  • 222067 02/25/11 17:05 smithg Target: powered off heater power supplies & pump controller
  • 222054 02/25/11 12:30 covrig Target: moved HOME, cool-down postponed to next week
  • 222053 02/25/11 11:24 smithg Target: picture showing no ice
  • 222049 02/25/11 11:04 smithg Target: No ice observed on target cell. Cooldown prospects dim cuz of qtor.
  • 222045 02/25/11 10:00 M Jones Target: Closed target 15K warm return, then opened 15K return
  • 222035 02/25/11 07:07 narayan Target: e-detector parked again
  • 222033 02/25/11 07:03 narayan Target: Andy on his way to check the vacuum pump status
  • 222031 02/25/11 06:46 neven Target: Screeshot showing JT valves closed
  • 222028 02/25/11 06:16 narayan Target: attempt to isolate Target still in progress
  • 222027 02/25/11 06:10 neven Target: Related screen snapshot (last hour)
  • 222026 02/25/11 05:53 narayan Target: 15k JT closed completely, 4k JT closed to 9%, pump turned OFF
  • 222025 02/25/11 05:51 smithg Target: dangerous 15K supply temps
  • 222023 02/25/11 05:13 narayan Target: both Heater turned OFF
  • 222022 02/25/11 05:05 neven Target: An other screen snapshot after power failure
  • 222020 02/25/11 04:45 neven Target:
  • 222016 02/25/11 04:16 Neven Target: Tungsten plug temperature
  • 221985 02/25/11 00:08 neven Target: Screen shots at the begining of the shift
  • Thursday

  • 221896 02/24/11 10:06 Jiawei Target: late entry: moved to out of beam
  • 221890 02/24/11 08:08 Jiawei Target: Screen shot of target at beginning of the shift
  • 221888 02/24/11 07:42 kamyers Target: end of shift screenshoot/report
  • 221865 02/24/11 04:27 kamyers Target: opened 4K JT by 1%
  • 221853 02/24/11 03:11 kamyers Target: HPH drops after beam trip/recovery
  • 221831 02/24/11 00:48 kamyers Target: beginning of shift screen shot
  • 221825 02/24/11 00:09 narayan Target: vmec18 came back after Han's intervention
  • Wednesday

  • 221814 02/23/11 22:46 narayan Target: a strange message
  • 221798 02/23/11 20:17 narayan Target: Tungsten plug temp alarm settled back
  • 221781 02/23/11 19:04 narayan Target: Tungsten plug temp LO alarm
  • 221770 02/23/11 18:29 narayan Target: oscillations settled
  • 221760 02/23/11 17:57 narayan Target: HPH goes down to 150W !
  • 221758 02/23/11 17:48 narayan Target: oscillations in 4k flow
  • 221743 02/23/11 16:54 narayan Target: generic screenshot
  • 221741 02/23/11 16:48 narayan Target: vacuum reporting
  • 221735 02/23/11 16:23 Jiawei Target: End of day shift screenshot
  • 221720 02/23/11 14:48 covrig Target: chamber vacuum behavior with 2K-CB trips
  • 221683 02/23/11 10:24 Jiawei Target: closed 4K JT a little bit to reduce the reserved HPH power to ~300W
  • 221663 02/23/11 08:01 kamyers Target: end of shift screenshot
  • 221620 02/23/11 02:38 kamyers Target: tungsten plug temp yellow alarm
  • 221617 02/23/11 02:32 kamyers Target: close 4K JT by 2%, 15K JT by 12%
  • 221616 02/23/11 01:59 kamyers Target: updated alarm limits - all good now
  • 221611 02/23/11 01:34 kamyers Target: Some alarm set point issues
  • 221605 02/23/11 01:04 kamyers Target: yellow alarms scattering chamber vacuum
  • 221600 02/23/11 00:34 Adesh Target: target GUI backup in case of target computer reboot/failure
  • 221598 02/23/11 00:19 narayan Target: target computer rebooted !
  • Tuesday

  • 221589 02/22/11 23:17 narayan Target: transitioned to full beam
  • 221585 02/22/11 23:09 narayan Target: Moved to LH2 target
  • 221583 02/22/11 23:00 narayan Target: going to LH2
  • 221579 02/22/11 22:47 narayan Target: heater at 1.9 kW power
  • 221577 02/22/11 22:42 smithg Target: Recovered again. Ready for beam.
  • 221576 02/22/11 22:39 narayan Target: beam being tuned, High Power Heater back
  • 221574 02/22/11 21:38 narayan Target: 3H09B and 3H09D closed
  • 221571 02/22/11 21:24 narayan Target: vacumm
  • 221567 02/22/11 20:02 smithg Target: starting 4K flow to the target
  • 221566 02/22/11 20:01 narayan Target: target cooling started
  • 221546 02/22/11 16:22 covrig Target: target is full, for now
  • 221541 02/22/11 15:46 jhlee Target: CHO 2K coolbox trip again, CRYO close 4k.
  • 221540 02/22/11 15:44 covrig Target: CHL CB2 tripped again, 4K flow back to zero until CB will recover
  • 221521 02/22/11 11:56 jhlee Target: Closing 4K JT supply valve requested by Silviu
  • 221519 02/22/11 11:40 jhlee Target: 2k coolbox is down, Cryo close all
  • 221516 02/22/11 11:30 covrig Target: 4 K woes
  • 221506 02/22/11 10:55 jhlee Target: Closing 4K JT supply valve, due to compressor problem of Cryo
  • 221493 02/22/11 09:56 covrig Target: re-enabled the 4K PID
  • 221470 02/22/11 07:57 kamyers Target: end of shift screenshot
  • 221405 02/22/11 00:38 kamyers Target: start of shift screen shot
  • Monday

  • 221376 02/21/11 22:33 narayan Target: GEM enclosure rad level normal
  • 221365 02/21/11 22:00 narayan Target: gem enclosure rad level alarm
  • 221349 02/21/11 20:02 narayan Target: regular screenshot
  • 221340 02/21/11 19:08 jhoskins Target: That is md3positive
  • 221332 02/21/11 17:36 narayan Target: generic Target snapshot
  • 221321 02/21/11 15:57 Armstrong Target: happy target
  • 221277 02/21/11 08:18 Armstrong Target: Screen shot at start of shift and some notes
  • 221244 02/21/11 04:18 M Jones Target: Target GUI and strip charts screenshots
  • Sunday

  • 221212 02/20/11 23:04 jhlee Target: Pump voltage alarm
  • 221184 02/20/11 20:33 jhlee Target: Tungsten plug water temp alarm, goes to 30.7
  • 221177 02/20/11 19:50 jhlee Target: Screen shot of target at the mid of swing shift
  • 221154 02/20/11 16:59 jhlee Target: Tungsten plug temp alarm, goes to 30.6
  • 221148 02/20/11 16:22 Pitt Target: End of day shift screenshot
  • 221139 02/20/11 15:05 Pitt Target: Change tungsten plug temp alarm "high" point
  • 221138 02/20/11 14:10 smithg Target: 4K PID story and short term strategy
  • 221133 02/20/11 13:43 Pitt Target: Tungsten plug temp minor alarm
  • 221127 02/20/11 13:23 smithg Target: one more point about the vacuum
  • 221126 02/20/11 13:16 smithg Target: downstream vacuum over past 24h
  • 221100 02/20/11 09:37 Pitt Target: Beginning of day shift screenshot
  • 221067 02/20/11 05:50 magee Target: 4k mass flow oscillating - HPH alarms
  • 221061 02/20/11 04:44 magee Target: Inlet sensor bad, 4k JT closed, HPH tanked - Fine now
  • 221057 02/20/11 03:41 magee Target: Cell input manifold temp alarm
  • 221056 02/20/11 03:41 magee Target: Cell input manifold temp alarm
  • 221054 02/20/11 03:38 magee Target: Cell input manifold temp alarm
  • Saturday

  • 220964 02/19/11 15:55 Nuruzzaman Target: Target GUI and strip charts screenshots
  • 220928 02/19/11 12:47 silwal Target: snapshot, target looks fine
  • 220861 02/19/11 08:06 magee Target: False current alarm
  • 220821 02/19/11 05:04 magee Target: Moved to home
  • 220810 02/19/11 04:35 magee Target: Shift screenshot
  • 220807 02/19/11 04:04 magee Target: Tungsten plug alarm again, Epics Archiver plot (readable formatting)
  • 220806 02/19/11 04:03 magee Target: Tungsten plug alarm again, Epics Archiver plot
  • 220800 02/19/11 01:25 magee Target: Tungsten plug temp alarm
  • Friday

  • 220793 02/18/11 23:51 Pitt Target: End of swing shift screenshot
  • 220763 02/18/11 19:45 Pitt Target: Move to LH2 target
  • 220756 02/18/11 18:22 Pitt Target: Move target to out of beam position
  • 220748 02/18/11 17:48 Pitt Target: Screen shot with attachment
  • 220747 02/18/11 17:47 Pitt Target: Beginning of swing shift screen shot
  • 220717 02/18/11 15:36 donjones Target: moved to LH2 for production running
  • 220714 02/18/11 15:17 donjones Target: at DS Centering Hole
  • 220698 02/18/11 11:51 covrig Target: un-parked the target
  • Thursday

  • 220685 02/17/11 22:26 Nuruzzaman Target: Target GUI and strip charts screen shots
  • 220682 02/17/11 18:01 smithg Target: no ice visible thru beam left port
  • 220675 02/17/11 14:36 covrig Target: half-parked the target until tomorrow
  • 220672 02/17/11 14:19 donjones Target: parking target
  • 220656 02/17/11 08:50 donjones Target: scattering chamber vacuum since 14th
  • 220654 02/17/11 07:49 Adesh Target: screenshot at the end of owl shift
  • 220649 02/17/11 00:01 Jiawei Target: End of swing shift screenshot
  • Wednesday

  • 220632 02/16/11 16:02 donjones Target: target stable all through day shift
  • 220631 02/16/11 16:02 covrig Target: ioc reboot and target motion test - late entry
  • 220623 02/16/11 12:07 covrig Target: 15 K supply - cause of the hph railing to zero
  • 220584 02/16/11 03:23 Adesh Target: HPH derailed to 0 Watts, recovered quickly on its own
  • Tuesday

  • 220557 02/15/11 23:56 V. Tvaskis Target: Target GUI and strip charts screenshots
  • 220481 02/15/11 15:43 birchall Target: Moved to LH2 target
  • 220475 02/15/11 13:14 covrig Target: horizontal range of motion
  • 220449 02/15/11 08:04 birchall Target: Screenshot at start of day shift
  • 220446 02/15/11 07:42 Adesh Target: End of owl shift screenshot
  • Monday

  • 220305 02/14/11 14:19 Birchall Target: Moved to LH2 target
  • 220235 02/14/11 09:01 birchall Target: Moved target out of beam for Moller measurement
  • 220226 02/14/11 08:24 birchall Target: Target screen shot at 8:25
  • 220169 02/14/11 00:00 V. Tvaskis Target: Target GUI and strip charts screenshots
  • Sunday

  • 220091 02/13/11 15:52 Pitt Target: End of day shift screenshot - with figure this time
  • 220090 02/13/11 15:51 Pitt Target: End of day shift screenshot
  • 220049 02/13/11 11:29 Pitt Target: QTOR trip
  • 220044 02/13/11 11:10 Pitt Target: QTOR trip
  • 220027 02/13/11 09:41 Pitt Target: QTOR trip
  • 220017 02/13/11 08:04 Pitt Target: Target screenshots at beginning of day shift
  • 220015 02/13/11 07:47 Adesh Target: Target GUI and strip charts screenshot at the end of owl shift
  • 220006 02/13/11 06:42 Adesh Target: Alarm on QTOR, tripped & recovered
  • Saturday

  • 219968 02/12/11 23:57 V. Tvaskis Target: Target GUI and strip charts screenshots
  • 219920 02/12/11 16:48 V. Tvaskis Target: Pump voltage alarm
  • 219913 02/12/11 15:47 Pitt Target: End of day shift screenshot
  • 219902 02/12/11 14:09 smithg Target: Updated encoder table resistive pot values
  • 219878 02/12/11 11:40 Pitt Target: Move to hydrogen target cell
  • 219873 02/12/11 10:15 Pitt Target: Pump frequency readback got noiser when target moved to HOME
  • 219871 02/12/11 09:36 Pitt Target: Move to out of beam position
  • 219870 02/12/11 09:35 Pitt Target: Screenshot at beginning of day shift - late entry
  • 219864 02/12/11 07:15 Jiawei Target: scattering chamber vacuum alarm enabled
  • 219863 02/12/11 06:27 Jiawei Target: Vacuum problem seems to be fixed
  • 219860 02/12/11 04:50 Jiawei Target: updated status
  • 219858 02/12/11 04:13 covrig Target: chamber vacuum recent history seems fine
  • 219857 02/12/11 03:44 Jiawei Target: Scattering Chamber vacuum should be fine
  • 219855 02/12/11 02:59 Jiawei Target: Scattering chamber vacuum has risen dramatically
  • 219830 02/12/11 00:14 Jiawei Target: screenshot at the start of owl shift
  • Friday

  • 219821 02/11/11 23:42 Pitt Target: End of shift scrrenshot
  • 219758 02/11/11 16:21 Pitt Target: Screenshot at start of Shift
  • 219703 02/11/11 10:58 covrig Target: last centering may spell trouble for getting to DS4% Al again
  • 219681 02/11/11 08:13 V. Tvaskis Target: Target GUI and strip charts screenshots
  • Thursday

  • 219604 02/10/11 23:46 smithg Target: late entry: moved to LH2
  • 219594 02/10/11 23:16 smithg Target: target screenshot
  • 219579 02/10/11 21:33 smithg Target: Shifted all encoder table horizontal steps 800 higher
  • 219569 02/10/11 18:31 smithg Target: moved to DS centering tgt.
  • 219568 02/10/11 18:26 smithg Target: late entry: moved to LH2
  • 219545 02/10/11 15:50 Jiawei Target: Screenshot of target at the end of the shift
  • 219501 02/10/11 11:33 covrig Target: target motion issue
  • 219448 02/10/11 08:20 Jiawei Target: Screenshot of target at beginning of the shift
  • Wednesday

  • 219355 02/09/11 21:12 Leckey Target: Target GUI and strip charts screenshots
  • 219344 02/09/11 20:09 covrig Target: h-motion power stage error
  • 219256 02/09/11 09:52 wdconinc Target: temperature DSdmB leveled off at 90K for 25uA
  • 219249 02/09/11 09:20 wdconinc Target: Moved to DS 4% Al target
  • 219233 02/09/11 07:48 V. Tvaskis Target: Target GUI and strip charts screenshots
  • Tuesday

  • 219138 02/08/11 21:03 smithg Target: Moved LH2 target in
  • 219112 02/08/11 17:45 smithg Target: pump tripped. Recovered fine.
  • 219105 02/08/11 16:59 smithg Target: screenshot
  • 219008 02/08/11 08:17 leacock Target: target out of beam for moller measurement
  • 218993 02/08/11 07:40 V. Tvaskis Target: Target GUI and strip charts screenshots
  • Monday

  • 218942 02/07/11 21:22 magee Target: target screenshot, stable running at 150uA
  • 218866 02/07/11 14:54 leacock Target: target screenshot, stable running at 150uA
  • 218790 02/07/11 06:16 Page Target: TO for Swing Today is Josh Magee
  • Sunday

  • 218616 02/06/11 16:21 birchall Target: Target screen shot at beginning of swing shift
  • 218569 02/06/11 07:52 Adesh Target: Target GUI and strip charts screenshot at the end of owl shift
  • Saturday

  • 218514 02/05/11 21:16 birchall Target: Wild Saturday night on target duty
  • 218490 02/05/11 17:30 birchall Target: Screen shot of target at 17:30
  • 218471 02/05/11 13:54 Jiawei Target: maximum current is 170 muA for current coolant flow rate
  • 218433 02/05/11 08:20 Jiawei Target: Screen shot of target at beginning of shift
  • 218424 02/05/11 07:21 rakithab Target: Alarm hi limit for qw:qt_mps_i_diff set 1.2
  • 218390 02/05/11 00:03 rakithab Target: Target GUI and strip charts screenshots
  • Friday

  • 218344 02/04/11 18:58 birchall Target: Target shot just after pump glitch
  • 218341 02/04/11 18:49 birchall Target: Pump glitch
  • 218335 02/04/11 18:25 birchall Target: Moved to LH2 target
  • 218325 02/04/11 17:55 birchall Target: Moved to DS 0.5% C target
  • 218324 02/04/11 17:53 birchall Target: Moved to DS 0.5% C target
  • 218288 02/04/11 16:05 birchall Target: Target screens at start of swing shift
  • 218197 02/04/11 07:52 Adesh Target: screenshot at the end of owl shift
  • 218150 02/04/11 00:21 Adesh Target: moved to LH2 target
  • Thursday

  • 218147 02/03/11 23:40 kamyers Target: end of shift screen shot
  • 218117 02/03/11 16:15 kamyers Target: beginning of shift screen shots
  • 218107 02/03/11 14:24 smithg Target: Moved to out of beam position
  • 218106 02/03/11 14:08 smithg Target: LH2 back in beam
  • 218102 02/03/11 13:36 smithg Target: Moved to out of beam position
  • 218076 02/03/11 10:29 smithg Target: pump tripped. Recovered fine.
  • 218064 02/03/11 07:51 Adesh Target: target screenshot at the end of owl shift
  • 218036 02/03/11 00:44 Adesh Target: Moved to LH2 target
  • 218033 02/03/11 00:37 Adesh Target: Target moved to HOME=Out-of-Beam position
  • Wednesday

  • 217907 02/02/11 16:57 leacock Target: LH2 pump tripped, recovered
  • 217881 02/02/11 13:40 Leckey Target: Raster Changed from 3.5 to 3.0 ???
  • 217880 02/02/11 13:35 Leckey Target: Target GUI and strip charts screenshots
  • 217854 02/02/11 07:49 Adesh Target: screenshot at the end of owl shift
  • Tuesday

  • 217806 02/01/11 23:31 leacock Target: pump current went to zero, readout glitch
  • 217805 02/01/11 23:27 leacock Target: moved to LH2
  • 217801 02/01/11 23:17 leacock Target: moved to upstream centering hole
  • 217800 02/01/11 23:17 leacock Target: moved to ds centering hole -- late entry
  • 217773 02/01/11 19:27 leacock Target: opening 15K JT to get heater to 2000W cooling
  • 217772 02/01/11 19:26 leacock Target: moved target out of beam
  • 217749 02/01/11 13:27 covrig Target: hph behavior last night
  • 217747 02/01/11 12:52 smithg Target: 4K oscillations: cured by unstinging Moller 5K bayonet?
  • 217735 02/01/11 07:56 Adesh Target: end of owl shift screenshot
  • 217712 02/01/11 04:09 Adesh Target: Alarm on IOC 4 (Halo Rates)
  • 217702 02/01/11 02:43 Adesh Target: Temporary solution to HPH issue
  • 217699 02/01/11 02:22 Adesh Target: HPH current dropped to zero again
  • 217698 02/01/11 02:13 Adesh Target: 4K suuply/pressure, HPH issues
  • 217689 02/01/11 01:44 Adesh Target: yet another HPH derailment, recovered
  • 217683 02/01/11 01:24 Adesh Target: HPH derailed, recovered
  • 217667 02/01/11 00:10 leacock Target: main hph current dropped to zero again