Nue Snapshot of magnets, collimator, target controllers
191989 10/22/09 18:31 Nue Beam: Beamline magnets setting after beam tune
191988 10/22/09 18:26 shichijo BCM & BPM screen shot
191987 10/22/09 18:25 Petkovic Current 7.5 microamps on 52Cr VISUAL SCALERS, Run # 76774 HES Collimator POsitin = 330.20 mm
191986 10/22/09 18:19 Nue Beam: Screenshot of New BPMs and other monitors
191985 10/22/09 18:16 shichijo buffer size change for events on ROC11
191984 10/22/09 18:15 cdaq Run 76774: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191983 10/22/09 18:10 cdaq End of Run 76773:
191982 10/22/09 18:07 cdaq Run 76773: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191981 10/22/09 18:03 cdaq End of Run 76772:
191980 10/22/09 17:55 cdaq Run 76772: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191979 10/22/09 17:51 cdaq End of Run 76771:
191978 10/22/09 17:37 cdaq E02017 Run 1488: Run with 5 uA beam 2344MeV, 52Cr target, with pressure 2.95Torr.
191977 10/22/09 17:36 shichijo Fission chamber:pumping to 50mTorr, and refill gas to 2.94Torr.
191976 10/22/09 17:29 saw ROC11/sfihes readout list
191975 10/22/09 17:25 cdaq E02017 End of Run 1487:
191974 10/22/09 17:10 Nue HES sieve slit scan started with Cr 5uA beam
191973 10/22/09 17:07 cdaq Run 76771: 2344 MeV,Buffered, 52Cr target@ 5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191972 10/22/09 17:05 cdaq End of Run 76770:
191971 10/22/09 17:02 Nue Target: FSD is now working for the target motion
191970 10/22/09 17:02 maruta EDC HV screen shot at 5uA Cr
191969 10/22/09 16:59 shichijo change beam current
191968 10/22/09 16:59 cdaq Run 76770: 2344 MeV,Buffered, 52Cr target@ 5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191967 10/22/09 16:57 shichijo reduce beam current to 6.5uA
191966 10/22/09 16:56 cdaq Run 76769: 2344 MeV,Buffered, 52Cr target@ 6.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191965 10/22/09 16:55 cdaq Run 76768: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191964 10/22/09 16:52 shichijo ROC 11 error
191963 10/22/09 16:46 shichijo DAQ error again, reboot ROC11
191962 10/22/09 16:43 shichijo this run was ended because of the DAQ error
191961 10/22/09 16:42 Nue Beam: Reference BPM positions were changed after beam outage
191960 10/22/09 16:34 Nue Screenshot of Ion Chambers at 45uA carbon
191959 10/22/09 16:34 cdaq E02017 Run 1487: Run with 7 uA beam 2344MeV, 52Cr target, with pressure 3.75Torr.
191958 10/22/09 16:31 cdaq Run 76766: 2344 MeV,Buffered, 52Cr target@ 7 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191957 10/22/09 16:29 cdaq E02017 End of Run 1486:
191956 10/22/09 16:29 cdaq End of Run 76765:
191955 10/22/09 16:25 cdaq E02017 Run 1486: Run with up to 40uA beam 2344MeV, C target, with pressure 3.70Torr.
191954 10/22/09 16:24 cdaq Run 76765: 2344 MeV,Buffered, C target@ up to 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191953 10/22/09 16:23 chench Day Shift Summary
191952 10/22/09 16:21 cdaq E02017 End of Run 1485:
191951 10/22/09 16:11 cdaq Beam Time Accounting
191950 10/22/09 15:55 cdaq E02017 Run 1485: Run with 2.5uA beam 2344MeV, BeO target, with pressure 3.53Torr.
191949 10/22/09 15:55 Chiba Cr=>BeOis correct
191948 10/22/09 15:54 cdaq E02017 End of Run 1484:
191947 10/22/09 15:53 Chiba target change C=>BeO
191946 10/22/09 15:51 Chiba histgram for 76764
191945 10/22/09 15:51 cdaq End of Run 76764:
191944 10/22/09 15:40 cdaq Run 76764: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191943 10/22/09 15:39 chench move the target to Cr52 and ask 7.5uA beam to check the beam size and beam position by rate
191942 10/22/09 15:39 cdaq E02017 Run 1484: Run with 7.0uA beam 2344MeV, 52Cr target, with pressure 3.44Torr.
191941 10/22/09 15:38 cdaq E02017 End of Run 1483:
191940 10/22/09 15:38 Chiba the beam position and beam size right now
191939 10/22/09 15:29 chench both beam position and beam size looks quite good right now
191938 10/22/09 15:25 Chiba Screenshot of BPMs.
191937 10/22/09 15:21 chench beam is tuning with 2.5uACW and MCC called the beam size is good enough
191936 10/22/09 15:17 Reinhold Run #76763: hks09.flags set wrong for this run
191935 10/22/09 15:13 maruta screen shot of the magnet controller
191934 10/22/09 15:11 Chiba Trigger of Run76762 and Run76763 were wrong.
191933 10/22/09 15:09 Chiba Trigger of Run76762 and Run76763 were wrong.
191932 10/22/09 15:03 chench MCC called they will send the pulsed beam to HALLC and study it
191931 10/22/09 14:47 chench Hall is going to power permit
191930 10/22/09 14:45 Reinhold There's no easy fix for the Harps; trying to figure out whether we can do w/out
191929 10/22/09 14:37 cdaq E02017 Run 1483: No beam run, pressure 3.07
191928 10/22/09 14:35 chench We are waiting for the decision from MCC because it is not sure that without HAPRS before target, beam tune can be done
191927 10/22/09 14:20 cdaq E02017 End of Run 1482:
191926 10/22/09 14:06 chench HARPS 3H03A and 3H03B are broken and so far MCC experts can not fix it
191925 10/22/09 13:58 chench MCC called to ask us move the target to BeO but thoese experts is still working in the HALL
191924 10/22/09 13:23 chench Hall C is still in controlled access, MCC said people are working on harps
191923 10/22/09 12:50 Chiba Screenshot of BPMs. 9th Dipole Still missing
191922 10/22/09 12:41 yuan New HKS hodoscope parameter file and "h_trans_scin.f" committed
191921 10/22/09 12:35 yuan Update HKS hodoscope time offset parameters
191920 10/22/09 12:29 Chiba Sorry, still not yet. My mistake
191919 10/22/09 12:23 Chiba Beam will come
191918 10/22/09 11:59 chench MCC asked the controlled access because PSS is broken
191917 10/22/09 11:55 Chiba 9th Dipole missing again. Because of controlled access?
191916 10/22/09 11:50 chench HALLC is in controlled access
191915 10/22/09 11:28 Chiba Screenshot of BPMs, 9th Dipole, etc
191914 10/22/09 11:23 chench Tuning is in the halft way, MCC would send the people to the HALL, controlled access is in its way
191913 10/22/09 11:07 cdaq E02017 Run 1482: Run with 0.08 uA beam 2344MeV, c-12 target, with pressure 3.11Torr. Pulsed beam.
191912 10/22/09 11:06 Chiba histgrams for 76763
191911 10/22/09 11:04 chench Pulsed beam is sent , and MCC is trying a serious beam tune
191910 10/22/09 11:01 cdaq E02017 End of Run 1481:
191909 10/22/09 11:01 cdaq End of Run 76763:
191908 10/22/09 10:54 cdaq E02017 Run 1481: Run with 20.0uA beam 2344MeV, C-12 target, with pressure 3.00Torr.
191907 10/22/09 10:53 chench visual scalers for run#76763 after they tuning the beam
191906 10/22/09 10:46 Nue Beam tune will start from 11:00
191905 10/22/09 10:45 cdaq Run 76763: 2344 MeV,Buffered, carbon target@ 20.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191904 10/22/09 10:43 Chiba target change BeO=>C
191903 10/22/09 10:42 cdaq E02017 End of Run 1480:
191902 10/22/09 10:41 cdaq End of Run 76762:
191901 10/22/09 10:27 chench visual scalers for run#76762 after they tuning the beam
191900 10/22/09 10:18 Nue Beam spot on BeO is large and off-centered
191899 10/22/09 10:14 Chiba histgrams for 76756
191898 10/22/09 10:08 cdaq Run 76762: Beam position check
191897 10/22/09 10:03 cdaq E02017 Run 1480: Run with 7.0uA beam 2344MeV, 52Cr target, with pressure 3.76Torr.
191896 10/22/09 10:03 cdaq E02017 End of Run 1479:
191895 10/22/09 10:01 Chiba target change Cr=>BeO
191894 10/22/09 10:00 cdaq End of Run 76761:
191893 10/22/09 10:00 Chiba at the end of run76753 ~ to at the beggining of run76756 beam status
191892 10/22/09 09:56 Chiba After end of run 76756 asked Beam current 7.5uA, and now back 5.0uA
191891 10/22/09 09:56 cdaq Run 76761: HES colimator scan
191890 10/22/09 09:55 cdaq Run 76760: JUNK
191889 10/22/09 09:55 cdaq End of Run 76760:
191888 10/22/09 09:53 cdaq Run 76759: LED trig HES colimator scan
191887 10/22/09 09:49 cdaq Run 76758: HES colimator scan
191886 10/22/09 09:47 cdaq Run 76757: HES colimator scan
191885 10/22/09 09:43 cdaq End of Run 76756:
191884 10/22/09 09:35 chench visual scalers for run#76756 after they tuning the beam
191883 10/22/09 09:33 Chiba BCM and BPM at the beginning of run#76756
191882 10/22/09 09:29 cdaq Run 76756: 2344 MeV,Buffered, 52Cr target@ 5.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191881 10/22/09 09:26 cdaq End of Run 76755:
191880 10/22/09 09:23 Tang Low means beam is aimed higher
191879 10/22/09 09:21 chench visual scalers for run#76755
191878 10/22/09 09:12 cdaq E02017 Run 1479: Run with 7.0uA beam 2344MeV, 52Cr target, with pressure 3.47Torr.
191877 10/22/09 09:11 cdaq E02017 End of Run 1478:
191876 10/22/09 09:04 Chiba histgram 75755
191875 10/22/09 08:52 chiba BCM and BPM during run#76755, target Cr52, beam 4.7uA
191874 10/22/09 08:46 Tang It is correct at YAG. I asked it tuned that way as our final tune.
191873 10/22/09 08:35 Reinhold Hall B pass change scheduled from 11 am to 1 pm
191872 10/22/09 08:33 Reinhold Mike Spata will have a look at the tune
191871 10/22/09 08:23 kawama ROC11 rebooted automatically
191870 10/22/09 08:23 kawama Owl shift summary
191869 10/22/09 08:20 kawama EDC & HDC screen shot
191868 10/22/09 08:16 cdaq Run 76755: 2344 MeV,Buffered, 52Cr target@ 5.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191867 10/22/09 08:14 cdaq Run 76754: 2344 MeV,Buffered, 52Cr target@ 5.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191866 10/22/09 08:13 cdaq E02017 Run 1478: Run with 5.0uA beam 2344MeV, 52Cr target, with pressure 3.11Torr.
191865 10/22/09 08:13 cdaq End of Run 76753:
191864 10/22/09 08:07 Nue Screenshot of BPMs, 9th Dipole, etc
191863 10/22/09 08:05 cdaq E02017 End of Run 1477:
191862 10/22/09 08:05 cdaq Beam Time Accounting
191861 10/22/09 07:51 kawama HES butterfly in run76744
191860 10/22/09 07:45 kawama EDC & HDC screen shot
191859 10/22/09 07:30 Reinhold Looks like 9th dipole NMR is not locking
191858 10/22/09 07:26 kawama EH2 shape is still strange
191857 10/22/09 07:20 kawama BPM & BCM screen shot
191856 10/22/09 07:18 kawama End run failed 76751 & ROC11 has auto rebooted again again again
191855 10/22/09 07:15 kawama Visual scaler rate during 76753
191854 10/22/09 07:05 cdaq Run 76753: 2344 MeV,Buffered, 52Cr target@ 5.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191853 10/22/09 07:05 kawama Call MCC; requested 5uA
191852 10/22/09 06:59 cdaq Run 76752: junk
191851 10/22/09 06:58 kawama Compare EDC tracking efficiency
191850 10/22/09 06:56 Reinhold Call from MCC: ask whether they should tune the photon line; we say yes.
191849 10/22/09 06:55 Reinhold BPM excursions and 9th dipole NMR off
191848 10/22/09 06:54 Nue photon on YAG looks too low.
191847 10/22/09 06:37 kawama Visual scaler rate during 76751
191846 10/22/09 06:34 kawama EDC & HDC screen shot
191845 10/22/09 06:30 Reinhold Call to MCC: ask about photon beam line tune
191844 10/22/09 06:26 Reinhold BCM scaler analysis
191843 10/22/09 06:25 Reinhold MCC reports harps 3h03a & b not working
191842 10/22/09 06:23 cdaq Run 76751: 2344 MeV,Buffered, 52Cr target@ 7.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191841 10/22/09 06:22 cdaq End of Run 76750:
191840 10/22/09 06:20 kawama BPM & BCM screen shot
191839 10/22/09 06:18 Nue Beam: Beamline magnets setting after the power outage
191838 10/22/09 06:11 kawama Probably this error is related to the higher data rate
191837 10/22/09 06:06 kawama Compare HDC-1 TDC
191836 10/22/09 06:01 cdaq Run 76750: Harp scanning, 2344 MeV,Buffered, 52Cr target@ 6.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191835 10/22/09 05:56 kawama Compare some histograms before/after power outage
191834 10/22/09 05:49 Nue Visual scaler rate was changed before and after the power outage, ibcm, magnets look OK
191833 10/22/09 05:42 Reinhold Request harp scans 3h03A and 3h03b
191832 10/22/09 05:41 cdaq End of Run 76749:
191831 10/22/09 05:40 vmaxwell visual scalers run # 76749 .. 7.0 uA on 52Cr target
191830 10/22/09 05:34 vmaxwell EDC1 raw hit tot before and after
191829 10/22/09 05:31 cdaq E02017 Run 1477: Run with 7.0uA beam 2344MeV, 52Cr target, with pressure 3.11Torr.
191827 10/22/09 05:23 kawama HDC & EDC screen shot
191826 10/22/09 05:22 cdaq E02017 End of Run 1476:
191825 10/22/09 05:22 kawama BPM & BCM screen shot
191824 10/22/09 05:19 kawama ROC11 rebooted automatically
191823 10/22/09 05:15 cdaq Run 76749: 2344 MeV,Buffered, 52Cr target@ 7.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191822 10/22/09 05:08 cdaq Run 76747: junk
191821 10/22/09 05:05 cdaq Run 76746: junk
191820 10/22/09 04:57 kawama Beam is off about 5 min.
191819 10/22/09 04:56 kawama rate during 76744, 7.5uA/7.0uA
191818 10/22/09 04:53 cdaq End of Run 76744:
191817 10/22/09 04:47 kawama requested 7.0 uA
191816 10/22/09 04:38 kawama HDC & EDC screen shot
191815 10/22/09 04:35 cdaq Run 76744: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191814 10/22/09 04:30 kawama EDC1 -5V was not working, now looks OK
191813 10/22/09 03:44 cdaq End of Run 76743:
191812 10/22/09 03:38 cdaq Run 76743: 2344 MeV,Buffered, 52Cr target@ 2.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191811 10/22/09 03:38 kawama HDC & EDC screen shot
191810 10/22/09 03:36 kawama Call to MCC; requested 2uA beam for EDC1 check
191809 10/22/09 03:24 cdaq End of Run 76742:
191808 10/22/09 03:09 vmaxwell EDC1 signal missing? run # 76742
191807 10/22/09 03:00 kawama HDC & EDC screen shot
191806 10/22/09 02:59 kawama Compare rate with #76737
191805 10/22/09 02:52 cdaq E02017 Run 1476: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.23Torr.
191804 10/22/09 02:49 cdaq Run 76742: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191803 10/22/09 02:44 kawama BPM screen shot
191802 10/22/09 02:43 kawama Beam is back; pulsed beam is OK
191801 10/22/09 02:39 kawama Stopped this run because beam is back
191800 10/22/09 02:39 kawama MCC called; Problem on some magnet
191799 10/22/09 02:33 cdaq E02017 End of Run 1475:
191798 10/22/09 02:28 cdaq E02017 Run 1475: Run with no beam
191797 10/22/09 01:54 kawama Call to MCC; they are working to fix the problem
191796 10/22/09 01:28 Nue Analysis: Carbon Cointime E01-011 vs E05-115
191795 10/22/09 01:26 kawama Copy of ELOG entry; some problem on 3C03
191794 10/22/09 01:18 kawama Turned off all drift chambers HV
191793 10/22/09 01:11 cdaq E02017 End of Run 1474:
191792 10/22/09 01:07 kawama Ntuples under paw/ were moved to /net/cdaqfs/scratch/cdaq/hks09
191791 10/22/09 01:06 kawama MCC called; pulsed beam will be delivered
191790 10/22/09 00:37 Reinhold Runplan for owl & start of day
191789 10/22/09 00:04 cdaq Beam Time Accounting
191788 10/22/09 00:03 Petkovic Beam: Swing Shift Summary
Wednesday
191787 10/21/09 23:55 Chiba Current WC NPE
191786 10/21/09 23:33 cdaq E02017 Run 1474: Run with no beam 7.5uA beam 2344MeV, empty target, with pressure 3.02 Torr.
191785 10/21/09 23:09 maruta DZ and two DW magnets are communication problem
191784 10/21/09 23:01 Petkovic Beam: 10:55 BeO positioned as the target for beam pulse tuning by the MCR
191783 10/21/09 22:51 cdaq End of Run 76741:
191782 10/21/09 22:51 cdaq E02017 End of Run 1473:
191781 10/21/09 22:19 Petkovic Beam: 10:10 Beam Expectation to Hall C
191780 10/21/09 22:09 maruta Sieve slit & target positions
191779 10/21/09 22:03 Nagao/Petkov 21:59 Ended Cosmics Run # 76740 and Start Cosmics Run #76741 in Coin-mode
191778 10/21/09 22:00 cdaq Run 76741: Cosmic run, target is empty,
191777 10/21/09 21:58 cdaq End of Run 76740:
191776 10/21/09 21:22 Reinhold You can run Online Replay on cdaql4
191775 10/21/09 21:17 cdaq E02017 Run 1473: Run with no beam 7.5uA beam 2344MeV, empty target, with pressure 3.40 Torr.
191774 10/21/09 21:16 cdaq E02017 End of Run 1472:
191773 10/21/09 20:51 kawama replay cannot be used on "local" cdaql3
191772 10/21/09 20:49 Petkovic Beam: 20:40 Controlled Access mode by the MCR (to check valves)
191771 10/21/09 20:25 kawama Dear shift takers : Online replay should be used on cdaql3
191770 10/21/09 20:15 cdaq E02017 Run 1472: Run with no beam 7.5uA beam 2344MeV, empty target, with pressure 3.02 Torr.
191769 10/21/09 20:04 cdaq E02017 End of Run 1471:
191768 10/21/09 19:42 Petkovic Beam: 19:20 Shift Crew of the MCR requested to open Beam Pipe (two valves) in the Hall C
191767 10/21/09 18:32 cdaq E02017 Run 1471: Run with no beam 7.5uA beam 2344MeV, empty target, with pressure 3.45Torr.
191766 10/21/09 18:30 cdaq E02017 End of Run 1470:
191765 10/21/09 17:39 shoh runlist #76740
191764 10/21/09 17:37 Petkovic Beam: 17:30 Dialogue with the MCR about Beam Recovery
191763 10/21/09 17:33 shoh revision of run condition
191762 10/21/09 17:27 cdaq E02017 Run 1470: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.07Torr.
191761 10/21/09 17:17 cdaq E02017 End of Run 1469:
191760 10/21/09 17:00 chench Late entry:Day shift summary
191759 10/21/09 16:32 bono aerogel study
191758 10/21/09 16:18 Petkovic Beam: 16:15 No beam. Running Cosmics data in Coin-mode
191757 10/21/09 16:03 cdaq Beam Time Accounting
191756 10/21/09 15:41 cdaq Run 76740: Cosmic run, target is empty,
191755 10/21/09 15:40 cdaq End of Run 76739:
191754 10/21/09 15:36 cdaq E02017 Run 1469: Run with no beam; 7.5uA beam 2344MeV, 52Cr target, with pressure 3.41 orr.
191753 10/21/09 15:34 cdaq E02017 End of Run 1468:
191752 10/21/09 15:26 Reinhold Runplan
191751 10/21/09 15:02 saw Late Entry: Magnets cycled and set
191750 10/21/09 14:24 cdaq E02017 Run 1468: No beam. P=2.97 Torr.
191749 10/21/09 14:16 Chiba Current WC threshold might be best
191748 10/21/09 14:10 cdaq E02017 End of Run 1467:
191747 10/21/09 13:21 chench checklist for the first 47000 events of the cosmic run#76739, all the detectors work normally
191746 10/21/09 12:38 chench All the HVs are on and start to take the cosmic run to test the dectectors
191745 10/21/09 12:37 cdaq Run 76739: Cosmic run, target is empty,
191744 10/21/09 12:28 chench Updated the HV of HKS drift chamber after power outage and before beam coming
191743 10/21/09 12:27 chench HV of drift chambers after the power outage before beam coming
191742 10/21/09 12:13 cdaq E02017 Run 1467: No beam after the power outage, pressure=2.98Torr
191741 10/21/09 11:19 Nue Do not touch removed targets on the target in Hall C
191740 10/21/09 11:09 chench HALL C is sweeping now
191739 10/21/09 11:04 Nue New CH2 plate, Carbon target were installed. Picture of old CH2 plate
191738 10/21/09 10:45 Reinhold Re: HES Q1 PS faults (big bite PS)
191737 10/21/09 10:43 chench MCC called they are going to sweep the HALL in 15mins
191736 10/21/09 10:33 chench turn off the HV of HDC1&2
191735 10/21/09 10:28 chench MCC alled they are ready for sweeping and beam may be can go down the HALL in 2:00pm
191734 10/21/09 10:19 chench Confirm that the NIM BIN for HKS HDC1&2 works well
191733 10/21/09 09:54 Reinhold HES Q1 PS faults (big bite PS)
191732 10/21/09 09:28 chench trun on the HDC1&2 high voltage to check the signal downstairs
191731 10/21/09 08:50 Reinhold Magnet controls not working
191730 10/21/09 08:18 Reinhold Replaces one CAEN A503 Positive HV card with a "spare" from HMS/SOS crates
191729 10/21/09 08:12 yez Owl Shift Summery
191728 10/21/09 05:17 vmaxwell HV turned on .. look good
191727 10/21/09 04:50 vmaxwell HV to aerogel layers and drift chambers set
191726 10/21/09 03:58 kawama Confirmed EDC1, EDC2 LVs are OK
191725 10/21/09 03:38 kawama Late entry : rebooted ROC11
191724 10/21/09 03:27 kawama DAQ looks fine
191723 10/21/09 03:26 kawama All drift chambers can be put HV=100V successfully
191722 10/21/09 03:24 cdaq End of Run 76738:
191721 10/21/09 03:23 cdaq Run 76738: DAQ test;junk
191720 10/21/09 03:19 maruta HES-Q2/D and HKS-Q1/D magnet control recover
191719 10/21/09 03:13 maruta Sieve Slits are at Sieve slit run position
191718 10/21/09 02:55 maruta Sieve Slits and target control recover
191717 10/21/09 02:44 yez Beam: Current Status
191716 10/21/09 02:35 maruta Reset HKS-Q1 and HES-Q2 power supplies
191715 10/21/09 02:03 chench All the bucking coil power supply voltage measured normal
191714 10/21/09 02:02 chench HKS Drift chamber NIM BIN power supply does not work properly
191713 10/21/09 01:55 saw Crate 33 AC power problem?
191712 10/21/09 01:52 chench Low valtage and threshold of All the chambers works properly
191711 10/21/09 01:38 saw HV crate 33 sick
191710 10/21/09 01:23 Reinhold Now all for drift chambers bubbling
191709 10/21/09 01:21 Reinhold Restarted gas flow to HKS and HES drift chambers; HKS DC not yet bubbling
191708 10/21/09 01:19 Reinhold Restarted HES, HKS, Dump Line Pumps and Turbos
191707 10/21/09 00:57 yez Threshold of HDC1 & HDC2 set to 6.0 V
Tuesday
191706 10/20/09 23:51 Kawama NIM bin and CAMAC crate voltage checked
191705 10/20/09 23:49 Kawama NIM Bon
191704 10/20/09 23:49 shichijo summary of swing shift
191703 10/20/09 23:21 Reinhold Talked to Joe
191702 10/20/09 23:19 Reinhold Talked to Andy
191701 10/20/09 22:45 Kawama NFS is not working
191700 10/20/09 22:40 Kawama Checked HV
191699 10/20/09 22:39 Kawama Checked HV
191698 10/20/09 22:24 Reinhold Site wide power outage; meanwhile power restored
191697 10/20/09 22:17 shichijo HallC counting room is recovered from electrical power down
191696 10/20/09 22:10 close valve of Ar and ethane bottle
191695 10/20/09 21:54 shichijo CEBAF shut down
191694 10/20/09 21:49 saw Shutdown cdaqfs
191693 10/20/09 21:47 saw All accelerator site power down
191692 10/20/09 21:39 saw Shutdown cdaql6
191691 10/20/09 21:35 saw All accelerator site power down
191690 10/20/09 21:34 saw Home directory almost full
191689 10/20/09 21:26 Kawama Counting house power has gone
191688 10/20/09 20:57 shoh EDC HV & Current
191687 10/20/09 20:57 shoh HDC HV & Current
191686 10/20/09 20:37 shoh rate & checklist #76737
191685 10/20/09 20:30 cdaq Run 76737: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191684 10/20/09 20:29 cdaq End of Run 76736:
191683 10/20/09 20:22 shichijo beam is not stable during this run
191682 10/20/09 20:06 shichijo BPM and BCM screen shot (run#76736)
191681 10/20/09 19:53 shoh rate & checklist #76736
191680 10/20/09 19:46 cdaq Run 76736: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191679 10/20/09 19:44 cdaq End of Run 76735:
191678 10/20/09 19:42 cdaq Run 76735: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191677 10/20/09 19:41 shichijo run#76734 ended because beam was stop
191676 10/20/09 19:36 cdaq End of Run 76734:
191675 10/20/09 19:10 shoh rate & checklist #76734
191674 10/20/09 18:58 cdaq Run 76734: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191673 10/20/09 18:57 cdaq End of Run 76733:
191672 10/20/09 18:31 cdaq E02017 Run 1466: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.03Torr.
191671 10/20/09 18:28 shoh rate & checklist #76733
191670 10/20/09 18:22 shichijo Stopped fission chamber run 1465 to pump down
191669 10/20/09 18:20 cdaq E02017 End of Run 1465:
191668 10/20/09 18:20 cdaq Run 76733: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191667 10/20/09 18:19 cdaq End of Run 76732:
191666 10/20/09 17:58 shichijo BCM and BPM screen shot (run#76732)
191665 10/20/09 17:45 shichijo pulsed beam
191664 10/20/09 17:40 shoh rate & checklist #76732
191663 10/20/09 17:32 cdaq Run 76732: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191662 10/20/09 17:31 cdaq End of Run 76731:
191661 10/20/09 17:15 cdaq E02017 Run 1465: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.57Torr.
191660 10/20/09 17:14 cdaq E02017 End of Run 1464:
191659 10/20/09 17:03 shoh rate & checklist #76731
191658 10/20/09 16:52 cdaq Run 76731: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191657 10/20/09 16:51 cdaq End of Run 76730:
191656 10/20/09 16:45 maruta Diagnose of the HES-Q2 hallprobe
191655 10/20/09 16:32 shoh check list #76730
191654 10/20/09 16:21 shoh rate #76730
191653 10/20/09 16:11 cdaq Run 76730: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191652 10/20/09 16:07 shichijo Hall C is now beam permit
191651 10/20/09 16:02 cdaq Beam Time Accounting
191650 10/20/09 15:58 chench Day shift summary
191648 10/20/09 15:34 cdaq E02017 Run 1464: Run with NO beam , with pressure 2.95Torr.
191647 10/20/09 15:30 Chench Asked Controlled Access to check HES Q2 field error
191646 10/20/09 15:25 cdaq E02017 End of Run 1463:
191645 10/20/09 15:20 Chiba Correction
191644 10/20/09 14:59 chench End the run due to the problem from MCC to send the beam
191643 10/20/09 14:55 chench Beam has tripped for 12mins, and MCC said beam would be down for another half an hour
191642 10/20/09 14:52 cdaq End of Run 76729:
191641 10/20/09 14:31 chench HV of Drift Chambers during beam current was 7.8uA
191640 10/20/09 14:28 chench BCM and BPM during run#76729
191639 10/20/09 14:27 cdaq E02017 Run 1463: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.30Torr.
191638 10/20/09 14:27 cdaq E02017 End of Run 1462:
191637 10/20/09 14:26 chench Visual Scalers for run#76729
191636 10/20/09 14:24 xqiu checklist for run #76729
191635 10/20/09 14:15 chench Hallc 9th dipole NMR signal becomes normal
191634 10/20/09 14:14 cdaq Run 76729: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191633 10/20/09 14:11 cdaq End of Run 76728:
191632 10/20/09 14:09 chench a big fluctuation of HALLC 9th Dipole NMR(HCNMR:SIG) signal
191631 10/20/09 13:49 chench BCM and BPM during run#76728
191630 10/20/09 13:43 xqiu checklist for run #76728
191629 10/20/09 13:42 chench Visual Scalers for run#76728
191628 10/20/09 13:35 cdaq Run 76728: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191627 10/20/09 13:32 cdaq End of Run 76727:
191626 10/20/09 13:28 xqiu Fission chamber:pumping to 50mTorr, and refill gas to 2.98Torr.
191625 10/20/09 13:28 cdaq E02017 Run 1462: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 2.9Torr.
191624 10/20/09 13:15 cdaq E02017 End of Run 1461:
191623 10/20/09 13:06 chench HV of Drift Chambers beam current 7.2uA, and target Cr52
191622 10/20/09 13:01 xqiu checklist for run #76727
191621 10/20/09 12:58 chench Visual Scalers for run#76727
191620 10/20/09 12:53 chench BCM and BPM during run#76727
191619 10/20/09 12:51 cdaq Run 76727: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191618 10/20/09 12:50 cdaq End of Run 76726:
191617 10/20/09 12:21 xqiu checklist for run #76726
191616 10/20/09 12:19 chench Visual Scalers for run#76726
191615 10/20/09 12:15 chench BCM and BPM during run#75726
191614 10/20/09 12:14 chench After MCC reboot SLI of HALLC, beam is back, current is 7.5uA
191613 10/20/09 12:13 chench Screenshot of BPM during last two hours
191612 10/20/09 12:09 cdaq E02017 Run 1461: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.32Torr.
191611 10/20/09 12:09 cdaq Run 76726: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191610 10/20/09 12:08 chench Beam: end the run since MCC reboot the SLI
191609 10/20/09 12:03 chench MCC called they would check SLI for hallc, beam would be down for a while
191608 10/20/09 12:02 cdaq E02017 End of Run 1460:
191607 10/20/09 12:02 cdaq End of Run 76725:
191606 10/20/09 11:56 xqiu checklist for run #76725
191605 10/20/09 11:55 xqiu checklist for run #76725
191604 10/20/09 11:54 chench BCM and BPM during run#76725
191603 10/20/09 11:52 chench Visual Scalers for run#76725
191602 10/20/09 11:46 chench Mcc called HallA request Half wave plate in
191601 10/20/09 11:42 cdaq Run 76725: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191600 10/20/09 11:41 cdaq End of Run 76724:
191599 10/20/09 11:38 Chench Called to MCC that the SLI always arond 8.0 and the energy spread goes up to 10*10-5
191598 10/20/09 11:23 xqiu checklist fir run #76724
191597 10/20/09 11:23 xqiu checklist fir run #76724
191596 10/20/09 11:22 chench BCM and BPM during run#76724
191595 10/20/09 11:21 cdaq E02017 Run 1460: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 2.98Torr.
191594 10/20/09 11:18 chench End the run to make sure the field error of HES Q2
191593 10/20/09 11:17 chench Visual Scalers for run#76724
191592 10/20/09 11:14 xqiu checklist fir run #76724
191591 10/20/09 11:14 mack TOF mass squared
191590 10/20/09 11:09 xqiu checklist for run #76723
191589 10/20/09 11:01 cdaq Run 76724: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191588 10/20/09 10:58 cdaq End of Run 76723:
191587 10/20/09 10:57 cdaq E02017 End of Run 1459:
191586 10/20/09 10:57 cdaq Run 76723: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191585 10/20/09 10:55 cdaq End of Run 76722:
191584 10/20/09 10:27 xqiu checklist for run #76722
191583 10/20/09 10:25 chench BCM and BPM during run#76722
191582 10/20/09 10:24 chench Visual Scalers for run#76722
191581 10/20/09 10:17 cdaq Run 76722: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191580 10/20/09 10:17 cdaq End of Run 76721:
191579 10/20/09 09:56 xqiu checklist for run #76721
191578 10/20/09 09:54 chench BCM and BPM during run#76721
191577 10/20/09 09:52 xqiu checklist for run #76721
191576 10/20/09 09:52 xqiu checklist for run #76721
191575 10/20/09 09:45 chench Visual Scalers for run#76721
191574 10/20/09 09:40 cdaq Run 76721: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191573 10/20/09 09:39 cdaq End of Run 76720:
191572 10/20/09 09:29 chench Correction: The run# is 76720
191571 10/20/09 09:07 chench BCM and BPM during run#76720
191570 10/20/09 09:07 xqiu checklist for run #76720
191569 10/20/09 09:06 chench Visual Scalers for run#76719
191568 10/20/09 08:57 cdaq Run 76720: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191567 10/20/09 08:56 chench DAQ problem during run#76719, stop the run at the event#3187426
191566 10/20/09 08:54 cdaq End of Run 76719:
191565 10/20/09 08:37 chench HV of drift chambers run#76719
191564 10/20/09 08:35 chench Visual Scalers for run#76719
191563 10/20/09 08:29 xqiu Analysis: checklist for run #76719
191562 10/20/09 08:24 chench BCM, BPM during run76719
191561 10/20/09 08:19 cdaq E02017 Run 1459: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 2.92Torr.
191560 10/20/09 08:19 Reinhold Call to MCC: Energy spread fluctuating
191559 10/20/09 08:17 cdaq Run 76719: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191558 10/20/09 08:15 cdaq End of Run 76718:
191557 10/20/09 08:11 xqiu Analysis: checklist for run #76718
191556 10/20/09 08:09 cdaq Beam Time Accounting
191555 10/20/09 08:02 cdaq E02017 End of Run 1458:
191554 10/20/09 07:55 seva Owl shift summary
191553 10/20/09 07:41 P Achenbach visual scalers run # 76718 at 7.5 uA on 52Cr
191552 10/20/09 07:39 cdaq Run 76718: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191551 10/20/09 07:36 cdaq End of Run 76717:
191550 10/20/09 07:26 P Achenbach visual scalers run # 76717 at 7.5 uA on 52Cr
191549 10/20/09 07:00 cdaq Run 76717: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191548 10/20/09 06:59 cdaq End of Run 76716:
191547 10/20/09 06:58 cdaq E02017 Run 1458: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.46 Torr.
191546 10/20/09 06:57 cdaq E02017 End of Run 1457:
191545 10/20/09 06:20 cdaq Run 76716: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191544 10/20/09 06:19 cdaq End of Run 76715:
191543 10/20/09 06:03 P Achenbach visual scalers run # 76715 at 7.5 uA on 52Cr
191542 10/20/09 06:00 cdaq E02017 Run 1457: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.11Torr.
191541 10/20/09 05:44 cdaq Run 76715: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191540 10/20/09 05:42 cdaq End of Run 76714:
191539 10/20/09 05:36 cdaq E02017 End of Run 1456:
191538 10/20/09 05:17 P Achenbach visual scalers run # 76714 at 7.5 uA on 52Cr
191537 10/20/09 05:14 cdaq Run 76714: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191536 10/20/09 05:06 cdaq End of Run 76713:
191535 10/20/09 04:49 P Achenbach visual scalers run # 76713 at 7.5 uA on 52Cr
191534 10/20/09 04:48 seva bcm and bpm run #76713
191533 10/20/09 04:46 cdaq E02017 Run 1456: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.84Torr.
191532 10/20/09 04:45 cdaq E02017 End of Run 1455:
191531 10/20/09 04:42 Chiba correction
191530 10/20/09 04:38 Chiba attempt to use carve cut & cointime shift
191529 10/20/09 04:32 cdaq Run 76713: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191528 10/20/09 04:28 cdaq End of Run 76712:
191527 10/20/09 04:11 P Achenbach visual scalers run # 76712 at 7.5 uA on 52Cr
191526 10/20/09 03:53 cdaq Run 76712: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191525 10/20/09 03:52 cdaq End of Run 76711:
191524 10/20/09 03:50 cdaq E02017 Run 1455: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.51Torr.
191523 10/20/09 03:49 cdaq E02017 End of Run 1454:
191522 10/20/09 03:44 P Achenbach visual scalers run # 76711 at 7.5 uA on 52Cr
191521 10/20/09 03:43 P Achenbach visual scalers run # 76710 at 7.5 uA on 52Cr
191520 10/20/09 03:40 cdaq Run 76711: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191519 10/20/09 03:10 cdaq End of Run 76710:
191518 10/20/09 02:31 cdaq Run 76710: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191517 10/20/09 02:31 cdaq E02017 Run 1454: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.02 Torr.
191516 10/20/09 02:30 cdaq End of Run 76709:
191515 10/20/09 02:25 P Achenbach visual scalers run # 76709 at 7.5 uA on 52Cr
191514 10/20/09 02:20 cdaq E02017 End of Run 1453:
191513 10/20/09 01:53 seva Run#76609 BCM&BPM
191512 10/20/09 01:51 cdaq Run 76709: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191511 10/20/09 01:50 cdaq End of Run 76708:
191510 10/20/09 01:18 P Achenbach visual scalers run # 76708 at 7.5 uA on 52Cr
191509 10/20/09 01:16 cdaq E02017 Run 1453: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.45 Torr.
191508 10/20/09 01:14 cdaq Run 76708: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191507 10/20/09 01:14 P Achenbach visual scalers run # 76707 at 7.5 uA on 52Cr
191506 10/20/09 01:11 cdaq End of Run 76707:
191505 10/20/09 01:10 cdaq E02017 End of Run 1452:
191504 10/20/09 01:09 Reinhold SVN COMMIT: add charge replay; revision 269
191503 10/20/09 00:33 cdaq Run 76707: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191502 10/20/09 00:32 cdaq End of Run 76706:
191501 10/20/09 00:26 Chiba beta tail in Cr recent run
191500 10/20/09 00:11 cdaq E02017 Run 1452: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.02 Torr.
191499 10/20/09 00:01 vmaxwell current 7.5 uA on 52Cr target .. visual scalers run # 76706
191498 10/20/09 00:01 cdaq Beam Time Accounting
Monday
191497 10/19/09 23:59 cdaq E02017 End of Run 1451:
191496 10/19/09 23:54 cdaq Run 76706: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191495 10/19/09 23:53 cdaq End of Run 76705:
191494 10/19/09 23:34 vmaxwell currrent 7.5 uA on 52Cr target .. visual scalers run # 76705
191493 10/19/09 23:29 cdaq Run 76705: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191492 10/19/09 23:27 cdaq End of Run 76704:
191491 10/19/09 22:58 vmaxwell current 7.5 uA on 52Cr target .. visual scalers run # 76704
191490 10/19/09 22:50 cdaq Run 76704: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191489 10/19/09 22:50 yuan The quality of TOF calibration
191488 10/19/09 22:44 cdaq End of Run 76703:
191487 10/19/09 22:35 vmaxwell current 7.5 uA on 52Cr target .. visual scalers run # 76703
191486 10/19/09 22:31 Tang This type of cut is a good idea but needs to be optimized.
191484 10/19/09 22:30 chench Adjust the flow rate of drift chamber gas from 1.0 to 1.64
191483 10/19/09 22:17 cdaq Run 76703: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191482 10/19/09 22:15 cdaq End of Run 76702:
191481 10/19/09 21:53 christy beam screens for run 76702
191480 10/19/09 21:47 vmaxwell current 7.5 uA on 52Cr target .. visual scalers run # 76702
191479 10/19/09 21:39 cdaq Run 76702: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191478 10/19/09 21:37 cdaq End of Run 76701:
191477 10/19/09 21:18 current 7.5 uA on 52Cr target .. visual scalers run # 76701
191476 10/19/09 21:01 cdaq Run 76701: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191475 10/19/09 20:59 cdaq End of Run 76700:
191474 10/19/09 20:42 vmaxwell current 7.5 uA on 52Cr target .. visual scalers run # 76700 ... strange livetime again
191473 10/19/09 20:25 cdaq Run 76700: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191472 10/19/09 20:23 cdaq End of Run 76699:
191471 10/19/09 20:11 cdaq E02017 Run 1451: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.11Torr.
191470 10/19/09 20:04 christy stop fission chamber run 1450 to pump down
191469 10/19/09 20:01 cdaq E02017 End of Run 1450:
191468 10/19/09 19:58 vmaxwell current 7.5 uA (nominal) on 52Cr target .. visual scalers run # 76699
191467 10/19/09 19:49 cdaq Run 76699: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191466 10/19/09 19:47 cdaq End of Run 76698:
191465 10/19/09 19:21 vmaxwell current 7.5 uA (nomianl) on 52Cr target .. visual scalers run # 76698
191464 10/19/09 19:15 vmaxwell livetime run 76697
191463 10/19/09 19:12 cdaq Run 76698: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191462 10/19/09 19:11 vmaxwell livetime for run # 76697 decreased to 98.8 % by end of run
191461 10/19/09 19:00 vmaxwell current 7.5 uA (nominal) on 52Cr target .. visual scalers run # 76697 ... strange livetime %
191460 10/19/09 18:49 christy beam screen grab - run 76695
191459 10/19/09 18:40 cdaq Run 76697: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191457 10/19/09 18:14 vmaxwell Current 7.5 (nominal) on 52Cr target .. visual scalers run # 76696
191456 10/19/09 18:06 cdaq Run 76696: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191455 10/19/09 18:04 cdaq End of Run 76695:
191454 10/19/09 17:36 vmaxwell Current 7.5 uA (nominal) on 52Cr target .. visual scalers run # 76695
191453 10/19/09 17:27 cdaq Run 76695: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191452 10/19/09 17:25 cdaq End of Run 76694:
191451 10/19/09 17:07 vmaxwell current 7.5 uA (nominal) on 52Cr target .. visual scalers run # 76694
191450 10/19/09 16:49 cdaq Run 76694: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191449 10/19/09 16:46 cdaq End of Run 76693:
191448 10/19/09 16:22 albayrak Current 7.5 uA on 52Cr --> VISUAL CSALERS Run # 76693
191447 10/19/09 16:14 Christy BPM & BCm Run # 76693
191446 10/19/09 16:11 cdaq Run 76693: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191445 10/19/09 16:05 Petkovic Day Shift Summary
191444 10/19/09 16:04 cdaq Beam Time Accounting
191443 10/19/09 15:56 Anusha Current 7.5 uA on 52Cr --> VISUAL CSALERS Run # 76692
191442 10/19/09 15:56 PETKOVIC BPM & FB Control Run # 76692
191441 10/19/09 15:54 Anusha Current 7.5 uA on 52Cr --> VISUAL CSALERS Run # 76691
191440 10/19/09 15:53 Petkovic Beam: 15:40 Beam back with 7.5 uA on 52Cr. Started Run # 76692
191439 10/19/09 15:52 Petkovic 15:40 Rebooted CODA for Fission Chamber Experiment
191438 10/19/09 15:49 Petkovic Beam: 15:40 Beam back with 7.5 uA on 52Cr. Started Run # 76692
191437 10/19/09 15:44 cdaq E02017 Run 1450: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.21Torr.
191436 10/19/09 15:41 cdaq Run 76692: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191435 10/19/09 15:36 Anusha Current 7.5 uA on 52Cr --> VISUAL CSALERS Run # 76691
191434 10/19/09 15:31 Petkovic Beam: 15:25 MCR reported Beam off (cca 05 hour) due to troubles with one magnet
191433 10/19/09 15:27 cdaq E02017 Run 1449: Run with no beam of 7.5uA beam 2344MeV, 52Cr target, with pressure 3.54 Torr.
191432 10/19/09 15:25 cdaq End of Run 76691:
191431 10/19/09 15:17 cdaq Run 76691: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191430 10/19/09 15:17 Gogami Track of Rates [52Cr target]
191429 10/19/09 15:16 cdaq End of Run 76690:
191428 10/19/09 15:14 cdaq E02017 End of Run 1448:
191427 10/19/09 15:01 Anusha/Petko Current 7.5 uA on 52Cr --> VISUAL CSALERS Run # 76690
191426 10/19/09 14:51 Petkovic BPM & BCM Run # 76690
191425 10/19/09 14:40 cdaq Run 76690: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191424 10/19/09 14:39 cdaq End of Run 76689:
191423 10/19/09 14:35 cdaq E02017 Run 1448: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.54 Torr.
191422 10/19/09 14:34 maruta
191421 10/19/09 14:34 cdaq E02017 End of Run 1447:
191420 10/19/09 14:17 Anusha/Petko Current 7.5 uA on 52Cr --> VISUAL CSALERS Run # 76689
191419 10/19/09 14:09 Petkovic BPM & BCM Run #76689
191418 10/19/09 14:04 cdaq Run 76689: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191417 10/19/09 14:03 cdaq End of Run 76688:
191416 10/19/09 13:39 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76688
191415 10/19/09 13:30 Petkovic 13:26 The IOC established, Beam back
191414 10/19/09 13:26 cdaq Run 76688: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191413 10/19/09 13:26 cdaq E02017 Run 1447: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.11Torr.
191412 10/19/09 13:19 shoh grouping summary
191411 10/19/09 13:15 cdaq E02017 End of Run 1446:
191410 10/19/09 13:07 Petkovic Beam: 13:00 MCR reported lost ot the IOC: Beam off expected for the half of an hour
191409 10/19/09 13:01 cdaq End of Run 76687:
191408 10/19/09 12:25 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76687
191407 10/19/09 12:22 Petkovic BPM & BCM Run # 76687
191406 10/19/09 12:16 cdaq Run 76687: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191405 10/19/09 12:15 cdaq End of Run 76686:
191404 10/19/09 12:15 shoh The number of lambda for Be target run
191403 10/19/09 12:12 Nue Power cycle did not solve the HES-Q2 Hall Probe
191402 10/19/09 11:52 Chiba kaon rate before and after threshold change
191401 10/19/09 11:51 cdaq E02017 Run 1446: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.45Torr.
191400 10/19/09 11:51 cdaq E02017 End of Run 1445:
191399 10/19/09 11:45 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76686
191398 10/19/09 11:39 cdaq Run 76686: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191397 10/19/09 11:37 cdaq End of Run 76685:
191396 10/19/09 11:21 Reinhold HES Q2 ; Field error
191395 10/19/09 11:19 Petkovic BPM & BCM Run # 76685
191394 10/19/09 11:19 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76685
191393 10/19/09 11:17 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76684
191392 10/19/09 11:11 Gogami DC HVs screenshot[52Cr@7.5[uA]/Run76685]
191391 10/19/09 11:05 Petkovic EDC1 Restarted Voltage and new Run # 76885 started, Current 7.5 uA on 52Cr.
191390 10/19/09 11:00 Gogami HES Q2 ; Field error ==>This is problem?
191389 10/19/09 10:59 cdaq Run 76685: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191388 10/19/09 10:55 Gogami Drift chamber was turned off.Tripped?
191387 10/19/09 10:52 cdaq End of Run 76684:
191386 10/19/09 10:52 Petkovic BPM & BCM Run # 76684
191385 10/19/09 10:44 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76684
191384 10/19/09 10:39 yez Fission Chamber Gas pump and refill
191383 10/19/09 10:37 cdaq E02017 Run 1445: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 2.98Torr.
191382 10/19/09 10:36 cdaq Run 76684: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191381 10/19/09 10:35 cdaq End of Run 76683:
191380 10/19/09 10:26 cdaq E02017 End of Run 1444:
191379 10/19/09 10:13 Anusha/Petko Fast FB Status, Run # 76683
191378 10/19/09 10:09 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76683
191377 10/19/09 10:06 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76682
191376 10/19/09 10:04 Petkovic BPM & BCM Run # 76683
191375 10/19/09 09:57 cdaq Run 76683: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191374 10/19/09 09:55 cdaq End of Run 76682:
191373 10/19/09 09:29 Petkovic BPM & BCM, Run # 76682
191372 10/19/09 09:29 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76682
191371 10/19/09 09:19 cdaq Run 76682: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191370 10/19/09 09:17 cdaq End of Run 76681:
191369 10/19/09 09:03 cdaq E02017 Run 1444: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.42Torr.
191368 10/19/09 09:02 cdaq E02017 End of Run 1443:
191367 10/19/09 09:01 Anusha Target 52Cr current 7.5 uA VISUAL SCALERS, Run # 76681
191366 10/19/09 09:01 Petkovic BPM & BCM Run # 76681
191365 10/19/09 08:56 Arshak ROC 14 error at the end of run#76669, almost 3.7M events
191364 10/19/09 08:55 Arshak 6:15 Beam is OFF, MCC is doing some tests, beam will back approximately 5-10min, as MCC told
191363 10/19/09 08:55 Arshak 6:40 Beam is back
191362 10/19/09 08:41 cdaq Run 76681: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191361 10/19/09 08:38 cdaq End of Run 76680:
191360 10/19/09 08:24 Petkovic BPM & BCM, Run # 76680
191359 10/19/09 08:14 Anusha Target 52Cr current 7.5 microamps VISUAL SCALERS, Run # 76680
191358 10/19/09 08:01 cdaq Beam Time Accounting
191357 10/19/09 08:01 Arshak OWL Shift summary
191356 10/19/09 07:59 cdaq E02017 Run 1443: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.02 Torr.
191355 10/19/09 07:59 cdaq Run 76680: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191354 10/19/09 07:57 cdaq End of Run 76679:
191353 10/19/09 07:48 cdaq E02017 End of Run 1442:
191352 10/19/09 07:23 P Achenbach Visual scalers for run#76679
191351 10/19/09 07:21 cdaq Run 76679: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191350 10/19/09 07:19 cdaq End of Run 76678:
191349 10/19/09 07:01 P Achenbach Visual scalers for run#76678
191348 10/19/09 06:40 Arshak 6:40 Beam is back
191347 10/19/09 06:40 cdaq Run 76678: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191346 10/19/09 06:40 cdaq E02017 Run 1442: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.55 Torr.
191345 10/19/09 06:33 cdaq E02017 End of Run 1441:
191344 10/19/09 06:20 Arshak 6:15 Beam is OFF, MCC is doing some tests, beam will back approximately 5-10min, as MCC told
191343 10/19/09 06:17 cdaq E02017 Run 1441: Run without beam, with pressure 3.42 Torr.
191342 10/19/09 06:15 P Achenbach Visual scalers for run#76677
191341 10/19/09 06:13 cdaq E02017 End of Run 1440:
191340 10/19/09 06:12 cdaq End of Run 76677:
191339 10/19/09 05:49 cdaq Run 76677: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191338 10/19/09 05:39 cdaq End of Run 76676:
191337 10/19/09 05:12 cdaq E02017 Run 1440: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.00Torr.
191336 10/19/09 05:09 P Achenbach Visual scalers for run#76676
191335 10/19/09 05:07 cdaq Run 76676: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191334 10/19/09 05:02 cdaq End of Run 76675:
191333 10/19/09 05:02 cdaq E02017 End of Run 1439:
191332 10/19/09 05:01 P Achenbach Visual scalers for run#76675
191331 10/19/09 04:34 cdaq Run 76675: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191330 10/19/09 04:23 cdaq End of Run 76674:
191329 10/19/09 03:53 P Achenbach Visual scalers for run#76674
191328 10/19/09 03:52 P Achenbach Visual scalers for run#76673
191327 10/19/09 03:50 cdaq E02017 Run 1439: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.39 Torr.
191326 10/19/09 03:49 cdaq E02017 End of Run 1438:
191325 10/19/09 03:49 cdaq Run 76674: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191324 10/19/09 03:46 cdaq End of Run 76673:
191323 10/19/09 03:10 cdaq Run 76673: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191322 10/19/09 03:09 cdaq End of Run 76672:
191321 10/19/09 02:48 cdaq E02017 Run 1438: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.00Torr.
191320 10/19/09 02:40 P Achenbach Visual scalers for run#76672
191319 10/19/09 02:37 P Achenbach Visual scalers for run#76671
191318 10/19/09 02:36 cdaq Run 76672: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191317 10/19/09 02:36 cdaq E02017 End of Run 1437:
191316 10/19/09 02:35 cdaq End of Run 76671:
191315 10/19/09 02:15 cdaq Run 76671: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191314 10/19/09 01:58 cdaq End of Run 76670:
191313 10/19/09 01:49 P Achenbach Visual scalers for run#76670
191312 10/19/09 01:43 chench HV of drift chamber at beam current 7.5uA, run#76670
191311 10/19/09 01:26 P Achenbach HKS drift chamber HV changed by 5 V
191310 10/19/09 01:21 cdaq Run 76670: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191309 10/19/09 01:20 Arshak ROC 14 error at the end of run#76669, almost 3.7M events
191308 10/19/09 01:18 cdaq End of Run 76669:
191307 10/19/09 01:03 cdaq E02017 Run 1437: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.43 Torr.
191306 10/19/09 01:03 cdaq E02017 End of Run 1436:
191305 10/19/09 00:48 cdaq Run 76669: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191304 10/19/09 00:47 P Achenbach Visual scalers for run#76669
191303 10/19/09 00:44 cdaq End of Run 76668:
191302 10/19/09 00:32 P Achenbach bpm and bcm run #76668
191301 10/19/09 00:28 cdaq Beam Time Accounting
191300 10/19/09 00:27 Reinhold RC: owl shift plan (kind of obvious)
191299 10/19/09 00:14 P Achenbach Visual scalers for run#76668
191298 10/19/09 00:07 cdaq Run 76668: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191297 10/19/09 00:06 cdaq End of Run 76667:
191296 10/19/09 00:00 Gogami Shift_summury[swing-18Oct2009] Run76652->Run76667
Sunday
191295 10/18/09 23:56 cdaq E02017 Run 1436: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.00 Torr.
191294 10/18/09 23:44 cdaq E02017 End of Run 1435:
191293 10/18/09 23:39 Gogami C HVs screenshot[52Cr@7.5[uA]/Run76667]
191292 10/18/09 23:37 Gogami BPM and BCM screenshot[52Cr@7.5[uA]/Run76667]
191291 10/18/09 23:36 Gogami Rates from Visual scalers[52Cr@7.5uA/Run76667]
191290 10/18/09 23:33 cdaq Run 76667: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191289 10/18/09 23:28 cdaq End of Run 76666:
191288 10/18/09 22:59 Gogami Rates from Visual scalers[52Cr@7.5uA/Run76666]
191287 10/18/09 22:51 cdaq Run 76666: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191286 10/18/09 22:50 cdaq End of Run 76665:
191285 10/18/09 22:32 kawama Analysis: SS analysis, a good picture and a bud picture
191284 10/18/09 22:25 Gogami Rates from Visual scalers[52Cr@7.5uA/Run76664] ==> worng{HES3 = 5.98 MHz },correct{HES3=4.98MHz}
191283 10/18/09 22:24 lgan Analysis: reply run76665,pdf
191282 10/18/09 22:23 Gogami Rates from Visual scalers[52Cr@7.5uA/Run76665]
191281 10/18/09 22:19 Gogami DC HVs screenshot[52Cr@7.5[uA]/Run76665]
191280 10/18/09 22:17 cdaq E02017 Run 1435: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.48Torr.
191279 10/18/09 22:14 cdaq E02017 End of Run 1434:
191278 10/18/09 22:13 cdaq Run 76665: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191277 10/18/09 22:12 cdaq End of Run 76664:
191276 10/18/09 21:47 Gogami Rates from Visual scalers[52Cr@7.5uA/Run76664]
191275 10/18/09 21:47 Gogami Rates from Visual scalers[52Cr@7.5uA/Run76664]
191274 10/18/09 21:43 Gogami BPM and BCM screenshot[52Cr@7.5[uA]/Run76664]
191273 10/18/09 21:37 cdaq Run 76664: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191272 10/18/09 21:33 Gogami End failed run76663
191271 10/18/09 21:16 cdaq E02017 Run 1434: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.10Torr.
191270 10/18/09 21:02 cdaq E02017 End of Run 1433:
191269 10/18/09 20:59 Gogami Rates from Visual scalers[52Cr@7.5uA/Run76663]
191268 10/18/09 20:54 cdaq Run 76663: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191267 10/18/09 20:52 cdaq End of Run 76662:
191266 10/18/09 20:46 Gogami This is not 8[uA]. Correct value is 8.6[uA].
191265 10/18/09 20:27 Gogami Rates from Visual scalers[52Cr@7.5uA/Run76662]
191264 10/18/09 20:24 Gogami DC HVs screenshot[52Cr@7.5[uA]/Run76662]
191263 10/18/09 20:19 Gogami BPM and BCM screenshot[52Cr@7.5[uA]/Run76662]
191262 10/18/09 20:17 Gogami Beam: Beam is back. now 7.5[uA] on 52Cr.
191261 10/18/09 20:16 cdaq E02017 Run 1433: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.73Torr.
191260 10/18/09 20:16 cdaq Run 76662: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191259 10/18/09 20:12 Gogami Run76660 is JUNK [see==>entry#191252]
191258 10/18/09 20:09 Gogami Run76661 was ended soon because beam was stopped.
191257 10/18/09 20:07 Gogami Beam: Beam is stopped and will be back in 10 minutes.
191256 10/18/09 20:05 Gogami Kill all and DAQ is recoverd .
191255 10/18/09 20:04 cdaq E02017 End of Run 1432:
191254 10/18/09 20:04 cdaq End of Run 76661:
191253 10/18/09 19:59 cdaq Run 76661: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191252 10/18/09 19:57 Gogami Error in ROC7[Run76660]
191251 10/18/09 19:56 cdaq End of Run 76660:
191250 10/18/09 19:54 cdaq Run 76660: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191249 10/18/09 19:51 cdaq End of Run 76659:
191248 10/18/09 19:32 cdaq E02017 Run 1432: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.47Torr.
191247 10/18/09 19:31 cdaq E02017 End of Run 1431:
191246 10/18/09 19:26 Gogami Rates from Visual scalers[52Cr@7.5uA/Run76659]
191245 10/18/09 19:23 Gogami DC HVs screenshot[52Cr@7.5[uA]/Run76659]
191244 10/18/09 19:17 cdaq Run 76659: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191243 10/18/09 19:15 cdaq End of Run 76658:
191242 10/18/09 19:10 chench Keep the HV of HDC1 in 1930V
191241 10/18/09 19:08 Gogami BPM and BCM screen shot[52Cr@7.5[uA]/Run76658]
191240 10/18/09 19:03 lgan Analysis: run76657.pdf
191239 10/18/09 18:59 Gogami Rates form Visual scalers[52Cr@7.5uA/Run76658]
191238 10/18/09 18:52 Gogami Coin rate at 8.0[uA] on 52Cr-target ==> 2.97[kHz]
191237 10/18/09 18:48 chench Additional information: Hits per plane before the tracking cut of HKS dritt chamber run#76651
191236 10/18/09 18:43 cdaq Run 76658: 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191235 10/18/09 18:40 chench Correction: The run# is 76649 and 76651
191234 10/18/09 18:40 cdaq End of Run 76657:
191233 10/18/09 18:40 lgan Analysis: reply run76657.pdf
191232 10/18/09 18:36 Gogami sorry, This run is JUNK[E02017 Run 1430]
191231 10/18/09 18:32 cdaq E02017 Run 1431: Run with 7.5uA beam 2344MeV, 52Cr target, with pressure 3.10Torr.
191230 10/18/09 18:31 cdaq E02017 End of Run 1430:
191229 10/18/09 18:31 cdaq E02017 Run 1430: Run with 6uA beam 2344MeV, 52Cr target, with pressure 3.08Torr.
191228 10/18/09 18:24 Gogami BPM and BCM screen shot[52Cr@7.5[uA]/Run76657]
191227 10/18/09 18:21 chench HV of drift chambers for beam current 7.5uA and target Cr52
191226 10/18/09 18:20 cdaq E02017 End of Run 1429:
191225 10/18/09 18:19 Gogami Rates form Visual scalers[52Cr@7.5uA/Run76657]
191224 10/18/09 18:19 Gogami Rates form Visual scalers[52Cr@7.5uA/Run76657]
191223 10/18/09 18:10 Gogami Event recorder was unstavle in this Run [Run76655 and Run76656].
191222 10/18/09 18:10 chench Additional disccussion for the trackable events
191221 10/18/09 18:08 Chiba Cut condition
191220 10/18/09 18:08 Gogami Asked MCC,decrease the beam current to 7.5[uA] (from Run76657)
191219 10/18/09 18:07 cdaq Run 76657: raised WC {threshold;} 2344 MeV,Buffered, 52Cr target@ 7.5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191218 10/18/09 17:54 Gogami Asked MCC , increase the beam current to 8[uA]
191217 10/18/09 17:51 cdaq Run 76655: raised WC {threshold;} 2344 MeV,Buffered, 52Cr target@ 8.0 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191216 10/18/09 17:50 chench what is the better beam current?
191215 10/18/09 17:47 chiba WC threshold changed (80,100) (low,high) => (100,120)(low,high)
191214 10/18/09 17:44 lgan dead channel is fixed
191213 10/18/09 17:43 cdaq End of Run 76654:
191212 10/18/09 17:38 cdaq Run 76654: raised WC {threshold;} 2344 MeV,Buffered, 52Cr target@ 7.3 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191211 10/18/09 17:36 Gogami Run was ended at 2.2M . because of missing channel in KTOF1X-11T(see==>191210)
191210 10/18/09 17:33 lgan SMS: dead channel
191209 10/18/09 17:31 cdaq End of Run 76653:
191208 10/18/09 17:24 Reinhold Killed some replay jobs on cdaql4
191207 10/18/09 17:20 Gogami Rates form Visual scalers[52Cr@7.3uA/Run76653] after WC threshold changed
191206 10/18/09 17:19 Reinhold 8 uA on Cr should be possible after WC threshold adjustment
191205 10/18/09 17:10 Chiba WC threshold changed (80,100) (low,high) => (100,120)(low,high) before Run76653
191204 10/18/09 17:10 cdaq Run 76653: raised WC threshold; 2344 MeV,Buffered, 52Cr target@ 7.3 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191203 10/18/09 17:08 cdaq E02017 Run 1429: Run with 7.3uA beam 2344MeV, 52Cr target, with pressure 3.67Torr.
191202 10/18/09 17:05 cdaq E02017 End of Run 1428:
191201 10/18/09 17:04 cdaq End of Run 76652:
191200 10/18/09 17:03 Tang HDC1 HV can be raised by another 10V
191199 10/18/09 16:52 Gogami DCs HV screenshot[52Cr@7.3uA/Run76652]
191198 10/18/09 16:50 Gogami Rates form Visual scalers[52Cr@7.3uA/Run76652]
191197 10/18/09 16:47 lgan reply .pdf file
191196 10/18/09 16:41 Gogami BPM and BCM screen shot[52Cr@7.3uA/Run76652]
191195 10/18/09 16:34 cdaq Run 76652: 2344 MeV,Buffered, 52Cr target@ 7.3 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191194 10/18/09 16:29 cdaq End of Run 76651:
191193 10/18/09 16:16 Reinhold Delayed entry: 52Cr running conditions for 6 uA beam
191192 10/18/09 16:09 chench Updated leakage current of drift chamber current 7.3uA and Target Cr52
191191 10/18/09 16:02 cdaq Beam Time Accounting
191190 10/18/09 16:01 Petkovic Day Shift Summary
191189 10/18/09 16:00 Reinhold During run 76650 adjust drift chamber (DC) high voltage (HV)
191188 10/18/09 15:59 Seva Visual scalers for run#76651
191187 10/18/09 15:57 seva Run#76651 BCM&BPM
191186 10/18/09 15:56 cdaq Run 76651: 2344 MeV,Buffered, 52Cr target@ 7.3 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191185 10/18/09 15:56 cdaq End of Run 76650:
191184 10/18/09 15:55 Seva Visual scalers for run#76650
191183 10/18/09 15:52 seva beam change to 7.3uA, Cr52 target; stable
191182 10/18/09 15:49 cdaq Run 76650: 2344 MeV,Buffered, 52Cr target@ 7.3 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191181 10/18/09 15:48 cdaq End of Run 76649:
191180 10/18/09 15:41 Tang Raise HDC1 &2 and EDC2 HV's
191179 10/18/09 15:38 Reinhold WC threshold for Cr running?
191178 10/18/09 15:32 Seva Visual scalers for run#76649
191177 10/18/09 15:30 seva Run#76649 BCM&BPM
191176 10/18/09 15:29 cdaq Run 76649: 2344 MeV,Buffered, 52Cr target@ 6 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191175 10/18/09 15:29 cdaq E02017 Run 1428: Run with 6uA beam 2344MeV, 52Cr target, with pressure 3.07Torr.
191174 10/18/09 15:17 cdaq E02017 End of Run 1427:
191173 10/18/09 15:08 chench The HV of Drift chamber for current 6uA, and Target Cr52
191172 10/18/09 15:07 seva Run#76648 BCM&BPM
191171 10/18/09 15:07 Seva Visual scalers for run#76648
191170 10/18/09 15:06 Seva Visual scalers for run#76647
191169 10/18/09 14:58 cdaq Run 76648: 2344 MeV,Buffered, 52Cr target@ 6 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191168 10/18/09 14:57 cdaq End of Run 76647:
191167 10/18/09 14:36 Petkovic Target: 14:10 Target changed to 52Cr (no raster) with 6 uA (form Be9 with 40 uA)
191166 10/18/09 14:20 Reinhold Drifty chamber HV at 8 uA
191165 10/18/09 14:17 Reinhold Drift chamber HV at 6 uA
191164 10/18/09 14:17 seva Beam Current is changed to 6 microA from 5 microA
191163 10/18/09 14:15 cdaq E02017 Run 1427: Run with 6uA beam 2344MeV, 52Cr target, with pressure 3.66Torr.
191162 10/18/09 14:15 seva Run#76647 BCM&BPM
191161 10/18/09 14:12 cdaq Run 76647: 2344 MeV,Buffered, 52Cr target@ 5 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191160 10/18/09 14:02 cdaq Run 76646: 2344 MeV,Buffered, 52Cr target@ 8 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191159 10/18/09 14:00 cdaq Run 76645: 2344 MeV,Buffered, 52Cr target@ 8 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191158 10/18/09 13:57 seva change of prescale factors: ps1=200;ps5=12000
191157 10/18/09 13:49 Reinhold Changed HD1&2 and EC2 HV
191156 10/18/09 13:46 cdaq E02017 End of Run 1426:
191155 10/18/09 13:46 cdaq End of Run 76644:
191154 10/18/09 13:43 Reinhold Instructions for drift chamber HV for Cr running
191153 10/18/09 13:25 cdaq E02017 Run 1426: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.36Torr.
191152 10/18/09 13:24 cdaq E02017 End of Run 1425:
191151 10/18/09 13:07 Seva Visual scalers for run#76644
191150 10/18/09 13:03 seva Run#76644 BCM&BPM
191149 10/18/09 13:03 cdaq Run 76644: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191148 10/18/09 13:02 cdaq End of Run 76643:
191147 10/18/09 12:44 Petkovic Target: Prescaling factors for 52Cr target with beam currrent 8 microamps
191146 10/18/09 12:23 Seva Visual scalers for run#76643
191145 10/18/09 12:22 cdaq E02017 Run 1425: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.00Torr.
191144 10/18/09 12:21 seva Run#76643 BCM&BPM
191143 10/18/09 12:18 cdaq Run 76643: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191142 10/18/09 12:17 cdaq End of Run 76642:
191141 10/18/09 12:11 cdaq E02017 End of Run 1424:
191140 10/18/09 11:38 Seva Visual scalers for run#76642
191139 10/18/09 11:34 seva Run#76642 BCM&BPM
191138 10/18/09 11:32 cdaq Run 76642: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191137 10/18/09 11:32 cdaq E02017 Run 1424: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.77Torr.
191136 10/18/09 11:31 Petkovic Beam: 10:55 - 11:10 MCR disabled beam due to the IOC problem.
191135 10/18/09 11:05 Reinhold RC: run plan for Sunday; a few more runs Be, then Cr at ~ 1:30 pm
191134 10/18/09 11:04 cdaq E02017 End of Run 1423:
191133 10/18/09 11:03 cdaq End of Run 76641:
191132 10/18/09 11:01 seva Run#76641 BCM&BPM
191131 10/18/09 11:01 cdaq Run 76641: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191130 10/18/09 10:56 cdaq End of Run 76640:
191129 10/18/09 10:54 Petkovic 09:46 Continued data on Be9 with 40uA, with an improved conditions
191128 10/18/09 10:49 seva Run#76640 BCM&BPM
191127 10/18/09 10:44 Reinhold Controlled access: HES-D communication problem is resolved
191126 10/18/09 10:42 cdaq Run 76640: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191125 10/18/09 10:42 cdaq E02017 Run 1423: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.48Torr.
191124 10/18/09 10:42 cdaq E02017 End of Run 1422:
191123 10/18/09 10:41 Reinhold Controlled access: Reboot IOC hlc3
191122 10/18/09 10:32 Petkovic Beam: Restricted Access Mode (MMCR) due to Hall C Ion Ch. issue; Reseted HES-D magnet
191121 10/18/09 09:37 Reinhold EH2-16T HV TRIP: fixed
191120 10/18/09 09:34 cdaq E02017 Run 1422: Run with NO beam, pressure 3.05 Torr.
191119 10/18/09 09:32 cdaq End of Run 76639:
191118 10/18/09 09:30 Reinhold End of Run #76638: HV crate 34 tripped a few minutes before end of run
191117 10/18/09 09:28 cdaq Run 76639: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191116 10/18/09 09:23 cdaq End of Run 76638:
191115 10/18/09 09:18 Seva ROC 7 errors, reboot of ROC 7 and coda
191114 10/18/09 09:15 cdaq Run 76638: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191112 10/18/09 09:02 cdaq E02017 End of Run 1421:
191111 10/18/09 08:29 Petkovic Keep going Be9 with 40 microamps. Proposal for the EH2 - 16T Trip Problem
191110 10/18/09 08:16 cdaq E02017 Run 1421: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.76Torr.
191109 10/18/09 08:16 cdaq E02017 End of Run 1420:
191108 10/18/09 08:15 Seva Visual scalers for run#76636 (with EH2-16T off)
191107 10/18/09 08:10 seva Run#76636 BCM&BPM
191106 10/18/09 08:06 cdaq Run 76636: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191105 10/18/09 08:05 cdaq End of Run 76635:
191104 10/18/09 08:02 cdaq Beam Time Accounting
191103 10/18/09 08:02 Arshak OWL Shift Summary
191102 10/18/09 07:44 Arshak HV snapshot
191101 10/18/09 07:32 Arshak HES HODO TDC/ADC
191100 10/18/09 07:32 P Achenbach Visual scalers for run#76635 (with EH2-16T off)
191099 10/18/09 07:25 Arshak EH2-16T HV TRIP
191098 10/18/09 07:18 cdaq Run 76635: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191097 10/18/09 07:18 cdaq E02017 Run 1420: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.00Torr.
191096 10/18/09 07:18 cdaq E02017 End of Run 1419:
191095 10/18/09 07:01 cdaq End of Run 76634:
191094 10/18/09 06:17 P Achenbach Visual scalers for run#76634
191093 10/18/09 06:15 cdaq E02017 Run 1419: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.00Torr.
191092 10/18/09 06:13 cdaq Run 76634: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191091 10/18/09 06:12 cdaq End of Run 76633:
191090 10/18/09 06:04 cdaq E02017 End of Run 1418:
191089 10/18/09 05:26 P Achenbach Visual scalers for run#76633
191087 10/18/09 05:23 cdaq Run 76633: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191086 10/18/09 05:21 cdaq End of Run 76632:
191085 10/18/09 04:57 cdaq E02017 Run 1418: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.48Torr.
191084 10/18/09 04:57 cdaq E02017 End of Run 1417:
191083 10/18/09 04:44 P Achenbach Visual scalers for run#76632
191082 10/18/09 04:41 cdaq Run 76632: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191081 10/18/09 04:38 cdaq End of Run 76631:
191080 10/18/09 04:00 P Achenbach Visual scalers for run#76631
191079 10/18/09 03:58 cdaq Run 76631: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191078 10/18/09 03:54 cdaq End of Run 76630:
191077 10/18/09 03:52 Arshak Beam Positions and FFB
191076 10/18/09 03:41 cdaq E02017 Run 1417: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.00Torr.
191075 10/18/09 03:30 cdaq E02017 End of Run 1416:
191074 10/18/09 03:18 P Achenbach Visual scalers for run#76630
191073 10/18/09 03:14 cdaq Run 76630: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191072 10/18/09 03:11 cdaq End of Run 76629:
191071 10/18/09 02:46 maruta HES-D communication problem is still unsolved
191070 10/18/09 02:30 cdaq Run 76629: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191069 10/18/09 02:23 cdaq E02017 Run 1416: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.49Torr.
191068 10/18/09 02:11 Arshak HES-D communication problem
191067 10/18/09 02:10 cdaq E02017 End of Run 1415:
191066 10/18/09 02:10 cdaq End of Run 76628:
191065 10/18/09 01:55 Reinhold HES communication problem
191064 10/18/09 01:46 P Achenbach Visual scalers for run#76628
191063 10/18/09 01:43 Arshak HES-D communication problem
191062 10/18/09 01:39 cdaq Run 76628: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191061 10/18/09 01:29 cdaq End of Run 76627:
191060 10/18/09 01:05 cdaq E02017 Run 1415: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.00Torr.
191059 10/18/09 00:55 cdaq E02017 End of Run 1414:
191058 10/18/09 00:52 P Achenbach Visual scalers for run#76627
191057 10/18/09 00:46 cdaq Run 76627: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191056 10/18/09 00:45 cdaq End of Run 76626:
191055 10/18/09 00:41 P Achenbach Visual scalers for run#76626
191054 10/18/09 00:35 Reinhold Run #76626: FFB off for roughly 10 minutes
191053 10/18/09 00:13 Arshak Beam Positions
191052 10/18/09 00:04 cdaq Run 76626: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191051 10/18/09 00:02 cdaq End of Run 76625:
191050 10/18/09 00:01 cdaq Beam Time Accounting
Saturday
191049 10/17/09 23:57 Danagoulian Shift summary, and visual scalers
191048 10/17/09 23:43 Danagoulian BPM-BCM for the run 76625
191047 10/17/09 23:22 cdaq E02017 Run 1414: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.47Torr.
191046 10/17/09 23:22 cdaq E02017 End of Run 1413:
191045 10/17/09 23:17 kawama BCM scaler channel in the parameter file of cdaq PC
191044 10/17/09 23:17 cdaq Run 76625: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191043 10/17/09 23:16 cdaq End of Run 76624:
191042 10/17/09 22:53 Danagoulian BPM-BCM snapshot, run # 76624
191041 10/17/09 22:33 cdaq Run 76624: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191040 10/17/09 22:32 cdaq End of Run 76623:
191039 10/17/09 22:10 Reinhold Re: BCM in the scaler
191038 10/17/09 22:10 Reinhold Re: BCM in the scaler
191037 10/17/09 22:09 cdaq E02017 Run 1413: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.0Torr.
191036 10/17/09 22:00 Danagoulian BPM-BCM snapshot
191035 10/17/09 21:58 cdaq E02017 End of Run 1412:
191034 10/17/09 21:49 cdaq E02017 Run 1412: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.96Torr.
191033 10/17/09 21:49 cdaq Run 76623: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191032 10/17/09 21:48 cdaq E02017 End of Run 1411:
191031 10/17/09 21:48 Danagoulian Beam was off
191030 10/17/09 21:47 Reinhold RC: night shift plan: continue taking data on Be target
191029 10/17/09 21:32 cdaq E02017 Run 1411: Run w/o beam , Be9 target, with pressure 3.86Torr.
191028 10/17/09 21:31 cdaq E02017 End of Run 1410:
191027 10/17/09 21:31 cdaq End of Run 76622:
191026 10/17/09 21:19 cdaq Run 76622: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191025 10/17/09 21:18 cdaq End of Run 76621:
191024 10/17/09 20:59 cdaq E02017 Run 1410: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.66Torr.
191023 10/17/09 20:59 cdaq E02017 End of Run 1409:
191022 10/17/09 20:38 Danagoulian Visual scalers for run#76621
191021 10/17/09 20:36 Danagoulian BPM-BCM snapshot, run 76621
191020 10/17/09 20:32 cdaq Run 76621: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191019 10/17/09 20:31 cdaq End of Run 76620:
191018 10/17/09 20:28 Reinhold Re: BCM in the scaler
191017 10/17/09 20:03 cdaq E02017 Run 1409: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.33Torr.
191016 10/17/09 20:03 cdaq E02017 End of Run 1408:
191015 10/17/09 19:55 Danagoulian Target BPM troubleshooting
191014 10/17/09 19:51 Danagoulian BPM screens are back on for the run 76620
191013 10/17/09 19:50 cdaq Run 76620: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191012 10/17/09 19:48 cdaq End of Run 76619:
191011 10/17/09 19:41 kawama BCM in the scaler
191010 10/17/09 19:31 cdaq Run 76619: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191009 10/17/09 19:30 cdaq End of Run 76618:
191008 10/17/09 19:02 cdaq E02017 Run 1408: Run with 40uA beam 2344MeV, Be9 target, with pressure 2.93Torr.
191007 10/17/09 18:47 Danagoulian Hall C BPM troubleshooting
191006 10/17/09 18:47 cdaq Run 76618: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
191005 10/17/09 18:45 cdaq End of Run 76617:
191004 10/17/09 18:44 Reinhold RUN 76617: Target BPM signals aslo missing from coda EPICS events
191003 10/17/09 18:44 Reinhold RUN 76617: Target BPM signals aslo missing from coda EPICS events
191002 10/17/09 18:35 Reinhold Missing BPM signals
191001 10/17/09 18:31 cdaq E02017 End of Run 1407:
191000 10/17/09 18:16 cdaq Run 76617: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190999 10/17/09 18:13 Reinhold Seems you have problems with the IOC for the last grider.
190998 10/17/09 18:09 lgan Beam: BPM IOC crashed
190997 10/17/09 17:53 cdaq End of Run 76616:
190996 10/17/09 17:10 Danagoulian BPM-BCM snapshots, run 76616
190995 10/17/09 17:09 cdaq Run 76616: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190994 10/17/09 17:08 cdaq End of Run 76615:
190993 10/17/09 17:02 cdaq E02017 Run 1407: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.52Torr.
190992 10/17/09 17:01 cdaq E02017 End of Run 1406:
190991 10/17/09 16:26 cdaq Run 76615: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190990 10/17/09 16:25 cdaq End of Run 76614:
190989 10/17/09 16:00 cdaq Beam Time Accounting
190988 10/17/09 15:55 Petkovic Day Shift Summary
190987 10/17/09 15:46 cdaq E02017 Run 1406: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.04Torr.
190986 10/17/09 15:38 Seva Visual scalers for run#76614, target is Be-9, Beam current 40uA
190985 10/17/09 15:36 seva Run#76614 BCM&BPM
190984 10/17/09 15:34 cdaq Run 76614: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190983 10/17/09 15:33 cdaq E02017 End of Run 1405:
190982 10/17/09 15:33 cdaq End of Run 76613:
190981 10/17/09 15:30 Tang Kawama's Lambsa/Sigma spectrum was pleased by audiences at DNP
190980 10/17/09 14:53 Seva Visual scalers for run#76613, target is Be-9, Beam current 40uA
190979 10/17/09 14:51 seva Run#76613 BCM&BPM
190978 10/17/09 14:51 cdaq Run 76613: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190977 10/17/09 14:50 cdaq End of Run 76612:
190976 10/17/09 14:33 cdaq E02017 Run 1405: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.42Torr.
190975 10/17/09 14:32 cdaq E02017 End of Run 1404:
190974 10/17/09 14:11 Seva Visual scalers for run#76612, target is Be-9, Beam current 40uA
190973 10/17/09 14:07 cdaq Run 76612: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190972 10/17/09 14:06 cdaq End of Run 76611:
190971 10/17/09 13:32 cdaq E02017 Run 1404: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.03 Torr.
190970 10/17/09 13:24 seva Run#76611 BCM&BPM
190969 10/17/09 13:22 Seva Visual scalers for run#76611, target is Be-9, Beam current 40uA
190968 10/17/09 13:20 cdaq Run 76611: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190967 10/17/09 13:19 cdaq E02017 End of Run 1403:
190966 10/17/09 13:19 cdaq End of Run 76610:
190965 10/17/09 13:12 Petkovic FFB Run # 76610
190964 10/17/09 12:41 Seva Visual scalers for run#76610, target is Be-9, Beam current 40uA
190963 10/17/09 12:39 seva Run#76610 BCM&BPM
190962 10/17/09 12:34 cdaq Run 76610: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190961 10/17/09 12:33 cdaq End of Run 76609:
190960 10/17/09 12:21 Reinhold Very clean beam for about an hour (BPM screens)
190959 10/17/09 12:15 cdaq E02017 Run 1403: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.53 Torr.
190958 10/17/09 12:14 cdaq E02017 End of Run 1402:
190957 10/17/09 12:11 Petkovic A Brief Report at the Middle of the Day Shift
190956 10/17/09 11:51 seva Run#76609 BPM&BCM
190955 10/17/09 11:50 Seva Visual scalers for run#76609, target is Be-9, Beam current 40uA
190954 10/17/09 11:46 cdaq Run 76609: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190953 10/17/09 11:46 cdaq End of Run 76608:
190952 10/17/09 11:10 seva Run#76608 BCM&BPM
190951 10/17/09 11:08 Seva Visual scalers for run#76608, target is Be-9, Beam current 40uA
190950 10/17/09 11:05 cdaq Run 76608: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190949 10/17/09 11:04 cdaq End of Run 76607:
190948 10/17/09 10:57 cdaq E02017 Run 1402: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.04 Torr.
190947 10/17/09 10:46 cdaq E02017 End of Run 1401:
190946 10/17/09 10:25 seva Run#76607 BCM&BPM
190945 10/17/09 10:23 Seva Visual scalers for run#76607, target is Be-9, Beam current 40uA
190944 10/17/09 10:20 cdaq Run 76607: 2344 MeV,Buffered, 9Be target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190943 10/17/09 10:19 cdaq End of Run 76606:
190942 10/17/09 09:42 cdaq E02017 Run 1401: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.62Torr.
190941 10/17/09 09:40 cdaq E02017 End of Run 1400:
190940 10/17/09 09:39 Seva Visual scalers for run#76606, target is Be-9, Beam current 40uA
190939 10/17/09 09:38 seva Run#76606 BCM&BPM
190938 10/17/09 09:32 cdaq Run 76606: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190937 10/17/09 09:31 cdaq End of Run 76605:
190936 10/17/09 08:49 seva Run#76605 BCM&BPM
190935 10/17/09 08:46 Petkovic Beam: 8:35 - 8: 40 Rebooting Beam Contol System (ABU) by the MCR
190934 10/17/09 08:45 Seva Visual scalers for run#76605, target is Be-9, Beam current 40uA
190933 10/17/09 08:43 cdaq Run 76605: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190932 10/17/09 08:42 cdaq E02017 Run 1400: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.27Torr.
190931 10/17/09 08:35 cdaq End of Run 76604:
190929 10/17/09 08:26 Seva Visual scalers for run#76604, target is Be-9, Beam current 40uA
190928 10/17/09 08:21 seva Run#76604 BCM&BPM
190927 10/17/09 08:20 Petkovic Shift Plan: Continued data Be9 with 40 microamps
190926 10/17/09 08:19 cdaq Run 76604: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190925 10/17/09 08:04 Arshak OWL Shift Summary
190924 10/17/09 08:03 cdaq E02017 Run 1399: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.02Torr.
190923 10/17/09 08:02 cdaq Beam Time Accounting
190922 10/17/09 07:57 Reinhold RC: Day shift plan; for now continue taking data on Be target
190921 10/17/09 07:52 cdaq E02017 End of Run 1398:
190920 10/17/09 07:33 cdaq Run 76603: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190919 10/17/09 07:32 P Achenbach Visual scalers for run#76603, target is Be-9, Beam current 40uA
190918 10/17/09 07:28 cdaq End of Run 76602:
190917 10/17/09 06:54 cdaq E02017 Run 1398: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.67Torr.
190916 10/17/09 06:53 cdaq E02017 End of Run 1397:
190915 10/17/09 06:45 P Achenbach Visual scalers for run#76602, target is Be-9, Beam current 40uA
190914 10/17/09 06:43 cdaq Run 76602: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190913 10/17/09 06:39 cdaq End of Run 76601:
190912 10/17/09 06:15 Arshak Beam Position after Beam is back
190911 10/17/09 05:58 P Achenbach Visual scalers for run#76601, target is Be-9, Beam current 40uA
190910 10/17/09 05:55 Arshak 5:55 Beam is back
190909 10/17/09 05:54 cdaq E02017 Run 1397: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.32 Torr.
190908 10/17/09 05:54 cdaq Run 76601: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190907 10/17/09 05:52 cdaq End of Run 76600:
190906 10/17/09 05:52 cdaq Run 76600: junk
190905 10/17/09 05:51 cdaq E02017 End of Run 1396:
190903 10/17/09 05:22 Arshak 5:00 Beam is OFF, MCC have a problem with RS
190902 10/17/09 05:08 cdaq E02017 Run 1396: Run without beam, with pressure 3.02 Torr.
190901 10/17/09 04:58 cdaq End of Run 76599:
190900 10/17/09 04:57 cdaq E02017 End of Run 1395:
190899 10/17/09 04:52 P Achenbach Visual scalers for run#76599, target is Be-9, Beam current 40uA
190898 10/17/09 04:49 cdaq Run 76599: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190897 10/17/09 04:47 cdaq End of Run 76598:
190896 10/17/09 04:11 P Achenbach Visual scalers for run#76598, target is Be-9, Beam current 40uA
190895 10/17/09 04:07 cdaq Run 76598: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190894 10/17/09 04:05 cdaq End of Run 76597:
190893 10/17/09 03:27 P Achenbach Visual scalers for run#76597, target is Be-9, Beam current 40uA
190892 10/17/09 03:23 cdaq Run 76597: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190891 10/17/09 03:22 cdaq E02017 Run 1395: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.40Torr.
190890 10/17/09 03:22 cdaq End of Run 76596:
190889 10/17/09 03:20 cdaq E02017 End of Run 1394:
190888 10/17/09 02:44 P Achenbach Visual scalers for run#76596, target is Be-9, Beam current 40uA
190887 10/17/09 02:40 cdaq Run 76596: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190886 10/17/09 02:37 cdaq End of Run 76595:
190885 10/17/09 02:19 cdaq E02017 Run 1394: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.00Torr.
190884 10/17/09 02:09 cdaq E02017 End of Run 1393:
190883 10/17/09 02:07 P Achenbach Visual scalers for run#76595, target is Be-9, Beam current 40uA
190882 10/17/09 02:05 P Achenbach bpm and bcm
190881 10/17/09 01:53 cdaq Run 76595: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190880 10/17/09 01:51 cdaq End of Run 76594:
190879 10/17/09 01:39 P Achenbach bpm and bcm and ffb
190878 10/17/09 01:17 P Achenbach Visual scalers for run#76594, target is Be-9, Beam current 40uA
190877 10/17/09 01:09 cdaq Run 76594: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190876 10/17/09 01:07 cdaq End of Run 76593:
190875 10/17/09 00:36 cdaq E02017 Run 1393: Run with 40uA beam 2344MeV, Be9 target, with pressure 3.40Torr.
190874 10/17/09 00:35 cdaq E02017 End of Run 1392:
190873 10/17/09 00:31 Arshak Visual scalers for run#76593, target is Be-9, Beam current 40uA
190872 10/17/09 00:25 cdaq Run 76593: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190871 10/17/09 00:24 cdaq End of Run 76592:
190870 10/17/09 00:12 Arshak Beam Position
190869 10/17/09 00:01 cdaq Beam Time Accounting
190868 10/17/09 00:00 Danagoulian Shift summary
Friday
190867 10/16/09 23:42 cdaq Run 76592: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190866 10/16/09 23:41 cdaq End of Run 76591:
190865 10/16/09 23:35 cdaq E02017 Run 1392: Run with 40uA beam 2344MeV, Beg target,with pressure 3.78Torr, 3x1 beam raster.
190864 10/16/09 23:32 chench HES sieve slit analysis result after change the cut sequence from run=75460
190863 10/16/09 23:23 cdaq E02017 End of Run 1391:
190862 10/16/09 22:52 Danagoulian BPM, BCM snapshot run # 76591
190861 10/16/09 22:51 cdaq Run 76591: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190860 10/16/09 22:50 cdaq End of Run 76590:
190859 10/16/09 22:43 Tang The way you made separation is incorrect
190858 10/16/09 22:26 cdaq E02017 Run 1391: Run with 40uA beam 2344MeV, Beg target,with pressure 3.78Torr, 3x1 beam raster.
190857 10/16/09 22:25 cdaq E02017 End of Run 1390:
190856 10/16/09 22:05 cdaq Run 76590: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190855 10/16/09 22:04 cdaq End of Run 76589:
190854 10/16/09 21:44 Danagoulian BPM snapshot, run 76589
190853 10/16/09 21:29 chench HES sieve slit data analysis result from run=75460
190852 10/16/09 21:16 cdaq Run 76589: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190851 10/16/09 21:14 cdaq End of Run 76588:
190850 10/16/09 20:43 Danagoulian BPM snapshot. Run 76588
190849 10/16/09 20:31 cdaq Run 76588: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190848 10/16/09 20:30 cdaq End of Run 76587:
190847 10/16/09 20:29 cdaq E02017 Run 1390: Run with 40uA beam 2344MeV, Beg target,with pressure 3.00Torr, 3x1 beam raster.
190846 10/16/09 20:18 cdaq E02017 End of Run 1389:
190845 10/16/09 19:46 cdaq Run 76587: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190844 10/16/09 19:44 Zhihong Ye Lambda & Sigma Resolution using other fitting method-Sigma is not that bad :-)
190843 10/16/09 19:44 cdaq End of Run 76586:
190842 10/16/09 19:16 Danagoulian BPM, BCM Snapshot,run 76586
190841 10/16/09 19:01 cdaq Run 76586: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190840 10/16/09 19:00 cdaq End of Run 76585:
190839 10/16/09 18:56 chench The efficiency of the Dfift chamber
190838 10/16/09 18:42 Danagoulian BPM, BCM snapshot run 76585
190837 10/16/09 18:39 chench HV of Drift Chambers with beam current=40uA, target Be9
190836 10/16/09 18:24 Gogami Analysis: 3 mountains in EHODO hitpattern
190835 10/16/09 18:14 cdaq Run 76585: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190834 10/16/09 18:12 cdaq End of Run 76584:
190833 10/16/09 18:07 kawama Rough calculation of QF carbon event in CH2 data
190832 10/16/09 17:29 shoh grouping puzzle
190831 10/16/09 17:28 Danagoulian BPM, BCM snapshot, run 76584
190829 10/16/09 17:25 cdaq Run 76584: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190828 10/16/09 17:23 cdaq End of Run 76583:
190827 10/16/09 17:00 Reinhold Call to MCC: 3H03BY pos off by 0.2 mm
190826 10/16/09 16:56 Danagoulian BPM Snapshot, run 76583
190825 10/16/09 16:40 cdaq Run 76583: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190824 10/16/09 16:35 cdaq End of Run 76582:
190823 10/16/09 16:34 cdaq E02017 Run 1389: Run with 40uA beam 2344MeV, Beg target,with pressure 3.00Torr, 3x1 beam raster.
190822 10/16/09 16:25 Reinhold Wrong Beam Position for last 1.5 hrs
190821 10/16/09 16:21 cdaq E02017 End of Run 1388:
190820 10/16/09 16:20 Petkovic Day Shift Summary
190819 10/16/09 16:18 cdaq Run 76582: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190818 10/16/09 16:15 cdaq End of Run 76581:
190817 10/16/09 16:06 cdaq Beam Time Accounting
190816 10/16/09 16:03 Petkovic BPM & BCM, Run # 76581
190815 10/16/09 15:56 Harikhanal Entry 190414 corresponds to run #76581
190814 10/16/09 15:48 Harikhanal Be 9 with 40 uA Visual scaler , Run#76578
190813 10/16/09 15:46 cdaq Run 76581: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190812 10/16/09 15:44 cdaq End of Run 76580:
190811 10/16/09 15:39 Petkovic CODA Rebooted. New prescaling factors for Run # 76580
190810 10/16/09 15:25 Petkovic/Kha BPM & BCM Run # 76580
190809 10/16/09 15:20 Nue Coin rate for 10uA
190808 10/16/09 15:20 cdaq Run 76580: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190807 10/16/09 15:18 cdaq End of Run 76579:
190806 10/16/09 15:10 cdaq Run 76579: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190805 10/16/09 15:00 cdaq Run 76578: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190804 10/16/09 14:55 Harikhanal Be 9 with 40 uA Visual scaler , Run#76577
190803 10/16/09 14:46 Petkovic Run # 76576 BPM & BCM, Be9 with 40 microasmps
190802 10/16/09 14:39 Petkovic HDC1 - F2 Voltage detected being "OFF" due to the empty histos via Replay Run # 76576
190801 10/16/09 14:38 kawama cointime still need to be modified
190800 10/16/09 14:34 cdaq Run 76577: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190799 10/16/09 14:18 cdaq End of Run 76576:
190798 10/16/09 14:15 Petkovic Checking of rates for Be9 with 40 microapms, Run # 76576 (real run)
190797 10/16/09 13:49 cdaq E02017 Run 1388: Run with 2uA beam 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
190796 10/16/09 13:40 cdaq Run 76576: 2344 MeV,Buffered, 9Br target@ 40 uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190795 10/16/09 13:38 cdaq E02017 End of Run 1387:
190794 10/16/09 13:36 Petkovic Test Run: Target Be9 with current 10 uA (while MCR doing DW tuning)
190793 10/16/09 13:16 cdaq Run 76575: 2344 MeV,Buffered, 9Be @ current beam10uA: CP0 (3/3) * WC(2/2) * !AC * HES0
190792 10/16/09 13:14 saw Try edmmonticello again
190791 10/16/09 12:48 Reinhold Monticello not starting
190790 10/16/09 12:11 Reinhold At request of MCC go to empty target; they'll look at DW tuning.
190789 10/16/09 12:07 Reinhold Call from MCC: ion chamber trips above 10 uA; go to viewer mode
190788 10/16/09 11:58 Petkovic BPM & BCM, beam at 11:40. Current 10 uA, Be9
190787 10/16/09 11:43 Petkovic Target: Target Be9 positioned for the Beam of 40 microamps
190786 10/16/09 11:39 Reinhold RC report/plan
190785 10/16/09 10:31 cdaq E02017 Run 1387: Run with no beam 2uA beam 2344MeV, CH2 target,with pressure 3.02 Torr, 3x1 beam raster.
190784 10/16/09 10:20 cdaq E02017 End of Run 1386:
190783 10/16/09 09:55 yuan Be9 running conditions for your reference
190782 10/16/09 09:50 yuan Beam current should be 40 uA for run # 76311
190781 10/16/09 09:21 Petkovic Beam: Plan to use Beam for the CH2 Calibration (several next runs)
190780 10/16/09 09:15 cdaq E02017 Run 1386: Run with 2uA beam 2344MeV, CH2 target,with pressure 3.67Torr, 3x1 beam raster. NO BEAM.
190779 10/16/09 09:14 cdaq E02017 End of Run 1385:
190778 10/16/09 08:17 cdaq E02017 Run 1385: Run with 2uA beam 2344MeV, CH2 target,with pressure 3.33Torr, 3x1 beam raster.
190777 10/16/09 08:16 cdaq E02017 End of Run 1384:
190776 10/16/09 08:02 cdaq Beam Time Accounting
190775 10/16/09 08:01 Simon Owl Shift Summary
190774 10/16/09 07:21 cdaq E02017 Run 1384: Run with NO beam , with pressure 2.98 Torr
190773 10/16/09 07:10 cdaq E02017 End of Run 1383:
190772 10/16/09 06:19 Simon beam
190771 10/16/09 06:08 cdaq E02017 Run 1383: Run with NO beam , with pressure 2.98 Torr
190770 10/16/09 06:07 cdaq E02017 End of Run 1382:
190768 10/16/09 04:55 cdaq E02017 Run 1382: Run with NO beam , with pressure 2.98 Torr
190767 10/16/09 04:44 cdaq E02017 End of Run 1381:
190766 10/16/09 04:42 Simon beam
190765 10/16/09 03:43 Simon beam has gone
190764 10/16/09 03:42 cdaq E02017 Run 1381: Run with NO beam , with pressure 3.27Torr
190763 10/16/09 03:41 cdaq E02017 End of Run 1380:
190762 10/16/09 03:40 cdaq End of Run 76574:
190761 10/16/09 03:34 cdaq E02017 Run 1380: Run with 2uA beam 2344MeV, CH2 target,with pressure 3.36Torr, 3x1 beam raster.
190760 10/16/09 03:33 cdaq E02017 End of Run 1379:
190759 10/16/09 03:13 Seva Run# 76574 Visual Scalers
190758 10/16/09 03:12 seva Run#76574 Fast Raster Replay
190757 10/16/09 03:08 seva Run#76574 BCM&BPM
190756 10/16/09 03:07 cdaq Run 76574: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190755 10/16/09 03:06 cdaq End of Run 76573:
190754 10/16/09 02:32 Seva Run# 76573 Visual Scalers
190753 10/16/09 02:32 seva Run#76573 Fast Raster Replay
190752 10/16/09 02:31 cdaq E02017 Run 1379: Run with 2uA beam 2344MeV, CH2 target,with pressure 2.97 Torr, 3x1 beam raster.
190751 10/16/09 02:26 seva Run#76573 BCM&BPM
190750 10/16/09 02:25 cdaq Run 76573: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190749 10/16/09 02:17 cdaq E02017 End of Run 1378:
190748 10/16/09 02:16 cdaq End of Run 76572:
190747 10/16/09 01:42 Seva Run# 76572 Visual Scalers
190746 10/16/09 01:37 seva Run#76572 Fast Raster Replay
190745 10/16/09 01:36 seva Run#76572 BCM&BPM
190744 10/16/09 01:35 cdaq Run 76572: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190743 10/16/09 01:34 cdaq End of Run 76571:
190742 10/16/09 01:06 Seva Run# 76571 Visual Scalers
190741 10/16/09 01:03 seva Run#76571 BPM&BCM
190740 10/16/09 01:02 seva Run#76571 Fast Raster Replay
190739 10/16/09 00:56 cdaq Run 76571: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190738 10/16/09 00:55 cdaq E02017 Run 1378: Run with 2uA beam 2344MeV, CH2 target,with pressure 3.31Torr, 3x1 beam raster.
190737 10/16/09 00:51 cdaq E02017 End of Run 1377:
190736 10/16/09 00:51 cdaq End of Run 76570:
190735 10/16/09 00:30 seva Run# 76570 Visual Scalers
190734 10/16/09 00:24 seva Run#76570 Fast Raster Replay
190733 10/16/09 00:23 seva Run#56570 BPM&BCM
190732 10/16/09 00:12 cdaq Run 76570: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190731 10/16/09 00:10 cdaq End of Run 76569:
190730 10/16/09 00:05 VM Rodriguez Swing Shift Summary
190729 10/16/09 00:05 cdaq E02017 Run 1377: Run with 2uA beam 2344MeV, CH2 target,with pressure 3.00 Torr, 3x1 beam raster.
190728 10/16/09 00:04 cdaq Beam Time Accounting
190727 10/16/09 00:01 VM Rodriguez Flushing Fission Chamber
Thursday
190726 10/15/09 23:53 cdaq E02017 End of Run 1376:
190725 10/15/09 23:41 VM Rodriguez Run# 76569 Fast Raster Reply
190724 10/15/09 23:40 VM Rodriguez Run# 76569 Visual Scalers
190723 10/15/09 23:37 VM Rodriguez Run# 76569 BPM & BCM
190722 10/15/09 23:35 cdaq Run 76569: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190721 10/15/09 23:35 VM Rodriguez Move CH2 Target to 146.74 mm.
190720 10/15/09 23:28 cdaq End of Run 76568:
190719 10/15/09 23:10 VM Rodriguez Run# 76568 Visual ScaleRs
190718 10/15/09 23:09 VM Rodriguez Run# 76568 BPM&BCM
190717 10/15/09 23:08 VM Rodriguez Run# 76568 Fast Raster Replay
190716 10/15/09 22:58 cdaq Run 76568: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190715 10/15/09 22:57 cdaq End of Run 76567:
190714 10/15/09 22:36 VM Rodriguez Run# 76567 Visual Scales
190713 10/15/09 22:34 VM Rodriguez Run# 76567 Fast Raster Replay
190712 10/15/09 22:29 VM Rodriguez Run# 76567 BPM and BCM Pictures
190711 10/15/09 22:28 cdaq Run 76567: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190710 10/15/09 22:28 cdaq E02017 Run 1376: Run with 2uA beam 2344MeV, CH2 target,with pressure 3.27Torr, 3x1 beam raster.
190709 10/15/09 22:27 cdaq E02017 End of Run 1375:
190708 10/15/09 22:17 Reinhold Run 76564: the REAL fast raster replay
190707 10/15/09 22:10 VM Rodriguez Run# 76566 Fast Raster Replay
190706 10/15/09 22:07 VM Rodriguez Run#76565 Fast Raster Replay
190705 10/15/09 22:06 VM Rodriguez Move CH2 Target to 147.74 mm.
190704 10/15/09 21:59 VM Rodriguez No beam because MCC is changing a Power Supply of Component MBS04B13
190703 10/15/09 21:58 Reinhold Run 76566: Fast Raster pattern
190702 10/15/09 21:49 cdaq E02017 Run 1375: Run with no beam 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
190701 10/15/09 21:48 cdaq End of Run 76566:
190700 10/15/09 21:35 cdaq E02017 End of Run 1374:
190699 10/15/09 21:29 cdaq Run 76566: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190698 10/15/09 21:27 cdaq End of Run 76565:
190697 10/15/09 21:00 VM Rodriguez Run# 76565 Visual Scales
190696 10/15/09 20:57 VM Rodriguez Run# 76565 BPM & BCM Pictures
190695 10/15/09 20:56 cdaq Run 76565: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190694 10/15/09 20:55 cdaq End of Run 76564:
190693 10/15/09 20:35 VM Rodriguez Run# 76564 Visual Scales
190692 10/15/09 20:33 VM Rodriguez Run# 76564 Fast Raster Replay
190691 10/15/09 20:27 VM Rodriguez BPM & BCM Pictures for Run# 76564
190690 10/15/09 20:23 cdaq E02017 Run 1374: Run with beam 2344MeV, CH2 target,with pressure 3.44Torr, 3x1 beam raster.
190689 10/15/09 20:23 cdaq Run 76564: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190688 10/15/09 20:22 Gogami Analysis: HES Butterfly
190687 10/15/09 20:21 VM Rodriguez Reposition the CH2 Target to 148.74 mm
190686 10/15/09 20:10 VM Rodriguez Change Prescale Factors
190685 10/15/09 20:06 cdaq End of Run 76563:
190684 10/15/09 20:06 cdaq E02017 End of Run 1373:
190683 10/15/09 19:35 Nue MCC sends 10uA for energy measurement
190682 10/15/09 19:12 cdaq Run 76563: 2344 MeV,Buffered, No Target 10uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190681 10/15/09 19:11 VM Rodriguez Change Prescale Factors
190680 10/15/09 18:56 cdaq E02017 Run 1373: Run with no beam 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
190679 10/15/09 18:56 Reinhold Greetings from Victor (we'll need to make him pay for this ;-)
190678 10/15/09 18:51 Reinhold Runs 76380 -- 76562: aerogel cherenkov signal study with LED triggered events
190677 10/15/09 18:50 VM Rodriguez Flushing Fission Chamber
190676 10/15/09 18:44 cdaq E02017 End of Run 1372:
190675 10/15/09 18:20 VM Rodriguez Change Prescale Factors
190674 10/15/09 18:17 bono turned off trigger to LED for AC
190673 10/15/09 18:13 cdaq End of Run 76562:
190672 10/15/09 18:13 yuan Run 76379 taken after beam off
190671 10/15/09 18:12 cdaq Run 76562: AC LED {trigger;} 7B {AC1-3;} Vled=13.0V
190670 10/15/09 18:11 cdaq End of Run 76561:
190669 10/15/09 18:10 cdaq Run 76561: AC LED {trigger;} 7B {AC1-3;} Vled=12.5V
190668 10/15/09 18:09 cdaq End of Run 76560:
190667 10/15/09 18:09 cdaq Run 76560: AC LED {trigger;} 7B {AC1-3;} Vled=12.0V
190666 10/15/09 18:08 cdaq End of Run 76559:
190665 10/15/09 18:07 cdaq Run 76559: AC LED {trigger;} 7B {AC1-3;} Vled=11.5V
190664 10/15/09 18:06 cdaq End of Run 76558:
190663 10/15/09 18:05 yuan run 76379 is junk
190662 10/15/09 18:05 cdaq Run 76558: AC LED {trigger;} 7B {AC1-3;} Vled=11.0V
190661 10/15/09 18:04 cdaq End of Run 76557:
190660 10/15/09 18:03 cdaq Run 76557: AC LED {trigger;} 7B {AC1-3;} Vled=10.5V
190659 10/15/09 18:02 cdaq End of Run 76556:
190658 10/15/09 18:01 cdaq Run 76556: AC LED {trigger;} 7B {AC1-3;} Vled=10.0V
190657 10/15/09 18:00 cdaq End of Run 76555:
190656 10/15/09 17:59 cdaq Run 76555: AC LED {trigger;} 7B {AC1-3;} Vled=9.5V
190655 10/15/09 17:59 cdaq End of Run 76554:
190654 10/15/09 17:58 cdaq Run 76554: AC LED {trigger;} 7B {AC1-3;} Vled=9.0V
190653 10/15/09 17:57 cdaq End of Run 76553:
190652 10/15/09 17:56 cdaq Run 76553: AC LED {trigger;} 7B {AC1-3;} Vled=8.5V
190651 10/15/09 17:55 cdaq End of Run 76552:
190650 10/15/09 17:54 cdaq Run 76552: AC LED {trigger;} 7B {AC1-3;} Vled=8.0V
190649 10/15/09 17:52 cdaq End of Run 76551:
190648 10/15/09 17:51 cdaq Run 76551: AC LED {trigger;} 7B {AC1-3;} Vled=7.5V
190647 10/15/09 17:49 cdaq End of Run 76550:
190646 10/15/09 17:48 cdaq Run 76550: AC LED {trigger;} 7B {AC1-3;} Vled=7.0V
190645 10/15/09 17:46 cdaq End of Run 76549:
190644 10/15/09 17:46 cdaq Run 76549: AC LED {trigger;} 6B {AC1-3;} Vled=13.0V
190643 10/15/09 17:44 cdaq End of Run 76548:
190642 10/15/09 17:43 cdaq Run 76548: AC LED {trigger;} 6B {AC1-3;} Vled=12.5V
190641 10/15/09 17:42 cdaq End of Run 76547:
190640 10/15/09 17:41 cdaq Run 76547: AC LED {trigger;} 6B {AC1-3;} Vled=12.0V
190639 10/15/09 17:39 cdaq End of Run 76546:
190638 10/15/09 17:38 cdaq Run 76546: AC LED {trigger;} 6B {AC1-3;} Vled=11.5V
190637 10/15/09 17:37 cdaq End of Run 76545:
190636 10/15/09 17:36 cdaq Run 76545: AC LED {trigger;} 6B {AC1-3;} Vled=11.0V
190635 10/15/09 17:35 cdaq End of Run 76544:
190634 10/15/09 17:35 Tang Beautiful and great work! Is Run#76379 good or junk run?
190633 10/15/09 17:34 cdaq Run 76544: AC LED {trigger;} 6B {AC1-3;} Vled=10.5V
190632 10/15/09 17:33 cdaq End of Run 76543:
190631 10/15/09 17:32 cdaq Run 76543: AC LED {trigger;} 6B {AC1-3;} Vled=10.0V
190630 10/15/09 17:31 cdaq End of Run 76542:
190629 10/15/09 17:30 cdaq Run 76542: AC LED {trigger;} 6B {AC1-3;} Vled=9.5V
190628 10/15/09 17:29 cdaq End of Run 76541:
190627 10/15/09 17:28 cdaq Run 76541: AC LED {trigger;} 6B {AC1-3;} Vled=9.0V
190626 10/15/09 17:27 cdaq End of Run 76540:
190625 10/15/09 17:26 cdaq Run 76540: AC LED {trigger;} 6B {AC1-3;} Vled=8.5V
190624 10/15/09 17:25 cdaq End of Run 76539:
190623 10/15/09 17:24 cdaq Run 76539: AC LED {trigger;} 6B {AC1-3;} Vled=8.0V
190622 10/15/09 17:23 cdaq End of Run 76538:
190621 10/15/09 17:22 cdaq Run 76538: AC LED {trigger;} 6B {AC1-3;} Vled=7.5V
190620 10/15/09 17:21 cdaq End of Run 76537:
190619 10/15/09 17:20 cdaq Run 76537: AC LED {trigger;} 6B {AC1-3;} Vled=7.0V
190618 10/15/09 17:18 cdaq End of Run 76536:
190617 10/15/09 17:17 cdaq Run 76536: AC LED {trigger;} 5B {AC1-3;} Vled=13.0V
190616 10/15/09 17:16 cdaq End of Run 76535:
190615 10/15/09 17:15 cdaq Run 76535: AC LED {trigger;} 5B {AC1-3;} Vled=12.5V
190614 10/15/09 17:14 cdaq End of Run 76534:
190613 10/15/09 17:13 cdaq Run 76534: AC LED {trigger;} 5B {AC1-3;} Vled=12.0V
190612 10/15/09 17:12 cdaq End of Run 76533:
190611 10/15/09 17:12 cdaq Run 76533: AC LED {trigger;} 5B {AC1-3;} Vled=11.5V
190610 10/15/09 17:11 cdaq End of Run 76532:
190609 10/15/09 17:10 cdaq Run 76532: AC LED {trigger;} 5B {AC1-3;} Vled=11.0V
190608 10/15/09 17:09 cdaq End of Run 76531:
190607 10/15/09 17:08 VM Rodriguez Update: no beam for at least 3 more hours
190606 10/15/09 17:08 cdaq Run 76531: AC LED {trigger;} 5B {AC1-3;} Vled=10.5V
190605 10/15/09 17:07 cdaq End of Run 76530:
190604 10/15/09 17:06 cdaq Run 76530: AC LED {trigger;} 5B {AC1-3;} Vled=10.0V
190603 10/15/09 17:05 cdaq End of Run 76529:
190602 10/15/09 17:04 cdaq Run 76529: AC LED {trigger;} 5B {AC1-3;} Vled=9.5V
190601 10/15/09 17:04 cdaq E02017 Run 1372: Run with no beam 2344MeV, CH2 target,with pressure 3.42Torr, 3x1 beam raster.
190600 10/15/09 17:04 cdaq E02017 End of Run 1371:
190599 10/15/09 17:03 cdaq End of Run 76528:
190598 10/15/09 17:02 cdaq Run 76528: AC LED {trigger;} 5B {AC1-3;} Vled=9.0V
190597 10/15/09 17:01 cdaq End of Run 76527:
190596 10/15/09 17:00 cdaq Run 76527: AC LED {trigger;} 5B {AC1-3;} Vled=8.5V
190595 10/15/09 16:59 cdaq End of Run 76526:
190594 10/15/09 16:58 cdaq Run 76526: AC LED {trigger;} 5B {AC1-3;} Vled=8.0V
190593 10/15/09 16:57 cdaq End of Run 76525:
190592 10/15/09 16:56 cdaq Run 76525: AC LED {trigger;} 5B {AC1-3;} Vled=7.5V
190591 10/15/09 16:55 cdaq End of Run 76524:
190590 10/15/09 16:54 cdaq Run 76524: AC LED {trigger;} 5B {AC1-3;} Vled=7V
190589 10/15/09 16:51 cdaq End of Run 76523:
190588 10/15/09 16:50 cdaq Run 76523: AC LED {trigger;} 4B {AC1-3;} Vled=13.0V
190587 10/15/09 16:49 cdaq End of Run 76522:
190586 10/15/09 16:48 cdaq Run 76522: AC LED {trigger;} 4B {AC1-3;} Vled=12.5V
190585 10/15/09 16:47 cdaq End of Run 76521:
190584 10/15/09 16:47 cdaq Run 76521: AC LED {trigger;} 4B {AC1-3;} Vled=12.0V
190583 10/15/09 16:46 cdaq End of Run 76520:
190582 10/15/09 16:45 cdaq Run 76520: AC LED {trigger;} 4B {AC1-3;} Vled=11.5V
190581 10/15/09 16:44 cdaq End of Run 76519:
190580 10/15/09 16:43 cdaq Run 76519: AC LED {trigger;} 4B {AC1-3;} Vled=11.0V
190579 10/15/09 16:42 cdaq End of Run 76518:
190578 10/15/09 16:41 cdaq Run 76518: AC LED {trigger;} 4B {AC1-3;} Vled=10.5V
190577 10/15/09 16:41 cdaq End of Run 76517:
190576 10/15/09 16:40 cdaq Run 76517: AC LED {trigger;} 4B {AC1-3;} Vled=10.0V
190575 10/15/09 16:38 cdaq End of Run 76516:
190574 10/15/09 16:38 cdaq Run 76516: AC LED {trigger;} 4B {AC1-3;} Vled=9.5V
190573 10/15/09 16:37 cdaq End of Run 76515:
190572 10/15/09 16:36 cdaq Run 76515: AC LED {trigger;} 4B {AC1-3;} Vled=9.0V
190571 10/15/09 16:35 cdaq End of Run 76514:
190570 10/15/09 16:34 cdaq Run 76514: AC LED {trigger;} 4B {AC1-3;} Vled=8.5V
190569 10/15/09 16:33 cdaq End of Run 76513:
190568 10/15/09 16:32 cdaq Run 76513: AC LED {trigger;} 4B {AC1-3;} Vled=8.0V
190567 10/15/09 16:31 cdaq End of Run 76512:
190566 10/15/09 16:30 cdaq Run 76512: AC LED {trigger;} 4B {AC1-3;} Vled=7.5V
190565 10/15/09 16:29 cdaq End of Run 76511:
190564 10/15/09 16:28 cdaq Run 76511: AC LED {trigger;} 4B {AC1-3;} Vled=7.0V
190563 10/15/09 16:26 cdaq End of Run 76510:
190562 10/15/09 16:26 cdaq Run 76510: AC LED {trigger;} 3B {AC1-3;} Vled=13.0V
190561 10/15/09 16:25 cdaq End of Run 76509:
190560 10/15/09 16:24 cdaq Run 76509: AC LED {trigger;} 3B {AC1-3;} Vled=12.5V
190559 10/15/09 16:23 cdaq End of Run 76508:
190558 10/15/09 16:23 cdaq Run 76508: AC LED {trigger;} 3B {AC1-3;} Vled=12.0V
190557 10/15/09 16:22 kawama lambda/sigma status
190556 10/15/09 16:21 cdaq End of Run 76507:
190555 10/15/09 16:21 cdaq Run 76507: AC LED {trigger;} 3B {AC1-3;} Vled=11.5V
190554 10/15/09 16:20 cdaq End of Run 76506:
190553 10/15/09 16:18 cdaq Run 76506: AC LED {trigger;} 3B {AC1-3;} Vled=11.0V
190552 10/15/09 16:17 cdaq End of Run 76505:
190551 10/15/09 16:16 cdaq Run 76505: AC LED {trigger;} 3B {AC1-3;} Vled=10.5V
190550 10/15/09 16:15 cdaq End of Run 76504:
190549 10/15/09 16:15 cdaq Run 76504: AC LED {trigger;} 3B {AC1-3;} Vled=10.0V
190548 10/15/09 16:13 cdaq End of Run 76503:
190547 10/15/09 16:12 cdaq Run 76503: AC LED {trigger;} 3B {AC1-3;} Vled=9.5V
190546 10/15/09 16:11 cdaq End of Run 76502:
190545 10/15/09 16:10 cdaq Run 76502: AC LED {trigger;} 3B {AC1-3;} Vled=9.0V
190544 10/15/09 16:09 cdaq End of Run 76501:
190543 10/15/09 16:08 cdaq Run 76501: AC LED {trigger;} 3B {AC1-3;} Vled=8.5V
190542 10/15/09 16:07 cdaq End of Run 76500:
190541 10/15/09 16:06 cdaq Run 76500: AC LED {trigger;} 3B {AC1-3;} Vled=8.0V
190540 10/15/09 16:05 cdaq End of Run 76499:
190539 10/15/09 16:04 cdaq Run 76499: AC LED {trigger;} 3B {AC1-3;} Vled=7.5V
190538 10/15/09 16:03 cdaq End of Run 76498:
190537 10/15/09 16:03 cdaq Run 76498: AC LED {trigger;} 3B {AC1-3;} Vled=7.0V
190536 10/15/09 16:01 cdaq E02017 Run 1371: Run without beam, 3.04 Torr.
190535 10/15/09 16:01 cdaq Beam Time Accounting
190534 10/15/09 16:00 cdaq End of Run 76497:
190533 10/15/09 15:59 cdaq Run 76497: AC LED {trigger;} 2B {AC1-3;} Vled=13.0V
190532 10/15/09 15:58 cdaq End of Run 76496:
190531 10/15/09 15:57 cdaq Run 76496: AC LED {trigger;} 2B {AC1-3;} Vled=12.5V
190530 10/15/09 15:57 Abdellah Swing Shift summary
190529 10/15/09 15:57 cdaq End of Run 76495:
190528 10/15/09 15:56 Nue Confirmed HV for EDC, HDC are off, Bill is working on gas sensor in the gas shed
190527 10/15/09 15:56 cdaq Run 76495: AC LED {trigger;} 2B {AC1-3;} Vled=12.0V
190526 10/15/09 15:55 cdaq End of Run 76494:
190525 10/15/09 15:54 cdaq Run 76494: AC LED {trigger;} 2B {AC1-3;} Vled=11.5V
190524 10/15/09 15:53 cdaq End of Run 76493:
190523 10/15/09 15:52 cdaq Run 76493: AC LED {trigger;} 2B {AC1-3;} Vled=11.0V
190522 10/15/09 15:51 cdaq End of Run 76492:
190521 10/15/09 15:50 cdaq Run 76492: AC LED {trigger;} 2B {AC1-3;} Vled=10.5V
190520 10/15/09 15:50 cdaq E02017 End of Run 1370:
190519 10/15/09 15:50 cdaq End of Run 76491:
190518 10/15/09 15:49 cdaq Run 76491: AC LED {trigger;} 2B {AC1-3;} Vled=10.0V
190517 10/15/09 15:47 cdaq End of Run 76490:
190516 10/15/09 15:46 cdaq Run 76490: AC LED {trigger;} 2B {AC1-3;} Vled=9.5V
190515 10/15/09 15:45 cdaq End of Run 76489:
190514 10/15/09 15:45 cdaq Run 76489: AC LED {trigger;} 2B {AC1-3;} Vled=9.0V
190513 10/15/09 15:43 cdaq End of Run 76488:
190512 10/15/09 15:43 cdaq Run 76488: AC LED {trigger;} 2B {AC1-3;} Vled=8.5V
190511 10/15/09 15:41 cdaq End of Run 76487:
190510 10/15/09 15:41 cdaq Run 76487: AC LED {trigger;} 2B {AC1-3;} Vled=8.0V
190509 10/15/09 15:40 cdaq End of Run 76486:
190508 10/15/09 15:37 cdaq Run 76486: AC LED {trigger;} 2B {AC1-3;} Vled=7.5V
190507 10/15/09 15:37 cdaq End of Run 76485:
190506 10/15/09 15:36 cdaq Run 76485: AC LED {trigger;} 2B {AC1-3;} Vled=7.0V
190505 10/15/09 15:33 cdaq End of Run 76484:
190504 10/15/09 15:32 cdaq Run 76484: AC LED {trigger;} 1B {AC1-3;} Vled=13.0V
190503 10/15/09 15:32 cdaq End of Run 76483:
190502 10/15/09 15:31 cdaq Run 76483: AC LED {trigger;} 1B {AC1-3;} Vled=12.5V
190501 10/15/09 15:30 cdaq End of Run 76482:
190500 10/15/09 15:29 cdaq Run 76482: AC LED {trigger;} 1B {AC1-3;} Vled=12.0V
190499 10/15/09 15:28 cdaq End of Run 76481:
190498 10/15/09 15:28 cdaq Run 76481: AC LED {trigger;} 1B {AC1-3;} Vled=11.5V
190497 10/15/09 15:26 cdaq End of Run 76480:
190496 10/15/09 15:25 cdaq Run 76480: AC LED {trigger;} 1B {AC1-3;} Vled=11.0V
190495 10/15/09 15:23 cdaq End of Run 76479:
190494 10/15/09 15:22 cdaq Run 76479: AC LED {trigger;} 1B {AC1-3;} Vled=10.5V
190493 10/15/09 15:22 cdaq End of Run 76478:
190492 10/15/09 15:21 cdaq Run 76478: AC LED {trigger;} 1B {AC1-3;} Vled=10.0V
190491 10/15/09 15:20 cdaq End of Run 76477:
190490 10/15/09 15:19 cdaq Run 76477: AC LED {trigger;} 1B {AC1-3;} Vled=9.5V
190489 10/15/09 15:18 cdaq End of Run 76476:
190488 10/15/09 15:17 cdaq Run 76476: AC LED {trigger;} 1B {AC1-3;} Vled=9.0V
190487 10/15/09 15:16 cdaq End of Run 76475:
190486 10/15/09 15:15 cdaq Run 76475: AC LED {trigger;} 1B {AC1-3;} Vled=8.5V
190485 10/15/09 15:14 cdaq End of Run 76474:
190484 10/15/09 15:13 cdaq Run 76474: AC LED {trigger;} 1B {AC1-3;} Vled=8.0V
190483 10/15/09 15:12 cdaq End of Run 76473:
190482 10/15/09 15:11 cdaq Run 76473: AC LED {trigger;} 1B {AC1-3;} Vled=7.5V
190481 10/15/09 15:10 cdaq End of Run 76472:
190480 10/15/09 15:09 cdaq Run 76472: AC LED {trigger;} 1B {AC1-3;} Vled=7.0V
190479 10/15/09 15:06 cdaq End of Run 76471:
190478 10/15/09 15:06 cdaq Run 76471: AC LED {trigger;} 7T {AC1-3;} Vled=13.0V
190477 10/15/09 15:04 cdaq End of Run 76470:
190476 10/15/09 15:04 cdaq Run 76470: AC LED {trigger;} 7T {AC1-3;} Vled=12.5V
190475 10/15/09 15:03 cdaq End of Run 76469:
190474 10/15/09 15:02 shoh The rate of lambda for Cr target (Calculation)
190473 10/15/09 15:02 cdaq Run 76469: AC LED {trigger;} 7T {AC1-3;} Vled=12.0V
190472 10/15/09 15:01 cdaq End of Run 76468:
190471 10/15/09 15:00 cdaq Run 76468: AC LED {trigger;} 7T {AC1-3;} Vled=11.5V
190470 10/15/09 14:59 cdaq End of Run 76467:
190469 10/15/09 14:58 cdaq Run 76467: AC LED {trigger;} 7T {AC1-3;} Vled=11.0V
190468 10/15/09 14:57 cdaq End of Run 76466:
190467 10/15/09 14:55 cdaq Run 76466: AC LED {trigger;} 7T {AC1-3;} Vled=10.5V
190466 10/15/09 14:54 cdaq End of Run 76465:
190465 10/15/09 14:53 cdaq Run 76465: AC LED {trigger;} 7T {AC1-3;} Vled=10.0V
190464 10/15/09 14:52 cdaq End of Run 76464:
190463 10/15/09 14:51 cdaq Run 76464: AC LED {trigger;} 7T {AC1-3;} Vled=9.5V
190462 10/15/09 14:50 cdaq End of Run 76463:
190461 10/15/09 14:49 cdaq Run 76463: AC LED {trigger;} 7T {AC1-3;} Vled=9.0V
190460 10/15/09 14:49 cdaq End of Run 76462:
190459 10/15/09 14:48 cdaq Run 76462: AC LED {trigger;} 7T {AC1-3;} Vled=8.5V
190458 10/15/09 14:47 cdaq End of Run 76461:
190457 10/15/09 14:46 cdaq Run 76461: AC LED {trigger;} 7T {AC1-3;} Vled=8.0V
190456 10/15/09 14:45 cdaq End of Run 76460:
190455 10/15/09 14:44 cdaq Run 76460: AC LED {trigger;} 7T {AC1-3;} Vled=7.5V
190454 10/15/09 14:43 cdaq End of Run 76459:
190453 10/15/09 14:43 cdaq Run 76459: AC LED {trigger;} 7T {AC1-3;} Vled=7.0V
190452 10/15/09 14:40 cdaq End of Run 76458:
190451 10/15/09 14:39 cdaq Run 76458: AC LED {trigger;} 6T {AC1-3;} Vled=13.0V
190450 10/15/09 14:38 cdaq End of Run 76457:
190449 10/15/09 14:37 cdaq Run 76457: AC LED {trigger;} 6T {AC1-3;} Vled=12.5V
190448 10/15/09 14:36 cdaq End of Run 76456:
190447 10/15/09 14:35 cdaq Run 76456: AC LED {trigger;} 6T {AC1-3;} Vled=12.0V
190446 10/15/09 14:34 cdaq End of Run 76455:
190445 10/15/09 14:34 cdaq Run 76455: AC LED {trigger;} 6T {AC1-3;} Vled=11.5V
190444 10/15/09 14:32 cdaq End of Run 76454:
190443 10/15/09 14:32 cdaq Run 76454: AC LED {trigger;} 6T {AC1-3;} Vled=11.0V
190442 10/15/09 14:31 cdaq End of Run 76453:
190441 10/15/09 14:30 cdaq Run 76453: AC LED {trigger;} 6T {AC1-3;} Vled=10.5V
190440 10/15/09 14:29 cdaq End of Run 76452:
190439 10/15/09 14:28 cdaq Run 76452: AC LED {trigger;} 6T {AC1-3;} Vled=10.0V
190438 10/15/09 14:27 cdaq End of Run 76451:
190437 10/15/09 14:26 cdaq Run 76451: AC LED {trigger;} 6T {AC1-3;} Vled=9.5V
190436 10/15/09 14:25 cdaq End of Run 76450:
190435 10/15/09 14:24 cdaq Run 76450: AC LED {trigger;} 6T {AC1-3;} Vled=9.0V
190434 10/15/09 14:23 cdaq End of Run 76449:
190433 10/15/09 14:22 cdaq Run 76449: AC LED {trigger;} 6T {AC1-3;} Vled=8.5V
190432 10/15/09 14:21 cdaq End of Run 76448:
190431 10/15/09 14:21 bono run 76446 and 76445
190430 10/15/09 14:20 cdaq Run 76448: AC LED {trigger;} 6T {AC1-3;} Vled=8.0V
190429 10/15/09 14:18 cdaq End of Run 76447:
190428 10/15/09 14:17 cdaq Run 76447: AC LED {trigger;} 6T {AC1-3;} Vled=7.5V
190427 10/15/09 14:16 cdaq End of Run 76446:
190426 10/15/09 14:16 cdaq Run 76446: AC LED {trigger;} 5T {AC1-3;} Vled=7.5V
190425 10/15/09 14:14 cdaq End of Run 76445:
190424 10/15/09 14:13 cdaq Run 76445: AC LED {trigger;} 5T {AC1-3;} Vled=13.5V
190423 10/15/09 14:12 cdaq End of Run 76444:
190422 10/15/09 14:11 cdaq Run 76444: AC LED {trigger;} 5T {AC1-3;} Vled=12.5V
190421 10/15/09 14:10 cdaq End of Run 76443:
190420 10/15/09 14:09 cdaq Run 76443: AC LED {trigger;} 5T {AC1-3;} Vled=12.0V
190419 10/15/09 14:08 cdaq End of Run 76442:
190418 10/15/09 14:08 cdaq Run 76442: AC LED {trigger;} 5T {AC1-3;} Vled=11.5V
190417 10/15/09 14:06 cdaq End of Run 76441:
190416 10/15/09 14:06 cdaq Run 76441: AC LED {trigger;} 5T {AC1-3;} Vled=11.0V
190415 10/15/09 14:05 cdaq End of Run 76440:
190414 10/15/09 14:04 cdaq Run 76440: AC LED {trigger;} 5T {AC1-3;} Vled=10.5V
190413 10/15/09 14:03 cdaq End of Run 76439:
190412 10/15/09 14:02 cdaq Run 76439: AC LED {trigger;} 5T {AC1-3;} Vled=10.0V
190411 10/15/09 14:00 cdaq End of Run 76438:
190410 10/15/09 14:00 cdaq Run 76438: AC LED {trigger;} 5T {AC1-3;} Vled=9.5V
190409 10/15/09 13:59 cdaq End of Run 76437:
190408 10/15/09 13:58 cdaq Run 76437: AC LED {trigger;} 5T {AC1-3;} Vled=9.0V
190407 10/15/09 13:57 cdaq End of Run 76436:
190406 10/15/09 13:56 cdaq Run 76436: AC LED {trigger;} 5T {AC1-3;} Vled=8.5V
190405 10/15/09 13:55 cdaq End of Run 76435:
190404 10/15/09 13:54 cdaq Run 76435: AC LED {trigger;} 5T {AC1-3;} Vled=8.0V
190403 10/15/09 13:53 cdaq End of Run 76434:
190402 10/15/09 13:52 cdaq Run 76434: AC LED {trigger;} 5T {AC1-3;} Vled=7.5V
190401 10/15/09 13:51 cdaq End of Run 76433:
190400 10/15/09 13:50 cdaq Run 76433: AC LED {trigger;} 5T {AC1-3;} Vled=7.0V
190399 10/15/09 13:48 cdaq End of Run 76432:
190398 10/15/09 13:48 cdaq Run 76432: AC LED {trigger;} 4T {AC1-3;} Vled=13.0V
190397 10/15/09 13:47 cdaq End of Run 76431:
190396 10/15/09 13:46 cdaq Run 76431: AC LED {trigger;} 4T {AC1-3;} Vled=12.5V
190395 10/15/09 13:45 cdaq End of Run 76430:
190394 10/15/09 13:44 cdaq Run 76430: AC LED {trigger;} 4T {AC1-3;} Vled=12.0V
190393 10/15/09 13:43 cdaq End of Run 76429:
190392 10/15/09 13:42 cdaq Run 76429: AC LED {trigger;} 4T {AC1-3;} Vled=11.5V
190391 10/15/09 13:41 cdaq End of Run 76428:
190390 10/15/09 13:40 cdaq Run 76428: AC LED {trigger;} 4T {AC1-3;} Vled=11.0V
190389 10/15/09 13:39 cdaq End of Run 76427:
190388 10/15/09 13:38 cdaq Run 76427: AC LED {trigger;} 4T {AC1-3;} Vled=10.5V
190387 10/15/09 13:37 cdaq End of Run 76426:
190386 10/15/09 13:36 cdaq Run 76426: AC LED {trigger;} 4T {AC1-3;} Vled=10.0V
190385 10/15/09 13:35 cdaq End of Run 76425:
190384 10/15/09 13:35 cdaq Run 76425: AC LED {trigger;} 4T {AC1-3;} Vled=9.5V
190383 10/15/09 13:33 cdaq End of Run 76424:
190382 10/15/09 13:33 cdaq Run 76424: AC LED {trigger;} 4T {AC1-3;} Vled=9.0V
190381 10/15/09 13:31 cdaq End of Run 76423:
190380 10/15/09 13:31 bono run 76422 is junk
190379 10/15/09 13:30 cdaq Run 76423: AC LED {trigger;} 4T {AC1-3;} Vled=8.5V
190378 10/15/09 13:29 cdaq End of Run 76422:
190377 10/15/09 13:28 cdaq Run 76422: AC LED {trigger;} 4T {AC1-3;} Vled=8.5V
190376 10/15/09 13:27 cdaq End of Run 76421:
190375 10/15/09 13:27 cdaq Run 76421: AC LED {trigger;} 4T {AC1-3;} Vled=8.0V
190374 10/15/09 13:25 cdaq End of Run 76420:
190373 10/15/09 13:25 cdaq Run 76420: AC LED {trigger;} 4T {AC1-3;} Vled=7.5V
190372 10/15/09 13:23 cdaq End of Run 76419:
190371 10/15/09 13:23 cdaq Run 76419: AC LED {trigger;} 4T {AC1-3;} Vled=7.0V
190370 10/15/09 13:21 cdaq End of Run 76418:
190369 10/15/09 13:20 cdaq Run 76418: AC LED {trigger;} 3T {AC1-3;} Vled=13.0V
190368 10/15/09 13:19 cdaq End of Run 76417:
190367 10/15/09 13:18 cdaq Run 76417: AC LED {trigger;} 3T {AC1-3;} Vled=12.5V
190366 10/15/09 13:17 cdaq End of Run 76416:
190365 10/15/09 13:16 cdaq Run 76416: AC LED {trigger;} 3T {AC1-3;} Vled=12.0V
190364 10/15/09 13:15 cdaq End of Run 76415:
190363 10/15/09 13:14 cdaq Run 76415: AC LED {trigger;} 3T {AC1-3;} Vled=11.5V
190362 10/15/09 13:13 cdaq End of Run 76414:
190361 10/15/09 13:13 bono run 76413 is junk
190360 10/15/09 13:12 cdaq Run 76414: AC LED {trigger;} 3T {AC1-3;} Vled=11.0 V
190359 10/15/09 13:11 cdaq End of Run 76413:
190358 10/15/09 13:11 cdaq Run 76413: AC LED {trigger;} 3T {AC1-3;} Vled=10.5 V
190357 10/15/09 13:09 cdaq End of Run 76412:
190356 10/15/09 13:08 cdaq Run 76412: AC LED {trigger;} 3T {AC1-3;} Vled=10.5 V
190355 10/15/09 13:07 cdaq End of Run 76411:
190354 10/15/09 13:06 cdaq Run 76411: AC LED {trigger;} 3T {AC1-3;} Vled=9.5 V
190353 10/15/09 13:05 cdaq End of Run 76410:
190352 10/15/09 13:05 cdaq Run 76410: AC LED {trigger;} 3T {AC1-3;} Vled=9.0 V
190351 10/15/09 13:05 cdaq E02017 Run 1370: Run without beam, with pressure 3.03 Torr.
190350 10/15/09 13:03 cdaq End of Run 76409:
190349 10/15/09 13:03 cdaq Run 76409: AC LED {trigger;} 3T {AC1-3;} Vled=8.5 V
190348 10/15/09 13:01 cdaq End of Run 76408:
190347 10/15/09 13:01 cdaq Run 76408: AC LED {trigger;} 3T {AC1-3;} Vled=8.0 V
190346 10/15/09 12:59 cdaq End of Run 76407:
190345 10/15/09 12:58 cdaq Run 76407: AC LED {trigger;} 3T {AC1-3;} Vled=7.5 V
190344 10/15/09 12:57 cdaq End of Run 76406:
190343 10/15/09 12:56 cdaq Run 76406: AC LED {trigger;} 3T {AC1-3;} Vled=7.0 V
190342 10/15/09 12:51 cdaq End of Run 76405:
190341 10/15/09 12:51 cdaq Run 76405: AC LED {trigger;} 2T {AC1-3;} Vled=13.0 V
190340 10/15/09 12:50 cdaq E02017 End of Run 1369:
190339 10/15/09 12:50 cdaq End of Run 76404:
190338 10/15/09 12:49 cdaq Run 76404: AC LED {trigger;} 2T {AC1-3;} Vled=12.5 V
190337 10/15/09 12:48 cdaq End of Run 76403:
190336 10/15/09 12:47 cdaq Run 76403: AC LED {trigger;} 2T {AC1-3;} Vled=12.0 V
190335 10/15/09 12:46 cdaq End of Run 76402:
190334 10/15/09 12:44 cdaq Run 76402: AC LED {trigger;} 2T {AC1-3;} Vled=11.5 V
190333 10/15/09 12:44 Abdellah beam might be back at 2:30 PM
190332 10/15/09 12:43 cdaq End of Run 76401:
190331 10/15/09 12:41 cdaq Run 76401: AC LED {trigger;} 2T {AC1-3;} Vled=11.0 V
190330 10/15/09 12:40 cdaq End of Run 76400:
190329 10/15/09 12:39 cdaq Run 76400: AC LED {trigger;} 2T {AC1-3;} Vled=10.5 V
190328 10/15/09 12:38 cdaq End of Run 76399:
190327 10/15/09 12:37 cdaq Run 76399: AC LED {trigger;} 2T {AC1-3;} Vled=10.0 V
190326 10/15/09 12:36 cdaq End of Run 76398:
190325 10/15/09 12:35 cdaq Run 76398: AC LED {trigger;} 2T {AC1-3;} Vled=9.5 V
190324 10/15/09 12:34 cdaq End of Run 76397:
190323 10/15/09 12:32 cdaq Run 76397: AC LED {trigger;} 2T {AC1-3;} Vled=9.0 V
190322 10/15/09 12:31 cdaq End of Run 76396:
190321 10/15/09 12:30 cdaq Run 76396: AC LED {trigger;} 2T {AC1-3;} Vled=8.5 V
190320 10/15/09 12:29 cdaq End of Run 76395:
190319 10/15/09 12:28 cdaq Run 76395: AC LED {trigger;} 2T {AC1-3;} Vled=8.0 V
190318 10/15/09 12:27 cdaq End of Run 76394:
190317 10/15/09 12:26 cdaq Run 76394: AC LED {trigger;} 2T {AC1-3;} Vled=7.5 V
190316 10/15/09 12:25 cdaq End of Run 76393:
190315 10/15/09 12:24 cdaq Run 76393: AC LED {trigger;} 2T {AC1-3;} Vled=7.0 V
190314 10/15/09 12:22 cdaq End of Run 76392:
190313 10/15/09 12:21 cdaq Run 76392: AC LED {trigger;} 1T {AC1-3;} Vled=13.0 V
190312 10/15/09 12:20 cdaq End of Run 76391:
190311 10/15/09 12:19 cdaq Run 76391: AC LED {trigger;} 1T {AC1-3;} Vled=12.5 V
190310 10/15/09 12:18 cdaq End of Run 76390:
190309 10/15/09 12:17 cdaq Run 76390: AC LED {trigger;} 1T {AC1-3;} Vled=12.0 V
190308 10/15/09 12:16 cdaq End of Run 76389:
190307 10/15/09 12:16 yuan WC1-2T HV swap back
190306 10/15/09 12:15 cdaq Run 76389: AC LED {trigger;} 1T {AC1-3;} Vled=11.5 V
190305 10/15/09 12:14 cdaq End of Run 76388:
190304 10/15/09 12:13 cdaq Run 76388: AC LED {trigger;} 1T {AC1-3;} Vled=11.0 V
190303 10/15/09 12:09 cdaq End of Run 76387:
190302 10/15/09 12:08 cdaq Run 76387: AC LED {trigger;} 1T {AC1-3;} Vled=10.5 V
190301 10/15/09 12:07 cdaq End of Run 76386:
190300 10/15/09 12:05 cdaq Run 76386: AC LED {trigger;} 1T {AC1-3;} Vled=10.0 V
190299 10/15/09 12:04 cdaq End of Run 76385:
190298 10/15/09 12:03 cdaq Run 76385: AC LED {trigger;} 1T {AC1-3;} Vled=9.5 V
190297 10/15/09 12:02 cdaq End of Run 76384:
190296 10/15/09 12:01 cdaq Run 76384: AC LED {trigger;} 1T {AC1-3;} Vled=9.0 V
190295 10/15/09 12:00 cdaq End of Run 76383:
190294 10/15/09 11:59 cdaq Run 76383: AC LED {trigger;} 1T {AC1-3;} Vled=8.6 V
190293 10/15/09 11:58 cdaq End of Run 76382:
190292 10/15/09 11:57 cdaq Run 76382: AC LED {trigger;} 1T {AC1-3;} Vled=8.0 V
190291 10/15/09 11:57 cdaq End of Run 76381:
190290 10/15/09 11:56 cdaq Run 76381: AC LED {trigger;} 1T {AC1-3;} Vled=7.5 V
190289 10/15/09 11:55 cdaq End of Run 76380:
190288 10/15/09 11:54 cdaq Run 76380: AC LED trigger; 1T AC1-3; Vled=7.0 V
190287 10/15/09 11:50 cdaq End of Run 76379:
190286 10/15/09 11:30 Arshak Is it updated in hks09-HVGUI? WC1-2T HV cable was plugged in Counting House 2-nd floor crate #35 channel 31.
190285 10/15/09 11:04 cdaq Run 76379: junk
190284 10/15/09 11:03 Reinhold Set trigger to LED for AC
190283 10/15/09 10:39 cdaq E02017 Run 1369: Run without beam, with pressure 3.62 Torr.
190282 10/15/09 10:38 cdaq E02017 End of Run 1368:
190281 10/15/09 10:37 Abdellah Beam off for injector work
190280 10/15/09 10:32 cdaq End of Run 76378:
190279 10/15/09 10:18 P Achenbach fast raster replay 76378
190278 10/15/09 10:18 Abdellah Visual scalers, run 76378
190277 10/15/09 10:14 cdaq Run 76378: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190276 10/15/09 10:10 cdaq End of Run 76377:
190275 10/15/09 10:02 P Achenbach bcm and bpm at 10:00 am
190274 10/15/09 09:59 P Achenbach fast raster replay 76376
190273 10/15/09 09:56 cdaq E02017 Run 1368: Run with no beam 2344MeV, CH2 target,with pressure 3.37Torr, 3x1 beam raster.
190272 10/15/09 09:56 cdaq E02017 End of Run 1367:
190271 10/15/09 09:54 P Achenbach fast raster replay 76377
190270 10/15/09 09:48 Abdellah Visual scalers, run 76377
190269 10/15/09 09:40 cdaq Run 76377: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190268 10/15/09 09:39 cdaq End of Run 76376:
190267 10/15/09 09:18 Abdellah Visual scalers, run 76376
190266 10/15/09 09:16 P Achenbach fast raster replay 76376
190265 10/15/09 09:11 cdaq Run 76376: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190264 10/15/09 09:06 cdaq End of Run 76375:
190263 10/15/09 08:52 yuan Status and plan ( from RC)
190262 10/15/09 08:50 cdaq E02017 Run 1367: Run with no beam 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
190261 10/15/09 08:47 Abdellah Injector work at 10:30
190260 10/15/09 08:45 P Achenbach fast raster replay 76375
190259 10/15/09 08:42 Abdellah Visual scalers, run 76375
190258 10/15/09 08:42 Abdellah Visual scalers, run 76375
190257 10/15/09 08:37 cdaq E02017 End of Run 1366:
190256 10/15/09 08:35 cdaq Run 76375: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190255 10/15/09 08:33 cdaq End of Run 76374:
190254 10/15/09 08:28 Abdellah Visual scalers, run 76374
190253 10/15/09 08:08 P Achenbach fast raster replay 76374
190252 10/15/09 08:06 cdaq Beam Time Accounting
190251 10/15/09 08:03 cdaq E02017 Run 1366: Run with beam 2344MeV, CH2 target,with pressure 3.66 Torr, 3x1 beam raster.
190250 10/15/09 08:02 cdaq Run 76374: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190249 10/15/09 08:02 cdaq E02017 End of Run 1365:
190248 10/15/09 08:01 P Achenbach bpm and bcm at 8:00 am
190247 10/15/09 07:58 Petkovic Owl (Night) Shift Summary
190246 10/15/09 07:32 Petkovic Beam: Beam coming --> postponed to 8:00, due to the RF problems on 2 magnets (MCR)
190245 10/15/09 06:59 cdaq E02017 Run 1365: Run with no beam 2344MeV, CH2 target,with pressure 3.28Torr, 3x1 beam raster.
190244 10/15/09 06:58 cdaq E02017 End of Run 1364:
190243 10/15/09 06:41 Petkovic Beam: TIMING (Properties) of the Run # 76373
190242 10/15/09 06:17 cdaq E02017 Run 1364: Run with no beam 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
190241 10/15/09 06:04 cdaq E02017 End of Run 1363:
190240 10/15/09 05:51 Tang How long is the actual beam on target time for Run76373?
190239 10/15/09 05:34 Petkovic Beam: Beam off for about 1 hour --> to fix only one QM in the Beam line (MCR)
190237 10/15/09 05:09 cdaq E02017 Run 1363: Run with no beam 2344MeV, CH2 target,with pressure 3.40Torr, 3x1 beam raster.
190236 10/15/09 05:07 cdaq E02017 End of Run 1362:
190235 10/15/09 05:05 cdaq End of Run 76373:
190234 10/15/09 05:04 Tang Please record BPM display after beam comes back
190233 10/15/09 04:59 cdaq E02017 Run 1362: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.35Torr, 3x1 beam raster.
190232 10/15/09 04:58 Tang Number of Sigma collected up to Run #76372 should be around 713
190231 10/15/09 04:58 cdaq E02017 End of Run 1361:
190230 10/15/09 04:43 Petkovic Stopped Beam -- > to fix Magnet problem (MCR)
190229 10/15/09 04:13 Petkovic/Kha CH2 target (raster on) beam current 2 uA --> VISUAL SCALERS Run # 76373
190228 10/15/09 04:09 cdaq E02017 Run 1361: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
190227 10/15/09 04:07 Khanal/Petko Reply fast raster #76373
190226 10/15/09 03:59 cdaq E02017 End of Run 1360:
190225 10/15/09 03:59 cdaq Run 76373: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190224 10/15/09 03:55 cdaq End of Run 76372:
190223 10/15/09 03:33 Petkovic/Kha CH2 target (raster on) beam current 2 uA --> VISUAL SCALERS Run # 76372
190222 10/15/09 03:32 Khanal/Petvo Reply for fast Rastar #76372
190221 10/15/09 03:25 cdaq Run 76372: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190220 10/15/09 03:24 cdaq End of Run 76371:
190219 10/15/09 03:08 Petkovic/Kha CH2 target (raster on) beam current 2 uA --> VISUAL SCALERS Run # 76371
190218 10/15/09 03:02 Khanal/Petvo Reply for fast rastar#76371
190217 10/15/09 03:01 Petkovic Analysis: CODA rebooted at the end of Run # 76370
190216 10/15/09 02:53 cdaq Run 76371: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190215 10/15/09 02:45 cdaq E02017 Run 1360: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.19Torr, 3x1 beam raster.
190214 10/15/09 02:44 cdaq E02017 End of Run 1359:
190213 10/15/09 02:29 Petkovic/Kha CH2 target (raster on) beam current 2 uA --> VISUAL SCALERS Run # 76370
190212 10/15/09 02:25 Khanal/Petvo Reply fast Raster #76370
190211 10/15/09 02:16 cdaq Run 76370: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190210 10/15/09 02:15 cdaq End of Run 76369:
190209 10/15/09 02:07 cdaq E02017 Run 1359: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 2.95Torr, 3x1 beam raster.
190208 10/15/09 02:03 Petkovic/Kha CH2 target (raster on) beam current 2 uA --> VISUAL SCALERS Run # 76369
190207 10/15/09 01:55 cdaq E02017 End of Run 1358:
190206 10/15/09 01:52 Khanal/Petko Fast Raster reply #76369
190205 10/15/09 01:44 cdaq Run 76369: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190204 10/15/09 01:39 cdaq End of Run 76368:
190203 10/15/09 01:29 Petkovic/Kha CH2 target (raster on) beam current 2 uA --> VISUAL SCALERS Run # 76368
190202 10/15/09 01:17 Khanal/Petko Faster Raster reply run no #76368
190201 10/15/09 01:08 cdaq Run 76368: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190200 10/15/09 01:07 cdaq End of Run 76367:
190199 10/15/09 00:53 Petkovic/Kha CH2 target (raster on) beam current 2 uA --> VISUAL SCALERS Run # 76367
190198 10/15/09 00:51 cdaq E02017 Run 1358: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.29Torr, 3x1 beam raster.
190197 10/15/09 00:50 cdaq E02017 End of Run 1357:
190196 10/15/09 00:49 Khanal/Petko Fast Raster Reply #76367
190195 10/15/09 00:47 kawama started new copymaker
190194 10/15/09 00:37 cdaq Run 76367: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190193 10/15/09 00:34 cdaq End of Run 76366:
190192 10/15/09 00:14 VM Rodriguez Run# 76352 Visual Scale
190191 10/15/09 00:10 cdaq Beam Time Accounting
190190 10/15/09 00:04 shoh pictures of 190187
190189 10/15/09 00:04 Abdellah Swing Shift summary
190188 10/15/09 00:03 Harikhanal Visual Scalers run#76366, with garget CH2 in current ~2uA
190187 10/15/09 00:02 shoh The number of QF (Cr target)
Wednesday
190186 10/14/09 23:51 cdaq E02017 Run 1357: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 2.90Torr
190185 10/14/09 23:48 Simon run #76366 fast raster
190184 10/14/09 23:45 cdaq Run 76366: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190183 10/14/09 23:44 cdaq End of Run 76365:
190182 10/14/09 23:33 cdaq E02017 End of Run 1356:
190181 10/14/09 23:24 Simon Run# 76365 Visual Scale
190180 10/14/09 23:20 Simon run #76365 fast raster
190179 10/14/09 23:16 Simon Event #76365 is junk
190178 10/14/09 23:14 cdaq Run 76365: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190177 10/14/09 23:09 cdaq Run 76364: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190176 10/14/09 23:01 Gogami Analysis: EHODO hitpat in different condition run ==> Mollor-electron
190175 10/14/09 22:40 Simon Run# 76363 Visual Scale
190174 10/14/09 22:38 Simon run #76363 fast raster
190173 10/14/09 22:33 cdaq Run 76363: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190172 10/14/09 22:32 cdaq E02017 Run 1356: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.26Torr
190171 10/14/09 22:32 cdaq E02017 End of Run 1355:
190170 10/14/09 22:32 cdaq End of Run 76362:
190169 10/14/09 22:05 Simon Run# 76362 Visual Scale
190168 10/14/09 22:01 Simon run #76362 fast raster
190167 10/14/09 21:58 cdaq Run 76362: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190166 10/14/09 21:54 cdaq End of Run 76361:
190165 10/14/09 21:37 yuan CH2 target moving distance change to 2 mm each step from 9:30 pm, 10/14/2009
190164 10/14/09 21:36 Simon Run# 76361 Visual Scale
190163 10/14/09 21:33 cdaq E02017 Run 1355: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 2.87Torr
190162 10/14/09 21:32 cdaq E02017 Run 1355: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 2.87Torr
190161 10/14/09 21:27 Simon run #76361 fast raster
190160 10/14/09 21:22 cdaq Run 76361: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190159 10/14/09 21:21 cdaq End of Run 76360:
190158 10/14/09 21:20 cdaq E02017 End of Run 1354:
190157 10/14/09 21:00 Simon Run# 76360 Visual Scale
190156 10/14/09 20:54 Simon run #76360 BPM
190155 10/14/09 20:54 Simon run #76360 fast raster
190154 10/14/09 20:49 cdaq Run 76360: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190153 10/14/09 20:40 cdaq End of Run 76359:
190152 10/14/09 20:20 cdaq E02017 Run 1354: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.31Torr
190151 10/14/09 20:20 cdaq E02017 End of Run 1353:
190150 10/14/09 20:19 Simon Run# 76359 Visual Scale
190149 10/14/09 20:15 Simon run #76359 fast raster
190148 10/14/09 20:12 abdellah ROC 7 error
190147 10/14/09 20:10 cdaq Run 76359: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190146 10/14/09 20:08 cdaq End of Run 76358:
190145 10/14/09 19:54 Simon Run# 76358 Visual Scale
190144 10/14/09 19:46 Simon run #76358 fast raster
190143 10/14/09 19:43 cdaq Run 76358: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190142 10/14/09 19:39 cdaq End of Run 76357:
190141 10/14/09 19:22 Simon Run# 76357 Visual Scale
190140 10/14/09 19:20 cdaq E02017 Run 1353: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 2.91Torr
190139 10/14/09 19:16 Simon run #76357 BPM
190138 10/14/09 19:15 Simon run #76357 fast raster
190137 10/14/09 19:12 cdaq Run 76357: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190136 10/14/09 19:10 cdaq End of Run 76356:
190135 10/14/09 19:09 cdaq E02017 End of Run 1352:
190134 10/14/09 18:47 Simon Run# 76356 Visual Scale
190133 10/14/09 18:42 Simon run #76356 fast raster
190132 10/14/09 18:39 cdaq Run 76356: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190131 10/14/09 18:36 cdaq End of Run 76355:
190130 10/14/09 18:17 Simon Run# 76355 Visual Scale
190129 10/14/09 18:17 Simon Run# 76355 Visual Scale
190128 10/14/09 18:11 Simon run #76355 BPM
190127 10/14/09 18:09 Simon run #76355 fast raster
190126 10/14/09 18:05 cdaq Run 76355: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190125 10/14/09 18:04 cdaq End of Run 76354:
190124 10/14/09 17:59 cdaq E02017 Run 1352: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.44Torr
190123 10/14/09 17:58 cdaq E02017 End of Run 1351:
190122 10/14/09 17:48 Simon Run# 76354 Visual Scale
190121 10/14/09 17:40 Simon run #76354 fast raster
190120 10/14/09 17:30 cdaq Run 76354: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190119 10/14/09 17:28 Chiba WC 1-2T ADC has been fine.
190118 10/14/09 17:26 cdaq End of Run 76353:
190117 10/14/09 17:10 Simon run #76353 BPM information
190116 10/14/09 17:08 Simon Run #76353 fast raster
190115 10/14/09 17:03 Simon Run# 76353 Visual Scale
190114 10/14/09 17:01 Reinhold Re: A figure makes you happier
190113 10/14/09 16:56 cdaq E02017 Run 1351: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.05Torr
190112 10/14/09 16:55 cdaq Run 76353: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190111 10/14/09 16:51 cdaq E02017 End of Run 1350:
190110 10/14/09 16:28 cdaq E02017 Run 1350: Run with no beam, 2.86 torr
190109 10/14/09 16:18 kawama Wrong explanation
190108 10/14/09 16:12 cdaq E02017 End of Run 1349:
190107 10/14/09 16:09 kawama krd macros committed (rev.257)
190106 10/14/09 16:01 VM Rodriguez Day Shift Summary
190105 10/14/09 16:01 cdaq Beam Time Accounting
190104 10/14/09 15:34 cdaq E02017 Run 1349: Run without beam, pressure 3.46Torr.
190103 10/14/09 15:32 cdaq E02017 End of Run 1348:
190101 10/14/09 15:31 VM Rodriguez No beam in next 2 hours due to cleaning of injectors by MCC
190100 10/14/09 15:23 cdaq E02017 Run 1348: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.40 Torr, 3x1 beam raster.
190099 10/14/09 15:22 cdaq E02017 End of Run 1347:
190098 10/14/09 15:22 VM Rodriguez Run# 76352 Visual Scale
190097 10/14/09 15:18 cdaq Run 76352: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190096 10/14/09 15:14 cdaq End of Run 76351:
190095 10/14/09 15:12 P Achenbach fast raster replay 76351
190094 10/14/09 14:58 doi distribution at SS(HES side)
190093 10/14/09 14:46 VM Rodriguez Run# 76351 Visual Scalers
190092 10/14/09 14:44 Zhihong Ye Analysis: Very beautiful! Some questions
190091 10/14/09 14:42 cdaq Run 76351: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190090 10/14/09 14:34 cdaq End of Run 76350:
190089 10/14/09 14:32 Zhihong Ye Analysis: Kaon Beta, Lambda Missing Mass for CH2 Run76312~766316
190088 10/14/09 14:25 kawama run# correction
190087 10/14/09 14:21 kawama Analysis: A figure makes you happier
190086 10/14/09 14:19 VM Rodriguez Run# 76350 Visual Scalers
190085 10/14/09 14:17 P Achenbach fast raster replay 76350
190084 10/14/09 14:12 cdaq E02017 Run 1347: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
190083 10/14/09 14:04 cdaq Run 76350: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190082 10/14/09 14:04 kawama The status of carbon missing mass
190081 10/14/09 14:02 cdaq End of Run 76349:
190080 10/14/09 13:59 cdaq E02017 End of Run 1346:
190079 10/14/09 13:42 VM Rodriguez Run# 76349 Visual Scalers
190078 10/14/09 13:40 P Achenbach fast raster replay 76349
190077 10/14/09 13:37 Chiba WC 1-2T ADC signal looks better
190076 10/14/09 13:33 cdaq E02017 Run 1346: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.79 Torr, 3x1 beam raster.
190075 10/14/09 13:32 cdaq E02017 End of Run 1345:
190074 10/14/09 13:32 cdaq Run 76349: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190073 10/14/09 13:27 cdaq End of Run 76348:
190072 10/14/09 13:02 VM Rodriguez Run# 76348 Visual Scalers
190071 10/14/09 13:00 P Achenbach fast raster replay 76348
190070 10/14/09 12:57 cdaq Run 76348: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190069 10/14/09 12:57 kawama Carbon cointime spectrum before/after run76092
190068 10/14/09 12:41 Reinhold Run #76347: find WC1 ADC cable plugged in wrong
190067 10/14/09 12:29 cdaq End of Run 76347:
190066 10/14/09 12:27 VM Rodriguez Run# 76347 Visual Scalers
190065 10/14/09 12:26 P Achenbach fast raster replay 76347
190064 10/14/09 12:26 Reinhold Run 76347: WC1-2T unplugged at beginning of run
190063 10/14/09 12:19 cdaq Run 76347: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190062 10/14/09 12:15 P Achenbach fast raster replay 76346
190061 10/14/09 12:15 Chiba WC 1-2T ADC channel missing again
190060 10/14/09 12:14 cdaq End of Run 76346:
190059 10/14/09 12:08 cdaq Run 76346: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190058 10/14/09 12:08 cdaq E02017 Run 1345: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.29Torr, 3x1 beam raster.
190057 10/14/09 12:06 cdaq E02017 End of Run 1344:
190056 10/14/09 11:54 cdaq E02017 Run 1344: Run without beam current , with pressure 3.00Torr, 3x1 beam raster.
190055 10/14/09 11:46 cdaq Run 76345: JUNK
190054 10/14/09 11:43 cdaq E02017 End of Run 1343:
190052 10/14/09 10:20 yuan ROC and DAQ rebooted
190051 10/14/09 10:17 VM Rodriguez Run# 76344 Visual Scalers
190050 10/14/09 10:14 cdaq E02017 Run 1343: Run with without beam with pressure 3.74Torr.
190049 10/14/09 10:13 VM Rodriguez Due to a valve problem, there will be no beam for 1 or 2 hours
190048 10/14/09 10:12 cdaq E02017 End of Run 1342:
190047 10/14/09 10:12 P Achenbach fast raster replay 76344
190046 10/14/09 10:11 cdaq End of Run 76344:
190045 10/14/09 10:02 cdaq Run 76344: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190044 10/14/09 10:00 cdaq End of Run 76343:
190043 10/14/09 09:36 VM Rodriguez Run# 76343 Visual Scalers
190042 10/14/09 09:35 P Achenbach fast raster replay 76343
190041 10/14/09 09:30 cdaq Run 76343: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190040 10/14/09 09:29 yuan Status and plan (from RC)
190039 10/14/09 09:28 P Achenbach fast raster replay 76342
190038 10/14/09 09:27 cdaq End of Run 76342:
190037 10/14/09 09:26 cdaq E02017 Run 1342: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.45 Torr, 3x1 beam raster.
190036 10/14/09 09:25 cdaq E02017 End of Run 1341:
190035 10/14/09 09:23 P Achenbach fast raster replay run 76342
190034 10/14/09 09:08 VM Rodriguez Run# 76342 Visual Scalers
190033 10/14/09 09:01 cdaq Run 76342: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190032 10/14/09 08:54 cdaq End of Run 76341:
190031 10/14/09 08:48 VM Rodriguez Run# 76341 Visual Scalers
190030 10/14/09 08:46 Chiba pull out WC ADC plug and checked signal, and restored
190029 10/14/09 08:41 P Achenbach fast raster replay 76341
190028 10/14/09 08:25 cdaq Run 76341: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190027 10/14/09 08:25 Chiba WC missing channel (solved?) and AC missing channnel
190026 10/14/09 08:21 cdaq End of Run 76340:
190025 10/14/09 08:20 cdaq End of Run 76340:
190024 10/14/09 08:15 cdaq E02017 Run 1341: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
190023 10/14/09 08:05 cdaq Beam Time Accounting
190022 10/14/09 08:04 cdaq E02017 End of Run 1340:
190021 10/14/09 07:58 chenh visual scarlers for run#76340
190020 10/14/09 07:54 chench Fast raster analysis for run#76340
190019 10/14/09 07:49 cdaq Run 76340: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190018 10/14/09 07:48 cdaq End of Run 76339:
190017 10/14/09 07:32 chench Fast raster analysis for run#76339
190016 10/14/09 07:28 Chunchua/Pet CH2 target (raster on) current 2 uA --> VISUAL SCALERS Run # 76339
190015 10/14/09 07:27 Gogami histograms Run76339
190014 10/14/09 07:20 chench Beam position and FFB after the target move to 178.20mm, run#76339
190013 10/14/09 07:17 cdaq Run 76339: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190012 10/14/09 07:17 cdaq E02017 Run 1340: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.71Torr, 3x1 beam raster.
190011 10/14/09 07:13 cdaq E02017 End of Run 1339:
190010 10/14/09 07:12 Gogami histograms Run76338
190009 10/14/09 07:07 cdaq End of Run 76338:
190008 10/14/09 06:45 chench Fast raster for run#76338
190007 10/14/09 06:41 Chunchua/Pet CH2 target (raster on) beam current 2 uA --> VISUAL SCALERS Run # 76338
190006 10/14/09 06:32 cdaq Run 76338: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
190005 10/14/09 06:30 cdaq End of Run 76337:
190004 10/14/09 06:16 chench Fast raster for run#76337
190003 10/14/09 06:11 chench visual scalers run#76337
190002 10/14/09 06:05 chench Beam position and FFB after the target move to 179.20mm at 6:00am
190001 10/14/09 06:04 Gogami histograms Run76337
190000 10/14/09 06:01 cdaq Run 76337: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189999 10/14/09 05:59 chench Since the beam has already on the target for around one hour, we decide to move the target by 1mm
189998 10/14/09 05:54 chench The errors come from DAQ run#76336
189997 10/14/09 05:51 cdaq End of Run 76336:
189996 10/14/09 05:49 chench HV of drift chambers
189995 10/14/09 05:46 Petkovic Fission CH Purged --> Started Run with Beam current 2 microapms (CH2 target)
189994 10/14/09 05:45 chench fast raster for run#76336
189993 10/14/09 05:44 cdaq E02017 Run 1339: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.15Torr, 3x1 beam raster.
189992 10/14/09 05:43 chench visual scalers run#76336
189991 10/14/09 05:42 Gogami histograms Run76335==>Run76336
189990 10/14/09 05:41 Gogami histograms Run76335
189989 10/14/09 05:39 chench Beam position and FFB after beam come back
189988 10/14/09 05:35 chench Beam is back, and current is 2uA
189987 10/14/09 05:33 cdaq Run 76336: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189986 10/14/09 05:33 cdaq E02017 End of Run 1338:
189985 10/14/09 05:33 cdaq E02017 Run 1338: junk
189984 10/14/09 05:27 Gogami Histograms Run76335
189983 10/14/09 05:27 Gogami Histograms Run76335
189982 10/14/09 05:26 cdaq E02017 End of Run 1337:
189980 10/14/09 05:22 cdaq E02017 Run 1337: run without beam
189979 10/14/09 05:21 chench Mcc called the beam would down for around 10minutes, stop both HKS run and fission run
189978 10/14/09 05:19 cdaq E02017 End of Run 1336:
189977 10/14/09 05:19 cdaq End of Run 76335:
189976 10/14/09 05:04 chench Fast raster for run76335
189975 10/14/09 05:03 Chunchua/Pet CH2 target (raster on) beam current 2 uA --> VISUAL SCALERS Run # 76335
189974 10/14/09 04:58 chench Beam position and FFB for run#76335 and target position is 180.20mm
189973 10/14/09 04:55 cdaq Run 76335: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189972 10/14/09 04:50 cdaq End of Run 76334:
189971 10/14/09 04:30 chench Fast rast analysis run#76334
189970 10/14/09 04:27 Gogami histograms Run76334
189969 10/14/09 04:27 chench Visual Scalers run#76334
189968 10/14/09 04:19 cdaq Run 76334: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189967 10/14/09 04:18 cdaq End of Run 76333:
189966 10/14/09 04:03 chench Sorry for the crab during the beam permit time, here is the correction for beam position and FFB run#76333
189965 10/14/09 04:00 chench Fast Raster for run#76333
189964 10/14/09 03:58 Chunchua/Pet CH2 target with Raster, current 2 uA --> VISUAL SCALERS Run # 76333
189963 10/14/09 03:55 chench Beam position and FFB after move the target to 181.20mm
189962 10/14/09 03:52 Gogami histograms Run76333
189961 10/14/09 03:48 cdaq Run 76333: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189960 10/14/09 03:43 cdaq End of Run 76332:
189959 10/14/09 03:43 chench beam position and FFB after beam tripped for around 5min
189958 10/14/09 03:35 Gogami histograms Run76332
189957 10/14/09 03:21 chench Fast rast for run376332, the gap becomes deeper
189956 10/14/09 03:15 chench Visual Scalers run#76332
189955 10/14/09 03:13 Gogmai Histograms check with cdaq doesn't work now
189954 10/14/09 03:09 cdaq Run 76332: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189953 10/14/09 03:08 cdaq End of Run 76331:
189952 10/14/09 02:54 Gogami histograms Run76331
189951 10/14/09 02:53 chench Visual Scalers run#76331
189950 10/14/09 02:53 Petkovic Fission Chamber Purged --> Started Run with a beam current 2 microapms, CH2 target
189949 10/14/09 02:50 chench Fast raster for run#76331
189948 10/14/09 02:46 cdaq E02017 Run 1336: Run with beam current 2uA, 2344MeV, CH2 target, with pressure 3.00Torr, 3x1 beam raster.
189947 10/14/09 02:40 chench FFB and Beam position after move the target again run#76331
189946 10/14/09 02:39 cdaq Run 76331: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189945 10/14/09 02:35 cdaq End of Run 76330:
189944 10/14/09 02:34 cdaq E02017 End of Run 1335:
189943 10/14/09 02:24 chench There is a deep gap, after check the visual scalers once and once again, we decide to keep running
189942 10/14/09 02:18 chench FAST RASTER for run#76330
189941 10/14/09 02:14 Chunchua/Pet CH2 target, current 2 microapms --> Visual Scalers Run# 7633040uA
189940 10/14/09 02:14 histograms Run76330
189939 10/14/09 02:08 cdaq Run 76330: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189938 10/14/09 02:06 cdaq End of Run 76329:
189937 10/14/09 01:54 chench fission chamber refill the gas just before this run
189936 10/14/09 01:50 chench Visual Scalers run#76329
189935 10/14/09 01:47 Gogami histograms Run76328
189934 10/14/09 01:47 chench Fast rast for run=76329
189933 10/14/09 01:39 cdaq Run 76329: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189932 10/14/09 01:39 chench FFB and beam position after move the target run=76329
189931 10/14/09 01:34 cdaq End of Run 76328:
189930 10/14/09 01:15 chench Fast rast for run=76328
189929 10/14/09 01:14 chench Visual Scalers run#76328
189928 10/14/09 01:04 cdaq Run 76328: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189927 10/14/09 01:02 cdaq End of Run 76327:
189926 10/14/09 00:56 chench Fast rast for run=76327
189925 10/14/09 00:53 chench Visual Scalers run=76327
189924 10/14/09 00:49 histograms Run76327
189923 10/14/09 00:47 chench fast raster for run=76326
189922 10/14/09 00:42 chench FFB and beam position for run = 76327
189921 10/14/09 00:34 cdaq Run 76327: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189920 10/14/09 00:26 cdaq End of Run 76326:
189919 10/14/09 00:24 cdaq Beam Time Accounting
189918 10/14/09 00:12 chench Visual Scalers run#76326, beam current=2uA and target=CH2
189917 10/14/09 00:09 Hari Khanal Shift summary ( swing 13 oct -13)
189916 10/14/09 00:07 shichijo I am very sorry
189915 10/14/09 00:07 kawama Probably the modification of rev.244 was wrong.
189914 10/14/09 00:02 shichijo I am sorry
189913 10/14/09 00:01 cdaq E02017 Run 1335: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
189912 10/14/09 00:00 kawama EDC missing slot problem was fixed; MAP file was wrong
Tuesday
189911 10/13/09 23:55 cdaq Run 76326: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189910 10/13/09 23:54 shichijo fast raster pattern and visual scaler rates for run #76325
189909 10/13/09 23:52 cdaq End of Run 76325:
189908 10/13/09 23:49 cdaq E02017 End of Run 1334:
189907 10/13/09 23:30 cdaq Run 76325: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189906 10/13/09 23:18 cdaq End of Run 76324:
189905 10/13/09 23:13 kawama At least no data after decoding
189904 10/13/09 23:00 shichijo visual scaler rates and fast raster pattern for run#76324
189903 10/13/09 22:50 Nue Do EDC1 missing channels have scaler counts?
189902 10/13/09 22:46 cdaq Run 76324: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189901 10/13/09 22:44 cdaq End of Run 76323:
189900 10/13/09 22:42 yuan Modified CH2 target running procedure
189899 10/13/09 22:33 shichijo fast raster pattern run #76323 and rates
189898 10/13/09 22:30 Nue What I proposed is move the target 1mm in every hour
189897 10/13/09 22:24 kawama EDC1 has still missing slot
189896 10/13/09 22:18 Hari target position
189895 10/13/09 22:10 kawama EDC1 card swapped
189894 10/13/09 22:07 cdaq Run 76323: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189893 10/13/09 21:40 Hari Controll excess
189892 10/13/09 21:38 yuan CH2 Target move to #5 (position: 186.20 mm)
189891 10/13/09 21:35 shichijo fast raster pattern run #76322
189890 10/13/09 21:34 cdaq End of Run 76322:
189889 10/13/09 21:28 cdaq Run 76322: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189888 10/13/09 21:23 shichijo this run stopped to change target position to #5
189887 10/13/09 21:20 cdaq End of Run 76321:
189886 10/13/09 21:12 Tang Start to use CH2 of #5 position at the edge close to #6 target and move toward #3 at the edge close to #2 target
189885 10/13/09 21:07 cdaq E02017 Run 1334: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
189884 10/13/09 21:05 shichijo visual scaler rates for run#76321
189883 10/13/09 20:55 cdaq E02017 End of Run 1333:
189882 10/13/09 20:52 shichijo fast raster pattern run #76321
189881 10/13/09 20:45 shichijo BPM and BCM screen shot
189880 10/13/09 20:42 cdaq Run 76321: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189879 10/13/09 20:39 cdaq End of Run 76320:
189878 10/13/09 20:37 Tang Remember what happened to the previous target ladder?
189877 10/13/09 20:22 shichijo It was run#76313
189876 10/13/09 20:13 shichijo fast raster pattern and visual scaler rates for run #76320
189875 10/13/09 19:57 shichijo EDC1 missing channel
189874 10/13/09 19:48 Hari target position
189873 10/13/09 19:46 cdaq Run 76320: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189872 10/13/09 19:42 shichijo fast raster pattern run #76319
189871 10/13/09 19:41 cdaq End of Run 76319:
189870 10/13/09 19:35 shichijo visual scaler rates for run#76319
189869 10/13/09 19:17 cdaq Run 76319: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189868 10/13/09 19:16 Reinhold Re: The number of lambda is decreased in run76316
189867 10/13/09 19:15 cdaq End of Run 76318:
189866 10/13/09 19:11 Reinhold Re: fast raster pattern run #76318: Note that X and Y are reversed
189865 10/13/09 18:57 Nue Some hydrogen may escape from the neighbor to the beam spot
189864 10/13/09 18:57 shichijo visual scaler rates for run#76138
189863 10/13/09 18:41 shichijo fast raster pattern run #76318
189862 10/13/09 18:32 kawama The number of lambda is decreased in run76316
189861 10/13/09 18:31 shichijo visual scaler rates for run#76137
189860 10/13/09 18:28 Hari Position of target
189859 10/13/09 18:23 shichijo fast raster pattern run #76317
189858 10/13/09 18:23 cdaq Run 76318: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189857 10/13/09 18:18 cdaq End of Run 76317:
189856 10/13/09 18:16 yuan Run conditions and monitors for CH2 target runs
189855 10/13/09 18:11 cdaq E02017 Run 1333: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
189854 10/13/09 18:04 kawama pe vs pk correlation in CH2 run
189853 10/13/09 18:01 cdaq Run 76317: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189852 10/13/09 18:01 cdaq E02017 End of Run 1332:
189851 10/13/09 18:00 cdaq End of Run 76316:
189850 10/13/09 18:00 kawama merged ch2 missing mass (run76313-76315)
189849 10/13/09 17:55 Tang This is more of a statistical effect
189848 10/13/09 17:49 kawama The number of lambda in 76315
189847 10/13/09 17:46 Hari BCM and BPM information
189846 10/13/09 17:42 Gogami Chromium QF with cointime correction
189845 10/13/09 17:28 shichijo visual scaler rates for run#76136
189844 10/13/09 17:20 shichijo fast raster pattern run#76316
189843 10/13/09 17:19 Nue Vacuum snapshot CH2 2uA
189842 10/13/09 17:12 Hari Traget position
189841 10/13/09 17:10 cdaq Run 76316: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189840 10/13/09 17:08 shichijo target position change
189839 10/13/09 17:03 cdaq End of Run 76315:
189838 10/13/09 16:57 shichijo visual scaler raates #76315
189837 10/13/09 16:57 kawama The number of lambda in 75314
189836 10/13/09 16:37 shichijo visual scaler rates #76135 (CH2 2uA)
189835 10/13/09 16:30 Gogami Analysis: Chromium QF
189834 10/13/09 16:30 shichijo raster pattern for run#76315
189833 10/13/09 16:29 Gogami Analysis: Chromium QF
189832 10/13/09 16:29 Gogami Analysis: Chromium QF
189830 10/13/09 16:19 Reinhold How-To Fast Raster Replay
189829 10/13/09 16:12 Tang No surprise. My estimation with 2uA is ~120 Lambdas and ~27 Sigmas per hour.
189828 10/13/09 16:12 cdaq Run 76315: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189827 10/13/09 16:11 shoh hit pattern was no problem
189826 10/13/09 16:10 cdaq End of Run 76314:
189825 10/13/09 16:04 Tang You got it! My estimation was about 7 counts of Sigma should be collected by this run.
189824 10/13/09 16:02 cdaq Beam Time Accounting
189823 10/13/09 16:02 Reinhold Fast raster pattern depends on trigger type
189822 10/13/09 16:02 VM Rodriguez Day Shift Summary
189821 10/13/09 15:57 Nue Run instruction for CH2 target
189820 10/13/09 15:42 kawama Analysis: A quick analysis result of #76313, finaly we got sigma?
189819 10/13/09 15:36 VM Rodriguez Run#76314 CH2, 2uA 3x1 Raster
189818 10/13/09 15:33 Nue Some counter missing the timing?
189817 10/13/09 15:27 cdaq Run 76314: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189816 10/13/09 15:24 shoh kaon rate (CH2 targer) quick analysis
189815 10/13/09 15:20 cdaq E02017 Run 1332: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.00Torr, 3x1 beam raster.
189814 10/13/09 15:13 kawama A quick analysis result of #76312
189813 10/13/09 15:06 Nue CH2 target was flat when it was made
189812 10/13/09 15:05 VM Rodriguez Asked MCC to go to Controlled Access
189811 10/13/09 15:03 Nue Hall went to control access
189810 10/13/09 14:58 Tang The raster pattern analysis has to be run for every run to decide change of location
189809 10/13/09 14:50 cdaq E02017 End of Run 1331:
189808 10/13/09 14:50 cdaq End of Run 76313:
189807 10/13/09 14:42 Reinhold Run 76313: fast raster pattern
189806 10/13/09 14:40 VM Rodriguez Run#76313 CH2, 2uA 3x1 Raster
189805 10/13/09 14:37 cdaq E02017 Run 1331: Run with beam current 2uA, 2344MeV, CH2 target,with pressure 3.82Torr, 3x1 beam raster.
189804 10/13/09 14:32 cdaq Run 76313: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189803 10/13/09 14:31 VM Rodriguez Run#76312 CH2, 2uA 3x1 Raster
189802 10/13/09 14:31 Reinhold Adjusted vertical raster amplifier gain
189801 10/13/09 14:30 cdaq End of Run 76312:
189800 10/13/09 14:20 Nue IC, FR for 2uA 1x3 FR on CH2
189799 10/13/09 14:15 cdaq Run 76312: 2344 MeV,Buffered, CH2 target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189798 10/13/09 14:14 VM Rodriguez Change the target to CH2
189797 10/13/09 14:13 VM Rodriguez Run#76311 Br9, 30uA No raster
189796 10/13/09 14:11 cdaq E02017 End of Run 1330:
189795 10/13/09 14:10 VM Rodriguez This is Run#76310
189794 10/13/09 14:08 Nue IC for 40uA on Be9
189793 10/13/09 14:05 VM Rodriguez Run# Br9, 30uA No raster
189792 10/13/09 14:05 cdaq Run 76311: 2344 MeV,Buffered, Be9 target@ 40uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189791 10/13/09 14:05 cdaq E02017 Run 1330: Run with beam current 40uA, 2344MeV, Be target,with pressure 3.61Torr.
189790 10/13/09 14:01 cdaq E02017 End of Run 1329:
189789 10/13/09 13:57 Reinhold Run 76309: Fast raster pattern; need to adjust the gain to fit ADC range
189788 10/13/09 13:54 cdaq E02017 Run 1329: Run with beam current 30uA, 2344MeV, BeO target,with pressure 3.55Torr.
189787 10/13/09 13:54 Nue Be9 target is in now instaed of CH2
189786 10/13/09 13:54 cdaq Run 76310: 2344 MeV,Buffered, Be target@ 30uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189785 10/13/09 13:48 VM Rodriguez Change the target to Be9
189784 10/13/09 13:46 VM Rodriguez Run# 76309 BeO, 2uA, 3x1 Beam Raster
189783 10/13/09 13:36 VM Rodriguez Change the target to CH2
189782 10/13/09 13:36 Gogami The Rates was decreasing in 10B Run(45uA and 40uA)
189781 10/13/09 13:32 cdaq E02017 End of Run 1328:
189780 10/13/09 13:32 cdaq End of Run 76309:
189779 10/13/09 13:31 Reinhold WC2 7-12 (?) discriminator width was too wide
189778 10/13/09 13:30 Chiba WC threshold changed before run 76310
189777 10/13/09 13:26 chench End the run failed , kill all and reset all, it works fine right now.
189776 10/13/09 13:23 Nue This run is a practice for CH2 prodcution data : Joerg is working on trigger modules.
189775 10/13/09 13:21 yez It seems that the hbeta distribution has problems but not WC
189774 10/13/09 13:18 cdaq E02017 Run 1328: Run with beam current 2uA, 2344MeV, BeO target,with pressure 3.32Torr, 3x1 beam raster.
189773 10/13/09 13:15 cdaq Run 76309: 2344 MeV,Buffered, BeO target@ 2uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189772 10/13/09 13:10 Nue Raster 3x1
189771 10/13/09 13:07 Nue snapshot vacuum, ion chamber on BeO 2uA
189770 10/13/09 13:06 cdaq E02017 End of Run 1327:
189769 10/13/09 12:58 Nue Target: Effective area of CH2
189768 10/13/09 12:50 Tang Showed this to Spata and ACC guys?
189767 10/13/09 12:41 Chiba WC2lay 1-6 discriminator`s some out may have been bad?
189766 10/13/09 12:41 chench End the run failed , kill all and reset all, it works fine right now.
189765 10/13/09 12:40 Tang This appeared to timing offsets between groups.
189764 10/13/09 12:35 cdaq Run 76308: LC self trigger 9B - 16 B
189763 10/13/09 12:33 cdaq End of Run 76307:
189762 10/13/09 12:31 cdaq Run 76307: LC self trigger 1B - 8 B
189761 10/13/09 12:28 cdaq End of Run 76306:
189760 10/13/09 12:27 Nue Target: Target Ladder #2 was mounted
189759 10/13/09 12:27 cdaq E02017 Run 1327: Run without Beam,with pressure 3.00Torr.
189758 10/13/09 12:25 cdaq Run 76306: LC self trigger 9T - 12T
189757 10/13/09 12:22 cdaq End of Run 76305:
189756 10/13/09 12:19 cdaq Run 76305: LC self trigger 1T - 8T
189755 10/13/09 12:16 cdaq End of Run 76304:
189754 10/13/09 12:15 cdaq Run 76304: LC self trigger 1B,2T&B,15T,16T&B
189753 10/13/09 12:13 cdaq End of Run 76303:
189752 10/13/09 12:09 cdaq E02017 End of Run 1326:
189751 10/13/09 12:04 Chiba WC threshold changed before run 76293
189750 10/13/09 12:02 cdaq Run 76303: Junk
189749 10/13/09 11:49 cdaq End of Run 76302:
189748 10/13/09 11:45 cdaq Run 76302: WC2 self trigger run 7B - 12B HV on
189747 10/13/09 11:42 VM Rodriguez Asked MCC to turn on Splitter Magnet
189746 10/13/09 11:40 cdaq End of Run 76301:
189745 10/13/09 11:39 chench Is the 'twin' from the the different gain match of the water chenrekov, analysis from run=76253?
189744 10/13/09 11:39 fanning Beam Time Accounting
189743 10/13/09 11:37 cdaq Run 76301: WC2 self trigger run 7T - 12T HV on
189742 10/13/09 11:19 cdaq End of Run 76300:
189741 10/13/09 11:16 cdaq Run 76300: WC2 self trigger run 1T - 6T HV on
189740 10/13/09 11:12 cdaq End of Run 76299:
189739 10/13/09 11:10 cdaq Run 76299: WC1 self trigger run 7b - 12b HV on
189738 10/13/09 11:07 cdaq End of Run 76298:
189737 10/13/09 11:03 cdaq Run 76298: WC1 self trigger run 7t - 12t HV on
189736 10/13/09 10:57 cdaq End of Run 76297:
189735 10/13/09 10:52 cdaq Run 76297: WC1 self trigger run 1t - 6t HV on
189734 10/13/09 10:47 cdaq End of Run 76296:
189733 10/13/09 10:41 cdaq Run 76296: WC1 self trigger run 1B - 6B HV on
189732 10/13/09 10:40 Reinhold WC1 1T 4B connector was not connceted properly after gate alignment
189731 10/13/09 10:37 cdaq End of Run 76295:
189730 10/13/09 10:34 cdaq E02017 Run 1326: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.00Torr. No Beam Run.
189729 10/13/09 10:23 cdaq Run 76295: WC1 self trigger run 1B - 6B HV on
189728 10/13/09 10:18 cdaq End of Run 76294:
189727 10/13/09 10:12 cdaq Run 76294: WC self trigger run 7T-12T HV on
189726 10/13/09 10:09 cdaq End of Run 76293:
189725 10/13/09 10:08 cdaq Run 76293: WC self trigger run 1T-6T HV on
189724 10/13/09 10:04 cdaq End of Run 76292:
189723 10/13/09 09:17 yuan Status and report (from RC)
189722 10/13/09 09:12 cdaq E02017 End of Run 1325:
189721 10/13/09 09:11 cdaq Run 76292: junk
189720 10/13/09 09:11 fanning Beam Time Accounting
189719 10/13/09 09:02 VM Rodriguez Asked MCC to go to Restricted Access
189718 10/13/09 09:00 chench Change the trigger configration to selftrigger and ps4=10
189717 10/13/09 08:58 cdaq End of Run 76291:
189716 10/13/09 08:56 cdaq Run 76291: lucite self test for all
189715 10/13/09 08:54 fanning Beam Time Accounting
189714 10/13/09 08:38 VM Rodriguez Asked MCC to turn off Splitter Magnet
189713 10/13/09 08:23 Petkovic Current 40 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76290)
189712 10/13/09 08:22 V.M.Rodrigue Target moved to empty
189711 10/13/09 08:16 Reinhold Re: WC NPE decreasing??
189710 10/13/09 08:14 cdaq E02017 Run 1325: Run with no beam current, pressure 3.03 Torr.
189709 10/13/09 08:12 cdaq E02017 Run 1324: Junk
189708 10/13/09 08:11 cdaq E02017 End of Run 1324:
189707 10/13/09 08:04 cdaq End of Run 76290:
189706 10/13/09 08:03 cdaq Beam Time Accounting
189705 10/13/09 08:03 frw owl shift summary
189704 10/13/09 08:01 cdaq E02017 End of Run 1323:
189703 10/13/09 07:42 frw hall access delayed
189702 10/13/09 07:07 Wesselmann/P BPM & BCM of Run # 76290
189701 10/13/09 07:04 Petkovic Current 40 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76290)
189700 10/13/09 06:52 cdaq Run 76290: 2344 MeV,Buffered, 10B target@ 40uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189699 10/13/09 06:51 cdaq End of Run 76289:
189698 10/13/09 05:43 Wesselmann/P BPM & BCM of Run #76289
189697 10/13/09 05:40 Petkovic Current 40 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76289)
189696 10/13/09 05:28 cdaq E02017 Run 1323: Run with beam current 40uA, 2344MeV, 10B target (no raster), with pressure 3.02 Torr.
189695 10/13/09 05:22 Chiba correction
189694 10/13/09 05:17 cdaq E02017 End of Run 1322:
189693 10/13/09 05:10 cdaq Run 76289: 2344 MeV,Buffered, 10B target@ 40uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189692 10/13/09 05:09 cdaq End of Run 76288:
189691 10/13/09 04:02 Chiba WC NPE decreasing??
189690 10/13/09 03:55 Wesselmann/P BPM & BCM of Run #76288
189689 10/13/09 03:52 Petkovic Current 40 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76288)
189688 10/13/09 03:39 cdaq Run 76288: 2344 MeV,Buffered, 10B target@ 40uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0, Trip on H2X-4T removed
189687 10/13/09 03:39 frw HV recovered
189686 10/13/09 03:37 cdaq E02017 Run 1322: Run with beam current 40uA, 2344MeV, 10B target (no raster), with pressure 3.40Torr.
189685 10/13/09 03:22 cdaq E02017 End of Run 1321:
189684 10/13/09 03:19 cdaq End of Run 76287:
189683 10/13/09 03:19 Wesselmann/P BPM & BCM of Run # 76287
189682 10/13/09 03:14 Petkovic Current 40 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76287)
189681 10/13/09 03:13 Chiba correction
189680 10/13/09 03:10 Chiba multipricity cause beta twin?
189679 10/13/09 03:03 frw fission chamber purged
189678 10/13/09 02:56 cdaq Run 76287: 2344 MeV,Buffered, 10B target@ 40uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0, H2X-4T H. volt. OFF (trip)
189677 10/13/09 02:50 cdaq E02017 Run 1321: Run with beam current 40uA, 2344MeV, 10B target,with pressure 3.09Torr.
189676 10/13/09 02:41 frw bad HV on H2X-4T
189675 10/13/09 02:38 cdaq E02017 End of Run 1320:
189674 10/13/09 02:22 cdaq End of Run 76286:
189673 10/13/09 02:08 Tang Chunhua Chen also needs LC self trigger runs when there is no beam
189672 10/13/09 01:27 Petkovic Current 40 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76286)
189671 10/13/09 01:18 Wesellmann/P BPM & BCM, Run # 76286
189670 10/13/09 01:10 cdaq Run 76286: 2344 MeV,Buffered, 10B target@ 40uA current beam (no raster): CP0 (3/3) * WC(2/2) * !AC * HES0
189669 10/13/09 01:08 cdaq End of Run 76285:
189668 10/13/09 00:25 Petkovic Current 40 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76285)
189667 10/13/09 00:19 maruta Comparison of Visual scaler before and after 1mm target movement
189666 10/13/09 00:19 Gogami/Petko Current 45 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76280)
189665 10/13/09 00:18 Wesellmann/P BPM & BCM for Run # 76285
189664 10/13/09 00:14 Gogami Shift_summury[swing-12Oct2009]
189663 10/13/09 00:05 cdaq Beam Time Accounting
189662 10/13/09 00:04 shichijo Ion chamber and target control screen shot
189661 10/13/09 00:02 Gogami This is test run to check rate will recover or not after moved target.
189660 10/13/09 00:00 shichijo Drift chamber HV screen shot
Monday
189659 10/12/09 23:56 Gogami noticed that rate is decreased , so stopped the run. target is melted?
189658 10/12/09 23:53 Gogami Current 45 uA on 10B (no raster) VISUAL SCALERS (Run76253)
189657 10/12/09 23:49 cdaq E02017 Run 1320: Run with beam current 40uA, 2344MeV, 10B target,with pressure 3.02Torr.
189656 10/12/09 23:48 cdaq Run 76285: 2344 MeV,Buffered, 10B target@ 40uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189655 10/12/09 23:46 Gogami changed beam current to 40[uA]
189654 10/12/09 23:45 Gogami It looks count rate is decreased !
189653 10/12/09 23:44 cdaq End of Run 76284:
189652 10/12/09 23:44 cdaq Run 76284: 2344 MeV,Buffered, 10B target@ 45uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189651 10/12/09 23:34 cdaq End of Run 76283:
189650 10/12/09 23:29 cdaq E02017 End of Run 1319:
189649 10/12/09 23:27 Gogami BPM and BCM screenshot[10B@45uA/Run76283]
189648 10/12/09 23:25 cdaq Run 76283: 2344 MeV,Buffered, 10B target@ 45uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189647 10/12/09 23:24 cdaq End of Run 76282:
189646 10/12/09 23:12 kawama Analysis: Carbon/water missing mass status
189645 10/12/09 22:23 Gogami Current 45 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76282) -->check histograms
189644 10/12/09 22:01 cdaq Run 76282: 2344 MeV,Buffered, 10B target@ 45uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189643 10/12/09 22:00 cdaq End of Run 76281:
189642 10/12/09 21:12 Gogami Current 45 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76281)
189641 10/12/09 21:04 Gogami BPM and BCM screenshot[10B@45uA/Run76281]
189640 10/12/09 21:02 Gogami DCs HV screen shot[10B@40uA/Run76281]
189639 10/12/09 20:59 cdaq E02017 Run 1319: Run with beam current 45uA, 2344MeV, 10B target (no raster), with pressure 3.07Torr.
189638 10/12/09 20:48 cdaq E02017 End of Run 1318:
189637 10/12/09 20:47 Gogami Error happend and stop the run
189636 10/12/09 20:47 cdaq Run 76281: 2344 MeV,Buffered, 10B target@ 45uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189635 10/12/09 20:46 gogami screen shot of DAQ error #76280
189634 10/12/09 20:44 Reinhold Re: I`d like to take one photon run for WC tomorrow
189633 10/12/09 19:56 Gogami/Petko Current 45 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76280)
189632 10/12/09 19:48 Gogami/Petko DCs HV screen shot[10B@45uA/Run76280]
189631 10/12/09 19:47 Gogami/Petko BPM & BCM of Run #76280
189630 10/12/09 19:43 cdaq Run 76280: 2344 MeV,Buffered, 10B target@ 45uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189629 10/12/09 19:42 cdaq End of Run 76279:
189628 10/12/09 18:54 Nue It is good to see raster monitor is working
189627 10/12/09 18:45 Gogami/Petko BPM and BCM screen shot[10B@45uA/Run76279]
189626 10/12/09 18:42 Gogami/Petko Current 45 uA on 10B (no raster) VISUAL SCALERS -->SLI Beam Energy Spread (Run # 76279)
189625 10/12/09 18:42 Gogami DCs HV screen shot[10B@45uA/Run76279]
189624 10/12/09 18:37 Gogami ps1=10 ==> ps1=2(correct)
189623 10/12/09 18:34 cdaq Run 76279: 2344 MeV,Buffered, 10B target@ 45uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189622 10/12/09 18:29 cdaq End of Run 76278:
189621 10/12/09 18:23 cdaq E02017 Run 1318: Run with beam current 45uA, 2344MeV, 10B target (no raster), with pressure 3.09Torr.
189620 10/12/09 18:21 Chiba I`d like to take one photon run for WC tomorrow
189619 10/12/09 18:11 cdaq E02017 End of Run 1317:
189618 10/12/09 17:54 Reinhold Run 76278: seems like raster was on for a bit
189617 10/12/09 17:51 cdaq E02017 Run 1317: Run with beam current 45uA, 2344MeV, 10B target,wi (no raster) witth pressure 3.87 Torr.
189616 10/12/09 17:49 cdaq E02017 End of Run 1316:
189615 10/12/09 17:47 Gogami/Petko BPM&BCM Run#76278
189614 10/12/09 17:40 Gogami/Petko Current 45 uA on 10B (no raster) VISUAL SCALERS -->Beam Energy Spread
189613 10/12/09 17:33 Gogami Raster controls screen shot[no raster]
189612 10/12/09 17:27 Gogami DCs HV screen shot[10B@45uA]
189611 10/12/09 17:23 Gogami BPM and BCM
189610 10/12/09 17:21 cdaq Run 76278: 2344 MeV,Buffered, 10B target@ 45uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189609 10/12/09 17:16 Gogami Beam: Beam is back !
189608 10/12/09 17:03 Gogami Beam: Still optimizing the beam injector , beam will be back one or two hours later.
189607 10/12/09 16:53 shichijo target plate #2
189606 10/12/09 16:17 shoh The number of quasi-free at Li target
189605 10/12/09 16:02 frw day shift summary
189604 10/12/09 16:01 cdaq Beam Time Accounting
189603 10/12/09 15:24 cdaq E02017 Run 1316: Run with no beam (With fixed valves)
189601 10/12/09 12:59 chench Can these be put into shift replay check document?
189600 10/12/09 12:55 frw no beam for now
189599 10/12/09 12:24 Reinhold Run #76276: Fast Raster pattern; target seems fine
189598 10/12/09 12:12 frw running conditions for B-10
189597 10/12/09 11:59 frw Target: changed to B-10 target
189596 10/12/09 10:58 frw work on fission chamber
189595 10/12/09 09:43 yuan Haper scan result from MCC
189594 10/12/09 09:28 yuan Status and plan (from RC)
189593 10/12/09 09:15 cdaq E02017 End of Run 1315:
189592 10/12/09 09:13 frw injector work -- access opportunity
189591 10/12/09 09:12 Simon Visual Scalers run#76277, beam: 35uA
189590 10/12/09 09:09 cdaq End of Run 76277:
189589 10/12/09 09:03 cdaq Run 76277: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189588 10/12/09 09:02 cdaq End of Run 76276:
189587 10/12/09 08:28 cdaq Run 76276: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189586 10/12/09 08:28 cdaq E02017 Run 1315: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.91Torr.
189585 10/12/09 08:23 frw harp scan
189584 10/12/09 08:22 cdaq End of Run 76275:
189583 10/12/09 08:16 cdaq E02017 End of Run 1314:
189582 10/12/09 08:14 cdaq Run 76275: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189581 10/12/09 08:13 cdaq End of Run 76274:
189580 10/12/09 08:01 horn Owl Shift Summary
189579 10/12/09 08:01 cdaq Beam Time Accounting
189578 10/12/09 07:45 ent Run 76274 - visual scaler rates
189577 10/12/09 07:36 cdaq Run 76274: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189576 10/12/09 07:34 cdaq End of Run 76273:
189575 10/12/09 07:22 ent Run 76273 - visual scaler rates
189574 10/12/09 07:04 cdaq Run 76273: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189573 10/12/09 07:03 cdaq End of Run 76272:
189572 10/12/09 06:36 ent Run 76272 - visual scaler rates
189571 10/12/09 06:31 horn Refilled fission chamber gas at ~6:30, pressure=3.1 Torr
189570 10/12/09 06:27 cdaq Run 76272: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189569 10/12/09 06:26 cdaq E02017 Run 1314: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.07Torr.
189568 10/12/09 06:21 cdaq E02017 End of Run 1313:
189567 10/12/09 06:21 cdaq End of Run 76271:
189566 10/12/09 05:59 ent Run 76271 - visual scaler rates
189565 10/12/09 05:47 cdaq Run 76271: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189564 10/12/09 05:46 cdaq End of Run 76270:
189563 10/12/09 05:28 ent Run 76270 - visual scaler rates
189561 10/12/09 05:14 cdaq Run 76270: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189560 10/12/09 05:13 cdaq End of Run 76269:
189559 10/12/09 04:45 ent Run 76269 - visual scaler rates
189558 10/12/09 04:37 cdaq Run 76269: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189557 10/12/09 04:37 horn Refilled fission chamber gas at ~4:30, pressure=3.07 Torr
189556 10/12/09 04:37 cdaq E02017 Run 1313: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.07Torr.
189555 10/12/09 04:32 cdaq E02017 End of Run 1312:
189554 10/12/09 04:31 cdaq End of Run 76268:
189553 10/12/09 04:13 ent Run 76268 - visual scaler rates
189552 10/12/09 03:59 cdaq Run 76268: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189551 10/12/09 03:57 cdaq End of Run 76267:
189550 10/12/09 03:52 ent Run 76267 - visual scaler rates
189549 10/12/09 03:23 cdaq Run 76267: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189548 10/12/09 03:22 cdaq End of Run 76266:
189547 10/12/09 02:58 ent Run 76266 - visual scaler rates
189546 10/12/09 02:41 cdaq Run 76266: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189545 10/12/09 02:41 horn Refilled fission chamber gas at ~2:30, pressure=3.11 Torr
189544 10/12/09 02:41 cdaq E02017 Run 1312: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.11Torr.
189543 10/12/09 02:35 cdaq E02017 End of Run 1311:
189542 10/12/09 02:35 cdaq End of Run 76265:
189541 10/12/09 02:34 ent Run 76265 - visual scaler rates
189540 10/12/09 02:06 cdaq Run 76265: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189539 10/12/09 02:02 cdaq End of Run 76264:
189538 10/12/09 01:35 ent Run 76264 - visual scaler rates
189537 10/12/09 01:19 cdaq Run 76264: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189536 10/12/09 01:17 cdaq End of Run 76263:
189535 10/12/09 00:52 ent Run 76263 - visual scaler rates
189534 10/12/09 00:41 cdaq Run 76263: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189533 10/12/09 00:41 cdaq E02017 Run 1311: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.06Torr.
189532 10/12/09 00:40 ent Run 1310 (fission)
189531 10/12/09 00:40 horn Refilled fission chamber gas at ~0:30, pressure=3.07 Torr
189530 10/12/09 00:38 cdaq E02017 End of Run 1310:
189529 10/12/09 00:33 chench HDC1&2 efficiency after the ethan problem fixed, result from run=76261
189528 10/12/09 00:28 cdaq End of Run 76262:
189527 10/12/09 00:01 frw swing shift summary
189526 10/12/09 00:01 cdaq Beam Time Accounting
Sunday
189525 10/11/09 23:57 W. Luo Visual Scalers run#76262, beam: 32.73uA
189524 10/11/09 23:50 cdaq Run 76262: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189523 10/11/09 23:48 cdaq End of Run 76261:
189522 10/11/09 23:10 W. Luo Visual Scalers run#76260, beam: 32.10uA
189521 10/11/09 23:09 chench HV of drift chamber after the ethan problem is fixed
189520 10/11/09 23:08 cdaq Run 76261: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189519 10/11/09 23:07 cdaq End of Run 76260:
189518 10/11/09 22:38 W. Luo Visual Scalers run#76260, beam: 32.10uA
189517 10/11/09 22:37 frw back in the game
189516 10/11/09 22:35 cdaq Run 76260: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189515 10/11/09 22:34 cdaq E02017 Run 1310: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.06Torr.
189514 10/11/09 22:19 W. Luo Refill gas of Fission Chamber, Pressure: 2.98Torr
189513 10/11/09 22:08 frw gas alarm neutralized
189512 10/11/09 21:42 chench Change Lucite bucking coil current from 2.53AMP To 2.35 AMP
189511 10/11/09 21:42 frw hall acess
189510 10/11/09 21:29 cdaq E02017 End of Run 1309:
189509 10/11/09 21:17 frw ethane leak alarm from gas shed
189508 10/11/09 20:44 frw dc gas alarm
189507 10/11/09 20:43 cdaq End of Run 76259:
189506 10/11/09 20:28 chench I redo the calibraion for HKS drift chamber after debug the hstart_time, and parameter files have been commited.
189505 10/11/09 20:21 W. Luo Visual Scalers run#76259, beam: 33.71uA
189504 10/11/09 20:18 cdaq Run 76259: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189503 10/11/09 20:17 cdaq End of Run 76258:
189502 10/11/09 20:06 W. Luo EDC2 new missing wire for run 76258
189501 10/11/09 19:51 W. Luo Visual Scalers run#76258, beam: 33.29uA
189500 10/11/09 19:48 W. Luo Refill gas of Fission Chamber, Pressure: 2.94Torr
189499 10/11/09 19:47 frw DAQ: kill-all due to ROC7
189498 10/11/09 19:47 cdaq E02017 Run 1309: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 2.94 Torr.
189497 10/11/09 19:45 cdaq Run 76258: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189496 10/11/09 19:35 cdaq E02017 End of Run 1308:
189495 10/11/09 19:22 W. Luo BPM & BCM screen shot
189494 10/11/09 19:21 W. Luo Visual Scalers run#76257, beam: 33.16uA
189493 10/11/09 19:17 cdaq Run 76257: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189492 10/11/09 19:16 cdaq End of Run 76256:
189491 10/11/09 18:51 Nue Li7 data can be taken until Monday morning.
189490 10/11/09 18:44 W. Luo Visual Scalers run#76256, beam: 33.40uA
189489 10/11/09 18:43 cdaq Run 76256: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189488 10/11/09 18:42 cdaq End of Run 76255:
189487 10/11/09 18:12 W. Luo Visual Scalers run#76255, beam: 33.40uA
189486 10/11/09 18:10 cdaq Run 76255: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189485 10/11/09 18:09 cdaq End of Run 76254:
189484 10/11/09 17:42 chench Change the lucite Bucking coil current from 3.00 to 2.53Amp
189483 10/11/09 17:41 chench HKS DC tracking results for run=76112 with ver253, everything looks normal!
189482 10/11/09 17:38 Tang Beam time allocation before Tuesday opening at 8AM
189481 10/11/09 17:36 W. Luo Visual Scalers run#76254, beam: 33.10uA
189480 10/11/09 17:32 cdaq Run 76254: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189479 10/11/09 17:31 cdaq End of Run 76253:
189478 10/11/09 17:26 W. Luo Refill gas of Fission Chamber, Pressure: 2.96Torr
189477 10/11/09 17:25 cdaq E02017 Run 1308: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 2.96Torr.
189476 10/11/09 17:13 cdaq E02017 End of Run 1307:
189475 10/11/09 17:11 Reinhold Re: Why was LC bucking coil current not changed at this access? This was a perfect access to do so.
189474 10/11/09 17:09 Reinhold HKS grouped PID trigger rates unchanged after AC bucking coil adjustment
189473 10/11/09 17:05 Tang Why LC bucking coil current was not changed at this access?
189472 10/11/09 17:03 W. Luo Visual Scalers run#76253, beam: 33.10uA
189471 10/11/09 16:50 cdaq E02017 Run 1307: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.91Torr.
189470 10/11/09 16:49 cdaq Run 76253: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189469 10/11/09 16:45 Reinhold Lowered AC bucking coil current from 9 A to 8.5 A
189468 10/11/09 16:43 Reinhold Reset HES control power and NMR; magnet up again
189467 10/11/09 16:16 cdaq E02017 End of Run 1306:
189466 10/11/09 16:03 cdaq Beam Time Accounting
189465 10/11/09 16:02 F.Garibaldi CONTROL ACCESS FOR FAILURE AT HES DIPOLE MAGNET POWER SUPPLY
189464 10/11/09 15:42 F.Garibaldi Run #76252 ended for alarm to HRS NMR
189463 10/11/09 15:40 cdaq there is an access error from HES dipole, during run=76252
189462 10/11/09 15:37 cdaq End of Run 76252:
189461 10/11/09 15:32 chench The HKS track chi2 I got from ver253
189460 10/11/09 15:26 cdaq Run 76252: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189459 10/11/09 15:25 cdaq End of Run 76251:
189458 10/11/09 14:51 cdaq Run 76251: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189457 10/11/09 14:50 cdaq End of Run 76250:
189456 10/11/09 13:51 cdaq Run 76250: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189455 10/11/09 13:49 cdaq End of Run 76249:
189454 10/11/09 13:08 cdaq Run 76249: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189453 10/11/09 13:07 cdaq End of Run 76248:
189452 10/11/09 12:35 cdaq Run 76248: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189451 10/11/09 12:34 cdaq End of Run 76247:
189450 10/11/09 12:26 F. Garilba Refilled fission chamber gas at ~12:30, pressure=3.1 Torr
189449 10/11/09 12:13 R. De Leo visual scaler rates [76247]
189448 10/11/09 12:03 cdaq Run 76247: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189447 10/11/09 11:59 cdaq End of Run 76246:
189446 10/11/09 11:36 yuan Stop run 76245 due to increased dead time
189445 10/11/09 11:27 cdaq Run 76246: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189444 10/11/09 11:24 cdaq End of Run 76245:
189443 10/11/09 10:46 cdaq Run 76245: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189442 10/11/09 10:45 cdaq End of Run 76244:
189441 10/11/09 10:07 cdaq Run 76244: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189440 10/11/09 10:05 cdaq End of Run 76243:
189439 10/11/09 09:46 R. De Leo visual scaler rates [76243]
189438 10/11/09 09:27 cdaq Run 76243: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189437 10/11/09 09:04 yuan Status and plan (from RC)
189436 10/11/09 09:00 garibaldi Refilled fission chamber gas at ~9:00, pressure=3.24 Torr
189435 10/11/09 08:56 cdaq E02017 Run 1306: Run without beam current,with pressure 3.06Torr.
189434 10/11/09 08:55 cdaq E02017 End of Run 1305:
189433 10/11/09 08:44 cdaq End of Run 76242:
189432 10/11/09 08:02 horn Owl Shift Summary
189431 10/11/09 08:02 cdaq Beam Time Accounting
189430 10/11/09 07:56 ent Run 76242 - visual scaler rates
189429 10/11/09 07:52 cdaq Run 76242: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189428 10/11/09 07:50 cdaq End of Run 76241:
189427 10/11/09 07:15 cdaq Run 76241: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189426 10/11/09 07:15 ent Run 76241 - visual scaler rates
189425 10/11/09 07:10 cdaq E02017 Run 1305: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.06Torr.
189424 10/11/09 06:47 horn Refilled fission chamber gas at ~6:30, pressure=3.04 Torr
189423 10/11/09 06:34 cdaq E02017 End of Run 1304:
189422 10/11/09 06:34 cdaq End of Run 76240:
189421 10/11/09 06:30 horn beam off for MCC trouble shooting
189420 10/11/09 06:22 ent Run 76240 - visual scaler rates
189419 10/11/09 06:13 cdaq Run 76240: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189418 10/11/09 06:01 cdaq End of Run 76239:
189416 10/11/09 05:03 ent Run 76239 - visual scaler rates
189415 10/11/09 04:59 hornt beam back - start run 76239
189414 10/11/09 04:50 cdaq Run 76239: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189413 10/11/09 04:49 cdaq E02017 Run 1304: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.06Torr.
189412 10/11/09 04:40 horn Refilled fission chamber gas at ~4:30, pressure=3.05 Torr
189411 10/11/09 04:18 cdaq E02017 End of Run 1303:
189410 10/11/09 04:18 horn Beam off for separation check in higher pass
189409 10/11/09 04:02 cdaq End of Run 76238:
189408 10/11/09 03:57 cdaq Run 76238: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189407 10/11/09 03:56 cdaq End of Run 76237:
189406 10/11/09 03:44 Chiba Bug in tracking part?
189405 10/11/09 03:35 ent Run 76237 - visual scaler rates
189404 10/11/09 03:20 cdaq Run 76237: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189403 10/11/09 03:18 cdaq End of Run 76236:
189402 10/11/09 02:52 ent Run 76236 - visual scaler rates
189401 10/11/09 02:48 horn Late entry: refilled gas of fission chamber ~12:30am, pressure 3 Torr
189400 10/11/09 02:47 horn Refilled gas of fission chamber ~2:34am, pressure 3.03 Torr
189399 10/11/09 02:46 cdaq E02017 Run 1303: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.00Torr.
189398 10/11/09 02:46 cdaq Run 76236: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189397 10/11/09 02:35 cdaq E02017 End of Run 1302:
189396 10/11/09 02:34 cdaq End of Run 76235:
189395 10/11/09 01:54 ent Run 76235 - visual scaler rates
189394 10/11/09 01:49 cdaq Run 76235: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189393 10/11/09 01:06 ent Run 76234 - visual scaler rates
189392 10/11/09 01:02 cdaq Run 76234: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189391 10/11/09 00:59 cdaq End of Run 76233:
189390 10/11/09 00:37 ent Run 76233 - visual scaler rates
189389 10/11/09 00:34 horn beam back - start run 76233
189388 10/11/09 00:29 W. Luo Current 31.53 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76232)
189387 10/11/09 00:28 cdaq Run 76233: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189386 10/11/09 00:28 cdaq E02017 Run 1302: Run with beam current 33uA, 2344MeV, 7Li target,with pressure 3.06Torr.
189385 10/11/09 00:17 horn beam off for dispersion check
189384 10/11/09 00:13 cdaq End of Run 76232:
189383 10/11/09 00:05 cdaq E02017 End of Run 1301:
189382 10/11/09 00:01 W. Luo Current 31.53 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76232)
189381 10/11/09 00:01 frw swing shift summary
189380 10/11/09 00:00 cdaq Beam Time Accounting
Saturday
189379 10/10/09 23:59 cdaq Run 76232: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189378 10/10/09 23:58 cdaq End of Run 76231:
189377 10/10/09 23:29 W. Luo Current 31.53 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76231)
189376 10/10/09 23:24 cdaq Run 76231: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189375 10/10/09 23:23 cdaq End of Run 76230:
189374 10/10/09 22:45 W. Luo Current 31.53 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76229)
189373 10/10/09 22:42 cdaq Run 76230: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189372 10/10/09 22:41 cdaq End of Run 76229:
189371 10/10/09 22:35 W. Luo Refill gas of Fission Chamber, Pressure: 2.92Torr
189370 10/10/09 22:34 cdaq E02017 Run 1301: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.93Torr.
189369 10/10/09 22:22 cdaq E02017 End of Run 1300:
189368 10/10/09 22:07 W. Luo Current 31.96 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76229)
189367 10/10/09 22:03 cdaq Run 76229: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189366 10/10/09 22:01 cdaq End of Run 76228:
189365 10/10/09 21:23 W. Luo Current 33.6 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76228)
189364 10/10/09 21:20 cdaq Run 76228: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189363 10/10/09 21:19 cdaq End of Run 76227:
189362 10/10/09 20:49 W. Luo Current 33.6 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76227)
189361 10/10/09 20:45 cdaq Run 76227: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189360 10/10/09 20:43 cdaq End of Run 76226:
189359 10/10/09 20:38 vmaxwell refrigerator in gas shed not closed properly
189358 10/10/09 20:13 W. Luo Current 33.6 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76226)
189357 10/10/09 20:08 cdaq Run 76226: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189356 10/10/09 20:07 cdaq E02017 Run 1300: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.99Torr.
189355 10/10/09 19:56 W. Luo Refill gas of Fission Chamber, Pressure: 2.88
189354 10/10/09 19:44 cdaq E02017 End of Run 1299:
189353 10/10/09 19:09 W. Luo COREECTION:For run=76225 visual scaler - good format
189352 10/10/09 19:07 W. Luo COREECTION:For run=76224 visual scaler - good format
189351 10/10/09 19:07 W. Luo COREECTION:For run=76224 visual scaler
189350 10/10/09 18:58 frw Beam: no beam
189349 10/10/09 18:48 cdaq End of Run 76225:
189348 10/10/09 18:33 vmaxwell histograms runs 76222 -24
189347 10/10/09 18:19 W. Luo Current 31.4 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76225)
189346 10/10/09 18:14 cdaq Run 76225: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189345 10/10/09 18:12 cdaq End of Run 76224:
189344 10/10/09 17:55 W. Luo Current 31.4 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76224)
189343 10/10/09 17:46 cdaq E02017 Run 1299: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189342 10/10/09 17:45 W. Luo Refill fission chamber gas at 17:44. Pressure read back: 3.23
189341 10/10/09 17:35 cdaq Run 76224: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189340 10/10/09 17:31 cdaq E02017 End of Run 1298:
189339 10/10/09 16:19 Nue EDC HV was found turned off
189338 10/10/09 16:07 frw Start Swing Shift
189337 10/10/09 15:57 cdaq Beam Time Accounting
189336 10/10/09 15:54 Reinhold Run 76223: Fast Raster pattern ; target seems fine
189335 10/10/09 15:31 cdaq E02017 Run 1298: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189334 10/10/09 15:30 cdaq E02017 End of Run 1297:
189333 10/10/09 15:22 cdaq End of Run 76223:
189332 10/10/09 15:18 Hari Beam: Beam unstable
189331 10/10/09 15:10 yuan Beam current unstable during Run 76222
189330 10/10/09 14:51 cdaq Run 76223: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189329 10/10/09 14:28 Harikhanal Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76122)
189328 10/10/09 14:25 cdaq End of Run 76222:
189327 10/10/09 14:03 chench Fix the bug for hdrift_time calcluation and the codes have been commit, the results from run=76191
189326 10/10/09 13:23 cdaq E02017 Run 1297: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189325 10/10/09 13:23 cdaq E02017 End of Run 1296:
189324 10/10/09 13:15 cdaq Run 76222: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189323 10/10/09 11:59 Garibaldi Problems with magnets control
189322 10/10/09 11:55 Garibaldi Problems with magnets control
189321 10/10/09 11:24 Harikhanal Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76221)
189320 10/10/09 10:55 cdaq E02017 Run 1296: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189319 10/10/09 10:51 cdaq Run 76221: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189318 10/10/09 10:49 cdaq End of Run 76220:
189317 10/10/09 10:46 cdaq E02017 End of Run 1295:
189316 10/10/09 10:30 Harikhanal Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76220)
189315 10/10/09 10:14 cdaq Run 76220: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189314 10/10/09 10:12 cdaq End of Run 76219:
189313 10/10/09 10:01 Harikhanal Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76219)
189312 10/10/09 09:40 cdaq Run 76219: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189311 10/10/09 09:38 cdaq End of Run 76218:
189310 10/10/09 09:30 yuan Status and plan (from RC)
189309 10/10/09 09:12 Harikhanal Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76218)
189308 10/10/09 09:04 cdaq Run 76218: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189307 10/10/09 09:02 cdaq End of Run 76217:
189306 10/10/09 08:49 cdaq E02017 Run 1295: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189305 10/10/09 08:48 cdaq E02017 End of Run 1294:
189304 10/10/09 08:45 Harikhanal Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76217)
189303 10/10/09 08:30 cdaq Run 76217: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189302 10/10/09 08:28 cdaq End of Run 76216:
189301 10/10/09 08:04 cdaq Beam Time Accounting
189300 10/10/09 08:04 Arshak Owl Shift Summary
189299 10/10/09 08:02 Harikhanal Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76216)
189298 10/10/09 07:51 cdaq Run 76216: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189297 10/10/09 07:49 cdaq End of Run 76215:
189296 10/10/09 07:25 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76215)
189295 10/10/09 07:16 cdaq Run 76215: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189294 10/10/09 07:14 cdaq End of Run 76214:
189293 10/10/09 07:02 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76214)
189292 10/10/09 06:43 cdaq E02017 Run 1294: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 3.01 Torr.
189291 10/10/09 06:35 cdaq Run 76214: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189290 10/10/09 06:34 cdaq End of Run 76213:
189289 10/10/09 06:31 cdaq E02017 End of Run 1293:
189288 10/10/09 06:12 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76213)
189287 10/10/09 05:59 cdaq Run 76213: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189286 10/10/09 05:58 cdaq End of Run 76212:
189285 10/10/09 05:33 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76212)
189283 10/10/09 05:22 cdaq Run 76212: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189282 10/10/09 05:21 cdaq End of Run 76211:
189281 10/10/09 05:05 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76211)
189280 10/10/09 04:51 cdaq Run 76211: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189279 10/10/09 04:49 cdaq End of Run 76210:
189278 10/10/09 04:40 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76210)
189277 10/10/09 04:38 cdaq E02017 Run 1293: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189276 10/10/09 04:24 cdaq E02017 End of Run 1292:
189275 10/10/09 04:15 cdaq Run 76210: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189274 10/10/09 04:13 cdaq End of Run 76209:
189273 10/10/09 04:02 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76209)
189272 10/10/09 03:42 Arshak Energy spread
189271 10/10/09 03:40 cdaq E02017 Run 1292: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 3.65Torr.
189270 10/10/09 03:40 cdaq Run 76209: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189269 10/10/09 03:37 cdaq E02017 End of Run 1291:
189268 10/10/09 03:19 cdaq E02017 Run 1291: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189267 10/10/09 03:08 Arshak Beam Spread problem,
189266 10/10/09 03:00 cdaq E02017 End of Run 1290:
189265 10/10/09 02:59 cdaq End of Run 76208:
189264 10/10/09 02:55 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76208)
189263 10/10/09 02:45 cdaq Run 76208: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189262 10/10/09 02:44 cdaq End of Run 76207:
189261 10/10/09 02:33 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76207)
189260 10/10/09 02:24 cdaq E02017 Run 1290: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189259 10/10/09 02:11 cdaq E02017 End of Run 1289:
189258 10/10/09 02:11 cdaq Run 76207: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189257 10/10/09 02:09 cdaq End of Run 76206:
189256 10/10/09 01:58 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Energy Spread (Run # 76206)
189255 10/10/09 01:40 cdaq Run 76206: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189254 10/10/09 01:40 Arshak HKS/HES DC HV
189253 10/10/09 01:38 Arshak HKS/HES DC HV
189252 10/10/09 01:36 cdaq End of Run 76205:
189251 10/10/09 01:32 Arshak Beam Position
189250 10/10/09 01:18 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Enerhy Spread (Run # 76205)
189249 10/10/09 01:05 Petkovic Current 35 uA on 7Li Visual Scalers --> Beam Enerhy Spread (Run # 76204)
189248 10/10/09 01:03 cdaq Run 76205: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189247 10/10/09 01:01 cdaq End of Run 76204:
189246 10/10/09 00:14 cdaq E02017 Run 1289: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189245 10/10/09 00:14 cdaq Run 76204: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189244 10/10/09 00:12 cdaq End of Run 76203:
189243 10/10/09 00:03 cdaq E02017 End of Run 1288:
189242 10/10/09 00:02 cdaq Beam Time Accounting
Friday
189241 10/09/09 23:32 cdaq Run 76203: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189240 10/09/09 23:04 Nue G&D gen for Visual scaler broken
189239 10/09/09 22:45 cdaq Run 76202: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189238 10/09/09 22:44 cdaq End of Run 76201:
189237 10/09/09 22:39 kawama Reverted h_trans_dc.f
189236 10/09/09 22:11 cdaq Run 76201: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189235 10/09/09 22:09 cdaq End of Run 76200:
189234 10/09/09 22:02 kawama rerun ./copymaker
189233 10/09/09 21:58 cdaq E02017 Run 1288: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 2.95Torr.
189232 10/09/09 21:56 Reinhold SVN Revison 245 broken
189231 10/09/09 21:46 cdaq E02017 End of Run 1287:
189230 10/09/09 21:37 cdaq Run 76200: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189229 10/09/09 21:35 cdaq End of Run 76199:
189228 10/09/09 21:31 yuan Plan for rest of the evening and owl shift
189227 10/09/09 21:03 cdaq Run 76199: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189226 10/09/09 21:02 cdaq End of Run 76198:
189225 10/09/09 20:55 Simon 35 uA on Li7 target Visual Scalers (Run#76198)
189224 10/09/09 20:55 Simon 35 uA on Li7 target Visual Scalers (Run#76198)
189223 10/09/09 20:28 cdaq Run 76198: 2344 MeV,Buffered, 7Li target@ 35uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189222 10/09/09 20:18 Reinhold Run #76197: Fast raster for 35 uA; target still seems fine
189221 10/09/09 20:09 Nue Current is 35uA for Run 76197
189220 10/09/09 19:55 Simon 30 uA on Li7 target Visual Scalers (Run#76197)
189219 10/09/09 19:50 cdaq E02017 Run 1287: Run with beam current 35uA, 2344MeV, 7Li target,with pressure 3.03Torr.
189218 10/09/09 19:48 cdaq Run 76197: 2344 MeV,Buffered, 7Li target@ 30uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189217 10/09/09 19:46 cdaq E02017 End of Run 1286:
189216 10/09/09 19:46 cdaq End of Run 76196:
189215 10/09/09 19:42 Simon 30 uA on Li7 target Visual Scalers (Run#76194)
189214 10/09/09 19:40 cdaq E02017 Run 1286: Run with beam current 30uA, 2344MeV, 7Li target,with pressure 2.93Torr.
189213 10/09/09 19:39 Reinhold Run #76196: Fast raster pattern at 30 uA
189212 10/09/09 19:38 Simon 20 uA on Li7 target Visual Scalers (Run#76194)
189211 10/09/09 19:35 Simon 10 uA on Li7 target Visual Scalers (Run#76193)
189210 10/09/09 19:28 cdaq E02017 End of Run 1285:
189209 10/09/09 19:28 cdaq Run 76196: 2344 MeV,Buffered, 7Li target@ 30uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189208 10/09/09 19:27 shoh ion chamber snapshot
189207 10/09/09 19:26 cdaq End of Run 76195:
189206 10/09/09 19:23 cdaq Run 76195: 2344 MeV,Buffered, 7Li target@ 30uA current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189205 10/09/09 19:23 Reinhold Run #76194: FR patern at 20 uA
189204 10/09/09 19:20 cdaq End of Run 76194:
189203 10/09/09 19:15 cdaq Run 76194: 2344 MeV,Buffered, 7Li target@ Variable current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189202 10/09/09 19:14 cdaq End of Run 76193:
189201 10/09/09 19:10 shoh The ratio of kaon for hardware cut
189200 10/09/09 19:02 Reinhold Run #76193: FR is ON and in data file
189199 10/09/09 18:46 chench HKS drift chamber efficiency for run=76191
189198 10/09/09 18:37 cdaq E02017 Run 1285: Run with beam current Variable current, 2344MeV, 7Li target,with pressure 3.66Torr.
189197 10/09/09 18:33 cdaq Run 76193: 2344 MeV,Buffered, 7Li target@ Variable current beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189196 10/09/09 18:29 cdaq E02017 End of Run 1284:
189195 10/09/09 18:29 cdaq End of Run 76192:
189194 10/09/09 18:24 cdaq Run 76192: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189193 10/09/09 18:23 cdaq End of Run 76191:
189192 10/09/09 18:10 vmaxwell 45 uA on B10 target Visual Scalers (Run # 76191)
189191 10/09/09 18:06 chench Drift Chamber HV for run=76191 beam current=45uA and Boron=10
189190 10/09/09 17:55 Reinhold Re: Adjust the current of the bucking coil for lucite! (this is like pulling teeth ;-)
189189 10/09/09 17:47 Simon Beam is back, 45 uA
189188 10/09/09 17:39 cdaq E02017 Run 1284: Run with beam current 45uA, 2344MeV, Boron target,with pressure 3.17Torr.
189187 10/09/09 17:39 cdaq Run 76191: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189186 10/09/09 17:33 cdaq E02017 End of Run 1283:
189185 10/09/09 17:12 cdaq E02017 Run 1283: Run with no beam
189184 10/09/09 17:00 cdaq E02017 End of Run 1282:
189183 10/09/09 16:01 cdaq Beam Time Accounting
189182 10/09/09 16:00 Nue KD NMR in data stream
189181 10/09/09 16:00 Petkovic Beam: Beam current expectation - for the Swing Shift
189180 10/09/09 15:51 De Leo/Petko Shift Summary (8:00 - 16:00) on 10B with 45 uA
189179 10/09/09 15:46 chench Adjust the current of the bucking coil for lucite!
189178 10/09/09 15:01 cdaq E02017 Run 1282: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr. NO BEAM RUN.
189177 10/09/09 14:48 cdaq E02017 End of Run 1281:
189176 10/09/09 12:24 cdaq E02017 Run 1281: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr. Start with NO BEAM.
189175 10/09/09 12:13 cdaq E02017 End of Run 1280:
189174 10/09/09 11:53 Petkovic Beam: Controlled Access Mode - Hall C (11:50)
189173 10/09/09 11:36 De Leo/Petko No beam
189172 10/09/09 11:32 cdaq End of Run 76190:
189171 10/09/09 10:50 Nue Or make y'(EDC1) vs y'(matrix)?
189170 10/09/09 10:45 Gogami Beam: To open windows of BPM and BCM
189169 10/09/09 10:43 Nue Could you make y'(EDC1) vs y'(EDC2) plot?
189168 10/09/09 10:27 yuan PD called, beam will be unstable for the next two hours
189167 10/09/09 10:24 cdaq E02017 Run 1280: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
189166 10/09/09 10:16 De Leo/Petko Current 45 uA on B10 VISUAL SCALERS --> Beam Energy Spread (Run # 76190)
189165 10/09/09 10:10 Petkovic DAQ - CODA Rebooted, Run # 76189
189164 10/09/09 10:06 Gogami BPM screen shot[Boron@45uA/Run76190]
189163 10/09/09 10:00 cdaq Run 76190: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189162 10/09/09 09:57 cdaq E02017 End of Run 1279:
189161 10/09/09 09:46 Gogami DCs HV screen shot[Boron@45uA/Run76189]
189160 10/09/09 09:40 cdaq Run 76189: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189159 10/09/09 09:38 yuan Status and plan (from RC)
189158 10/09/09 09:33 Gogami Hist Check[Run76188] ==> looks good
189157 10/09/09 09:33 yuan Another half an hour before beam come back
189156 10/09/09 09:29 Gogami Analysis: Changed Run flag in REPLAY.PARAM @cdaql5
189155 10/09/09 09:07 cdaq End of Run 76188:
189154 10/09/09 09:06 Raffaele De Beam: Beam Off
189153 10/09/09 08:59 De Leo/Petko Current 45 uA on 10B VISUAL SCALERS --> Beam Energy Spread (76188)
189152 10/09/09 08:48 kawama About HES y' issue
189151 10/09/09 08:47 cdaq Run 76188: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189150 10/09/09 08:38 cdaq End of Run 76187:
189149 10/09/09 08:32 De Leo/Petko Current 45 uA on 10B VISUAL SCALERS --> Beam Energy Spread (76187)
189148 10/09/09 08:15 Reinhold Aerogel bucking coils
189147 10/09/09 08:08 Reinhold Hall want to control access and back to beam permit: What was the lucite bucking coil adjustment?
189146 10/09/09 08:01 Mostafa Elaa Shift summary
189145 10/09/09 08:01 cdaq Beam Time Accounting
189144 10/09/09 07:58 cdaq E02017 Run 1279: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
189143 10/09/09 07:49 cdaq E02017 End of Run 1278:
189142 10/09/09 07:49 cdaq Run 76187: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189141 10/09/09 07:47 cdaq End of Run 76186:
189140 10/09/09 07:18 Hari Khanal Rates for 45 uA on B10 (run # 76186) & histograms
189139 10/09/09 07:05 cdaq Run 76186: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189138 10/09/09 07:03 cdaq End of Run 76185:
189137 10/09/09 06:20 cdaq Run 76185: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189136 10/09/09 06:17 cdaq End of Run 76184:
189135 10/09/09 06:15 Hari Khanal Rates for 45 uA on B10 (run # 76184) & histograms
189134 10/09/09 05:58 mostafa Elaa HKS BPM
189133 10/09/09 05:56 mostafa Elaa HKS BPM
189132 10/09/09 05:49 cdaq E02017 Run 1278: Run with beam current 45uA, 2344MeV, Boron target,with pressure 3.01Torr.
189131 10/09/09 05:48 cdaq E02017 End of Run 1277:
189130 10/09/09 05:36 cdaq Run 76184: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189129 10/09/09 05:34 cdaq End of Run 76183:
189127 10/09/09 05:17 Hari Khanal Rates for 45 uA on B10 (run # 76183) & histograms
189126 10/09/09 05:15 cdaq Run 76183: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189125 10/09/09 05:10 Mostafa Elaa SLI
189124 10/09/09 04:54 Mostafa Elaa SLI
189123 10/09/09 04:54 cdaq End of Run 76182:
189122 10/09/09 04:29 Hari Khanal Rates for 45 uA on B10 (run # 76182) & histograms
189121 10/09/09 04:14 cdaq Run 76182: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189120 10/09/09 04:14 cdaq E02017 Run 1277: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
189119 10/09/09 04:12 cdaq End of Run 76181:
189118 10/09/09 04:11 Reinhold EHODO timing (some issues)
189117 10/09/09 03:45 cdaq E02017 End of Run 1276:
189116 10/09/09 03:43 Hari Khanal Rates for 45 uA on B10 (run # 76181) & histograms
189115 10/09/09 03:33 cdaq Run 76181: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189114 10/09/09 03:31 cdaq End of Run 76180:
189113 10/09/09 02:59 Hari Khanal Rates for 45 uA on B10 (run # 76180) & histograms
189112 10/09/09 02:58 Chiba BPM 02:55
189111 10/09/09 02:52 Chiba SLI monitor 02:50
189110 10/09/09 02:50 Reinhold We don't have yet HES Y-prime tracking correct?
189109 10/09/09 02:44 cdaq Run 76180: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189108 10/09/09 02:43 Chiba SLI monitor 02:40 (more bad one)
189107 10/09/09 02:42 cdaq End of Run 76179:
189106 10/09/09 02:39 Chiba SLI minitor 0235
189105 10/09/09 02:26 Chiba SLI monitor 02:20
189104 10/09/09 02:11 Hari Khanal Rates for 40 uA on B10 (run # 76178) & histograms
189103 10/09/09 02:09 Hari Khanal Rates for 40 uA on B10 (run # 76177) & histograms
189102 10/09/09 02:07 Mostafa Elaa Beam: Current beam status
189101 10/09/09 02:02 cdaq Run 76179: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189100 10/09/09 02:00 Mostafa Elaa Beam: The beam is back 45uA
189099 10/09/09 01:55 Mostafa Elaa Beam: Current beam status
189098 10/09/09 01:55 Mostafa Elaa Beam: Current beam status
189097 10/09/09 01:50 cdaq E02017 Run 1276: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
189096 10/09/09 01:39 cdaq E02017 End of Run 1275:
189095 10/09/09 01:39 Chiba DAQ for Run #76178 was stopped bacause there is no beam for 20 minuits or so
189094 10/09/09 01:38 Hari Khanal Rates for 40 uA on B10 (run # 76177) & histograms
189093 10/09/09 01:36 cdaq End of Run 76178:
189092 10/09/09 01:14 cdaq Run 76178: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189091 10/09/09 01:11 cdaq End of Run 76177:
189090 10/09/09 01:06 Mostafa Elaa Beam: SLI Screen
189089 10/09/09 00:28 cdaq Run 76177: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189088 10/09/09 00:25 cdaq End of Run 76176:
189087 10/09/09 00:02 cdaq Beam Time Accounting
189086 10/09/09 00:00 Abdellah Shift Summary
Thursday
189085 10/08/09 23:43 cdaq E02017 Run 1275: Run with beam current 45uA, 2344MeV, Boron target,with pressure 3.0Torr.
189084 10/08/09 23:38 Arshak Visual Scalers run#76176, after beam back ~45uA
189083 10/08/09 23:33 cdaq Run 76176: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189082 10/08/09 23:31 cdaq E02017 End of Run 1274:
189081 10/08/09 23:10 cdaq E02017 Run 1274: NO beam run, heptan pressure 3.49Torr.
189080 10/08/09 23:08 cdaq E02017 End of Run 1273:
189079 10/08/09 23:08 cdaq End of Run 76175:
189078 10/08/09 22:54 Arshak Visual Scalers run#76175, beam ~45uA, target Borom-10
189077 10/08/09 22:49 cdaq Run 76175: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189076 10/08/09 22:48 cdaq End of Run 76174:
189075 10/08/09 22:35 Nue Analysis: HALLC:p : with graphs
189074 10/08/09 22:31 Nue Analysis: HALLC:p
189073 10/08/09 22:18 Nue 50uA Beam made bright spot on B10
189072 10/08/09 22:16 cdaq E02017 Run 1273: Run with beam current 45uA, 2344MeV, Boron target,with pressure 3.01Torr.
189071 10/08/09 22:10 Gogami modified EHODO param and commited to SVN (revision246)
189070 10/08/09 22:10 Arshak Visual Scalers run#76174, beam ~45uA
189069 10/08/09 22:03 cdaq Run 76174: 2344 MeV,Buffered, Boron target@ 45uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189068 10/08/09 22:02 cdaq E02017 End of Run 1272:
189067 10/08/09 22:02 cdaq End of Run 76173:
189066 10/08/09 21:27 maruta Screen shot of EDC/HDC HV at 40uA
189065 10/08/09 21:26 Arshak Beam Position, with beam current 40uA
189064 10/08/09 21:21 Arshak Visual Scalers run#76173, ~40uA
189063 10/08/09 21:18 cdaq E02017 Run 1272: Run with beam current 40uA, 2344MeV, Boron target,with pressure 3.33Torr.
189062 10/08/09 21:15 cdaq Run 76173: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189061 10/08/09 21:15 Visual Scalers run#76171, after beam back ~50uA
189060 10/08/09 21:13 cdaq End of Run 76172:
189059 10/08/09 21:13 cdaq E02017 End of Run 1271:
189058 10/08/09 21:09 cdaq Run 76172: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189057 10/08/09 21:07 cdaq End of Run 76171:
189056 10/08/09 21:07 cdaq E02017 Run 1271: Run with beam current 50uA, 2344MeV, Boron target,with pressure 3.22Torr.
189055 10/08/09 21:04 cdaq Run 76171: 2344 MeV,Buffered, Boron target@ 50uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189054 10/08/09 21:01 Abdellah Beam is back
189053 10/08/09 20:59 cdaq E02017 End of Run 1270:
189052 10/08/09 20:43 cdaq E02017 Run 1270: Run with NO beam, with heptan pressure 3.01Torr
189051 10/08/09 20:31 cdaq E02017 End of Run 1269:
189050 10/08/09 19:27 Arshak Run #76169, after Beam was back, and was very unstable from 20-40uA current
189049 10/08/09 19:19 shoh The number of lambda (bind & quasi free) at Boron target
189048 10/08/09 19:02 Arshak run#1269 starts with 3.20Torr heptan pressure
189047 10/08/09 19:00 Abdellah Beam off for 30 min
189046 10/08/09 18:59 Chench Is the run=76169 after beam back?
189045 10/08/09 18:59 cdaq E02017 Run 1269: Run with NO beam
189044 10/08/09 18:57 cdaq E02017 End of Run 1268:
189043 10/08/09 18:57 cdaq End of Run 76170:
189042 10/08/09 18:54 Arshak Beam Position, with beam current 40uA
189041 10/08/09 18:47 cdaq Run 76170: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189040 10/08/09 18:47 cdaq E02017 Run 1268: Run with beam current 40uA, 2344MeV, 10-Boron target,with pressure 3.11Torr.
189039 10/08/09 18:46 cdaq End of Run 76169:
189038 10/08/09 18:46 cdaq E02017 End of Run 1267:
189037 10/08/09 18:45 Arshak Visual Scalers run#76189, after beam back ~38uA
189036 10/08/09 18:33 cdaq E02017 Run 1267: Run with unstable beam
189035 10/08/09 18:32 cdaq Run 76169: run with unstabile Beam
189034 10/08/09 18:11 Abdellah Beam is back
189033 10/08/09 18:08 cdaq E02017 End of Run 1266:
189032 10/08/09 17:10 cdaq E02017 Run 1266: No beam run, with pressure 3.0 Torr.
189031 10/08/09 16:59 cdaq E02017 End of Run 1265:
189030 10/08/09 16:11 cdaq Beam Time Accounting
189029 10/08/09 16:01 Garibaldi/Pe Shift Summary (8:00 - 16:00)
189028 10/08/09 15:18 chench HV of drift chambers after no beam for around 70minutes
189027 10/08/09 15:09 T. Petkovic Beam: Injector Problem_Beam Expectation to Hall C
189026 10/08/09 14:58 cdaq E02017 Run 1265: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr. NO Beam Run.
189025 10/08/09 14:46 cdaq E02017 End of Run 1264:
189024 10/08/09 14:44 Nue Hall want to control access and back to beam permit
189023 10/08/09 13:40 F. Garbaldi Beam: Poblem with injector
189022 10/08/09 13:38 cdaq End of Run 76168:
189021 10/08/09 13:24 cdaq Run 76168: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189020 10/08/09 13:22 cdaq End of Run 76167:
189019 10/08/09 13:00 Garibaldi/Pe Current 40 uA on 10 B Visual Scalers --> Beam Energy Spread (Run # 76167)
189018 10/08/09 12:55 Petkovic BPM for th 40 microamps
189017 10/08/09 12:45 cdaq Run 76167: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189016 10/08/09 12:44 cdaq End of Run 76166:
189015 10/08/09 12:36 cdaq E02017 Run 1264: Run with beam current 30uA, 2344MeV, Boron target,with pressure 2.98Torr.
189014 10/08/09 12:32 Nue Beam current is limited to 30uA due to frequent trip in injector
189013 10/08/09 12:29 Garibaldi/Pe Current 30 uA on 10 B Visual Scalers --> Beam Energy Spread (Run # 76166)
189012 10/08/09 12:16 cdaq E02017 End of Run 1263:
189011 10/08/09 11:31 kawama Compare measured field map with TOSCA
189010 10/08/09 11:16 cdaq Run 76166: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
189009 10/08/09 11:15 cdaq E02017 Run 1263: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr. Previous run was non beam run.
189008 10/08/09 11:14 cdaq E02017 End of Run 1262:
189007 10/08/09 10:12 cdaq E02017 Run 1262: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr. Data with no beam!
189006 10/08/09 10:03 maruta Status (RC report)
189005 10/08/09 09:59 cdaq E02017 End of Run 1261:
189004 10/08/09 09:49 cdaq End of Run 76165:
189003 10/08/09 09:46 Garibaldi/Pe Current 40 uA on 10 B Visual Scalers --> Beam Energy Spread (Run # 76165)
189002 10/08/09 09:32 Nue Shift takes! Please check and record visual scalers
189001 10/08/09 09:30 cdaq E02017 Run 1261: Run with beam current 40uA, 2344MeV, Boron target,with pressure 3.77Torr.
189000 10/08/09 09:28 cdaq E02017 End of Run 1260:
188999 10/08/09 08:27 cdaq E02017 Run 1260: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
188998 10/08/09 08:06 cdaq E02017 End of Run 1259:
188997 10/08/09 08:01 Mostafa Elaa Shift summary
188996 10/08/09 08:01 cdaq Beam Time Accounting
188995 10/08/09 07:37 cdaq Run 76165: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188994 10/08/09 07:32 dalton Drift chamber snap shot
188993 10/08/09 07:31 cdaq End of Run 76164:
188992 10/08/09 07:25 Mostafa Elaa Beam: The beam is unstable
188991 10/08/09 07:05 Mostafa Elaa The Beam is back at 5:50 Am
188990 10/08/09 06:55 Mostafa Elaa The Beam is back at 5:50 Am
188989 10/08/09 06:38 cdaq Run 76164: 2344 MeV,Buffered, Boron target@ 42uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188988 10/08/09 06:22 cdaq End of Run 76163:
188987 10/08/09 06:02 Reinhold SVN COMMIT: fixed a lucite bug, pedestal bug, add pedestal histos
188986 10/08/09 05:55 cdaq E02017 Run 1259: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
188985 10/08/09 05:51 cdaq Run 76163: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188984 10/08/09 05:43 cdaq E02017 End of Run 1258:
188982 10/08/09 03:52 cdaq E02017 Run 1258: Run with beam current 0uA, 0MeV, Boron target,with pressure 3.18Torr.
188981 10/08/09 03:40 cdaq E02017 End of Run 1257:
188980 10/08/09 02:19 dalton Fission gas refill
188979 10/08/09 01:50 cdaq E02017 Run 1257: Run with beam current 0uA, 0MeV, Boron target,with pressure 3.10Torr.
188978 10/08/09 01:37 cdaq E02017 End of Run 1256:
188977 10/08/09 00:51 cdaq Beam Time Accounting
188976 10/08/09 00:28 Reinhold Re: strange cut of HKS forcal plane x v.s. x'
Wednesday
188975 10/07/09 23:57 Nue Tonight Run Plan
188974 10/07/09 23:51 Abdellah Swing shift summary
188973 10/07/09 23:51 Abdellah Swing shift summary
188972 10/07/09 23:50 Abdellah Swing shift summary
188971 10/07/09 23:44 cdaq E02017 Run 1256: Run with no beam
188970 10/07/09 23:43 Abdellah Cryo problem again
188969 10/07/09 23:42 cdaq E02017 End of Run 1255:
188968 10/07/09 23:41 cdaq End of Run 76162:
188967 10/07/09 23:39 vmaxwell Rates for 18.7 uA on B10 (run # 76162) & histograms
188966 10/07/09 23:24 Nue B10's current limit was 20uA
188964 10/07/09 23:12 Nue BCM calibration was finished. B10 target is in
188963 10/07/09 23:11 cdaq E02017 Run 1255: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.93Torr.
188962 10/07/09 23:10 abdellah back to 10Br target
188961 10/07/09 23:10 cdaq Run 76162: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188960 10/07/09 23:08 abdellah BCM Calib. completed
188959 10/07/09 23:06 cdaq End of Run 76161:
188958 10/07/09 22:59 cdaq Run 76161: 2344 MeV,Buffered, Empty target@ 50uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188957 10/07/09 22:59 cdaq E02017 End of Run 1254:
188956 10/07/09 22:58 cdaq End of Run 76160:
188955 10/07/09 22:39 cdaq E02017 Run 1254: Run with beam current 2-25uA, 2344MeV, Carbon target,with pressure 3.65Torr.
188954 10/07/09 22:37 cdaq Run 76160: 2344 MeV,Buffered, Carbon target@ 2 - 25uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188953 10/07/09 22:36 cdaq E02017 End of Run 1253:
188952 10/07/09 22:35 cdaq End of Run 76159:
188951 10/07/09 22:32 cdaq E02017 Run 1253: Run with beam current 25-50uA, 2344MeV, Empty target,with pressure 3.62Torr.
188950 10/07/09 22:29 cdaq Run 76159: 2344 MeV,Buffered, Empty target@ 25-50uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188949 10/07/09 22:29 cdaq E02017 End of Run 1252:
188948 10/07/09 22:27 cdaq End of Run 76158:
188947 10/07/09 22:19 cdaq E02017 Run 1252: Run with beam variable current, 2344MeV, Boron target,with pressure 3.5Torr.
188946 10/07/09 22:09 Abdellah BCM calibration
188945 10/07/09 22:05 cdaq Run 76158: BCM calibration, Carbon target
188944 10/07/09 22:03 Nue Carbon target in, BCM calibration will start
188943 10/07/09 22:01 cdaq End of Run 76157:
188942 10/07/09 21:58 cdaq Run 76157: 2344 MeV,Buffered, Empty target@ 45-50uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188941 10/07/09 21:52 cdaq E02017 End of Run 1251:
188940 10/07/09 21:50 shoh strange cut of HKS forcal plane x v.s. x'
188939 10/07/09 21:49 Reinhold Re: Almost the same quasi-free yield from B10 as that from C12
188938 10/07/09 21:17 cdaq E02017 Run 1251: Run with no beam
188937 10/07/09 21:06 cdaq E02017 End of Run 1250:
188936 10/07/09 21:03 Tang Almost the same quasi-free yield from B10 as that from C12
188935 10/07/09 19:49 Tang Coincident kaons, not Lambda peak
188934 10/07/09 19:07 shoh Boron study (kaon rate, cointime and so on)
188933 10/07/09 18:54 cdaq E02017 Run 1250: Run with no beam
188932 10/07/09 18:43 cdaq E02017 End of Run 1249:
188931 10/07/09 18:24 Abdellah Beam status
188930 10/07/09 18:20 Zhihong Ye Analysis: The RF signals are from channel 1 and channel 2,
188929 10/07/09 17:46 Reinhold SVN COMMIT: added BPM and FR ADC to most recent MAP; define BPM and FR histos in CTP
188928 10/07/09 17:43 Reinhold GMISC definition conflicts
188927 10/07/09 17:39 Tang It is natural to have lower kaon rate in high momentum side in coin_time spectrum
188926 10/07/09 17:38 Nue Beam stopped due to Cryo alam in Linac
188925 10/07/09 17:29 shoh HTOF1X-13 revival
188924 10/07/09 17:28 cdaq E02017 Run 1249: Run with no beam
188923 10/07/09 17:27 Nue Target empty
188922 10/07/09 17:27 cdaq E02017 End of Run 1248:
188921 10/07/09 17:27 cdaq End of Run 76156:
188920 10/07/09 17:10 shoh cointime peak before and after changing collimetor
188919 10/07/09 17:07 cdaq E02017 Run 1248: Run with beam current variable current, 2344MeV, Carbom target,with pressure 3.2Torr.
188918 10/07/09 17:06 cdaq Run 76156: 2344 MeV,Buffered, Carbon target@ variable curent beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188917 10/07/09 16:44 abdellah run 76155 stopped
188916 10/07/09 16:41 Nue B10 was removed, put Carbon for BCM calibration
188915 10/07/09 16:38 cdaq E02017 End of Run 1247:
188914 10/07/09 16:38 cdaq End of Run 76155:
188913 10/07/09 16:36 cdaq E02017 Run 1247: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.92Torr.
188911 10/07/09 16:24 cdaq E02017 End of Run 1246:
188910 10/07/09 16:20 cdaq Run 76155: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188909 10/07/09 16:19 cdaq End of Run 76154:
188908 10/07/09 16:07 Petkovic Shift Summary (8:00 - 16:00) on 10B target
188907 10/07/09 16:01 cdaq Beam Time Accounting
188906 10/07/09 15:53 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76154)
188905 10/07/09 15:41 cdaq Run 76154: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188904 10/07/09 15:39 cdaq End of Run 76153:
188903 10/07/09 15:20 shoh commit new hhodo.param file
188902 10/07/09 15:19 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76153)
188901 10/07/09 15:18 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76152)
188900 10/07/09 15:11 Petkovic/Kha Erata in Run # 76151 and 76151 w.r.t. log Entries
188899 10/07/09 15:03 cdaq Run 76153: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188898 10/07/09 15:01 cdaq End of Run 76152:
188897 10/07/09 14:42 Petkovic Entry 188896 corresponds to Run # 76160
188896 10/07/09 14:32 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76149)
188895 10/07/09 14:26 cdaq Run 76152: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188894 10/07/09 14:26 cdaq E02017 Run 1246: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
188893 10/07/09 14:24 cdaq End of Run 76151:
188892 10/07/09 14:17 cdaq E02017 End of Run 1245:
188891 10/07/09 13:49 cdaq Run 76151: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188890 10/07/09 13:48 cdaq End of Run 76150:
188889 10/07/09 13:38 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76149)
188888 10/07/09 13:14 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76149)
188887 10/07/09 13:12 cdaq Run 76150: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188886 10/07/09 13:10 cdaq End of Run 76149:
188885 10/07/09 12:35 cdaq E02017 Run 1245: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
188884 10/07/09 12:35 cdaq Run 76149: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188883 10/07/09 12:34 cdaq End of Run 76148:
188882 10/07/09 12:16 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76148)
188881 10/07/09 12:15 cdaq E02017 End of Run 1244:
188880 10/07/09 12:15 Tang The shift is on HES side
188879 10/07/09 11:52 cdaq Run 76148: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188878 10/07/09 11:51 cdaq End of Run 76147:
188877 10/07/09 11:30 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76147)
188876 10/07/09 11:15 cdaq Run 76147: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188875 10/07/09 11:13 cdaq End of Run 76146:
188874 10/07/09 11:11 mack unaccounted for saturation in the field integral?
188873 10/07/09 10:36 cdaq Run 76146: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188872 10/07/09 10:34 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76146)
188871 10/07/09 10:25 cdaq End of Run 76145:
188870 10/07/09 10:09 cdaq E02017 Run 1244: Run with beam current 39.5uA, 2344MeV, Boron target,with pressure 2.95Torr.
188869 10/07/09 10:06 cdaq Run 76145: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188868 10/07/09 10:03 kawama The problem of missing mass
188867 10/07/09 09:54 cdaq Run 76145: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188866 10/07/09 09:53 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76145)
188865 10/07/09 09:45 cdaq End of Run 76144:
188864 10/07/09 09:21 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76144)
188863 10/07/09 09:06 cdaq E02017 End of Run 1243:
188862 10/07/09 09:03 Khanal/Petko Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76143)
188861 10/07/09 08:58 cdaq End of Run 76143:
188860 10/07/09 08:43 cdaq Run 76143: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188859 10/07/09 08:35 Petkovic Current 40 uA on 10B --> Visual Scalers & Beam Energy Spread (Run # 76142)
188858 10/07/09 08:22 cdaq Run 76142: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188857 10/07/09 08:20 cdaq End of Run 76141:
188856 10/07/09 08:02 mostafa_elaa Shift summary
188855 10/07/09 08:01 mostafa_elaa Shift summary
188854 10/07/09 08:01 cdaq Beam Time Accounting
188853 10/07/09 07:57 kawama I'm so sorry ... This is my mistake
188852 10/07/09 07:51 Nuruzzaman Restarted HKS CODA three times during the OWL shift
188851 10/07/09 07:44 kenyon Helium bottles
188850 10/07/09 07:41 Nuruzzaman Beam Position Snap
188849 10/07/09 07:40 cdaq Run 76141: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188848 10/07/09 07:39 cdaq End of Run 76140:
188847 10/07/09 07:08 cdaq E02017 Run 1243: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.76Torr.
188846 10/07/09 07:05 cdaq E02017 End of Run 1242:
188845 10/07/09 06:58 cdaq Run 76140: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188844 10/07/09 06:57 cdaq End of Run 76139:
188843 10/07/09 06:17 cdaq Run 76139: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188842 10/07/09 06:05 cdaq End of Run 76138:
188841 10/07/09 06:03 kawama Modified HKS reconstruction matrix
188840 10/07/09 05:39 Nuruzzaman Beam Position Snap
188839 10/07/09 05:35 cdaq Run 76138: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188838 10/07/09 05:33 cdaq End of Run 76137:
188836 10/07/09 04:53 cdaq Run 76137: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188835 10/07/09 04:51 cdaq End of Run 76136:
188834 10/07/09 04:49 cdaq E02017 Run 1242: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.63Torr.
188833 10/07/09 04:46 cdaq E02017 End of Run 1241:
188832 10/07/09 04:27 cdaq Run 76136: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188831 10/07/09 04:12 cdaq End of Run 76135:
188830 10/07/09 03:34 cdaq Run 76135: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188829 10/07/09 03:31 cdaq End of Run 76134:
188828 10/07/09 02:49 cdaq Run 76134: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188827 10/07/09 02:46 cdaq End of Run 76133:
188826 10/07/09 02:42 cdaq Run 76133: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188825 10/07/09 02:41 cdaq End of Run 76132:
188824 10/07/09 02:37 Gogami EHODO raw hitpattern of some run
188823 10/07/09 02:23 shoh new hhodo.param, HTOF1X13 fixed
188822 10/07/09 02:15 Nuruzzaman Beam Position Snap
188821 10/07/09 02:12 Reinhold GMISC definition conflicts
188820 10/07/09 02:05 cdaq Run 76132: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188819 10/07/09 02:04 cdaq End of Run 76131:
188818 10/07/09 01:44 cdaq E02017 Run 1241: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.51Torr.
188817 10/07/09 01:40 cdaq E02017 End of Run 1240:
188816 10/07/09 01:31 cdaq Run 76131: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188815 10/07/09 01:26 cdaq End of Run 76130:
188814 10/07/09 01:03 Gogami [HES momentum gap caused by EHODO17] ==> EHODO hitpat(coin ntuple) ==>correct histogram
188813 10/07/09 01:00 [HES momentum gap caused by EHODO17] ==> EHODO hitpat(coin ntuple)
188812 10/07/09 00:46 cdaq Run 76130: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188811 10/07/09 00:44 cdaq End of Run 76129:
188810 10/07/09 00:42 Gogami HES momentum gap caused by EHODO17
188809 10/07/09 00:41 Nuruzzaman Rates 10B @ 40uA [Run76129]
188808 10/07/09 00:12 Nuruzzaman Beam Position Snap
188807 10/07/09 00:10 Mostafa Elaa fission chamber was off
188806 10/07/09 00:07 cdaq E02017 Run 1240: Run with beam current 40uA, 2344MeV, Boron target,with pressure 3.57Torr.
188805 10/07/09 00:06 cdaq E02017 End of Run 1239:
188804 10/07/09 00:04 cdaq Run 76129: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
Tuesday
188803 10/06/09 23:58 cdaq End of Run 76128:
188802 10/06/09 23:48 hubt shift summary 10/06 swing
188801 10/06/09 23:37 Reinhold HHodo Timing offsets (again with better figure)
188800 10/06/09 23:36 Reinhold HHodo Timing offsets
188799 10/06/09 23:32 cdaq Run 76128: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188798 10/06/09 23:21 cdaq End of Run 76127:
188797 10/06/09 23:10 cdaq E02017 Run 1239: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
188796 10/06/09 23:05 cdaq E02017 End of Run 1238:
188795 10/06/09 23:00 Nue Target is B10, not B11
188794 10/06/09 22:42 cdaq Run 76127: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188793 10/06/09 22:39 cdaq End of Run 76126:
188792 10/06/09 22:31 saw CODA errors
188791 10/06/09 22:13 vmaxwell errors during run # 76124
188790 10/06/09 22:02 cdaq Run 76126: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188789 10/06/09 22:00 cdaq End of Run 76125:
188788 10/06/09 21:23 cdaq Run 76125: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188787 10/06/09 21:14 cdaq E02017 Run 1238: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
188786 10/06/09 21:09 cdaq E02017 End of Run 1237:
188785 10/06/09 20:57 vmaxwell histograms run # 76124
188784 10/06/09 20:50 Gogami Rates 11B @ 40uA [Run76124]
188783 10/06/09 20:44 Gogami Ion chamber and Raster controller screen shot[11B @ 40uA/Run76124]
188782 10/06/09 20:42 Gogami DCs HV screen shot[boron@40uA/Run76124]
188781 10/06/09 20:36 cdaq E02017 Run 1237: Run with beam current 40uA, 2344MeV, Boron target,with pressure 2.98Torr.
188780 10/06/09 20:35 cdaq E02017 End of Run 1236:
188779 10/06/09 20:32 cdaq Run 76124: 2344 MeV,Buffered, Boron target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188778 10/06/09 20:19 Hari Beam: Mcc rebooting ISO -20
188777 10/06/09 20:11 Nue Rates 35uA on B without raster
188776 10/06/09 20:09 cdaq End of Run 76123:
188775 10/06/09 20:03 vmaxwell noticed both helium bottles open during gas check
188774 10/06/09 19:43 Gogami [Ion chamber and fast raster controls] screen shot
188773 10/06/09 19:42 Nue Rates for 35uA on B10, 1x1 FR
188772 10/06/09 19:41 cdaq E02017 Run 1236: Run with beam current 35uA, 2344MeV, Boron target,with pressure 2.98Torr.
188771 10/06/09 19:40 cdaq Run 76123: 2344 MeV,Buffered, Boron target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188770 10/06/09 19:39 cdaq E02017 End of Run 1235:
188769 10/06/09 19:39 cdaq End of Run 76122:
188768 10/06/09 19:34 cdaq E02017 Run 1235: Run with beam current 35uA, 2344MeV, Boron target,with pressure 2.98Torr. fast raster 1x1
188767 10/06/09 19:33 cdaq Run 76122: 2344 MeV,Buffered, Boron target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188766 10/06/09 19:33 cdaq E02017 End of Run 1234:
188765 10/06/09 19:32 cdaq End of Run 76121:
188764 10/06/09 19:31 Nue Rate 30uA on B10, raster 1x1, Ion Chamber
188763 10/06/09 19:27 Tang About 20 MeV/c shift - possibly due to HES X shift
188762 10/06/09 19:25 cdaq Run 76121: 2344 MeV,Buffered, Boron target@ 30uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188761 10/06/09 19:20 cdaq E02017 Run 1234: Run with beam current 30uA, 2344MeV, C target,with pressure 2.98Torr. fast raster 1x1
188760 10/06/09 19:17 vmaxwell info incorrect for run # 1231 due to callibrations occuring throughout run time
188759 10/06/09 19:17 Nue Scaler B10, 5uA 1x1 FR
188758 10/06/09 19:17 cdaq Run 76120: 2344 MeV,Buffered, Boron target@ 30uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188757 10/06/09 19:16 cdaq E02017 End of Run 1233:
188756 10/06/09 19:16 cdaq End of Run 76119:
188755 10/06/09 19:15 yuan No TOF beta cut in current HKS TOF code
188754 10/06/09 19:15 cdaq E02017 Run 1233: Run with beam current 5uA, 2344MeV, B10 target,with pressure 2.98Torr. fast raster 1x1
188753 10/06/09 19:12 cdaq E02017 Run 1232: junk
188752 10/06/09 19:11 cdaq E02017 End of Run 1232:
188751 10/06/09 19:11 Nue Ion Chamber for Boron10, 5uA raster 1x1
188750 10/06/09 19:10 Nue Ion Chamber for Boron10, 5uA raster 1x1
188749 10/06/09 19:10 cdaq E02017 End of Run 1231:
188748 10/06/09 19:06 cdaq Run 76119: 2344 MeV,Buffered, Boron target@ 5.6uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188747 10/06/09 19:02 cdaq End of Run 76118:
188746 10/06/09 19:01 cdaq Run 76118: 2344 MeV,Buffered, BeO target@ 2 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188745 10/06/09 19:00 shoh kaon momentum distrubution for HES v.s. HKS
188744 10/06/09 18:58 Reinhold Run 76118: asked for FRY=1.5 mm FRX=1mm
188743 10/06/09 18:57 Gogami fast raster controls show y-direction extension.But seeing at Beam position at BeO , it seems x-direction extension.
188742 10/06/09 18:53 Reinhold Run 76117: first run with properly recorded fast raster signals
188741 10/06/09 18:52 cdaq End of Run 76117:
188740 10/06/09 18:46 cdaq Run 76117: 2344 MeV,Buffered, BeO target@ 2 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188739 10/06/09 18:44 cdaq End of Run 76116:
188738 10/06/09 18:40 cdaq Run 76116: 2344 MeV,Buffered, BeO target@ 2 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188737 10/06/09 18:37 cdaq End of Run 76115:
188736 10/06/09 18:22 Reinhold Run #76114 (coin) : adjusted Fast Raster amplifier setting during this run
188735 10/06/09 18:22 vmaxwell Rates for 2 uA on BeO
188734 10/06/09 18:21 cdaq Run 76115: 2344 MeV,Buffered, C target@ 40 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188733 10/06/09 18:20 cdaq End of Run 76114:
188732 10/06/09 18:13 Chiba AC npe vs WC npe & WC threshold
188731 10/06/09 18:10 cdaq Run 76114: 2344 MeV,Buffered, C target@ 40 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188730 10/06/09 18:06 cdaq End of Run 76113:
188729 10/06/09 17:47 Gogami fast raster screen shot
188728 10/06/09 17:46 cdaq Run 76113: Fast Raster 1x1 ON
188727 10/06/09 17:34 cdaq E02017 Run 1231: Run with beam current 39.5uA, 2344MeV, C target,with pressure 2.98Torr.
188726 10/06/09 17:30 cdaq End of Run 76112:
188725 10/06/09 17:24 Chiba beta<0.2? particle and HTOF timing
188724 10/06/09 17:21 cdaq E02017 End of Run 1230:
188723 10/06/09 17:05 maruta This run was end with attached screen shot error
188722 10/06/09 17:00 cdaq Run 76112: 2344 MeV,Buffered, C target@ 40 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188721 10/06/09 16:58 histograms run # 76111
188720 10/06/09 16:06 cdaq Run 76111: 2344 MeV,Buffered, C target@ 40 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188719 10/06/09 16:03 Reinhold Re: Lucite ADC problem
188718 10/06/09 16:01 cdaq Beam Time Accounting
188717 10/06/09 16:01 cdaq End of Run 76110:
188716 10/06/09 15:58 Reinhold Re: background rate
188715 10/06/09 15:53 gaskell Day Shift Summary: 10/06/2009
188714 10/06/09 15:48 Reinhold Re: Aerogel over kill?
188713 10/06/09 15:48 Gogami Hist Check[Run76109] no missing channel
188712 10/06/09 15:38 Gaskell/Petk Current 40 uA on 12C --> Visual scalers & Beam Energy Spread (X)
188711 10/06/09 15:37 Zhihong Ye Analysis: By comparing with Geant Simulation, look getting better
188710 10/06/09 15:26 cdaq E02017 Run 1230: Run with beam current 39.5uA, 2344MeV, C target,with pressure 2.98Torr.
188709 10/06/09 15:21 cdaq End of Run 76109:
188708 10/06/09 15:15 cdaq Run 76109: 2344 MeV,Buffered, C target@ 40 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188707 10/06/09 15:12 cdaq E02017 End of Run 1229:
188706 10/06/09 15:02 Gaskell/Petk Current 36 uA on 12C --> Visual scalers & Beam Energy Spread (X)
188705 10/06/09 15:01 Zhihong Ye Analysis: Switch the map of K1X and Lucite, K1X-13 is OK, Lucite ADC problem
188704 10/06/09 14:41 Gaskell/Petk Current 36 uA on 12C --> Visual scalers & Beam Energy Spread (X)
188703 10/06/09 14:19 cdaq End of Run 76108:
188702 10/06/09 14:15 Gogami Theta vs. phi [HES side] with and without y' infomation
188701 10/06/09 14:02 Petkovic Current 36 uA on 12C --> Visual scalers & Beam Energy Spread (X)
188700 10/06/09 13:42 cdaq Run 76108: 2344 MeV,Buffered, C target@ 40 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188699 10/06/09 13:34 cdaq End of Run 76107:
188698 10/06/09 13:30 Petkovic Current 36 uA on 12C --> Visual scalers & Beam Energy Spread (X)
188697 10/06/09 13:08 cdaq E02017 Run 1229: Run with beam current 39.5uA, 2344MeV, C target,with pressure 3.02Torr.
188696 10/06/09 12:56 cdaq E02017 End of Run 1228:
188695 10/06/09 12:52 cdaq Run 76107: 2344 MeV,Buffered, C target@ 40 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188694 10/06/09 12:51 cdaq End of Run 76106:
188693 10/06/09 12:28 Petkovic Current 36 uA on 12C --> Visual scalers
188692 10/06/09 12:25 Tang Your 13 hours may be wrong
188691 10/06/09 12:18 Petkovic Current 36 uA on 12C --> Visual scalers & Beam Energy Spread
188690 10/06/09 12:15 cdaq Run 76106: 2344 MeV,Buffered, C target@ 40 uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188689 10/06/09 12:14 cdaq End of Run 76105:
188688 10/06/09 12:07 cdaq Run 76105: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188687 10/06/09 12:07 maruta Visual Scalar rate at 48uA
188686 10/06/09 12:04 kawama Carbon missing mass status
188685 10/06/09 12:03 gaskell beam back
188684 10/06/09 11:36 shichijo background rate
188683 10/06/09 11:00 Chiba Aerogel over kill?
188682 10/06/09 10:34 cdaq E02017 Run 1228: Run with no beam,with pressure 3.16Torr.
188681 10/06/09 10:29 cdaq E02017 End of Run 1227:
188680 10/06/09 10:24 cdaq E02017 Run 1227: Run no beam, with pressure 3.02Torr.
188679 10/06/09 10:07 cdaq E02017 End of Run 1226:
188678 10/06/09 09:47 gaskell Beam gone for injector work
188677 10/06/09 09:28 gaskell SLI control unit reset
188676 10/06/09 09:28 maruta status (RC report)
188675 10/06/09 09:16 cdaq Run 76104: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188674 10/06/09 09:12 cdaq End of Run 76104:
188673 10/06/09 08:44 Petkovic Current 38 uA on 12C VISUAL SCALERS
188672 10/06/09 08:25 cdaq End of Run 76103:
188671 10/06/09 08:01 Mostafa Elaa Shift Summary
188670 10/06/09 08:01 cdaq Beam Time Accounting
188669 10/06/09 07:57 Mostafa Elaa SLI screen
188668 10/06/09 07:48 cdaq Run 76103: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188667 10/06/09 07:44 cdaq End of Run 76102:
188666 10/06/09 07:24 Nuruzzaman Beam Position Snaps
188665 10/06/09 07:18 cdaq Run 76102: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188664 10/06/09 07:09 cdaq E02017 Run 1226: Run with beam current 35uA, 2344MeV, C target,with pressure 2.56Torr.
188663 10/06/09 07:06 cdaq E02017 End of Run 1225:
188662 10/06/09 06:56 cdaq End of Run 76101:
188661 10/06/09 06:14 cdaq Run 76101: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188660 10/06/09 06:10 cdaq End of Run 76100:
188659 10/06/09 05:41 Picture Horizontal Beam Plane
188658 10/06/09 05:40 Nuruzzaman Beam Position snap
188657 10/06/09 05:34 cdaq Run 76100: 2344 MeV,Buffered, C target@ 36uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188656 10/06/09 05:33 Mostafa Picture Horizontal beam plane
188655 10/06/09 05:31 Mostafa Picture Horizontal beam plane
188654 10/06/09 05:30 cdaq End of Run 76099:
188653 10/06/09 05:09 Mostafa Elaa Horizontal beam plane
188651 10/06/09 04:53 cdaq Run 76099: 2344 MeV,Buffered, C target@ 36uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188650 10/06/09 04:51 cdaq End of Run 76098:
188649 10/06/09 04:49 kawama This may be offset parameter problem
188648 10/06/09 04:44 Nuruzzaman Fission Chamber FFD-C-I alarm
188647 10/06/09 04:33 kawama BCM scaler value
188646 10/06/09 04:18 cdaq E02017 Run 1225: Run with beam current 36.5uA, 2344MeV, C target,with pressure 2.58Torr.
188645 10/06/09 04:13 cdaq E02017 End of Run 1224:
188644 10/06/09 04:11 Reinhold H1X13 puzzle: a software issue? (now hopefully with the figure)
188643 10/06/09 04:11 cdaq Run 76098: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188642 10/06/09 04:09 cdaq End of Run 76097:
188641 10/06/09 04:09 Reinhold H1X13 puzzle: a software issue?
188640 10/06/09 03:44 Nuruzzaman Beam Position Snaps
188639 10/06/09 03:43 kawama Rate with visual scaler w/ carbon, 35uA
188638 10/06/09 03:36 kawama Changed prescale factor
188637 10/06/09 03:32 cdaq Run 76097: 2344 MeV,Buffered, C target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188636 10/06/09 03:18 kawama MCC called; Beam is off about 30 minuites
188635 10/06/09 03:17 cdaq End of Run 76096:
188634 10/06/09 03:12 kawama Beam is unstable during this run
188633 10/06/09 03:08 Chiba From Run 76059- WC threshold is (80=lowp,100=highp)
188632 10/06/09 02:48 cdaq E02017 Run 1224: Run with beam current 20uA, 2344MeV, C target,with pressure 3.38Torr.
188631 10/06/09 02:43 cdaq E02017 End of Run 1223:
188630 10/06/09 02:40 Nuruzzaman Snpas shot of HKS,HES and Fission Chamber
188629 10/06/09 02:37 Nuruzzaman Beam Position snap
188628 10/06/09 02:34 cdaq Run 76096: 2344 MeV,Buffered, C target@ 30uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188627 10/06/09 02:14 Nue Beam current cannot go beyond 30uA again
188626 10/06/09 02:05 cdaq End of Run 76095:
188625 10/06/09 02:02 Nuruzzaman HKS and HES Drift chamber snaps
188624 10/06/09 01:42 Reinhold H1X13 puzzle
188623 10/06/09 01:42 cdaq Run 76095: 2344 MeV,Buffered, C target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188622 10/06/09 01:39 cdaq End of Run 76094:
188621 10/06/09 01:37 cdaq Run 76094: 2344 MeV,Buffered, C target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188620 10/06/09 01:15 Nuruzzaman Correction
188619 10/06/09 01:13 cdaq End of Run 76093:
188618 10/06/09 01:10 Nuruzzaman Gas pressure went up >4Torr
188617 10/06/09 01:09 cdaq Run 76093: 2344 MeV,Buffered, C target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188616 10/06/09 01:07 Nuruzzaman Beam Position Snap
188615 10/06/09 01:00 cdaq End of Run 76092:
188614 10/06/09 00:44 shoh hit pattern of HTOF 1X & 1Y & 2X at hscin-ntuple
188613 10/06/09 00:44 cdaq Run 76092: 2344 MeV,Buffered, C target@ 2uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188612 10/06/09 00:42 ReinholdAdd Add AC back to CPi vetoes
188611 10/06/09 00:39 Reinhold Restored order of H1X13 & 15
188610 10/06/09 00:38 cdaq End of Run 76091:
188609 10/06/09 00:35 Nue We had already bad background in 2005.
188608 10/06/09 00:30 cdaq Run 76091: 2344 MeV,Buffered, C target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188607 10/06/09 00:29 Reinhold Swapped H1X13 & 15 at discriminator
188606 10/06/09 00:26 cdaq End of Run 76090:
188605 10/06/09 00:20 Reinhold Adjust H1X13 timing
188604 10/06/09 00:01 cdaq Beam Time Accounting
Monday
188603 10/05/09 23:59 Bitao Hu shit sumarry 10/05 swing
188602 10/05/09 23:58 Bitao Hu shit sumarry 10/05 swing
188601 10/05/09 23:49 cdaq End of Run 76089:
188600 10/05/09 23:42 bono plot correction
188599 10/05/09 23:29 Arshak HKS/HES DC HV
188598 10/05/09 23:27 bono timing offset in the H1X13
188597 10/05/09 23:27 Arshak Beam Position, with beam current 2 uA
188596 10/05/09 23:26 maruta Signal and noise distribution at z=400cm
188595 10/05/09 23:25 Arshak Visual Scalers run#76089
188594 10/05/09 23:21 Reinhold Rate for CP0&Ki for 10uA on C was for 2 uA
188593 10/05/09 23:10 Nue Rate for CP0&Ki for 10uA on C
188592 10/05/09 22:59 cdaq Run 76089: 2344 MeV,Buffered, C target@ 2uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188591 10/05/09 22:59 Reinhold no_key
188590 10/05/09 22:53 cdaq End of Run 76088:
188589 10/05/09 22:44 cdaq E02017 Run 1223: Run with beam current 2uA, 2344MeV, C target,with pressure 3.01Torr.
188588 10/05/09 22:43 cdaq E02017 End of Run 1222:
188587 10/05/09 22:43 cdaq E02017 Run 1222: Junk
188586 10/05/09 22:40 cdaq Run 76088: 2344 MeV,Buffered, C target@ 2uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188585 10/05/09 22:39 Reinhold Set trigger grouped charged particle
188584 10/05/09 22:35 Arshak Asked 2uA beam current, Joerg is checking Trigger time
188583 10/05/09 22:33 cdaq E02017 End of Run 1221:
188582 10/05/09 22:32 cdaq End of Run 76087:
188581 10/05/09 22:06 shoh figure is wrong at my previous entry
188580 10/05/09 21:57 cdaq Run 76087: 2344 MeV,Buffered, C target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188579 10/05/09 21:56 cdaq End of Run 76086:
188578 10/05/09 21:56 Nue Rates for 10uA on C, new TUL
188577 10/05/09 21:47 cdaq Run 76086: 2344 MeV,Buffered, C target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188576 10/05/09 21:45 cdaq End of Run 76085:
188575 10/05/09 21:23 cdaq Run 76085: junk
188574 10/05/09 21:04 Arshak HKS/HES Dc HV
188573 10/05/09 20:59 Arshak Beam Position
188572 10/05/09 20:56 cdaq E02017 Run 1221: Run with 10uA beam current, carbon target, with pressure 3.04Torr.
188571 10/05/09 20:40 cdaq E02017 End of Run 1220:
188570 10/05/09 20:27 maruta Each group events on the FP
188569 10/05/09 20:01 Arshak incorrect entry 188567 10/05/09 19:43 Arshak Fission run#1216--->(incorrect) should be run#1219 is junk
188568 10/05/09 19:44 cdaq E02017 Run 1220: Run with NO beam,with pressure 3.01Torr.
188567 10/05/09 19:43 Arshak Fission run#1216 is junk
188566 10/05/09 19:43 cdaq E02017 End of Run 1219:
188565 10/05/09 19:41 cdaq E02017 Run 1219: Run with NO beam,with pressure 2.99Torr.
188564 10/05/09 19:31 cdaq E02017 End of Run 1218:
188563 10/05/09 18:09 cdaq E02017 Run 1218: Run with beam current 10uA, 2344MeV, C target,with pressure 3.09Torr.
188562 10/05/09 17:56 cdaq E02017 End of Run 1217:
188561 10/05/09 17:33 cdaq E02017 Run 1217: Run with beam current 10uA, 2344MeV, C target,with pressure 3.8Torr.
188560 10/05/09 17:33 Arshak Fission run#1216, before end of this run the beam current was changed to 10 uA
188559 10/05/09 17:31 cdaq E02017 End of Run 1216:
188558 10/05/09 17:10 cdaq End of Run 76083:
188557 10/05/09 16:49 Arshak Visual Scalers run#76083
188556 10/05/09 16:35 cdaq Run 76083: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188555 10/05/09 16:34 cdaq End of Run 76082:
188554 10/05/09 16:16 Nue Beam: BCM calibration plan
188553 10/05/09 16:09 Arshak HKS/HES DC HV
188552 10/05/09 16:07 Arshak Beam Position
188551 10/05/09 16:02 cdaq Beam Time Accounting
188550 10/05/09 16:00 kohlm shift summary 10/05 day
188549 10/05/09 15:59 cdaq Run 76082: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188548 10/05/09 15:59 cdaq E02017 Run 1216: Run with beam current 40uA, 2344MeV, C target,with pressure 2.98Torr.
188547 10/05/09 15:58 kohlm Beam: beam is back on
188546 10/05/09 15:56 shoh The grouping range for new program
188545 10/05/09 15:45 kohlm
188544 10/05/09 15:29 kohlm Beam: MCR accessing HallC
188543 10/05/09 15:27 cdaq End of Run 76081:
188542 10/05/09 15:23 Petkovic Current 40 uA on 12C VISUAL SCALERS
188541 10/05/09 15:18 cdaq E02017 End of Run 1215:
188540 10/05/09 15:08 cdaq Run 76081: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188539 10/05/09 14:59 cdaq End of Run 76080:
188538 10/05/09 14:39 Kohl/Petkovi Current 40 uA on 12C VISUAL SCALERS
188537 10/05/09 14:29 cdaq Run 76080: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188536 10/05/09 14:23 cdaq End of Run 76079:
188535 10/05/09 14:01 cdaq Run 76079: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188534 10/05/09 13:59 Petkovic Current 40 uA on 12C target VIsual Scalers
188533 10/05/09 13:46 cdaq End of Run 76078:
188532 10/05/09 13:27 Nue We changed collomator position to recover high P coin events in HES
188531 10/05/09 13:25 Tang HV change for HDC1 & 2, and EDC2
188530 10/05/09 13:12 cdaq Run 76078: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188529 10/05/09 13:07 cdaq End of Run 76077:
188528 10/05/09 13:02 Tang You and Shoh had great effort and did great job. You do see Sigma!
188527 10/05/09 13:02 cdaq E02017 Run 1215: Run with beam current 39.5uA, 2344MeV, C target,with pressure 2.98Torr.
188526 10/05/09 12:48 Nue DC currents for 40uA on C
188525 10/05/09 12:44 Petkovic Current 40 uA on 12C VIsual Scalers
188524 10/05/09 12:42 cdaq E02017 End of Run 1214:
188523 10/05/09 12:40 cdaq Run 76077: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188522 10/05/09 12:31 cdaq End of Run 76076:
188521 10/05/09 12:16 kohlm Beam: increased current from 35muA to 40muA after 76075
188520 10/05/09 12:10 Chiba WC status in th100mV and comparison of 1-12 & 2-12 in th 100mV and 120 mV
188519 10/05/09 12:08 Petkovic Current 40 uA on 12C (HES coll. down as it was) Visual Scalers
188518 10/05/09 11:55 Petkovic Current 37 uA on 12C Visual Scalers
188517 10/05/09 11:53 cdaq Run 76076: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188516 10/05/09 11:49 cdaq End of Run 76075:
188515 10/05/09 11:46 shoh write new programs, and don't download yet
188514 10/05/09 11:39 kohlm stopped run 76074 to check a lemo cable
188513 10/05/09 11:32 cdaq Run 76075: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188512 10/05/09 11:27 cdaq End of Run 76074:
188511 10/05/09 11:23 cdaq Run 76074: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188510 10/05/09 11:18 cdaq End of Run 76073:
188509 10/05/09 11:00 Petkovic Current 37 uA on 12C Visual Scalers (HES coll. down by 3 cm)
188508 10/05/09 10:45 kohlm HES collimator position change
188507 10/05/09 10:45 cdaq Run 76073: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188506 10/05/09 10:39 cdaq End of Run 76072:
188505 10/05/09 10:22 kohlm Beam: energy spread improved
188504 10/05/09 10:15 cdaq Run 76072: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188503 10/05/09 10:13 kohlm Run 76071 ended with EB error
188502 10/05/09 10:07 Petkovic Current 37 uA on 12C Visual Scalers
188501 10/05/09 09:57 cdaq Run 76071: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188500 10/05/09 09:52 cdaq E02017 Run 1214: Run with beam current 33.54uA, 2344MeV, C target,with pressure 2.97Torr.
188499 10/05/09 09:48 cdaq End of Run 76070:
188498 10/05/09 09:38 cdaq E02017 End of Run 1213:
188497 10/05/09 09:37 kawama Errata
188496 10/05/09 09:33 kawama Look at my directory for cointime correction function
188495 10/05/09 09:31 maruta Status (RC report)
188494 10/05/09 09:30 Petkovic Current 37 uA on 12C Visual Scalers
188493 10/05/09 09:26 cdaq Run 76070: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188492 10/05/09 09:05 cdaq End of Run 76069:
188491 10/05/09 09:00 Zhihong Ye Analysis: Would you please tell me your cointime calculation?
188490 10/05/09 08:29 cdaq Run 76069: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188489 10/05/09 08:29 Petkovic Current 37 uA on 12C Visual Scalers
188488 10/05/09 08:15 cdaq End of Run 76068:
188487 10/05/09 08:07 kawama HKS alarm handler keep beeping w/ beam momentum
188486 10/05/09 08:01 cdaq Beam Time Accounting
188485 10/05/09 07:40 Chiba Comparison of WC lay1 lowp box th = 120mV and 80mV
188484 10/05/09 07:34 cdaq Run 76068: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188483 10/05/09 07:33 cdaq End of Run 76067:
188482 10/05/09 07:24 kawama BCM & BPM screen shot
188481 10/05/09 07:21 kawama Beam spot was hopping on the target
188480 10/05/09 07:16 cdaq E02017 Run 1213: Run with beam current 35uA, 2344MeV, C target,with pressure 2.97Torr.
188479 10/05/09 07:15 cdaq E02017 End of Run 1212:
188478 10/05/09 06:47 cdaq Run 76067: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188477 10/05/09 06:37 kawama Missing mass of water target run; modified
188476 10/05/09 06:26 hari beam stopped
188475 10/05/09 06:24 kawama BCM & BPM screen shot
188474 10/05/09 06:23 cdaq End of Run 76066:
188473 10/05/09 06:09 Reinhold Some H1X13 inefficiency
188472 10/05/09 06:04 cdaq Run 76066: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188471 10/05/09 06:03 cdaq End of Run 76065:
188470 10/05/09 06:00 Reinhold Group Analysis: Summary
188469 10/05/09 05:54 Reinhold Group Analysis: AC grouping
188468 10/05/09 05:47 Reinhold Group Analysis: WC1 & 2 grouping
188467 10/05/09 05:35 cdaq E02017 Run 1212: Run with beam current 35uA, 2344MeV, C target,with pressure 2.97Torr.
188466 10/05/09 05:35 Reinhold Group Analysis: H1X/H2X grouping
188465 10/05/09 05:30 Reinhold Group Analysis: good & bad events cut definition
188464 10/05/09 05:29 kawama Run76064:Not junk, but very low statistics
188463 10/05/09 05:28 kawama PS1=20 and PS5=2000 from run76065
188461 10/05/09 05:24 cdaq Run 76065: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0
188460 10/05/09 05:23 cdaq End of Run 76064:
188459 10/05/09 05:23 cdaq Run 76064: junk
188458 10/05/09 05:20 cdaq End of Run 76063:
188457 10/05/09 05:11 kawama Trigger rate w/ 35uA, carbon & change PS factor
188456 10/05/09 04:34 kawama BCM & BPM screen shot
188455 10/05/09 04:32 Reinhold Observe hopping beam; MCC says to give it a few minutes
188454 10/05/09 04:25 cdaq Run 76063: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188453 10/05/09 04:24 cdaq End of Run 76062:
188452 10/05/09 03:51 cdaq E02017 End of Run 1211:
188451 10/05/09 03:46 kawama BCM & BPM screen shot
188450 10/05/09 03:19 cdaq Run 76062: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188449 10/05/09 03:17 cdaq End of Run 76061:
188448 10/05/09 02:59 kawama BCM & BCM screen shot
188447 10/05/09 02:15 cdaq Run 76061: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188446 10/05/09 02:14 cdaq E02017 Run 1211: Run with beam current 35uA, 2344MeV, C target,with pressure 2.97Torr.
188445 10/05/09 02:13 cdaq End of Run 76060:
188444 10/05/09 02:03 cdaq E02017 End of Run 1210:
188443 10/05/09 01:39 kawama HKS alarm handler
188442 10/05/09 01:37 Hari Target: Bright spot in traget
188441 10/05/09 01:31 kawama BCM & BPM screen shot
188440 10/05/09 01:16 Chiba Why WC threshold was changed
188439 10/05/09 01:09 cdaq Run 76060: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188438 10/05/09 01:07 cdaq End of Run 76059:
188437 10/05/09 00:54 kawama Simple analysis for background
188436 10/05/09 00:32 doi missing mass spectrum
188435 10/05/09 00:21 shoh kaon distribution for cointime
188434 10/05/09 00:17 maruta Trigger rate at 35uA carbon target after change WC th from (-80, -120) to (-80, -100)
188433 10/05/09 00:14 cdaq Beam Time Accounting
188432 10/05/09 00:10 Chiba Sorry, (80,120)=>(80,100) is correct
188431 10/05/09 00:04 Chiba WC threshold changed before Run76059 (80,120)=>(80,120)
188430 10/05/09 00:04 cdaq E02017 Run 1210: Run with beam current 35uA, 2344MeV, C target,with pressure 2.97Torr.
188429 10/05/09 00:03 cdaq Run 76059: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188428 10/05/09 00:01 Simon Swing shif t summary
Sunday
188427 10/04/09 23:58 cdaq End of Run 76058:
188426 10/04/09 23:52 cdaq E02017 End of Run 1209:
188425 10/04/09 23:43 shoh missing mass of C target
188424 10/04/09 23:41 cdaq Run 76058: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188423 10/04/09 23:39 cdaq End of Run 76057:
188422 10/04/09 23:31 kawama This is surely carbon run
188421 10/04/09 23:05 maruta results Geant4 simulation
188420 10/04/09 22:59 Tang Good, but not enough. What is the multiplicity?
188419 10/04/09 22:43 cdaq E02017 Run 1209: Run with beam current 35uA, 2344MeV, C target,with pressure 2.9Torr.
188418 10/04/09 22:39 cdaq Run 76057: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188417 10/04/09 22:35 Simon Beam is back
188416 10/04/09 22:35 Tang Another way?
188415 10/04/09 22:32 cdaq E02017 End of Run 1208:
188414 10/04/09 22:20 Nue Probably low momentum positrons
188413 10/04/09 21:28 Gogami EHODO offset parameters have been committed to SVN
188412 10/04/09 21:20 Tang The question is whether this background can be blocked.
188411 10/04/09 21:12 cdaq E02017 Run 1208: Run with no beam
188410 10/04/09 21:03 maruta Add 9th dipole NMR value (HCNMR:SIG) to Archiver
188409 10/04/09 21:01 cdaq E02017 End of Run 1207:
188408 10/04/09 20:06 Reinhold Background comes from HKS-D NMR port?
188407 10/04/09 19:43 Simon Run #1206 is junk
188406 10/04/09 19:41 Nue Beam stop is due to fault of vacuum valve 4T09A
188405 10/04/09 19:34 Nue Hall C beam instablity was caused by MQA3C07
188404 10/04/09 19:06 cdaq End of Run 76056:
188403 10/04/09 19:05 Simon Beam has gone
188402 10/04/09 18:59 cdaq E02017 Run 1207: Run with no beam
188401 10/04/09 18:58 cdaq E02017 End of Run 1206:
188400 10/04/09 18:55 cdaq E02017 Run 1206: Run with beam current 35uA, 2344MeV, C target,with pressure 2.97Torr.
188399 10/04/09 18:44 cdaq E02017 End of Run 1205:
188398 10/04/09 18:40 maruta The movie
188397 10/04/09 18:27 cdaq Run 76056: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188396 10/04/09 18:22 cdaq End of Run 76055:
188395 10/04/09 17:26 Simon/Bitao Curent 35 uA on 12C target Visual Scalers
188394 10/04/09 17:17 Reinhold Analysis of background for Cr @ 8 uA run 75981
188393 10/04/09 17:05 cdaq Run 76055: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188392 10/04/09 17:03 cdaq End of Run 76054:
188391 10/04/09 17:02 cdaq E02017 Run 1205: Run with beam current 35uA, 2344MeV, C target,with pressure 3.1Torr.
188390 10/04/09 16:56 cdaq E02017 End of Run 1204:
188389 10/04/09 16:53 mack bright spot
188388 10/04/09 16:51 maruta Background comes from HKS-D NMR port?
188387 10/04/09 16:38 Nue Even spot looks a supernova, ion chambers are quiet as normal
188386 10/04/09 16:25 Nue Beam: Beam spot on the carbon target is extraordinary bright
188385 10/04/09 16:24 Petkovic A Longer Shift Summary (8:00 - 16:00, Oct 4)
188384 10/04/09 16:03 cdaq Beam Time Accounting
188383 10/04/09 15:51 cdaq Run 76054: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188382 10/04/09 15:51 Nunez 35 uA C target, Energy spread too high
188381 10/04/09 15:42 cdaq End of Run 76053:
188380 10/04/09 15:25 shoh change argon tank
188379 10/04/09 15:17 Nunez Drift chamber currents 35uA C target
188378 10/04/09 14:56 Rate Screenshot for 35uA on Carbon [EHODO]
188377 10/04/09 14:56 cdaq E02017 Run 1204: Run with beam current 35uA, 2344MeV, C target,with pressure 2.97Torr.
188376 10/04/09 14:52 Tang Compare number of counts in ADC and in coin_TDC window
188375 10/04/09 14:49 Nue Screenshot for 35uA on Carbon
188374 10/04/09 14:46 Nunez/Petkov Curent 35 uA on 12C target Visual Scalers
188373 10/04/09 14:43 cdaq E02017 End of Run 1203:
188372 10/04/09 14:41 cdaq Run 76053: 2344 MeV,Buffered, C target@ 35uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=50,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188371 10/04/09 14:36 cdaq End of Run 76052:
188370 10/04/09 14:31 Tang Are those coincident quasi-free events?
188369 10/04/09 13:57 Nunez/Petkov Curent 10 uA on 12C target Visual Scalers
188368 10/04/09 13:44 cdaq Run 76052: 2344 MeV,Buffered, C target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=4,ps2=999999,ps3=1,ps4=9999999,ps5=100,ps6=1,ps7=1
188367 10/04/09 13:43 cdaq End of Run 76051:
188366 10/04/09 13:25 cdaq E02017 Run 1203: Run with beam current 10uA, 2344MeV, C target,with pressure 2.93Torr. Trigger T1andT4.
188365 10/04/09 13:12 cdaq E02017 End of Run 1202:
188364 10/04/09 13:00 Nunez Carbon target 10uA visual scalar
188363 10/04/09 12:58 Nunez/Petkov Carbon target 4uA visual scalar
188362 10/04/09 12:48 Nue Snapshot singles rates 10uA on Carbon, WC 120mV
188361 10/04/09 12:47 Nue Snapshot singles rates 4uA on Carbon, WC 120mV
188360 10/04/09 12:45 cdaq Run 76051: 2344 MeV,Buffered, C target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=4,ps2=999999,ps3=1,ps4=9999999,ps5=100,ps6=1,ps7=1
188359 10/04/09 12:43 cdaq End of Run 76050:
188358 10/04/09 12:39 Nunez/Petkov Carbon target 4uA visual scalar
188357 10/04/09 12:32 cdaq Run 76050: 2344 MeV,Buffered, C target@ 4uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188356 10/04/09 12:29 Nue Snapshot 4uA on Cr, WC 120mV
188355 10/04/09 12:27 cdaq End of Run 76049:
188354 10/04/09 12:23 Nunez/Petkov Current 4 uA on 52Cr Visual scalers (important)
188353 10/04/09 12:17 cdaq Run 76049: 2344 MeV,Buffered, 52Cr target@ 4uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188352 10/04/09 12:09 cdaq End of Run 76048:
188351 10/04/09 12:06 cdaq E02017 Run 1202: Run with beam current 8.2uA, 2344MeV, Cr target,with pressure 2.94Torr. only change T1 and T4 set up trigger for this run.
188350 10/04/09 12:04 kawama Carbon quasi-free rate
188349 10/04/09 11:55 Nunez/Petkov Current 8 uA on 52Cr Visual Scalers
188348 10/04/09 11:54 cdaq E02017 End of Run 1201:
188347 10/04/09 11:52 Nue Beta Brite hung up
188346 10/04/09 11:50 kawmaa rerun ./copymaker
188345 10/04/09 11:44 cdaq Run 76048: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188344 10/04/09 11:36 cdaq End of Run 76047:
188343 10/04/09 11:21 kawama WC threshold changed & found wrong threshold value
188342 10/04/09 11:20 Nue Screenshot for 8uA on Cr, after WC threshold change
188341 10/04/09 11:15 kawama This is 8uA, Cr run
188340 10/04/09 11:14 kawama Compare HES momentum acceptance w/ Geant
188339 10/04/09 11:13 Nunez 8 uA 52Cr threshold 120mV on WC Visual Scalar
188338 10/04/09 11:05 cdaq Run 76047: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188337 10/04/09 10:57 cdaq End of Run 76046:
188336 10/04/09 10:55 PETKOVIC Finished study on 2 uA on 52Cr (Run #76045). Continued with 8 uA on 52Cr
188335 10/04/09 10:50 kawama Screen shot of HKS rate meter for 2uA, Cr
188334 10/04/09 10:49 cdaq Run 76046: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188333 10/04/09 10:47 cdaq End of Run 76045:
188332 10/04/09 10:46 Nunez 2 micro Ampere Visual Scalar "Important Data"
188331 10/04/09 10:33 PETKOVIC Current of 2 uA on 52CR
188330 10/04/09 10:31 kawama Screen shot of HKS rate meter for 2uA, Cr
188329 10/04/09 10:30 cdaq Run 76045: 2344 MeV,Buffered, 52Cr target@ 2uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188328 10/04/09 10:29 kawama Screen shot of HKS rate meter for 4uA, Cr
188327 10/04/09 10:27 cdaq End of Run 76044:
188326 10/04/09 10:25 shichijo rate for 4uA on Cr
188325 10/04/09 10:19 Nunez Target 52Cr with 4microAmpere current Visual Scaler
188324 10/04/09 10:03 PETKOVIC Water leak fixed. Beam current on 52Cr decreased to 4 uA
188323 10/04/09 09:56 cdaq E02017 Run 1201: Run with beam current 4.0uA, 2344MeV, Cr target,with pressure 3.0Torr.
188322 10/04/09 09:53 cdaq Run 76044: 2344 MeV,Buffered, 52Cr target@ 4.0uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188321 10/04/09 09:48 Chiba Suggestion for higher threshold
188320 10/04/09 09:42 cdaq E02017 End of Run 1200:
188319 10/04/09 09:38 PETKOVIC Beam stopped at 9:17 by the MCR's chief rew
188318 10/04/09 09:21 Nunez/Petkov Target 52Cr with a current 8 uA
188317 10/04/09 09:17 cdaq End of Run 76043:
188316 10/04/09 08:45 cdaq Run 76043: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188315 10/04/09 08:43 cdaq End of Run 76042:
188314 10/04/09 08:29 Nunez/Petkov Target 52Cr, current 8 uA (Visual scalers)
188313 10/04/09 08:14 cdaq Run 76042: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188312 10/04/09 08:10 cdaq End of Run 76041:
188311 10/04/09 08:03 cdaq Beam Time Accounting
188310 10/04/09 07:55 neville Owl shift summary
188309 10/04/09 07:51 cdaq E02017 Run 1200: Run with beam current 8.2uA, 2344MeV, Cr target,with pressure 3.04Torr.
188308 10/04/09 07:35 cdaq Run 76041: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188307 10/04/09 07:35 cdaq E02017 End of Run 1199:
188306 10/04/09 07:34 cdaq End of Run 76040:
188305 10/04/09 07:10 cdaq Run 76040: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188304 10/04/09 06:57 cdaq End of Run 76039:
188303 10/04/09 06:56 Nue Flat readout of the 9th dipole NMR is better
188302 10/04/09 06:18 cdaq Run 76039: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188301 10/04/09 06:17 cdaq End of Run 76038:
188300 10/04/09 06:07 Badui Call from MCC
188299 10/04/09 05:42 cdaq Run 76038: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188298 10/04/09 05:41 cdaq End of Run 76037:
188297 10/04/09 05:40 cdaq E02017 Run 1199: Run with beam current 7.7uA, 2344MeV, Cr target,with pressure 3.00Torr.
188296 10/04/09 05:28 cdaq E02017 End of Run 1198:
188294 10/04/09 05:07 cdaq Run 76037: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188293 10/04/09 05:05 cdaq End of Run 76036:
188292 10/04/09 04:50 kawama HallA requested to change half plate
188291 10/04/09 04:37 kawama Keyboard for BPM monitor PC is broken
188290 10/04/09 04:33 cdaq Run 76036: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188289 10/04/09 04:31 cdaq End of Run 76035:
188288 10/04/09 04:31 Badui Hall C 9th Dipole NMR
188287 10/04/09 03:56 cdaq Run 76035: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188286 10/04/09 03:55 cdaq End of Run 76034:
188285 10/04/09 03:35 cdaq Run 76034: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188284 10/04/09 03:34 cdaq E02017 Run 1198: Run with beam current 8.2uA, 2344MeV, Cr target,with pressure 3.00Torr.
188283 10/04/09 03:23 cdaq End of Run 76033:
188282 10/04/09 03:22 cdaq E02017 End of Run 1197:
188281 10/04/09 02:55 cdaq Run 76033: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188280 10/04/09 02:48 cdaq End of Run 76032:
188279 10/04/09 02:45 kawama CODA recovered
188278 10/04/09 02:40 Gogami Theta vs. phi [HES side]
188277 10/04/09 02:37 neville 8.1 uA visual scalars
188276 10/04/09 02:18 cdaq Run 76032: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188275 10/04/09 01:55 doi phi-theta scatter plot at target
188274 10/04/09 01:37 Badui End fail on run # 76030
188273 10/04/09 01:23 cdaq E02017 Run 1197: Run with beam current 8.2uA, 2344MeV, Cr target,with pressure 3.00Torr.
188272 10/04/09 01:11 cdaq E02017 End of Run 1196:
188271 10/04/09 00:56 cdaq Run 76030: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188270 10/04/09 00:54 cdaq End of Run 76029:
188269 10/04/09 00:24 kawama Error on gen_event_info.cmn
188268 10/04/09 00:21 cdaq Run 76029: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188267 10/04/09 00:20 cdaq End of Run 76028:
188266 10/04/09 00:11 chench lucite TDC cut, analysis results from run=76024
Saturday
188265 10/03/09 23:58 cdaq Beam Time Accounting
188264 10/03/09 23:56 Arshak Swing Shift Summary
188263 10/03/09 23:51 chench Change Lucite V_TH_TOP=10mV and V_TH_BOT=10mV before run=76024
188262 10/03/09 23:48 cdaq Run 76028: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188261 10/03/09 23:47 cdaq End of Run 76027:
188260 10/03/09 23:16 cdaq E02017 Run 1196: Run with beam current 8.2uA, 2344MeV, Cr target,with pressure 3.00Torr.
188259 10/03/09 23:16 cdaq Run 76027: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188258 10/03/09 23:15 cdaq End of Run 76026:
188257 10/03/09 23:07 Nue 9th Dipole NMR (HCNMR:SIG) vs HALLC:p
188256 10/03/09 23:04 cdaq E02017 End of Run 1195:
188255 10/03/09 22:44 cdaq Run 76026: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188254 10/03/09 22:43 cdaq End of Run 76025:
188253 10/03/09 22:13 cdaq Run 76025: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188252 10/03/09 22:12 cdaq End of Run 76024:
188251 10/03/09 21:58 Reinhold SVN COMMIT: add TS latched pattern analysis (at revision 231)
188250 10/03/09 21:42 cdaq Run 76024: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188249 10/03/09 21:38 Reinhold Wrong order in e_trans_dc1!
188248 10/03/09 21:38 Arshak 76023 is Junk
188247 10/03/09 21:33 cdaq Run 76023: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188246 10/03/09 21:31 cdaq End of Run 76022:
188245 10/03/09 21:14 Arshak Visual Scalers run#76022
188244 10/03/09 21:10 cdaq E02017 Run 1195: Run with beam current 8.0uA, 2344MeV, Cr target,with pressure 3.00Torr.
188243 10/03/09 21:03 Arshak Beam Position after controlled access
188242 10/03/09 21:01 Nue HES-D PS cannot be controled. Control access to Hall.
188241 10/03/09 21:01 cdaq Run 76022: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188240 10/03/09 21:00 chench Lucite TDC cut, analysis from run=76017
188239 10/03/09 20:56 cdaq E02017 End of Run 1194:
188238 10/03/09 20:32 cdaq E02017 Run 1194: Run without beam
188237 10/03/09 20:32 cdaq E02017 End of Run 1193:
188236 10/03/09 20:31 Arshak Asked for Controlled access, HES Dipole have problem and also we lost communication with Dipole
188235 10/03/09 20:27 cdaq End of Run 76021:
188234 10/03/09 20:15 Arshak HDC/EDC HV
188233 10/03/09 20:01 cdaq Run 76021: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188232 10/03/09 19:58 cdaq End of Run 76020:
188231 10/03/09 19:26 cdaq Run 76020: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188230 10/03/09 19:25 cdaq End of Run 76019:
188229 10/03/09 18:54 cdaq Run 76019: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188228 10/03/09 18:53 cdaq End of Run 76018:
188227 10/03/09 18:49 cdaq E02017 Run 1193: Run with beam current 8.2uA, 2344MeV, Cr target,with pressure 3.03Torr.
188226 10/03/09 18:47 cdaq E02017 End of Run 1192:
188225 10/03/09 18:47 cdaq E02017 Run 1192: Junk
188224 10/03/09 18:39 Arshak Cdaql5 died. I rebooted it.
188223 10/03/09 18:35 cdaq E02017 End of Run 1191:
188222 10/03/09 18:22 cdaq Run 76018: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188221 10/03/09 18:21 cdaq End of Run 76017:
188220 10/03/09 18:00 Reinhold Analysis of TS trigger data register (continued)
188219 10/03/09 17:59 chench Before this run, vth_lucite change to 40mV
188218 10/03/09 17:58 chench lucite TDC cut ,analysis result for run=76013
188217 10/03/09 17:54 Arshak Visual Scalers run#76017
188216 10/03/09 17:45 cdaq Run 76017: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0, buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188215 10/03/09 17:40 cdaq End of Run 76016:
188214 10/03/09 17:07 cdaq Run 76016: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188213 10/03/09 17:01 cdaq Run 76015: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188212 10/03/09 16:49 cdaq E02017 Run 1191: Run with beam current 8.2uA, 2344MeV, Cr target,with pressure 3.04Torr.
188211 10/03/09 16:37 cdaq E02017 End of Run 1190:
188210 10/03/09 16:37 cdaq Run 76014: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188209 10/03/09 16:36 cdaq End of Run 76013:
188208 10/03/09 16:30 Arshak Visual Scalers run#76013
188207 10/03/09 16:17 chech LUCITE HV after first change from LC7B TO LC16B
188206 10/03/09 16:16 Arshak Beam Position
188205 10/03/09 16:15 chench LUCITE HV after first change run=76013
188204 10/03/09 16:02 cdaq Beam Time Accounting
188203 10/03/09 16:01 cdaq Run 76013: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188202 10/03/09 15:59 cdaq End of Run 76012:
188201 10/03/09 15:50 Nue HES singles rate should be still dominated by background
188200 10/03/09 15:42 neville 10/3/09 Day shift summary
188199 10/03/09 15:24 cdaq Run 76012: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188198 10/03/09 15:23 cdaq End of Run 76011:
188197 10/03/09 15:22 Neville/Petk Current 8 uA on 52Cr (Visual Scalers)
188196 10/03/09 15:09 Reinhold Analysis of TS trigger data register (continued)
188195 10/03/09 15:00 Reinhold Analysis of TS trigger data register
188194 10/03/09 14:50 cdaq Run 76011: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188193 10/03/09 14:48 cdaq End of Run 76010:
188192 10/03/09 14:38 cdaq E02017 Run 1190: Run with beam current 8.2uA, 2344MeV, Cr target,with pressure 2.9Torr.
188191 10/03/09 14:25 cdaq E02017 End of Run 1189:
188190 10/03/09 14:18 Gogami EHODO 13 parameters have committed to SVN.
188189 10/03/09 14:12 cdaq Run 76010: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188188 10/03/09 14:11 cdaq End of Run 76009:
188187 10/03/09 13:37 cdaq Run 76009: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188186 10/03/09 13:36 cdaq End of Run 76008:
188185 10/03/09 13:23 Petkovic Current 8 uA on 52Cr
188184 10/03/09 13:16 Tang Rough estimate on yield rates
188183 10/03/09 13:04 cdaq Run 76008: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188182 10/03/09 13:03 cdaq End of Run 76007:
188181 10/03/09 12:41 Petkovic 8 uA on 52Cr target (Visual Scalers)
188180 10/03/09 12:39 cdaq E02017 Run 1189: Run with beam current 8.0uA, 2344MeV, Cr target,with pressure 2.9Torr.
188179 10/03/09 12:29 cdaq Run 76007: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188178 10/03/09 12:26 maruta Get new compact flash
188177 10/03/09 12:19 cdaq E02017 End of Run 1188:
188176 10/03/09 12:17 neville IOC reset
188175 10/03/09 11:54 neville IOC HLC 3 Lost
188174 10/03/09 11:49 Reinhold Correct trigger definition likely {[CPi(3/3)*!ACi] * WCi(2/2)} * HES0, i.e. the grouped CP and not CP0
188173 10/03/09 11:49 cdaq End of Run 76006:
188172 10/03/09 11:48 cdaq Run 76006: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188171 10/03/09 11:46 cdaq End of Run 76005:
188170 10/03/09 11:28 neville Current of 7.7 uA on target Cr
188169 10/03/09 11:17 neville Beam is Back
188168 10/03/09 11:14 cdaq Run 76005: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188167 10/03/09 10:28 Nue Could you check the MM formula for proton kinematics?
188166 10/03/09 10:26 cdaq E02017 Run 1188: Run with beam current 0uA, 2344MeV, Cr target,with pressure 3.0Torr. Beam off
188165 10/03/09 10:14 cdaq E02017 End of Run 1187:
188164 10/03/09 09:48 kawama pk vs pe distribution in water and carbon target
188163 10/03/09 09:33 kawama # of lambda in the spectrum
188162 10/03/09 09:22 maruta ELOG copy
188161 10/03/09 09:21 Nue HKS p distribution looks normal for H2O
188160 10/03/09 09:05 maruta status (RC report)
188159 10/03/09 08:22 cdaq E02017 Run 1187: Run with beam current NOBEAM, 2344MeV, Cr target,with pressure 3.01Torr. Under Beam Permit.
188158 10/03/09 08:12 cdaq E02017 End of Run 1186:
188157 10/03/09 08:04 Danagoulian Shift summary
188156 10/03/09 08:02 cdaq Beam Time Accounting
188155 10/03/09 07:46 cdaq E02017 Run 1186: No beam Run
188154 10/03/09 04:44 kawama Follow up for figure explanation
188153 10/03/09 04:40 kawama Compare the mm shape and HKS mom. distribution between carbon and water target
188152 10/03/09 04:38 Badui Owl Shift 10/3/09
188151 10/03/09 03:42 cdaq End of Run 76004:
188150 10/03/09 03:21 cdaq Run 76004: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188149 10/03/09 02:32 cdaq E02017 Run 1185: Run with beam current 7.52uA, 2344MeV, Cr target,with pressure 2.9Torr.
188148 10/03/09 02:31 cdaq E02017 End of Run 1185:
188147 10/03/09 02:17 cdaq E02017 End of Run 1184:
188146 10/03/09 02:04 cdaq End of Run 76003:
188145 10/03/09 01:44 cdaq Run 76003: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188144 10/03/09 01:43 cdaq End of Run 76002:
188143 10/03/09 01:18 Danagoulian ROC 7 error message
188142 10/03/09 01:10 cdaq Run 76002: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188141 10/03/09 01:08 cdaq End of Run 76001:
188140 10/03/09 00:48 cdaq Run 76001: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188139 10/03/09 00:46 cdaq End of Run 76000:
188138 10/03/09 00:14 cdaq Run 76000: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188137 10/03/09 00:12 cdaq E02017 Run 1184: Run with beam current 7.52uA, 2344MeV, Cr target,with pressure 2.9Torr.
188136 10/03/09 00:11 cdaq End of Run 75999:
188135 10/03/09 00:09 cdaq Beam Time Accounting
188134 10/03/09 00:03 maeda Swing shift run summary
188133 10/03/09 00:00 cdaq E02017 End of Run 1183:
Friday
188132 10/02/09 23:53 maeda run#75999 replay visual scaler
188131 10/02/09 23:51 cdaq E02017 Run 1183: Run with beam current 7.32uA, 2344MeV, Cr target,with pressure 3.03Torr.
188130 10/02/09 23:43 maeda beam back
188129 10/02/09 23:40 cdaq Run 75999: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188128 10/02/09 23:37 cdaq E02017 End of Run 1182:
188127 10/02/09 23:08 cdaq E02017 Run 1182: Run with No Beam
188126 10/02/09 23:08 cdaq E02017 End of Run 1181:
188125 10/02/09 21:56 maruta HES-D is recovered
188124 10/02/09 21:49 saw Smart drive failing?
188123 10/02/09 21:43 maruta hcpc10402 smart drive going to die?
188122 10/02/09 21:43 maruta hcpc10402 smart drive going to die?
188121 10/02/09 21:42 maeda HES recovered,
188120 10/02/09 21:29 cdaq E02017 Run 1181: Run with No Beam
188119 10/02/09 21:25 saw Reloaded alarm limits for PC104s
188118 10/02/09 21:17 cdaq E02017 End of Run 1180:
188117 10/02/09 21:17 cdaq E02017 Run 1180: junk
188116 10/02/09 20:55 maeda Hall C controlle access to check HES dipole controle.
188115 10/02/09 20:54 maruta HES-D is down
188114 10/02/09 20:51 cdaq E02017 End of Run 1179:
188113 10/02/09 20:33 maeda run75998 stop HKS alarm handler warning,
188112 10/02/09 20:21 cdaq End of Run 75998:
188111 10/02/09 20:09 Casey Nevill Alarm Handler Warnings
188110 10/02/09 20:03 maeda run#75998 replay visual scaler
188109 10/02/09 19:39 cdaq Run 75998: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188108 10/02/09 19:38 cdaq End of Run 75997:
188107 10/02/09 19:19 maeda run#75997 visual scaler, replay
188106 10/02/09 19:17 shoh The number of Kaon before and ahter changing TUL probrams
188105 10/02/09 19:12 cdaq E02017 Run 1179: Run with beam current 7.52uA, 2344MeV, Cr target,with pressure 2.9Torr.
188104 10/02/09 19:05 maeda beam back start new run at 7:05PM
188103 10/02/09 19:04 cdaq Run 75997: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188102 10/02/09 18:58 cdaq E02017 End of Run 1178:
188101 10/02/09 18:35 maeda run stop because of no beam
188100 10/02/09 18:34 cdaq End of Run 75996:
188099 10/02/09 18:24 cdaq Run 75996: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188098 10/02/09 18:17 cdaq End of Run 75995:
188097 10/02/09 17:55 maeda run#75995, replay and visual scaler
188096 10/02/09 17:44 cdaq Run 75995: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188095 10/02/09 17:43 cdaq End of Run 75994:
188094 10/02/09 17:42 cdaq E02017 Run 1178: Run with beam current 7.52uA, 2344MeV, Cr target,with pressure 3.05Torr.
188093 10/02/09 17:28 cdaq E02017 End of Run 1177:
188092 10/02/09 17:22 maeda run#75994, replay, visual scaler
188091 10/02/09 17:10 cdaq Run 75994: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188090 10/02/09 17:08 cdaq End of Run 75993:
188089 10/02/09 17:03 maeda visual scalar 8uA, Cr
188088 10/02/09 16:45 maeda I=8uA Target:Cr
188087 10/02/09 16:36 yuan New code commited to SVN (rev 227)
188086 10/02/09 16:34 cdaq Run 75993: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188085 10/02/09 16:32 cdaq End of Run 75992:
188084 10/02/09 16:23 saw Alarm handler for beam and magnet conditions (Beta)
188083 10/02/09 16:02 cdaq Beam Time Accounting
188082 10/02/09 16:01 gaskell Day Shift Summary: 10/2/2009
188081 10/02/09 15:58 cdaq Run 75992: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188080 10/02/09 15:57 cdaq End of Run 75991:
188079 10/02/09 15:45 yuan Fixed a bug in TOF beta calculation, related to multiple hit TDC
188078 10/02/09 15:34 Petkovic Comment / Correction on the Scalers w.r.t. the entries: 188069 and 188072
188077 10/02/09 15:29 cdaq E02017 Run 1177: Beam current 7.6 uA. P=2.99 Torr
188076 10/02/09 15:25 chench After run=75990, before grun=75991, the threshold of lucite change to 60mV
188075 10/02/09 15:23 cdaq Run 75991: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188074 10/02/09 15:16 cdaq E02017 End of Run 1176:
188073 10/02/09 15:14 cdaq End of Run 75990:
188072 10/02/09 14:59 Petkovic Current I = 8 uA on target Cr
188071 10/02/09 14:41 cdaq Run 75990: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188070 10/02/09 14:39 cdaq End of Run 75989:
188069 10/02/09 14:29 Petkovic Current I = 8 uA on Cr target (Visual Scalers)
188068 10/02/09 14:20 Nue Large background from Water Cell is due to window, we need to design CH2 bar
188067 10/02/09 14:05 cdaq Run 75989: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188066 10/02/09 14:04 cdaq End of Run 75988:
188065 10/02/09 14:02 Reinhold First lambda peak??
188064 10/02/09 13:56 Reinhold Answer for Nue: About prescale factor for LED/Laser trigger (correction)
188063 10/02/09 13:54 shoh Kaon distrubution for forcal plane
188062 10/02/09 13:53 Reinhold Answer for Nue: About prescale factor for LED/Laser trigger
188061 10/02/09 13:29 cdaq Run 75988: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188060 10/02/09 13:27 cdaq End of Run 75987:
188059 10/02/09 13:09 chench The threshold of LC becomes 100mV after run=75986 and before 75987
188058 10/02/09 13:00 gaskell Rates for 8 uA on 52Cr
188057 10/02/09 12:53 cdaq E02017 Run 1176: Beam current 8 uA. Cr target.
188056 10/02/09 12:53 cdaq Run 75987: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188055 10/02/09 12:51 gaskell switchnig to 52Cr
188054 10/02/09 12:49 cdaq End of Run 75986:
188053 10/02/09 12:47 Tomislav Pet Rates for Current 10uA on Carbon target
188052 10/02/09 12:39 cdaq Run 75986: 2344 MeV,Buffered, Water target@ 2.8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188051 10/02/09 12:37 shoh HKS forcal plane v.s. beta
188050 10/02/09 12:32 gaskell Changing target to water cell
188049 10/02/09 12:29 cdaq E02017 End of Run 1175:
188048 10/02/09 12:28 cdaq End of Run 75985:
188047 10/02/09 12:06 Zhihong Ye Analysis: Strange distribution of HES FP X vs HES Target RF with new ehodo parameters
188046 10/02/09 11:56 cdaq Run 75985: 2344 MeV,Buffered, C target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=9999999,ps5=12000,ps6=1,ps7=1
188045 10/02/09 11:53 gaskell beam back
188044 10/02/09 11:43 cdaq E02017 Run 1175: Run with beam. 2.8 uA. Water target. We add shilding after YAG view.
188043 10/02/09 11:35 cdaq E02017 End of Run 1174:
188042 10/02/09 11:27 Tang Wrong threshold for LC
188041 10/02/09 11:26 gaskell access to add shielding for fission chamber
188040 10/02/09 11:25 cdaq E02017 Run 1174: Beam permit. P=3.43 Torr.
188039 10/02/09 11:24 cdaq E02017 End of Run 1173:
188038 10/02/09 11:24 shoh ADC saturation of HTOF
188037 10/02/09 11:20 gaskell camera fixed
188036 10/02/09 10:56 maruta Present status (Run coordinator)
188035 10/02/09 10:41 gaskell bubbler camera flaky
188034 10/02/09 10:34 cdaq E02017 Run 1173: No beam run. P=2.96
188033 10/02/09 10:21 cdaq E02017 End of Run 1172:
188032 10/02/09 08:34 gaskell and it's gone....
188031 10/02/09 08:32 cdaq End of Run 75984:
188030 10/02/09 08:28 cdaq E02017 Run 1172: Run with beam off, beam energy 2344MeV,carbon target,with pressure 3.08Torr.
188029 10/02/09 08:27 cdaq Run 75984: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
188028 10/02/09 08:22 cdaq E02017 End of Run 1171:
188027 10/02/09 08:20 gaskell 2 uA on the way
188026 10/02/09 08:08 cdaq Beam Time Accounting
188025 10/02/09 08:01 Gogami Owl shift summary[02_Oct_2009_]
188024 10/02/09 07:59 kawama current cointime staus
188023 10/02/09 07:10 kawama First lambda peak??
188022 10/02/09 06:36 cdaq E02017 Run 1171: Run with no beam , pressure 2.98Torr.
188021 10/02/09 06:30 Gogmai BCM & BPM
188020 10/02/09 06:25 Gogami Call from MCC . Beam is stopped . problem have not fixed yet.
188019 10/02/09 06:23 cdaq E02017 End of Run 1170:
188018 10/02/09 06:22 cdaq End of Run 75983:
188017 10/02/09 06:21 Gogami Beam is back . now 52Cr @ 8[uA]
188016 10/02/09 06:19 cdaq Run 75983: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC * HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
188015 10/02/09 05:58 kawama Compare the S/N ratio in the coitime between carbon and water target
188014 10/02/09 05:51 Gogami BPM & BCM screen shot
188013 10/02/09 05:45 Gogami This is 52Cr target
188012 10/02/09 05:39 Badui HKS-HES Checklist
188011 10/02/09 05:28 maruta recovery time is still unknown
188010 10/02/09 05:09 Gogami Beam: Call from MCC. They have some problems. beam is stopped.
188009 10/02/09 05:04 cdaq End of Run 75982:
188008 10/02/09 04:58 cdaq Run 75982: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
188007 10/02/09 04:56 cdaq End of Run 75981:
188006 10/02/09 04:37 cdaq Beam Time Accounting
188005 10/02/09 04:32 badui Histograms for run 75981
188004 10/02/09 04:22 cdaq Run 75981: 2344 MeV,Buffered, 52Cr target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
188003 10/02/09 04:20 cdaq End of Run 75980:
188002 10/02/09 04:17 cdaq E02017 Run 1170: Run with beam current 8.0uA, beam energy 2344MeV,
188001 10/02/09 04:10 Gogami [Rate 52Cr @ 10uA ] coin4.08MHz ==>coin4.08kHz
188000 10/02/09 04:03 cdaq E02017 End of Run 1169:
187999 10/02/09 04:01 Gogami Rate Cr @ 8.0[uA]
187998 10/02/09 03:56 Gogami Rate 52Cr @ 10uA
187997 10/02/09 03:51 Gogami Drift chambers HVs and current[52Cr @ 8uA]
187996 10/02/09 03:48 Gogami Beam current is too high to take data , coin rate 4.0[kHz] . Changed to 8[uA].
187995 10/02/09 03:47 cdaq Run 75980: 2344 MeV,Buffered, H2O target@ 8uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187994 10/02/09 03:46 cdaq End of Run 75979:
187993 10/02/09 03:44 cdaq Run 75979: 2344 MeV,Buffered, 52Cr target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC Test Run buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187992 10/02/09 03:40 Gogami This is 52Cr @10uA
187991 10/02/09 03:40 cdaq End of Run 75978:
187990 10/02/09 03:39 Gogami Drift chambers HVs screen shot [52Cr @ 10uA]
187989 10/02/09 03:38 cdaq Run 75978: 2344 MeV,Buffered, H2O target@ 10uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187988 10/02/09 03:35 cdaq Run 75977: 2344 MeV,Buffered, H2O target@ 2.8uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187987 10/02/09 03:35 Gogami Target: Changed the target from H20 to 52Cr @ 10[uA]
187986 10/02/09 03:35 cdaq End of Run 75977:
187985 10/02/09 03:34 Badui Rates for H2O target at 2.4 uA (run #75976)
187984 10/02/09 03:23 cdaq End of Run 75976:
187983 10/02/09 03:02 badui bpm&bcm
187982 10/02/09 02:41 badui Histograms for run 75976
187981 10/02/09 02:34 cdaq Run 75976: 2344 MeV,Buffered, H2O target@ 2.4uA beam: CP0 (3/3) * WC(2/2) * !AC*HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187980 10/02/09 02:32 cdaq End of Run 75975:
187979 10/02/09 01:53 Gogami Crash the run ==> This is JUNK
187978 10/02/09 01:46 cdaq E02017 Run 1169: Run with beam current 2.4uA, beam energy 2344MeV,water target,with pressure 3.02Torr.
187977 10/02/09 01:45 cdaq Run 75975: 2344 MeV,Buffered, H2O target@ 2.4uA beam: CP0 (3/3) * WC(2/2) * !AC*HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187976 10/02/09 01:43 badui Error in run #75974
187975 10/02/09 01:40 cdaq End of Run 75974:
187974 10/02/09 01:36 cdaq Run 75974: 2344 MeV,Buffered, H2O target@ 2.8uA beam: CP0 (3/3) * WC(2/2) * !AC*HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187973 10/02/09 01:20 cdaq End of Run 75973:
187972 10/02/09 01:12 bad Histograms for run 75973
187971 10/02/09 01:02 Gogami Beam: Call from MCC , Beem was stopped for a few minutes . now beem's back.
187970 10/02/09 01:00 Chiba add some imformation and comment
187969 10/02/09 00:58 badui bcm&bpm screenshot
187968 10/02/09 00:55 badui Histograms for run 75973
187967 10/02/09 00:53 cdaq E02017 End of Run 1168:
187965 10/02/09 00:35 chench Lucite TDC cut results from run=75909
187964 10/02/09 00:33 cdaq Run 75973: 2344 MeV,Buffered, H2O target@ 2.8uA beam: CP0 (3/3) * WC(2/2) * !AC*HES0 buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187963 10/02/09 00:21 Gogami Rate H2O @ 2.8[uA]
187962 10/02/09 00:19 cdaq End of Run 75972:
Thursday
187961 10/01/09 23:47 cdaq Run 75972: 2344 MeV,Buffered, H2O target@ 2.8uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187960 10/01/09 23:45 cdaq End of Run 75971:
187959 10/01/09 23:26 albayrak Rates 2.8uA on H2O
187958 10/01/09 23:14 cdaq Run 75971: 2344 MeV,Buffered, H2O target@ 2.8uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187957 10/01/09 23:13 cdaq Run 75970: 2344 MeV,Buffered, H2O target@ 2.8uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187956 10/01/09 23:12 cdaq End of Run 75970:
187955 10/01/09 23:06 cdaq End of Run 75969:
187954 10/01/09 22:56 Tang Are we taking data 40uA on C?
187953 10/01/09 22:48 cdaq E02017 Run 1168: Run with beam current 9.78uA, beam energy 2344MeV,carbon target,with pressure 3.02Torr.
187952 10/01/09 22:42 albayrak Rates for 10uA on C
187951 10/01/09 22:36 cdaq Run 75969: UTUL Program 2344 MeV,Buffered, C target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187950 10/01/09 22:27 cdaq End of Run 75968:
187949 10/01/09 22:25 Nue BPM for 40uA on Carbon after energy scan (energy spread is bad)
187948 10/01/09 22:15 albayrak Rates for 10uA on C
187947 10/01/09 22:14 albayrak Rates for 10uA on C
187946 10/01/09 22:14 albayrak Rates for 10uA on C
187945 10/01/09 22:00 Nue Swing/Owl Plan
187944 10/01/09 21:58 cdaq Run 75968: 2344 MeV,Buffered, C target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187943 10/01/09 21:56 cdaq End of Run 75967:
187942 10/01/09 21:44 Reinhold Call to MCC: inquire about energy spread; they are running crest right now
187941 10/01/09 21:43 maruta Screenshots of digital oscilloscope before/after 10ns delay added
187940 10/01/09 21:23 cdaq E02017 End of Run 1167:
187939 10/01/09 21:20 Nue Swing/Owl Plan
187938 10/01/09 21:13 Reinhold Re: EHODO13s are fixed by delaying EH2-13T&B just before Discriminator
187937 10/01/09 21:08 Gogami EHODO13s are fixed by delaying EH2-13T&B just before Discriminator
187936 10/01/09 21:07 chench drift chamber HV and leakage current
187935 10/01/09 21:07 cdaq E02017 Run 1167: Run with beam current 37.93uA, beam energy 2344MeV,carbontarget,with pressure 3.00Torr.
187934 10/01/09 21:05 cdaq E02017 End of Run 1166:
187933 10/01/09 21:01 cdaq Run 75967: 2344 MeV,Buffered, C target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187932 10/01/09 21:01 cdaq E02017 Run 1166: Run with beam current 36.56uA, beam energy 2344MeV,carbontarget,with pressure 3.00Torr.
187931 10/01/09 20:59 doi TDC value per 1 bin
187930 10/01/09 20:56 cdaq End of Run 75966:
187929 10/01/09 20:56 cdaq Run 75966: 2344 MeV,Buffered, C target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187928 10/01/09 20:51 TDC value per 1 bin
187927 10/01/09 20:14 Reinhold MCC delivering 35 uA; however SLI shows 6.5e-5; they''ll look at it
187926 10/01/09 19:57 cdaq E02017 End of Run 1165:
187925 10/01/09 19:53 cdaq E02017 Run 1165: RPrevious run with beam tuning. This run is junk.
187924 10/01/09 19:51 cdaq E02017 End of Run 1164:
187923 10/01/09 19:49 cdaq Run 75965: junk
187922 10/01/09 19:29 Tang Fission Exp: ADC gate problem
187921 10/01/09 19:25 Nue TUL new program was not yet downloaded
187920 10/01/09 18:59 Nue Tried to send 40uA on Carbon and failed
187919 10/01/09 18:56 Chiba kaon and proton in WC
187918 10/01/09 18:43 albayrak HKS HES HV turned on
187917 10/01/09 18:43 cdaq End of Run 75964:
187916 10/01/09 18:41 cdaq Run 75964: 2344 MeV,Buffered, C target@ 40uA beam: CP0 (3/3) * WC(2/2) * !AC
187915 10/01/09 18:41 cdaq E02017 Run 1164: Run with beam. Corrected wrong ADC gate signal.
187914 10/01/09 18:39 shichijo HKS TUL program change
187913 10/01/09 18:36 cdaq E02017 End of Run 1163:
187912 10/01/09 18:33 cdaq End of Run 75963:
187911 10/01/09 18:30 cdaq E02017 Run 1163: adc test, junk
187910 10/01/09 18:29 cdaq Run 75963: 2344 MeV,Buffered, BeO target@ Pulsed beam: CP0 (3/3) * HES layer2.or. buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187909 10/01/09 18:26 cdaq End of Run 75962:
187908 10/01/09 18:20 cdaq Run 75962: 2344 MeV,Buffered, BeO target@ Pulsed beam: CP0 (3/3) * HES layer1.or. buf,nped=1000,sparse,ps1=200,ps2=999999,ps3=1,ps4=1,ps5=12000,ps6=1,ps7=1
187907 10/01/09 18:20 cdaq E02017 End of Run 1162:
187906 10/01/09 18:13 albayrak MCC notified that they will send beam at 18:15
187905 10/01/09 18:13 cdaq End of Run 75961:
187904 10/01/09 18:03 shoh kaon rate of WC 1/2 & 2/2
187903 10/01/09 16:13 cdaq Beam Time Accounting
187902 10/01/09 15:53 maeda Day shift summary
187901 10/01/09 15:52 cdaq the prescale for run=75961 is:nped=1000,sparse,cosmics,ps1=999999,ps2=99999,ps3=1,ps4=1,ps5=1,ps6=1,ps7=1
187900 10/01/09 15:48 chench run= 75960 is junk
187899 10/01/09 15:46 cdaq Run 75961: Cosmic Test
187898 10/01/09 15:43 cdaq End of Run 75960:
187897 10/01/09 15:37 cdaq E02017 Run 1162: Run with no beam , gas pressure 3.03Torr.
187896 10/01/09 15:25 cdaq Run 75960: Cosmic Test
187895 10/01/09 15:23 cdaq End of Run 75959:
187894 10/01/09 15:20 cdaq Run 75959: Luicte self trigger run
187893 10/01/09 13:26 Nue Beam permit was requested for Hall C
187892 10/01/09 13:25 Nue WC coin level back to 2/2
187891 10/01/09 12:57 Reinhold Late entry: some EH inefficiency and lose UHF connectors
187890 10/01/09 12:47 Nue Control access was requested
187889 10/01/09 12:38 Nue Beam tuning status
187888 10/01/09 12:37 cdaq E02017 End of Run 1161:
187887 10/01/09 12:31 Zhihong Ye The correct path length correction is...
187886 10/01/09 12:29 Zhihong Ye Analysis: Better Coincident time spectra for Pion,Proton,and Kaon
187885 10/01/09 10:58 maeda Target: BeO target
187884 10/01/09 10:46 cdaq E02017 Run 1161: Run wihout beam; beam permit; p=3.46. previous run was junk.
187883 10/01/09 10:44 cdaq E02017 End of Run 1160:
187882 10/01/09 10:34 cdaq E02017 Run 1160: Rnew heptane botle; p= 3.34; no beam; beam permit
187881 10/01/09 10:31 shoh revision of Fig2
187880 10/01/09 10:28 shoh The comparison of WC 1/2 & WC 2/2
187879 10/01/09 10:11 Nue We took only +20MeV, no +10MeV data
187878 10/01/09 10:07 Nue Hall is going to Beam permit
187877 10/01/09 09:58 Nue Hall went to control access to refill heptane for fission chamber
187876 10/01/09 09:19 Zhihong Ye +10MeV runs are also done? Are runs from 75937 to 73958 actually +10MeV tuning?
187875 10/01/09 08:54 kawama EHODO offset adjustment
187874 10/01/09 08:41 Nue Today's plan, report from RC
187873 10/01/09 08:37 Nue HDC2 foils are not updated on the hv.tcl
187872 10/01/09 08:27 maeda Drift chamber HV off because of beam tunning
187871 10/01/09 08:18 maeda Change to normal energy
187870 10/01/09 08:07 cdaq Beam Time Accounting
187869 10/01/09 08:00 cdaq End of Run 75958:
187868 10/01/09 07:41 Darko Owl shift summary
187867 10/01/09 07:28 Nue IC for 30uA on C (+20MeV beam)
187866 10/01/09 07:28 cdaq Run 75958: 2365 MeV,Buffered, C target@ 35uA: HKS single & HKS group (3/3) * WC (1/2 for Gr1-3, 2/2 for Gr4-6) ! AC* HES0
187865 10/01/09 07:26 cdaq End of Run 75957:
187864 10/01/09 07:05 Nue WC coin level (1/2) for G1-3, (2/2) for G4-6, rates for 30uA on C
187863 10/01/09 06:57 cdaq Run 75957: 2365 MeV,Buffered, C target@ 35uA: HKS single & HKS group (3/3) * WC (1/2 for Gr1-3, 2/2 for Gr4-6) ! AC* HES0
187862 10/01/09 06:54 cdaq End of Run 75956:
187861 10/01/09 06:35 Nue WC coin level was changed from 2/2 to 1/2, Rates
187860 10/01/09 06:30 cdaq Run 75956: 2365 MeV,Buffered, C target@ 35uA: HKS single & HKS group (3/3) * WC (1/2) ! AC* HES0
187859 10/01/09 06:27 cdaq End of Run 75955:
187858 10/01/09 06:04 cdaq Run 75955: 2365 MeV,Buffered, C target@ 35uA: HKS single & HKS group (3/3) * WC (2/2) ! AC* HES0
187857 10/01/09 06:02 cdaq End of Run 75954:
187855 10/01/09 04:43 cdaq Run 75954: 2365 MeV,Buffered, C target@ 35uA: HKS single & HKS group (3/3) * WC (2/2) ! AC* HES0
187854 10/01/09 04:37 cdaq End of Run 75953:
187853 10/01/09 03:39 cdaq Run 75953: 2365 MeV,Buffered, C target@ 35uA: HKS single & HKS group (3/3) * WC (2/2) ! AC* HES0
187852 10/01/09 03:38 cdaq End of Run 75952:
187851 10/01/09 03:30 Chiba Simple plot of beta : xfp
187850 10/01/09 02:48 Darko Scalers> 35uA Carbon
187849 10/01/09 02:30 cdaq Run 75952: 2365 MeV,Buffered, C target@ 35uA: HKS single & HKS group (3/3) * WC (2/2) ! AC* HES0
187848 10/01/09 02:28 cdaq End of Run 75951:
187847 10/01/09 02:25 Darko 35uA beam is delivering to HallC
187846 10/01/09 01:49 Darko Scalers> 30uA Carbon
187845 10/01/09 01:30 chench HKS drift chamber efficiency from run=75931
187844 10/01/09 01:28 Chiba Rates for 30uA Carbon, 2.365GeV
187843 10/01/09 01:23 kawama HDC, EDC HV screen shot (30uA, C)
187842 10/01/09 01:12 cdaq E02017 End of Run 1159:
187841 10/01/09 01:04 shoh MAP of TUL SEL switch
187840 10/01/09 01:01 Chiba Rates for 8uA Carbon
187839 10/01/09 00:50 Darko Beam: Beam cca 8uA
187838 10/01/09 00:49 cdaq E02017 Run 1159: Run with beam current 7.9uA, beam energy 2364MeV, water target,with pressure 3.01Torr.
187837 10/01/09 00:44 kawama HDC. EDC HV screen shot (9uA)
187836 10/01/09 00:26 Nue Data stream contain the Hallc:p information
187835 10/01/09 00:24 Nue BPM for +20MeV just after tune was finished (Late entry)
187834 10/01/09 00:21 cdaq Run 75951: 2365 MeV,Buffered, C target@ 30uA: HKS single & HKS group (3/3) * WC (2/2) ! AC* HES0
187833 10/01/09 00:19 cdaq End of Run 75950:
187832 10/01/09 00:14 Darko Changing target to Carbon
187831 10/01/09 00:11 cdaq E02017 End of Run 1158:
187830 10/01/09 00:04 cdaq Run 75950: 2365 MeV,Buffered, H2O target@ 2.8uA: HKS single & HKS group (3/3) * WC (2/2) ! AC* HES0
187829 10/01/09 00:01 cdaq Beam Time Accounting
This file generated by /group/hallc/www/hallcweb/apps/logbooks/hclog/src/hclogscript version HC2.13
If you have any comments or problems, please contact:
Stephen A. Wood
saw@jlab.org
(757) 269-7367