Main INDEX, Monthly INDEX, PREV, NEXT
Make New Entry, Make Followup Entry

User name buddhini

Log entry time 11:49:01 on February 24, 2011

Entry number 221906

This entry is a followup to: 221900

Followups:

keyword=Finished checking beam off bpm signal levels at the cage.

I managed to check the bpm wire signal voltage levels when there is no beam in the hall. For the few I ckecked, they matched what I get from the data files. Next I will check the signal level when there is beam in the hall.

signal voltage levels when beam is off
3h07bXM = 2.23 V
3h07aXM = 2.28 V
3h07cXM = 2.20 V
3h07cYM = 2.15 V


A copy of this log entry has been emailed to: pking,buddhini